14 Steam to Turbin

4 10 FLOW PROSES SHANGHAI BOILER CFK #3


12
240 T/H

13 9
HP Heater
11 From Turbin
6
5
22 19 From Condenser
To LP/Deaerator BFWP
2
18
7
1
8
23 28
17
31

24 Low Tempt.
27 Economizer
29
27

3 16
25
26
15 30
20

21
1. Furnace 8. Distributed Header 22. Conveyor Batubara dari CFK 1&2 29. IDF (Induced Draft Fan)
15. Primary Air Fan (PAF) A & B
2. Water Wall 9. Lower Temperature Superheater 23. Coal Bunker. 30. Ash Silo
16. Forced Draft Fan (DAF) A & B / Secondary Air Fan
3. Buttom Ash 10. Superheater First Desuperheater UP dan DOWN 24. Coal Feeder 31. Chimney
17. Air Preheater
4. Steam Drum 11. Superheater Panel / Platen Superheater 18. Hot Primary Air Duct 25. Coal Mill
5. Down Commer 12. Superheater Second Desuperheater UP dan DOWN 19. Hot Secondary Air Duct 26. Sel Work Pump
6. Upper Economizer 13. Superheater Finish Temperature (High Temperature Superheater) 20. Cold Primary Air Duct 27. Coal Pipe
7. Lower Economizer 14. Main Steam Header 21. Sealing Air Fan 28. ESP (Electro Static Precipitator)
FLOW PROCES DONGFANG TURBIN GENERATOR 60 MW
PT. CAHAYA FAJAR KALTIM UNIT 3
From Boiler Steam Header 2 3 27 28
30
Water to Boiler 1

19 2

18 29
17

11 4
14 13

5
23
12 16
15 Steam From
Sealing
20
From Boiler
21 24

22
10 9 7
8 6
25
6
1. MSV (Main Steam Valve) 8. Low Temperature Economizer 15. Extraction 5 22. Water Jet Pump 29. Main Trafo CFK #3
2. Governing Valve 9. Low Pressure (LP) Heater No. 5 16. Extraction 4 23. Cooling Tower 30. Transmisi Jaringan
3. Turbin 10. Low Pressure (LP) Heater No. 4 17. Extraction 3 24. Cooling Water Pump / Circulating Cooling Water Pump
4. Condenser 11. Deaerator 18. Extraction 2 25. Demineralized Water Tank
5. Hot Well 12. Boiler Feed Water Pump (BFWP) 19. Extraction 1 26. Make-up Pump
6. Condensate Pump 13. High Pressure (HP) Heater No. 2
7. Gland Steam Condenser 14. High Pressure (HP) Heater No. 1
20. Ejector
21. Water Jet Tank
27. Generator
28. Exciter (Excitation Transformer) 26