1.0 PRELIMINARY DESIGN
1.1 LETTER OF AWARD 25/03/17
1.2 SITE APPRAISAL REPORT 01/04/17 08/04/17 DURATION
1.3 TOPOGRAPHIC SURVEY 22/04/17 13/05/17 MILESTONE
1.4 SOIL INVESTIGATION 22/04/17 13/05/17
1.5 PRELIMINARY DESIGN AND COSTING 14/05/17 04/06/17
1.6 REVIEW AND APPROVAL BY IWK 05/06/17 12/06/17
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
W1
W2
W3
W4
4.0 CONSTRUCTION STAGE
5.1 CONSTRUCTION DRAWINGS 26/10/17
5.2 MONITORING OF WORKS 26/10/17 26/07/18
5.5 TESTING AND COMISSIONING REPORTS 25/04/18 24/07/18
5.6 AS-BUILT DRAWINGS 24/07/18 22/10/18