Project :

Owner :
Owners Consultant: :
Prime Contractor :
EPC Sub Contractor: :
Specification Reference
:
No.
Document Title :
Document by :
Offer Reference No. :

Spec. Ref. Cl. BIDDERS Reply


S. No. Bid Cl. No. Description from Tender Document
No.
Please confirm the Requirement
Monopole / Lattice Tower.
As per Tender Document we have to
consider the Latice Tower.
General
Also Confirm that the 220 kV D/C towers
E1. Information 1.1.1 Scope: Supply of all type of 220 kV D/C towers of TATA Design
of TATA Design will be Provided by
and scope
MSIL or we have to Arrange for the same.
Who will bear the Cost towards
Procurement of TATA make 220 kV D/C
Tower.
Please Confirm the Scope of Work is only
for the OHL, or some of the Portion is oif
The Scope of Work is having two parts
Underground Cable. If yes then please
Take-in arrangement of existing 220kV Dualtabad-Mau
General specify the Exact length so based on that
D/C line at proposed 220 kV S/stn. Transport Hub .
E2. Information 1.1.6 we can quote our competitve offer.
Proposed 220 kV S/stn. Transport Hub Manesar to sector-
and scope There is nor description of underground
3A MSIL-Manesar with 0.4sq ACSR conductor.
Cable in the tender document, however in
Approx tentative length is 4.7 kM
the drawing some of the portion is
indicated as 220 kV Cable, please clarify.
General
Payment of compensation toward the clearances etc. will We understand that ROW is in the Scope
E3. Information 1.5.11
be the responsibility of the HVPNL. of HVPNL, please confirm
and scope
E4. Tower 4.1 General These specifications provide general guidelines for the Please Confirm that the HVPNL Approved
Page 1 of 2
Project :
Owner :
Owners Consultant: :
Prime Contractor :
EPC Sub Contractor: :
Specification Reference
:
No.
Document Title :
Document by :
Offer Reference No. :

Spec. Ref. Cl. BIDDERS Reply


S. No. Bid Cl. No. Description from Tender Document
No.
Foundation Design/Drawing will be
construction of tower foundations as per design supplied provided by M/s MSIL or we have to
by HVPNL and the gantry tower foundations as per
Foundation arrange for the same and who will bear the
design supplied by HVPNL of the proposed transmission
line(s) covered in the tender. Cost towards procurement of the
Foundation Drawings from HVPNL.
4.8.1 To eliminate delays and avoid disputes and
litigation if is agreed between the parties to the contract
that all matters and questions shall be referred to the Please confirm that the Charges for the
General 4.8 HVPNL Supervision/Inspection from HVPNL
HVPNL and his decision shall be final.
E5. Technical
Requirements Supervision Personals is a part of the Tender or it will
4.8.2 The manufacturing of the product shall be be arrane by MSIL.
performed under the direction and supervision of the
HVPNL.

Page 2 of 2