RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PENATAAN TAMAN & PARKIRAN SEKOLAH
LOKASI : SMKN 4 BULUKUMBA
HARGA SATUAN
NO URAIAN PEKERJAAN VOLUME SAT
( RP )
II PEKERJAAN PONDASI
1 Pekerjaan Pasangan batu kosong 12.000 M3 430,026.00
2 Pekerjaan pasangan pondasi batu kali 1pc : 5 ps 32.000 M3 746,810.00
Sub.Jumlah Pekerjaan Pondasi
`
III PEKERJAAN STRUKTUR
1 Beton Sloof 15/20
- Cor Beton - M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 183,650.00
2 Beton Sloof 20/25
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 183,650.00
3 Beton Kolom 15/15
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 356,055.00
4 Beton Kolom 20/20
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 356,055.00
5 Ringbalk Beton 15/25
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 356,055.00
6 Pek.Cor Plat Beton
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 120,000.00
7 Pemasangan Paving Blok 225.000 M2 178,510.00
Sub.Jumlah Pekerjaan Struktur
V PEKERJAAN ATAP
1 Pekerjaan Kuda-Kuda Rangka Baja Ringan - M2 159,240.00
2 Pekerjaan Atap Galvalum 0,30 mm - M2 94,461.70
3 Pek Nok dan Talang Atap Galvalum 0,30 - M' 78,660.00
4 Pek.Listplank Wood Plank 30 cm Polos - M' 46,200.00
Sub.Jumlah Pekerjaan Atap
IX PEKERJAAN ELEKTRIKAL
1 Stop Kontak - Bh 36,155.00
2 Pek.Instalasi Titik Nyala - Titik 150,000.00
3 Sakelar Tunggal - Titik 31,155.00
4 Sakelar Ganda - Bh 34,155.00
5 MCB Box - Bh 125,000.00
6 Lampu T5 Plapond - Bh 75,000.00
7 Lampu RM 2 X 18 Watt - Bh 225,000.00
8 Lampu TL 18 WATT - Bh 65,000.00
9 Lampu Taman - Bh 225,000.00
10 Lampu Sorot Hologen Untuk Dinding - Bh 250,000.00
11 Pengadaan KWH - Ls 7,500,000.00
Sub.Jumlah Pekerjaan Elektrikal
47,855.00 -
26,750.00 -
175,000.00 19,600,000.00
218,900.00 7,661,500.00
27,261,500.00
430,026.00 5,160,312.00
746,810.00 23,897,920.00
29,058,232.00
-
956,050.00 -
12,535.50 -
183,650.00 -
-
956,050.00 -
12,535.50 -
183,650.00 -
956,050.00 -
12,535.50 -
356,055.00 -
956,050.00 -
12,535.50 -
356,055.00 -
-
956,050.00 -
12,535.50 -
356,055.00 -
-
956,050.00 -
12,535.50 -
120,000.00 -
178,510.00 40,164,750.00
40,164,750.00
107,119.50 14,461,132.50
42,240.00 9,504,000.00
29,887.50 2,540,437.50
45,000.00 5,625,000.00
5,000,000.00 5,000,000.00
37,130,570.00
159,240.00 -
94,461.70 -
78,660.00 -
46,200.00 -
-
204,316.50 13,280,572.50
212,300.00 13,799,500.00
215,174.00 -
269,600.00 18,063,200.00
45,143,272.50
96,250.00 -
43,920.00 -
13,665.00 -
-
118,380.00 -
527,820.00 -
794,120.00 -
350,000.00 -
170,445.00 -
20,300.00 -
28,450.00 -
30,000.00 -
30,000.00 -
125,000.00 -
150,000.00 -
75,000.00 -
850,000.00 -
-
-
36,155.00 -
150,000.00 -
31,155.00 -
34,155.00 -
125,000.00 -
75,000.00 -
225,000.00 -
65,000.00 -
225,000.00 -
250,000.00 -
7,500,000.00 -
-
23,593.00 6,039,808.00
23,593.00 -
31,814.00 -
31,814.00 -
35,000.00 -
3,000,000.00 -
450,000.00 -
6,039,808.00
357,780.00 -
48,531.25 -
35,000.00 -
11,198.75 -
26,737.50 -
3,986,006.28 -
835,890.00 -
1,700,000.00 -
476,650.00 -
12,000,000.00 -
6,910,000.00 -
6,039,808.00
15,000,000.00 15,000,000.00
5,600,000.00 5,600,000.00
17,000,000.00 17,000,000.00
12,500,000.00 50,000,000.00
85,000.00 -
87,600,000.00
DAFTAR ANALISA HARGA SATU PEKERJAAN
TAHUN ANGGARAN 2017
Kode Analisa :
Jenis Pekerjaan : PENGUKURAN DAN PEMASANGAN BOUPLANK
Satuan Pembayaran : M
A BAHAN
1 Kayu Kls III ( Balok 5/7) M3 0.120 Rp 4
2 Paku 5 cm - 12 cm Kg 0.020 Rp
3 Papan Kayu Kls III M3 0.007 Rp 4
JUMLAH HARG
B UPAH
1 Pekerja OH 0.100 Rp
2 Tukang OH 0.100 Rp
3 Kepala Tukang OH 0.010 Rp
4 Mandor OH 0.005 Rp
JUMLAH HARGA
C PERALATAN
1
2
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MENGGALI 1 M3 TANAH BIASA SEDALAM 1.00 M
Satuan Pembayaran : M
A BAHAN
1
JUMLAH HARG
B UPAH
1 Pekerja OH 0.563 Rp
2 Mandor OH 0.056 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MENGURUG KEMBALI 1 M3 GALIAN ( 1/3 INDEKS GALIAN )
Satuan Pembayaran : M
A BAHAN
1
JUMLAH HARG
B UPAH
1 Pekerja OH 0.250 Rp
2 Mandor OH 0.080 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1
JUMLAH HARG
B UPAH
1 Pekerja OH 0.500 Rp
2 Mandor OH 0.050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MENGURUG 1 M3 PASIR URUG
Satuan Pembayaran : M
A BAHAN
1 Pasir Urug M3 1.200 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.500 Rp
2 Mandor OH 0.050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M3 PONDASI BATU BELAH CAMPURAN 1 PC : 4 PP
Satuan Pembayaran : M
A BAHAN
1 Batu Gunung M3 1.200 Rp
2 Semen (PC) Kg 163.000 Rp
3 Pasir Pasang (PP) M3 0.520 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.500 Rp
2 Tukang OH 0.600 Rp
3 Kepala Tukang OH 0.060 Rp
4 Mandor OH 0.075 Rp
JUMLAH HARGA
C PERALATAN
1
2
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Batu Gunung M3 1.200 Rp
2 Pasir Pasang (PP) M3 0.432 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.780 Rp
2 Tukang OH 0.390 Rp
3 Kepala Tukang OH 0.039 Rp
4 Mandor OH 0.039 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMBUAT BETON MUTU Fc=14,5 Mpa (K-175),SLUMP (12 2) CM.W/C=0,66
Satuan Pembayaran : M
A BAHAN
1 Semen (PC) Kg 326.000 Rp
2 Pasir Beton (PB) M3 0.447 Rp
3 Kerikil Beton ( Maks 30 mm) M3 0.616 Rp
4 Air Liter 215.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.650 Rp
2 Tukang OH 0.275 Rp
3 Kepala Tukang OH 0.028 Rp
4 Mandor OH 0.083 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMBUAT BETON MUTU Fc=16,9 Mpa (K-225),SLUMP (12 2) CM.
Satuan Pembayaran : M
A BAHAN
1 Semen (PC) Kg 371.000 Rp
2 Pasir Beton (PB) M3 0.411 Rp
3 Kerikil Beton ( Maks 30 mm) M3 1.595 Rp
4 Air Liter 215.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.650 Rp
2 Tukang OH 0.275 Rp
3 Kepala Tukang OH 0.028 Rp
4 Mandor OH 0.083 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Semen (PC) Kg 352.000 Rp
2 Pasir Beton (PB) M3 0.135 Rp
3 Kerikil Beton ( Maks 30 mm) M3 0.502 Rp
4 Air Liter 215.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.650 Rp
2 Tukang OH 0.275 Rp
3 Kepala Tukang OH 0.028 Rp
4 Mandor OH 0.083 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMBESIAN 1 KG BESI POLOS
Satuan Pembayaran : Kg
A BAHAN
1 Besi Beton Polos Kg 1.050 Rp
2 Kawat Beton Kg 0.015 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0070 Rp
2 Tukang OH 0.0070 Rp
3 Kepala Tukang OH 0.0007 Rp
4 Mandor OH 0.0004 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 BEKISTING UNTUK SLOOF
Satuan Pembayaran : M
A BAHAN
1 Kayu Papan Bekisting M3 0.045 Rp 2
2 Paku 5 cm - 12 cm Kg 0.300 Rp
3 Minyak bekisting Liter 0.100 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.5200 Rp
2 Tukang OH 0.2600 Rp
3 Kepala Tukang OH 0.0260 Rp
4 Mandor OH 0.0260 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Kayu Papan Bekisting M3 0.040 Rp 2
2 Paku 5 cm - 12 cm Kg 0.400 Rp
3 Minyak bekisting Liter 0.200 Rp
4 Kayu Kls II M3 0.015 Rp 6
5 Plywood Tebal 6 mm Lembar 0.350 Rp
6 Dolken Kayu (8-10) cm Panjang 4 m Batang 2.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.6600 Rp
2 Tukang OH 0.3300 Rp
3 Kepala Tukang OH 0.0330 Rp
4 Mandor OH 0.0330 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 BEKISTING UNTUK BALOK
Satuan Pembayaran : M
A BAHAN
1 Kayu Papan Bekisting M3 0.040 Rp 2
2 Paku 5 cm - 12 cm Kg 0.400 Rp
3 Minyak bekisting Liter 0.200 Rp
4 Kayu Kls II M3 0.015 Rp 6
5 Plywood Tebal 6 mm Lembar 0.350 Rp
6 Dolken Kayu (8-10) cm Panjang 4 m Batang 2.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.6600 Rp
2 Tukang OH 0.3300 Rp
3 Kepala Tukang OH 0.0330 Rp
4 Mandor OH 0.0330 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 BEKISTING UNTUK LANTAI
Satuan Pembayaran : M
A BAHAN
1 Kayu Papan Bekisting M3 0.040 Rp 2
2 Paku 5 cm - 12 cm Kg 0.400 Rp
3 Minyak bekisting Liter 0.200 Rp
4 Kayu Kls II M3 0.015 Rp 6
5 Plywood Tebal 6 mm Lembar 0.350 Rp
6 Dolken Kayu (8-10) cm Panjang 4 m Batang 2.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.6600 Rp
2 Tukang OH 0.3300 Rp
3 Kepala Tukang OH 0.0330 Rp
4 Mandor OH 0.0330 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 DINDING BATA UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA CAMP.1 PC :
Satuan Pembayaran : M
A BAHAN
1 Bata Merah Buah 70.000 Rp
2 Semen (PC) Kg 14.370 Rp
3 Pasir Pasang (PP) M3 0.040 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.3000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0150 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 DINDING BATA UKURAN (5 X 11 X 22) CM TEBAL 1/2 BATA CAMP.1 PC :
Satuan Pembayaran : M
A BAHAN
1 Bata Merah Buah 70.000 Rp
2 Semen (PC) Kg 9.680 Rp
3 Pasir Pasang (PP) M3 0.045 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.3000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0150 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 PLESTERAN 1 PC : 3 PP, TEBAL 15 MM
Satuan Pembayaran : M
A BAHAN
1 Semen (PC) Kg 5.184 Rp
2 Pasir Pasang (PP) M3 0.026 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.3000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0150 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 PLESTERAN 1 PC : 4PP, TEBAL 15 MM
Satuan Pembayaran : M
A BAHAN
1 Semen (PC) Kg 6.480 Rp
2 Pasir Pasang (PP) M3 0.019 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.2000 Rp
2 Tukang OH 0.1500 Rp
3 Kepala Tukang OH 0.0150 Rp
4 Mandor OH 0.0010 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 ACIAN
Satuan Pembayaran : M
No URAIAN SATUAN INDEKS HARGA S
A BAHAN
1 Semen (PC) Kg 3.250 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.2000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0100 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 kayu Kelas II M3 1.200 Rp 6
2 Paku 10 cm Kg 1.250 Rp
2 Lem Kayu Kg 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 6.0000 Rp
2 Tukang OH 18.0000 Rp
3 Kepala Tukang OH 1.8000 Rp
4 Mandor OH 0.3000 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMBUAT DAN MEMSANG 1 M2 DAUN PINTU PANEL KAYU KELAS II
Satuan Pembayaran : M2
A BAHAN
1 kayu Kelas II M3 0.040 Rp 6
2 Lem Kayu Kg 0.500 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.0000 Rp
2 Tukang OH 3.0000 Rp
3 Kepala Tukang OH 0.3000 Rp
4 Mandor OH 0.0500 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMBUAT DAN MEMSANG 1 M2 PINTU DAN JENDELA KACA KAYU KELAS II
Satuan Pembayaran : M2
A BAHAN
1 kayu Kelas II M3 0.024 Rp 6
2 Lem Kayu Kg 0.300 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.8000 Rp
2 Tukang OH 2.4000 Rp
3 Kepala Tukang OH 0.2400 Rp
4 Mandor OH 0.0400 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Papan kayu Kelas II M3 0.064 Rp 6
2 Lem Kayu Kg 0.500 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.0000 Rp
2 Tukang OH 3.0000 Rp
3 Kepala Tukang OH 0.3000 Rp
4 Mandor OH 0.0500 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M2 JALUSI KUSEN KAYU KLS II
Satuan Pembayaran : M2
A BAHAN
1 Papan kayu Kelas II M3 0.060 Rp 6
2 paku 1 - 2,5 cm Kg 0.150 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.6700 Rp
2 Tukang OH 2.0000 Rp
3 Kepala Tukang OH 0.2000 Rp
4 Mandor OH 0.3350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 DAUN PINTU TAEKWOOD RANGKAP RANGKA KAYU KELAS II
Satuan Pembayaran : M2
A BAHAN
1 Papan Kayu Kelas Ii M3 0.019 Rp 6
2 Paku 5cm Paku 1 cm - 2,5 cm Kg 0.030 Rp
3 Lem Kayu Kg 0.300 Rp
4 Taekwood 120 x 240 x 3 mm Lembar 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.6000 Rp
2 Tukang OH 2.0000 Rp
3 Kepala Tukang OH 0.2000 Rp
4 Mandor OH 0.0300 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Papan Kayu Kelas Ii M3 0.019 Rp 6
2 Paku 5cm Paku 1 cm - 2,5 cm Kg 0.015 Rp
3 Lem Kayu Kg 0.300 Rp
4 Taekwood 120 x 240 x 3 mm Lembar 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.3000 Rp
2 Tukang OH 1.0000 Rp
3 Kepala Tukang OH 0.1000 Rp
4 Mandor OH 0.0150 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M' KUSEN PINTU ALUMINIUM
Satuan Pembayaran : M'
A BAHAN
1 Profil Aluminium M' 1.100 Rp
2 Sekrup Fixer Buah 2.000 Rp
3 Sealent Tube 0.060 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0430 Rp
2 Tukang OH 0.0430 Rp
3 Kepala Tukang OH 0.0043 Rp
4 Mandor OH 0.0021 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M2 PINTU ALUMINIUM STRIP LEBAR 8 CM
Satuan Pembayaran : M2
A BAHAN
1 Profil Aluminium M' 4.400 Rp
2 Aluminium Strip Buah 14.600 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0430 Rp
2 Tukang OH 0.0430 Rp
3 Kepala Tukang OH 0.0043 Rp
4 Mandor OH 0.0021 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M2 PINTU KACA RANGKA ALUMINIUM
Satuan Pembayaran : M2
A BAHAN
1 Pintu Aluminium M' 4.400 Rp
2 Propil kaca M' 4.500 Rp
3 Sealent Buah 0.270 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0850 Rp
2 Tukang OH 0.0850 Rp
3 Kepala Tukang OH 0.0090 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M3 KONSTRUKSI KUDA-KUDA KONVENSIONAL KAYU KELAS II
Satuan Pembayaran : M3
A BAHAN
1 Kayu Kelas II M3 1.200 Rp 6
2 Besi Streep tebal 5 mm Kg 15.000 Rp
3 Paku 12 cm Kg 5.600 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 6.7000 Rp
2 Tukang OH 20.1000 Rp
3 Kepala Tukang OH 2.0100 Rp
4 Mandor OH 0.3350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M3 KONSTRUKSI GORDENG KAYU KELAS II
Satuan Pembayaran : M3
A BAHAN
1 Kayu Kelas II M3 1.100 Rp 6
2 Besi Streep tebal 5 mm Kg 15.000 Rp
3 Paku 12 cm Kg 3.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 6.7000 Rp
2 Tukang OH 20.1000 Rp
3 Kepala Tukang OH 2.0100 Rp
4 Mandor OH 0.3350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 KASO DAN RENG KAYU KELAS II
Satuan Pembayaran : M3
A BAHAN
1 Kayu Kelas II M3 0.012 Rp 6
2 Paku 12 cm Kg 0.150 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 KUDA-KUDA DAN RANGKA ATAP BAJA RINGAN
Satuan Pembayaran : M2
A BAHAN
1 Canal C 65.80 M' 1.850 Rp
2 Reng TS 0,35 M' 3.650 Rp
4 Screw 10 16x16 Bh 40.000 Rp
5 L.Braket Bh 1.520 Rp
6 Dyna Bolt Bh 1.840 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.100 Rp
2 Tukang OH 0.800 Rp
3 Kepala Tukang OH 0.075 Rp
4 Mandor OH 0.0075 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 ATAP GALVALUM 0,30 MM
Satuan Pembayaran : M2
A BAHAN
1 Atap Spandek 0,30 mm M' 1.351 Rp
2 Baut Sekrup Atap Bh 8.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0750 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0800 Rp
4 Mandor OH 0.1200 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M TALANG JURAI Galvalum 0,30 mm LEBAR 45 CM
Satuan Pembayaran : M1
A BAHAN
1 Galvalum Plat 0,30 mm Warna M 1.050 Rp
2 sekrup BH 3.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0750 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0800 Rp
4 Mandor OH 0.1200 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Seng Gelombang Lbr 0.700 Rp
2 Paku Biasa Kg 0.020 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1200 Rp
2 Tukang OH 0.0600 Rp
3 Kepala Tukang OH 0.0060 Rp
4 Mandor OH 0.0060 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M' NOK ATAP SENG
Satuan Pembayaran : M'
A BAHAN
1 Seng Plat 3" x 6' bjls 28 Lbr 0.300 Rp
2 Paku Biasa Kg 0.040 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1500 Rp
2 Tukang OH 0.0700 Rp
3 Kepala Tukang OH 0.0070 Rp
4 Mandor OH 0.0060 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M' LISTPLANK KAYU KLS ii
Satuan Pembayaran : M'
A BAHAN
1 kayu Papan Kls II M3 0.011 Rp 6
2 Paku Biasa Kg 0.050 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1000 Rp
2 Tukang OH 0.2000 Rp
3 Kepala Tukang OH 0.0200 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Genteng Metal Bh 1.020 Rp
2 Paku Kg 0.200 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.2000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0010 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Nok Genteng Metal Bh 1.100 Rp
2 Paku Kg 0.050 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.2500 Rp
2 Tukang OH 0.1500 Rp
3 Kepala Tukang OH 0.0150 Rp
4 Mandor OH 0.0130 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M'WOODPLANK
Satuan Pembayaran : M'
A BAHAN
1 Woodplank 30 cm M' 1.100 Rp
2 Baut Sekrup Bh 4.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1500 Rp
2 Tukang OH 0.0700 Rp
3 Kepala Tukang OH 0.0070 Rp
4 Mandor OH 0.0060 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1M2 RANGKA LANGIT-LANGIT (50 X 100 ) KAYU KELAS II
Satuan Pembayaran : M2
A BAHAN
1 Kayu Kelas II M3 0.015 Rp 4
2 paku 5 - 7 cm Kg 0.200 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1500 Rp
2 Tukang OH 0.3000 Rp
3 Kepala Tukang OH 0.0300 Rp
4 Mandor OH 0.0750 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Rangka Hollow 20.40.2 M' 4.000 Rp
2 Sekrup 3 cm Kg 0.010 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0500 Rp
2 Tukang OH 0.4500 Rp
3 Kepala Tukang OH 0.0450 Rp
4 Mandor OH 0.0025 Rp
JUMLAH HARGA
C PERALATAN
1 alat Bantu Ls 1.000 Rp
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1M2 RANGKA BESI HOLLOW 1X40X40.2 MM,MODUL 60 X 120 CM DINDING P
Satuan Pembayaran : M2
A BAHAN
1 Rangka Metal Hollow 40.40.2 mm M' 3.500 Rp
2 Acc ( Perkuatan Las ) Ls 0.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.2500 Rp
2 Tukang OH 0.2500 Rp
3 Kepala Tukang OH 0.0250 Rp
4 Mandor OH 0.0130 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 LANGIT-LANGIT GYPSUM BOARD ( 120X240X9 0MM
Satuan Pembayaran : M2
A BAHAN
1 Gypsum Board Lembar 0.364 Rp
2 Sekrup 3 cm Kg 0.110 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1000 Rp
2 Tukang OH 0.0500 Rp
3 Kepala Tukang OH 0.0050 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1 alat Bantu
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Tripleks Lembar 0.375 Rp
2 paku Tripleks Kg 0.003 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.1000 Rp
2 Tukang OH 0.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M' LIST PLAPOND KAYU PROPIL
Satuan Pembayaran : M'
A BAHAN
1 Kayu Propile M' 1.050 Rp
2 Paku Kg 0.010 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0500 Rp
2 Tukang OH 0.0500 Rp
3 Kepala Tukang OH 0.0050 Rp
4 Mandor OH 0.0030 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M' LIST PLAPOND GYPSUM 7 CM
Satuan Pembayaran : M'
A BAHAN
1 List Gypsum M' 1.050 Rp
2 Sekrup Bh 4.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0500 Rp
2 Tukang OH 0.0500 Rp
3 Kepala Tukang OH 0.0050 Rp
4 Mandor OH 0.0030 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Keramik lantai Polos Uk(.40 x 40 ) cm M2 1.000 Rp
2 Semen (PC) Kg 8.190 Rp
3 Pasir Pasang (PP) M3 0.045 Rp
4 semen Warna Kg 1.620 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.7000 Rp
2 Tukang OH 0.3500 Rp
3 Kepala Tukang OH 0.0350 Rp
4 Mandor OH 0.0350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 LANTAI KERAMIK UKURAN (20X20) CM
Satuan Pembayaran : M2
A BAHAN
1 Keramik lantai Uk(.20 x 20 ) cm M2 1.000 Rp
2 Semen (PC) Kg 10.400 Rp
3 Pasir Pasang (PP) M3 0.045 Rp
4 semen Warna Kg 1.620 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.7000 Rp
2 Tukang OH 0.3500 Rp
3 Kepala Tukang OH 0.0350 Rp
4 Mandor OH 0.0350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M2 DINDING KERAMIK UKURAN (20X25) CM
Satuan Pembayaran : M2
A BAHAN
1 Keramik lantai Uk(.20 x 20 ) cm M2 1.000 Rp
2 Semen (PC) Kg 10.000 Rp
3 Pasir Pasang (PP) M3 0.018 Rp
4 semen Warna Kg 1.940 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.7000 Rp
2 Tukang OH 0.3500 Rp
3 Kepala Tukang OH 0.0350 Rp
4 Mandor OH 0.0350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG LANTAI SEMEN 1 PC : 5 PS
Satuan Pembayaran : M2
A BAHAN
1 Semen (PC) Kg 10.000 Rp
2 Pasir Pasang (PP) M3 0.022 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.2600 Rp
2 Tukang OH 0.1250 Rp
3 Kepala Tukang OH 0.0125 Rp
4 Mandor OH 0.0130 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 M' PLINT KERAMIK UKURAN (10X40) CM
Satuan Pembayaran : M2
A BAHAN
1 Plint Keramik 10 x 40 cm Buah 2.500 Rp
2 Semen (PC) Kg 1.140 Rp
3 Pasir Pasang (PP) M3 0.003 Rp
4 semen Warna Kg 0.025 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0900 Rp
2 Tukang OH 0.0900 Rp
3 Kepala Tukang OH 0.0090 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M' PIPA PVC TIPE AW DIA 2,5"
Satuan Pembayaran : M'
A BAHAN
1 Pipa PVC dia 2,5 " M 1.200 Rp
2 Perlengkapan % 35.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0810 Rp
2 Tukang OH 0.1350 Rp
3 Kepala Tukang OH 0.0135 Rp
4 Mandor OH 0.0040 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M' PIPA PVC TIPE AW DIA 3"
Satuan Pembayaran : M'
A BAHAN
1 Pipa PVC dia 3 " M 1.200 Rp
2 Perlengkapan % 35.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0810 Rp
2 Tukang OH 0.1350 Rp
3 Kepala Tukang OH 0.0135 Rp
4 Mandor OH 0.0040 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M' PIPA PVC TIPE AW DIA 3/4"
Satuan Pembayaran : M'
A BAHAN
1 Pipa PVC dia 3/4 " M 1.200 Rp
2 Perlengkapan % 35.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0360 Rp
2 Tukang OH 0.0600 Rp
3 Kepala Tukang OH 0.0060 Rp
4 Mandor OH 0.0020 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 BH KRAN AIR 1/2" ATAU 3/4"
Satuan Pembayaran : M'
A BAHAN
1 Kran air M 1.000 Rp
2 seal tape Buah 0.025 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0100 Rp
2 Tukang OH 0.4000 Rp
3 Kepala Tukang OH 0.0400 Rp
4 Mandor OH 0.0050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 BH URINOIR
Satuan Pembayaran : BH
A BAHAN
1 Urinoir Unit 1.000 Rp
2 Semen Portland Kg 6.000 Rp
3 Pasir pasang M3 0.010 Rp
4 Perlengkapan % 30.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.0000 Rp
2 Tukang OH 1.0000 Rp
3 Kepala Tukang OH 0.1000 Rp
4 Mandor OH 0.0500 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 BH WASTAFEL
Satuan Pembayaran : BH
A BAHAN
1 wastafel Unit 1.200 Rp
2 Semen Portland Kg 6.000 Rp
3 Pasir pasang M3 0.010 Rp
4 Perlengkapan % 12.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.2000 Rp
2 Tukang OH 1.4500 Rp
3 Kepala Tukang OH 0.1500 Rp
4 Mandor OH 0.0600 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 BH KLOSET JONGKOK PORSELIN
Satuan Pembayaran : BH
A BAHAN
1 Kloset jongkok Unit 1.000 Rp
2 Semen Portland Kg 6.000 Rp
3 Pasir pasang M3 0.010 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 1.0000 Rp
2 Tukang OH 1.5000 Rp
3 Kepala Tukang OH 0.1500 Rp
4 Mandor OH 0.1600 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 BH KLOSET DUDUK
Satuan Pembayaran : BH
A BAHAN
1 Kloset Duduk Unit 1.000 Rp
2 Perlengkapan Ls 6% x Closet Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 3.3000 Rp
2 Tukang OH 1.1000 Rp
3 Kepala Tukang OH 0.0100 Rp
4 Mandor OH 0.1600 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : Pemasangan 1 M Wallpaper
Satuan Pembayaran : M2
A BAHAN
1 Wallpaper M2 1.200 Rp
2 Lem Kg 0.200 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0200 Rp
2 Tukang OH 0.2000 Rp
3 Kepala Tukang OH 0.0200 Rp
4 Mandor OH 0.0025 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : Pengecatan tembok lama ( 1Lapis Cat dasar,2 lapis cat Penutup)
Satuan Pembayaran : M2
A BAHAN
1 Cat dasar Kg 0.120 Rp
2 Cat Penutup Kg 0.180 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0280 Rp
2 Tukang OH 0.0420 Rp
3 Kepala Tukang OH 0.0042 Rp
4 Mandor OH 0.0030 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : Pengecatan tembok Baru(1 Lapis Plamur, 1 Lapis Cat dasar,2 lapis cat Penutup)
Satuan Pembayaran : M2
A BAHAN
1 Plamur Kg 0.100 Rp
2 Cat dasar Kg 0.100 Rp
2 Cat Penutup Kg 0.260 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0200 Rp
2 Tukang OH 0.0630 Rp
3 Kepala Tukang OH 0.0063 Rp
4 Mandor OH 0.0030 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : 1 M2 PENGECATAN KAYU BARU ( 1 LAPIS PLAMUR, 1 LAPIS CAT DASAR 2 LAPIS CAT PENUT
Satuan Pembayaran : M2
A BAHAN
1 Meni Kayu Kg 0.200 Rp
2 Plamir Kayu Kg 0.150 Rp
3 Cat Dasar Kayu Kg 0.170 Rp
4 Cat Kayu Mutu Menengah Kg 0.260 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0700 Rp
2 Tukang OH 0.0070 Rp
3 Kepala Tukang OH 0.0060 Rp
4 Mandor OH 0.0030 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : 1 M2 PENGECATAN ULANG KAYU
Satuan Pembayaran : M2
A BAHAN
1 Meni Kayu Kg 0.150 Rp
2 Plamir Kayu Kg 0.170 Rp
3 Cat Dasar Kayu Kg 0.170 Rp
4 Cat Kayu Mutu Menengah Kg 0.260 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.0700 Rp
2 Tukang OH 0.0070 Rp
3 Kepala Tukang OH 0.0060 Rp
4 Mandor OH 0.0030 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : 1 M2 PENGECATAN GENTENG
Satuan Pembayaran : M2
A BAHAN
1 Cat Genteng Kg 0.100 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.020 Rp
2 Tukang OH 0.200 Rp
3 Kepala Tukang OH 0.020 Rp
4 Mandor OH 0.0100 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG 1 BUAH KUNCI TANAM BIASA
Satuan Pembayaran : BH
A BAHAN
1 Kunci Pintu Setara Merk Imperial Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.010 Rp
2 Tukang OH 0.500 Rp
3 Kepala Tukang OH 0.010 Rp
4 Mandor OH 0.005 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG 1 BUAH ENGSEL JENDELA
Satuan Pembayaran : BH
A BAHAN
1 Engsel Jendela Setara Merk Viper Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.010 Rp
2 Tukang OH 0.100 Rp
3 Kepala Tukang OH 0.010 Rp
4 Mandor OH 0.0005 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG 1 BUAH KAIT ANGIN
Satuan Pembayaran : BH
A BAHAN
1 Kait Angin Kecil Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.015 Rp
2 Tukang OH 0.150 Rp
3 Kepala Tukang OH 0.015 Rp
4 Mandor OH 0.00075 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG 1 BUAH DOOR CLOSER
Satuan Pembayaran : BH
A BAHAN
1 Door Closer Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Tukang OH 0.200 Rp
2 Kepala Tukang OH 0.020 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG 1 BUAH DOOR HOLDER
Satuan Pembayaran : BH
A BAHAN
1 Door Holder Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Tukang OH 0.100 Rp
2 Kepala Tukang OH 0.010 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Door Stop Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Tukang OH 0.125 Rp
2 Kepala Tukang OH 0.013 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PASANG 1 BUAH GRENDEL
Satuan Pembayaran : BH
A BAHAN
1 Grendel Besar Buah 1.000 Rp
JUMLAH HARG
B UPAH
1 Tukang OH 0.100 Rp
2 Kepala Tukang OH 0.010 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : 1 M2 PASANG KACA POLOS TEBAL 3 MM
Satuan Pembayaran : M2
A BAHAN
1 Kaca Polos 3 mm M2 1.100 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.150 Rp
2 Tukang OH 0.150 Rp
3 Kepala Tukang OH 0.015 Rp
4 Mandor OH 0.00075 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Kabel NYM (2 x 2,5)mm M' 20.000 Rp
1 Klem Kabel no 10 Bh 40.000 Rp
1 Pipa Konduit m' 3.000 Rp
1 Inbow Dos Bh 1.000 Rp
1 Isolasi Roll 4.000 Rp
2 T-Dos Bh 1.000 Rp
3 Las Dop Bh 3.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.500 Rp
2 Tukang OH 0.500 Rp
3 Kepala Tukang OH 0.050 Rp
4 Mandor OH 0.005 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 BH SAKELAR GANDA
Satuan Pembayaran : BH
A BAHAN
1 Sakelar Ganda Bh 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.005 Rp
2 Tukang OH 0.050 Rp
3 Kepala Tukang OH 0.005 Rp
4 Mandor OH 0.0003 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 BH SAKELAR TUNGGAL
Satuan Pembayaran : BH
A BAHAN
1 Sakelar Tunggal Bh 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.005 Rp
2 Tukang OH 0.050 Rp
3 Kepala Tukang OH 0.005 Rp
4 Mandor OH 0.0003 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Sakelar Tunggal Bh 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.005 Rp
2 Tukang OH 0.050 Rp
3 Kepala Tukang OH 0.005 Rp
4 Mandor OH 0.0003 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 BH STOP KONTAK
Satuan Pembayaran : BH
A BAHAN
1 Stop Kontak Bh 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.005 Rp
2 Tukang OH 0.050 Rp
3 Kepala Tukang OH 0.005 Rp
4 Mandor OH 0.0003 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MEMASANG 1 BH FITTING LAMPU
Satuan Pembayaran : BH
A BAHAN
1 FITTING LAMPU Bh 1.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.005 Rp
2 Tukang OH 0.050 Rp
3 Kepala Tukang OH 0.005 Rp
4 Mandor OH 0.0003 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Paving Blok Bh 50.000 Rp
2 Pasir Urug M3 0.230 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.100 Rp
2 Tukang OH 0.800 Rp
3 Kepala Tukang OH 0.075 Rp
4 Mandor OH 0.0000 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M2 BATU CANDI
Satuan Pembayaran : M2
A BAHAN
1 batu Candi M2 1.200 Rp
2 Pasir Pasang M3 0.025 Rp
3 Semen Portland Kg 5.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.240 Rp
2 Tukang OH 0.120 Rp
3 Kepala Tukang OH 0.012 Rp
4 Mandor OH 0.0240 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN 1 M2 PLESTERAN CIPRAT 1 SP : 2 PP
Satuan Pembayaran : M2
A BAHAN
1 Pasir Pasang M3 0.006 Rp
2 Semen Portland Kg 4.320 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.300 Rp
2 Tukang OH 0.100 Rp
3 Kepala Tukang OH 0.010 Rp
4 Mandor OH 0.0150 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
A BAHAN
1 Batu Tempel Hitam M2 1.100 Rp
2 Pasir Pasang M3 0.035 Rp
3 Semen Portland Kg 11.750 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.700 Rp
2 Tukang OH 0.350 Rp
3 Kepala Tukang OH 0.035 Rp
4 Mandor OH 0.0350 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : PEMASANGAN BAK CUCI PIRING STAINLESS STEEL
Satuan Pembayaran : BH
A BAHAN
1 Bak cuci Piring Unit 1.000 Rp
2 Water drain Bh 1.000 Rp
3 Pasir Pasang M3 0.050 Rp
4 Semen Portland Kg 20.000 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.050 Rp
2 Tukang OH 0.500 Rp
3 Kepala Tukang OH 0.050 Rp
4 Mandor OH 0.0250 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
Kode Analisa :
Jenis Pekerjaan : MENGURUG 1 M3 TANAH TIMBUNAN
Satuan Pembayaran : M
A BAHAN
1 Tanah Timbunan M3 1.200 Rp
JUMLAH HARG
B UPAH
1 Pekerja OH 0.500 Rp
2 Mandor OH 0.050 Rp
JUMLAH HARGA
C PERALATAN
1
JUMLAH HARGA PE
D Jumlah ( A + B + C )
JUMLAH
U PEKERJAAN
17
Rp 4,270,000.00 Rp 512,400.00
Rp 14,000.00 Rp 280.00
Rp 4,270,000.00 Rp 29,890.00
-
JUMLAH HARGA BAHAN Rp 542,570.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 17,500.00
Rp -
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 560,070.00
Rp -
Rp 560,070.00
Rp -
-
JUMLAH HARGA BAHAN Rp -
Rp 75,000.00 Rp 42,225.00
Rp 100,000.00 Rp 5,630.00
JUMLAH HARGA TENAGA Rp 47,855.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 47,855.00
Rp -
Rp 47,855.00
Rp -
-
JUMLAH HARGA BAHAN Rp -
Rp 75,000.00 Rp 18,750.00
Rp 100,000.00 Rp 8,000.00
JUMLAH HARGA TENAGA Rp 26,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 26,750.00
Rp -
Rp 26,750.00
HARGA SATUAN JUMLAH HARGA
Rp -
-
JUMLAH HARGA BAHAN Rp -
Rp 75,000.00 Rp 37,500.00
Rp 100,000.00 Rp 5,000.00
JUMLAH HARGA TENAGA Rp 42,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 42,500.00
Rp -
Rp 42,500.00
Rp 147,000.00 Rp 176,400.00
-
JUMLAH HARGA BAHAN Rp 176,400.00
Rp 75,000.00 Rp 37,500.00
Rp 100,000.00 Rp 5,000.00
JUMLAH HARGA TENAGA Rp 42,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 218,900.00
Rp -
Rp 218,900.00
Rp 197,000.00 Rp 236,400.00
Rp 1,350.00 Rp 220,050.00
Rp 218,000.00 Rp 113,360.00
-
JUMLAH HARGA BAHAN Rp 569,810.00
Rp 75,000.00 Rp 112,500.00
Rp 85,000.00 Rp 51,000.00
Rp 100,000.00 Rp 6,000.00
Rp 100,000.00 Rp 7,500.00
JUMLAH HARGA TENAGA Rp 177,000.00
Rp -
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 746,810.00
Rp -
Rp 746,810.00
HARGA SATUAN JUMLAH HARGA
Rp 197,000.00 Rp 236,400.00
Rp 218,000.00 Rp 94,176.00
JUMLAH HARGA BAHAN Rp 330,576.00
Rp 75,000.00 Rp 58,500.00
Rp 85,000.00 Rp 33,150.00
Rp 100,000.00 Rp 3,900.00
Rp 100,000.00 Rp 3,900.00
JUMLAH HARGA TENAGA Rp 99,450.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 430,026.00
Rp -
Rp 430,026.00
Rp 1,350.00 Rp 440,100.00
Rp 225,000.00 Rp 100,575.00
Rp 400,000.00 Rp 246,400.00
Rp 50.00 Rp 10,750.00
JUMLAH HARGA BAHAN Rp 797,825.00
Rp 75,000.00 Rp 123,750.00
Rp 85,000.00 Rp 23,375.00
Rp 100,000.00 Rp 2,800.00
Rp 100,000.00 Rp 8,300.00
JUMLAH HARGA TENAGA Rp 158,225.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 956,050.00
Rp -
Rp 956,050.00
Rp 1,350.00 Rp 500,850.00
Rp 225,000.00 Rp 92,475.00
Rp 400,000.00 Rp 638,000.00
Rp 50.00 Rp 10,750.00
JUMLAH HARGA BAHAN Rp 1,242,075.00
Rp 75,000.00 Rp 123,750.00
Rp 85,000.00 Rp 23,375.00
Rp 100,000.00 Rp 2,800.00
Rp 100,000.00 Rp 8,300.00
JUMLAH HARGA TENAGA Rp 158,225.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 1,400,300.00
Rp -
Rp 1,400,300.00
HARGA SATUAN JUMLAH HARGA
Rp 1,350.00 Rp 475,200.00
Rp 225,000.00 Rp 30,375.00
Rp 400,000.00 Rp 200,800.00
Rp 50.00 Rp 10,750.00
JUMLAH HARGA BAHAN Rp 717,125.00
Rp 75,000.00 Rp 123,750.00
Rp 85,000.00 Rp 23,375.00
Rp 100,000.00 Rp 2,800.00
Rp 100,000.00 Rp 8,300.00
JUMLAH HARGA TENAGA Rp 158,225.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 875,350.00
Rp -
Rp 875,350.00
Rp 10,500.00 Rp 11,025.00
Rp 18,700.00 Rp 280.50
JUMLAH HARGA BAHAN Rp 11,305.50
Rp 75,000.00 Rp 525.00
Rp 85,000.00 Rp 595.00
Rp 100,000.00 Rp 70.00
Rp 100,000.00 Rp 40.00
JUMLAH HARGA TENAGA Rp 1,230.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 12,535.50
Rp -
Rp 12,535.50
Rp 2,500,000.00 Rp 112,500.00
Rp 14,000.00 Rp 4,200.00
Rp 6,500.00 Rp 650.00
JUMLAH HARGA BAHAN Rp 117,350.00
Rp 75,000.00 Rp 39,000.00
Rp 85,000.00 Rp 22,100.00
Rp 100,000.00 Rp 2,600.00
Rp 100,000.00 Rp 2,600.00
JUMLAH HARGA TENAGA Rp 66,300.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 183,650.00
Rp -
Rp 183,650.00
HARGA SATUAN JUMLAH HARGA
Rp 2,500,000.00 Rp 100,000.00
Rp 14,000.00 Rp 5,600.00
Rp 6,500.00 Rp 1,300.00
Rp 6,600,000.00 Rp 99,000.00
Rp 74,300.00 Rp 26,005.00
Rp 20,000.00 Rp 40,000.00
JUMLAH HARGA BAHAN Rp 271,905.00
Rp 75,000.00 Rp 49,500.00
Rp 85,000.00 Rp 28,050.00
Rp 100,000.00 Rp 3,300.00
Rp 100,000.00 Rp 3,300.00
JUMLAH HARGA TENAGA Rp 84,150.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 356,055.00
Rp -
Rp 356,055.00
Rp 2,500,000.00 Rp 100,000.00
Rp 14,000.00 Rp 5,600.00
Rp 6,500.00 Rp 1,300.00
Rp 6,600,000.00 Rp 99,000.00
Rp 74,300.00 Rp 26,005.00
Rp 20,000.00 Rp 40,000.00
JUMLAH HARGA BAHAN Rp 271,905.00
Rp 75,000.00 Rp 49,500.00
Rp 85,000.00 Rp 28,050.00
Rp 100,000.00 Rp 3,300.00
Rp 100,000.00 Rp 3,300.00
JUMLAH HARGA TENAGA Rp 84,150.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 356,055.00
Rp -
Rp 356,055.00
Rp 2,500,000.00 Rp 100,000.00
Rp 14,000.00 Rp 5,600.00
Rp 6,500.00 Rp 1,300.00
Rp 6,600,000.00 Rp 99,000.00
Rp 74,300.00 Rp 26,005.00
Rp 20,000.00 Rp 40,000.00
JUMLAH HARGA BAHAN Rp 271,905.00
Rp 75,000.00 Rp 49,500.00
Rp 85,000.00 Rp 28,050.00
Rp 100,000.00 Rp 3,300.00
Rp 100,000.00 Rp 3,300.00
JUMLAH HARGA TENAGA Rp 84,150.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 356,055.00
Rp -
Rp 356,055.00
Rp 650.00 Rp 45,500.00
Rp 1,350.00 Rp 19,399.50
Rp 218,000.00 Rp 8,720.00
JUMLAH HARGA BAHAN Rp 73,619.50
Rp 75,000.00 Rp 22,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 33,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 107,119.50
Rp -
Rp 107,119.50
Rp 650.00 Rp 45,500.00
Rp 1,350.00 Rp 13,068.00
Rp 218,000.00 Rp 9,810.00
JUMLAH HARGA BAHAN Rp 68,378.00
Rp 75,000.00 Rp 22,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 33,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 101,878.00
Rp -
Rp 101,878.00
Rp 1,350.00 Rp 6,998.40
Rp 218,000.00 Rp 5,668.00
JUMLAH HARGA BAHAN Rp 12,666.40
Rp 75,000.00 Rp 22,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 33,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 46,166.40
Rp -
Rp 46,166.40
Rp 1,350.00 Rp 8,748.00
Rp 218,000.00 Rp 4,142.00
JUMLAH HARGA BAHAN Rp 12,890.00
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 12,750.00
Rp 100,000.00 Rp 1,500.00
Rp 100,000.00 Rp 100.00
JUMLAH HARGA TENAGA Rp 29,350.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 42,240.00
Rp -
Rp 42,240.00
HARGA SATUAN JUMLAH HARGA
Rp 1,350.00 Rp 4,387.50
JUMLAH HARGA BAHAN Rp 4,387.50
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 1,000.00
JUMLAH HARGA TENAGA Rp 25,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 29,887.50
Rp -
Rp 29,887.50
NDELA KAYU KELAS II
Rp 6,600,000.00 Rp 7,920,000.00
Rp 14,000.00 Rp 17,500.00
Rp 25,000.00 Rp 25,000.00
JUMLAH HARGA BAHAN Rp 7,962,500.00
Rp 75,000.00 Rp 450,000.00
Rp 85,000.00 Rp 1,530,000.00
Rp 100,000.00 Rp 180,000.00
Rp 100,000.00 Rp 30,000.00
JUMLAH HARGA TENAGA Rp 2,190,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 10,152,500.00
Rp -
Rp 10,152,500.00
Rp 6,600,000.00 Rp 264,000.00
Rp 25,000.00 Rp 12,500.00
JUMLAH HARGA BAHAN Rp 276,500.00
Rp 75,000.00 Rp 75,000.00
Rp 85,000.00 Rp 255,000.00
Rp 100,000.00 Rp 30,000.00
Rp 100,000.00 Rp 5,000.00
JUMLAH HARGA TENAGA Rp 365,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 641,500.00
Rp -
Rp 641,500.00
Rp 6,600,000.00 Rp 158,400.00
Rp 25,000.00 Rp 7,500.00
JUMLAH HARGA BAHAN Rp 165,900.00
Rp 75,000.00 Rp 60,000.00
Rp 85,000.00 Rp 204,000.00
Rp 100,000.00 Rp 24,000.00
Rp 100,000.00 Rp 4,000.00
JUMLAH HARGA TENAGA Rp 292,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 457,900.00
Rp -
Rp 457,900.00
HARGA SATUAN JUMLAH HARGA
Rp 6,600,000.00 Rp 422,400.00
Rp 25,000.00 Rp 12,500.00
JUMLAH HARGA BAHAN Rp 434,900.00
Rp 75,000.00 Rp 75,000.00
Rp 85,000.00 Rp 255,000.00
Rp 100,000.00 Rp 30,000.00
Rp 100,000.00 Rp 5,000.00
JUMLAH HARGA TENAGA Rp 365,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 799,900.00
Rp -
Rp 799,900.00
Rp 6,600,000.00 Rp 396,000.00
Rp 25,000.00 Rp 3,750.00
JUMLAH HARGA BAHAN Rp 399,750.00
Rp 75,000.00 Rp 50,250.00
Rp 85,000.00 Rp 170,000.00
Rp 100,000.00 Rp 20,000.00
Rp 100,000.00 Rp 33,500.00
JUMLAH HARGA TENAGA Rp 273,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 673,500.00
Rp -
Rp 673,500.00
Rp 6,600,000.00 Rp 125,400.00
Rp 14,000.00 Rp 420.00
Rp 25,000.00 Rp 7,500.00
Rp 115,000.00 Rp 115,000.00
JUMLAH HARGA BAHAN Rp 248,320.00
Rp 75,000.00 Rp 45,000.00
Rp 85,000.00 Rp 170,000.00
Rp 100,000.00 Rp 20,000.00
Rp 100,000.00 Rp 3,000.00
JUMLAH HARGA TENAGA Rp 238,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 486,320.00
Rp -
Rp 486,320.00
A LAMA) RANGKA KAYU KELAS II
Rp 6,600,000.00 Rp 125,400.00
Rp 14,000.00 Rp 210.00
Rp 25,000.00 Rp 7,500.00
Rp 115,000.00 Rp 115,000.00
JUMLAH HARGA BAHAN Rp 248,110.00
Rp 75,000.00 Rp 22,500.00
Rp 85,000.00 Rp 85,000.00
Rp 100,000.00 Rp 10,000.00
Rp 100,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 119,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 367,110.00
Rp -
Rp 367,110.00
Rp 100,000.00 Rp 110,000.00
Rp 250.00 Rp 500.00
Rp 6,000.00 Rp 360.00
JUMLAH HARGA BAHAN Rp 110,860.00
Rp 75,000.00 Rp 3,225.00
Rp 85,000.00 Rp 3,655.00
Rp 100,000.00 Rp 430.00
Rp 100,000.00 Rp 210.00
JUMLAH HARGA TENAGA Rp 7,520.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 118,380.00
Rp -
Rp 118,380.00
Rp 100,000.00 Rp 440,000.00
Rp 5,500.00 Rp 80,300.00
JUMLAH HARGA BAHAN Rp 520,300.00
Rp 75,000.00 Rp 3,225.00
Rp 85,000.00 Rp 3,655.00
Rp 100,000.00 Rp 430.00
Rp 100,000.00 Rp 210.00
JUMLAH HARGA TENAGA Rp 7,520.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 527,820.00
Rp -
Rp 527,820.00
Rp 100,000.00 Rp 440,000.00
Rp 75,000.00 Rp 337,500.00
Rp 6,000.00 Rp 1,620.00
JUMLAH HARGA BAHAN Rp 779,120.00
Rp 75,000.00 Rp 6,375.00
Rp 85,000.00 Rp 7,225.00
Rp 100,000.00 Rp 900.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 15,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 794,120.00
Rp -
Rp 794,120.00
Rp 6,600,000.00 Rp 7,920,000.00
Rp 5,500.00 Rp 82,500.00
Rp 14,000.00 Rp 78,400.00
JUMLAH HARGA BAHAN Rp 8,080,900.00
Rp 75,000.00 Rp 502,500.00
Rp 85,000.00 Rp 1,708,500.00
Rp 100,000.00 Rp 201,000.00
Rp 100,000.00 Rp 33,500.00
JUMLAH HARGA TENAGA Rp 2,445,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 10,526,400.00
Rp -
Rp 10,526,400.00
Rp 6,600,000.00 Rp 7,260,000.00
Rp 5,500.00 Rp 82,500.00
Rp 14,000.00 Rp 42,000.00
JUMLAH HARGA BAHAN Rp 7,384,500.00
Rp 75,000.00 Rp 502,500.00
Rp 85,000.00 Rp 1,708,500.00
Rp 100,000.00 Rp 201,000.00
Rp 100,000.00 Rp 33,500.00
JUMLAH HARGA TENAGA Rp 2,445,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 9,830,000.00
Rp -
Rp 9,830,000.00
Rp 6,600,000.00 Rp 79,200.00
Rp 14,000.00 Rp 2,100.00
JUMLAH HARGA BAHAN Rp 81,300.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 17,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 98,800.00
Rp -
Rp 98,800.00
HARGA SATUAN JUMLAH HARGA
Rp 18,000.00 Rp 33,300.00
Rp 7,000.00 Rp 25,550.00
Rp 225.00 Rp 9,000.00
Rp 2,000.00 Rp 3,040.00
Rp 2,500.00 Rp 4,600.00
JUMLAH HARGA BAHAN Rp 75,490.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 68,000.00
Rp 100,000.00 Rp 7,500.00
Rp 100,000.00 Rp 750.00
JUMLAH HARGA TENAGA Rp 83,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 159,240.00
Rp -
Rp 159,240.00
Rp 41,700.00 Rp 56,336.70
Rp 500.00 Rp 4,000.00
JUMLAH HARGA BAHAN Rp 60,336.70
Rp 75,000.00 Rp 5,625.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 8,000.00
Rp 100,000.00 Rp 12,000.00
JUMLAH HARGA TENAGA Rp 34,125.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 94,461.70
Rp -
Rp 94,461.70
Rp 41,700.00 Rp 43,785.00
Rp 250.00 Rp 750.00
JUMLAH HARGA BAHAN Rp 44,535.00
Rp 75,000.00 Rp 5,625.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 8,000.00
Rp 100,000.00 Rp 12,000.00
JUMLAH HARGA TENAGA Rp 34,125.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 78,660.00
Rp -
Rp 78,660.00
HARGA SATUAN JUMLAH HARGA
Rp 7,600.00 Rp 5,320.00
Rp 14,000.00 Rp 280.00
JUMLAH HARGA BAHAN Rp 5,600
Rp 75,000.00 Rp 9,000.00
Rp 85,000.00 Rp 5,100.00
Rp 100,000.00 Rp 600.00
Rp 100,000.00 Rp 600.00
JUMLAH HARGA TENAGA Rp 15,300.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 20,900.00
Rp -
Rp 20,900.00
Rp 68,000.00 Rp 20,400.00
Rp 14,000.00 Rp 560.00
JUMLAH HARGA BAHAN Rp 20,960
Rp 75,000.00 Rp 11,250.00
Rp 85,000.00 Rp 5,950.00
Rp 100,000.00 Rp 700.00
Rp 100,000.00 Rp 600.00
JUMLAH HARGA TENAGA Rp 18,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 39,460.00
Rp -
Rp 39,460.00
Rp 6,600,000.00 Rp 72,600.00
Rp 14,000.00 Rp 700.00
JUMLAH HARGA BAHAN Rp 73,300.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 17,000.00
Rp 100,000.00 Rp 2,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 27,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 100,300.00
Rp -
Rp 100,300.00
HARGA SATUAN JUMLAH HARGA
Rp 28,000.00 Rp 28,560.00
Rp 14,000.00 Rp 2,800.00
JUMLAH HARGA BAHAN Rp 31,360.00
Rp 75,000.00 Rp 15,000.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 100.00
JUMLAH HARGA TENAGA Rp 24,600.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 55,960.00
Rp -
Rp 55,960.00
HARGA SATUAN JUMLAH HARGA
Rp 25,000.00 Rp 27,500.00
Rp 14,000.00 Rp 700.00
JUMLAH HARGA BAHAN Rp 28,200.00
Rp 75,000.00 Rp 18,750.00
Rp 85,000.00 Rp 12,750.00
Rp 100,000.00 Rp 1,500.00
Rp 100,000.00 Rp 1,300.00
JUMLAH HARGA TENAGA Rp 34,300.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 62,500.00
Rp -
Rp 62,500.00
Rp 25,000.00 Rp 27,500.00
Rp 50.00 Rp 200.00
JUMLAH HARGA BAHAN 27,700.00
Rp 75,000.00 Rp 11,250.00
Rp 85,000.00 Rp 5,950.00
Rp 100,000.00 Rp 700.00
Rp 100,000.00 Rp 600.00
JUMLAH HARGA TENAGA Rp 18,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 46,200.00
Rp -
Rp 46,200.00
Rp 4,270,000.00 Rp 65,758.00
Rp 14,000.00 Rp 2,800.00
JUMLAH HARGA BAHAN Rp 68,558.00
Rp 75,000.00 Rp 11,250.00
Rp 85,000.00 Rp 25,500.00
Rp 100,000.00 Rp 3,000.00
Rp 100,000.00 Rp 7,500.00
JUMLAH HARGA TENAGA Rp 47,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 115,808.00
Rp -
Rp 115,808.00
0.2 MM,MODUL 60 X 60 CM
Rp 8,500.00 Rp 34,000.00
Rp 50,000.00 Rp 500.00
JUMLAH HARGA BAHAN Rp 34,500.00
Rp 75,000.00 Rp 3,750.00
Rp 85,000.00 Rp 38,250.00
Rp 100,000.00 Rp 4,500.00
Rp 100,000.00 Rp 250.00
JUMLAH HARGA TENAGA Rp 46,750.00
Rp 15,000.00 Rp 15,000.00
JUMLAH HARGA PERALATAN Rp 15,000.00
Rp 96,250.00
Rp -
Rp 96,250.00
Rp 22,500.00 Rp 78,750.00
Rp - Rp -
JUMLAH HARGA BAHAN Rp 78,750.00
Rp 75,000.00 Rp 18,750.00
Rp 85,000.00 Rp 21,250.00
Rp 100,000.00 Rp 2,500.00
Rp 100,000.00 Rp 1,300.00
JUMLAH HARGA TENAGA Rp 43,800.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 122,550.00
Rp -
Rp 122,550.00
Rp 67,500.00 Rp 24,570.00
Rp 60,000.00 Rp 6,600.00
JUMLAH HARGA BAHAN Rp 31,170.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 12,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 43,920.00
Rp -
Rp 43,920.00
HARGA SATUAN JUMLAH HARGA
Rp 49,500.00 Rp 18,562.50
Rp 14,000.00 Rp 42.00
JUMLAH HARGA BAHAN Rp 18,605
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 17,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 36,104.50
Rp -
Rp 36,104.50
Rp 4,500.00 Rp 4,725.00
Rp 14,000.00 Rp 140.00
JUMLAH HARGA BAHAN Rp 4,865.00
Rp 75,000.00 Rp 3,750.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 300.00
JUMLAH HARGA TENAGA Rp 8,800.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 13,665.00
Rp -
Rp 13,665.00
Rp 31,000.00 Rp 32,550.00
Rp 50.00 Rp 200.00
JUMLAH HARGA BAHAN Rp 32,750.00
Rp 75,000.00 Rp 3,750.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 300.00
JUMLAH HARGA TENAGA Rp 8,800.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 41,550.00
Rp -
Rp 41,550.00
HARGA SATUAN JUMLAH HARGA
Rp 53,700.00 Rp 53,700.00
Rp 1,350.00 Rp 11,056.50
Rp 218,000.00 Rp 9,810.00
Rp 25,000.00 Rp 40,500.00
JUMLAH HARGA BAHAN Rp 115,066.50
Rp 75,000.00 Rp 52,500.00
Rp 85,000.00 Rp 29,750.00
Rp 100,000.00 Rp 3,500.00
Rp 100,000.00 Rp 3,500.00
JUMLAH HARGA TENAGA Rp 89,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 204,316.50
Rp -
Rp 204,316.50
Rp 58,700.00 Rp 58,700.00
Rp 1,350.00 Rp 14,040.00
Rp 218,000.00 Rp 9,810.00
Rp 25,000.00 Rp 40,500.00
JUMLAH HARGA BAHAN Rp 123,050.00
Rp 75,000.00 Rp 52,500.00
Rp 85,000.00 Rp 29,750.00
Rp 100,000.00 Rp 3,500.00
Rp 100,000.00 Rp 3,500.00
JUMLAH HARGA TENAGA Rp 89,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 212,300.00
Rp -
Rp 212,300.00
Rp 60,000.00 Rp 60,000.00
Rp 1,350.00 Rp 13,500.00
Rp 218,000.00 Rp 3,924.00
Rp 25,000.00 Rp 48,500.00
JUMLAH HARGA BAHAN Rp 125,924.00
Rp 75,000.00 Rp 52,500.00
Rp 85,000.00 Rp 29,750.00
Rp 100,000.00 Rp 3,500.00
Rp 100,000.00 Rp 3,500.00
JUMLAH HARGA TENAGA Rp 89,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 215,174.00
Rp -
Rp 215,174.00
Rp 1,350.00 Rp 13,500.00
Rp 218,000.00 Rp 4,687.00
JUMLAH HARGA BAHAN Rp 18,187.00
Rp 75,000.00 Rp 19,500.00
Rp 85,000.00 Rp 10,625.00
Rp 100,000.00 Rp 1,250.00
Rp 100,000.00 Rp 1,300.00
JUMLAH HARGA TENAGA Rp 32,675.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 50,862.00
Rp -
Rp 50,862.00
Rp 75,000.00 Rp 6,750.00
Rp 85,000.00 Rp 7,650.00
Rp 100,000.00 Rp 900.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 15,800.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 49,868.00
Rp -
Rp 49,868.00
Rp 16,250.00 Rp 19,500.00
Rp 5,687.50 Rp 5,687.50
JUMLAH HARGA BAHAN Rp 5,687.50
Rp 75,000.00 Rp 6,075.00
Rp 85,000.00 Rp 11,475.00
Rp 100,000.00 Rp 1,350.00
Rp 100,000.00 Rp 400.00
JUMLAH HARGA TENAGA Rp 19,300.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 24,987.50
Rp -
Rp 24,987.50
Rp 21,250.00 Rp 25,500.00
Rp 7,437.50 Rp 7,437.50
JUMLAH HARGA BAHAN Rp 7,437.50
Rp 75,000.00 Rp 6,075.00
Rp 85,000.00 Rp 11,475.00
Rp 100,000.00 Rp 1,350.00
Rp 100,000.00 Rp 400.00
JUMLAH HARGA TENAGA Rp 19,300.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 26,737.50
Rp -
Rp 26,737.50
Rp 7,425.00 Rp 8,910.00
Rp 2,598.75 Rp 2,598.75
JUMLAH HARGA BAHAN Rp 2,598.75
Rp 75,000.00 Rp 2,700.00
Rp 85,000.00 Rp 5,100.00
Rp 100,000.00 Rp 600.00
Rp 100,000.00 Rp 200.00
JUMLAH HARGA TENAGA Rp 8,600.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 11,198.75
Rp -
Rp 11,198.75
Rp 7,425.00 Rp 7,425.00
Rp 1,856.25 Rp 1,856.25
JUMLAH HARGA BAHAN Rp 9,281.25
Rp 75,000.00 Rp 750.00
Rp 85,000.00 Rp 34,000.00
Rp 100,000.00 Rp 4,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 39,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 48,531.25
Rp -
Rp 48,531.25
Rp 650,000.00 Rp 650,000.00
Rp 1,350.00 Rp 8,100.00
Rp 218,000.00 Rp 2,180.00
Rp 195,000.00 Rp 195,000.00
JUMLAH HARGA BAHAN Rp 855,280.00
Rp 75,000.00 Rp 75,000.00
Rp 85,000.00 Rp 85,000.00
Rp 100,000.00 Rp 10,000.00
Rp 100,000.00 Rp 5,000.00
JUMLAH HARGA TENAGA Rp 175,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 1,030,280.00
Rp -
Rp 1,030,280.00
Rp 75,000.00 Rp 90,000.00
Rp 85,000.00 Rp 123,250.00
Rp 100,000.00 Rp 15,000.00
Rp 100,000.00 Rp 6,000.00
JUMLAH HARGA TENAGA Rp 234,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 835,890.00
Rp -
Rp 835,890.00
Rp 114,000.00 Rp 114,000.00
Rp 1,350.00 Rp 8,100.00
Rp 218,000.00 Rp 2,180.00
JUMLAH HARGA BAHAN Rp 124,280.00
Rp 75,000.00 Rp 75,000.00
Rp 85,000.00 Rp 127,500.00
Rp 100,000.00 Rp 15,000.00
Rp 100,000.00 Rp 16,000.00
JUMLAH HARGA TENAGA Rp 233,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 357,780.00
Rp -
Rp 357,780.00
Rp 371,200.00 Rp 371,200.00
Rp 22,272.00 Rp 22,272.00
JUMLAH HARGA BAHAN Rp 393,472.00
Rp 75,000.00 Rp 247,500.00
Rp 85,000.00 Rp 93,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 16,000.00
JUMLAH HARGA TENAGA Rp 358,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 751,472.00
Rp -
Rp 751,472.00
Rp 45,000.00 Rp 54,000.00
Rp 30,000.00 Rp 6,000.00
JUMLAH HARGA BAHAN Rp 60,000
Rp 75,000.00 Rp 1,500.00
Rp 85,000.00 Rp 17,000.00
Rp 100,000.00 Rp 2,000.00
Rp 100,000.00 Rp 250.00
JUMLAH HARGA TENAGA Rp 20,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 80,750.00
Rp -
Rp 80,750.00
Rp 24,280.00 Rp 2,913.60
Rp 23,700.00 Rp 4,266.00
JUMLAH HARGA BAHAN Rp 7,179.60
Rp 75,000.00 Rp 2,100.00
Rp 85,000.00 Rp 3,570.00
Rp 100,000.00 Rp 420.00
Rp 100,000.00 Rp 300.00
JUMLAH HARGA TENAGA Rp 6,390.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 13,569.60
Rp -
Rp 13,569.60
Rp 16,800.00 Rp 1,680.00
Rp 24,280.00 Rp 2,428.00
Rp 45,000.00 Rp 11,700.00
JUMLAH HARGA BAHAN Rp 15,808.00
Rp 75,000.00 Rp 1,500.00
Rp 85,000.00 Rp 5,355.00
Rp 100,000.00 Rp 630.00
Rp 100,000.00 Rp 300.00
JUMLAH HARGA TENAGA Rp 7,785.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 23,593.00
Rp -
Rp 23,593.00
Rp 20,300.00 Rp 4,060.00
Rp 16,800.00 Rp 2,520.00
Rp 27,700.00 Rp 4,709.00
Rp 53,000.00 Rp 13,780.00
JUMLAH HARGA BAHAN Rp 25,069.00
Rp 75,000.00 Rp 5,250.00
Rp 85,000.00 Rp 595.00
Rp 100,000.00 Rp 600.00
Rp 100,000.00 Rp 300.00
JUMLAH HARGA TENAGA Rp 6,745.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 31,814.00
Rp -
Rp 31,814.00
Rp 20,300.00 Rp 3,045.00
Rp 16,800.00 Rp 2,856.00
Rp 27,700.00 Rp 4,709.00
Rp 53,000.00 Rp 13,780.00
JUMLAH HARGA BAHAN Rp 24,390.00
Rp 75,000.00 Rp 5,250.00
Rp 85,000.00 Rp 595.00
Rp 100,000.00 Rp 600.00
Rp 100,000.00 Rp 300.00
JUMLAH HARGA TENAGA Rp 6,745.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 31,135.00
Rp -
Rp 31,135.00
Rp 75,000.00 Rp 7,500.00
JUMLAH HARGA BAHAN Rp 7,500.00
Rp 75,000.00 Rp 1,500.00
Rp 85,000.00 Rp 17,000.00
Rp 100,000.00 Rp 2,000.00
Rp 100,000.00 Rp 1,000.00
JUMLAH HARGA TENAGA Rp 21,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 29,000.00
Rp -
Rp 29,000.00
Rp 75,000.00 Rp 750.00
Rp 85,000.00 Rp 42,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 44,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 220,750.00
Rp -
Rp 220,750.00
Rp 10,000.00 Rp 10,000.00
JUMLAH HARGA BAHAN Rp 10,000.00
Rp 75,000.00 Rp 750.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 50.00
JUMLAH HARGA TENAGA Rp 10,300.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 20,300.00
Rp -
Rp 20,300.00
Rp 13,000.00 Rp 13,000.00
JUMLAH HARGA BAHAN Rp 13,000.00
Rp 75,000.00 Rp 1,125.00
Rp 85,000.00 Rp 12,750.00
Rp 100,000.00 Rp 1,500.00
Rp 100,000.00 Rp 75.00
JUMLAH HARGA TENAGA Rp 15,450.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 28,450.00
Rp -
Rp 28,450.00
Rp 125,000.00 Rp 125,000.00
JUMLAH HARGA BAHAN Rp 125,000.00
Rp 85,000.00 Rp 17,000.00
Rp 100,000.00 Rp 2,000.00
JUMLAH HARGA TENAGA Rp 19,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 144,000.00
Rp -
Rp 144,000.00
Rp 85,000.00 Rp 85,000.00
JUMLAH HARGA BAHAN Rp 85,000.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
JUMLAH HARGA TENAGA Rp 9,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 94,500.00
Rp -
Rp 94,500.00
HARGA SATUAN JUMLAH HARGA
Rp 85,000.00 Rp 85,000.00
JUMLAH HARGA BAHAN Rp 85,000.00
Rp 85,000.00 Rp 10,625.00
Rp 100,000.00 Rp 1,300.00
JUMLAH HARGA TENAGA Rp 11,925.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 96,925.00
Rp -
Rp 96,925.00
Rp 20,500.00 Rp 20,500.00
JUMLAH HARGA BAHAN Rp 20,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
JUMLAH HARGA TENAGA Rp 9,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 30,000.00
Rp -
Rp 30,000.00
Rp 131,700.00 Rp 144,870.00
JUMLAH HARGA BAHAN Rp 144,870.00
Rp 75,000.00 Rp 11,250.00
Rp 85,000.00 Rp 12,750.00
Rp 100,000.00 Rp 1,500.00
Rp 100,000.00 Rp 75.00
JUMLAH HARGA TENAGA Rp 25,575.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 170,445.00
Rp -
Rp 170,445.00
HARGA SATUAN JUMLAH HARGA
Rp 4,070.00 Rp 81,400.00
Rp 50.00 Rp 2,000.00
Rp 2,500.00 Rp 7,500.00
Rp 3,500.00 Rp 3,500.00
Rp 5,000.00 Rp 20,000.00
Rp 2,500.00 Rp 2,500.00
Rp 1,500.00 Rp 4,500.00
JUMLAH HARGA BAHAN Rp 121,400.00
Rp 75,000.00 Rp 37,500.00
Rp 85,000.00 Rp 42,500.00
Rp 100,000.00 Rp 5,000.00
Rp 100,000.00 Rp 500.00
JUMLAH HARGA TENAGA Rp 85,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 206,900.00
Rp -
Rp 206,900.00
Rp 29,000.00 Rp 29,000.00
JUMLAH HARGA BAHAN Rp 29,000.00
Rp 75,000.00 Rp 375.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 30.00
JUMLAH HARGA TENAGA Rp 5,155.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 34,155.00
Rp -
Rp 34,155.00
Rp 26,000.00 Rp 26,000.00
JUMLAH HARGA BAHAN Rp 26,000.00
Rp 75,000.00 Rp 375.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 30.00
JUMLAH HARGA TENAGA Rp 5,155.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 31,155.00
Rp -
Rp 31,155.00
HARGA SATUAN JUMLAH HARGA
Rp 26,000.00 Rp 26,000.00
JUMLAH HARGA BAHAN Rp 26,000.00
Rp 75,000.00 Rp 375.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 30.00
JUMLAH HARGA TENAGA Rp 5,155.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 31,155.00
Rp -
Rp 31,155.00
Rp 31,000.00 Rp 31,000.00
JUMLAH HARGA BAHAN Rp 31,000.00
Rp 75,000.00 Rp 375.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 30.00
JUMLAH HARGA TENAGA Rp 5,155.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 36,155.00
Rp -
Rp 36,155.00
Rp 15,000.00 Rp 15,000.00
JUMLAH HARGA BAHAN Rp 15,000.00
Rp 75,000.00 Rp 375.00
Rp 85,000.00 Rp 4,250.00
Rp 100,000.00 Rp 500.00
Rp 100,000.00 Rp 30.00
JUMLAH HARGA TENAGA Rp 5,155.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 20,155.00
Rp -
Rp 20,155.00
HARGA SATUAN JUMLAH HARGA
Rp 1,234.00 Rp 61,700.00
Rp 147,000.00 Rp 33,810.00
JUMLAH HARGA BAHAN Rp 95,510.00
Rp 75,000.00 Rp 7,500.00
Rp 85,000.00 Rp 68,000.00
Rp 100,000.00 Rp 7,500.00
Rp 100,000.00 Rp -
JUMLAH HARGA TENAGA Rp 83,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 178,510.00
Rp -
Rp 178,510.00
Rp 188,000.00 Rp 225,600.00
Rp 218,000.00 Rp 5,450.00
Rp 1,350.00 Rp 6,750.00
JUMLAH HARGA BAHAN Rp 237,800.00
Rp 75,000.00 Rp 18,000.00
Rp 85,000.00 Rp 10,200.00
Rp 100,000.00 Rp 1,200.00
Rp 100,000.00 Rp 2,400.00
JUMLAH HARGA TENAGA Rp 31,800.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 269,600.00
Rp -
Rp 269,600.00
Rp 218,000.00 Rp 1,308.00
Rp 1,350.00 Rp 5,832.00
JUMLAH HARGA BAHAN Rp 7,140.00
Rp 75,000.00 Rp 22,500.00
Rp 85,000.00 Rp 8,500.00
Rp 100,000.00 Rp 1,000.00
Rp 100,000.00 Rp 1,500.00
JUMLAH HARGA TENAGA Rp 33,500.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 40,640.00
Rp -
Rp 40,640.00
HARGA SATUAN JUMLAH HARGA
Rp 194,000.00 Rp 213,400.00
Rp 218,000.00 Rp 7,630.00
Rp 1,350.00 Rp 15,862.50
JUMLAH HARGA BAHAN Rp 236,892.50
Rp 75,000.00 Rp 52,500.00
Rp 85,000.00 Rp 29,750.00
Rp 100,000.00 Rp 3,500.00
Rp 100,000.00 Rp 3,500.00
JUMLAH HARGA TENAGA Rp 89,250.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 326,142.50
Rp -
Rp 326,142.50
Rp 350,000.00 Rp 350,000.00
Rp 35,000.00 Rp 35,000.00
Rp 218,000.00 Rp 10,900.00
Rp 1,350.00 Rp 27,000.00
JUMLAH HARGA BAHAN Rp 422,900.00
Rp 75,000.00 Rp 3,750.00
Rp 85,000.00 Rp 42,500.00
Rp 100,000.00 Rp 5,000.00
Rp 100,000.00 Rp 2,500.00
JUMLAH HARGA TENAGA Rp 53,750.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 476,650.00
Rp -
Rp 476,650.00
Rp 100,000.00 Rp 120,000.00
-
JUMLAH HARGA BAHAN Rp 120,000.00
Rp 100,000.00 Rp 50,000.00
Rp 100,000.00 Rp 5,000.00
JUMLAH HARGA TENAGA Rp 55,000.00
Rp -
JUMLAH HARGA PERALATAN Rp -
Rp 175,000.00
Rp -
Rp 175,000.00
HARGA SATUAN JUMLAH HARGA
Rp 47,855.00 Rp 203,383.75
Rp 875,350.00 Rp 380,777.25
Rp 12,535.50 Rp 599,823.68
Rp 356,055.00 Rp 712,110.00
Rp 101,878.00 Rp 1,324,414.00
Rp 46,166.40 Rp 415,497.60
Rp 100,000.00 Rp 100,000.00
Rp 250,000.00 Rp 250,000.00
Rp 3,986,006.28
STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA
PEMERINTAH KABUPATEN BULUKUMBA
SEMESTER I TAHUN 2017
Bend 90
4 inch (SNI) Bh 38,200
3 inch (SNI) Bh 38,000
2 inch (SNI) Bh 38,600
1.5 inch (SNI) Bh 38,600
BAHAN LANGIT-LANGIT -
1 Eternit 100 X 100 Set 19,800
2 Tripleks -
122 X 244 x 0.2 cm Lbr 40,200
122 X 244 x 0.3 cm Lbr 49,500
122 X 244 x 0.6 cm Lbr 74,300
122 X 244 x 0.9 cm Lbr 112,300
3 Tripleks Melamin -
122 X 244 x 0.3 cm Lbr 66,200
4 Accoustic 40 X 60 Lbr -
5 Teakwood -
80 X 244 x 0.3 cm Lbr 115,000
122 X 244 x 0.3 cm Lbr 125,000
Karsiboard Lbr 66,200
Gypsum Lbr 67,500
Les gipsum Lbr 31,000
6 Hard Board 122 X 244 cm Lbr 156,700
7 Asbes Plat Harfeks -
200 X 100 X 0.3 cm Lbr 52,000
9 List Profil -
2 x 3 cm / 4 m Btg 12,500
3 x 3 cm / 4 m Btg 12,500
4 x 4 cm / 4 m Btg 15,000
4 x 5 cm / 4 m Btg 18,000
-
BAHAN ATAP -
1 Genteng -
Beton Biji 35,900
Keramik Bh 17,500
Asbes gelombang 7 kaki Lbr 67,000
Harfles (115X85x0.5 cm) Lbr 64,500
2 Atap Metal lbr 28,000
3 Asbes Genteng Lbr 34,000
4 Sirap Ikat 315,000
5 Seng gelombang kecil -
BJLS 0.20 mm Kaki 7,000
BJLS 0.22 mm Kaki 7,300
BJLS 0.30 mm Kaki 7,600
BJLS 0.35 mm Lbr 73,500
BJLS 0.30 mm Warna 6 Kaki Lbr 52,000
Bitumen Gelombang ( 200x95x0,3 Cm) Lbr 161,500
Bitumen Genteng (106x40x0,3 Cm) Lbr 72,500
Nok Bitumen (50x90x0,3 Cm) Lbr 98,000
6 Seng Plat -
BJLS 0.30 mm 40x180 Lbr 68,000
BJLS 0.35 mm Lbr 78,000
7 Seng Super Deck -
180 X 70 cm 10 kaki Kaki 21,500
8 Spandek -
Spandek Silver -
Spandek t = 0,30 Mtr 41,700
Spandek t = 0,35 Mtr 46,700
Spandek Warna -
Spandek t = 0,30 Mtr 44,500
Spandek t = 0,35 Mtr 49,200
9 Seng Aluminium Gelombang -
SWG 32 0.27 mm Kaki 12,500
SWG 30 0.31 mm Kaki 15,000
SWG 28 0.38 mm Kaki 16,000
10 Seng Plastik (Fiber) Kaki 16,500
11 Fiber Semen (Harflex) -
Super 240 X 108 X 0.6 cm Kaki 82,000
Super 180 X 108 X 0.6 cm Kaki 68,000
Ekonomi 240 X 92 X 0.5 cm Kaki 72,500
Ekonomi 180 X 92 X 0.4 cm Kaki 66,000
Mini 240 X 105 X 0.4 cm Kaki 65,500
Mini 180 X 92 X 0.5 cm Kaki 74,000
Super 240 X 105 X 0.4 cm Kaki 69,500
Super 180 X 105 X 0.4 cm Kaki 72,000
12 Nok/Bubungan -
Genteng Beton Bh 38,500
Genteng Asbes Bh 58,500
Genteng Keramik Bh 23,500
Alm. SWG 28 -180 cm Lbr 47,500
Alm. SWG 28 105 cm Lbr 42,500
13 Nok Steel Gelombang -
Super 180 cm Bh 56,500
Mini 105 cm Bh 45,500
Ekonomi 95 cm Bh 23,000
14 Nok Steel Rata -
Super 108 cm Bh 34,000
Mini 105 cm Bh 29,500
Ekonomi 95 cm Bh 25,000
15 Nok Lingkaran Bh 44,500
16 Karet Pelapis Genteng
Ukuran 55 mtr 6,300
Ukuran 90 Mtr 7,700
BAHAN PENGGANTUNG -
1 Kunci Tanam -
1 Slag Bh 176,000
Double Slag Bh 326,000
2 Penggantung -
Hak Angin Kecil Bh 13,000
Hak Angin Besar Bh 18,000
Grendel Kecil Bh 16,000
Grendel Besar Bh 20,500
Engsel Pintu Bh 15,000
Engsel Jendela Bh 10,000
Expanyolet Bh 128,000
-
BAHAN SANITER -
Kloset Jongkok Bh 114,000
Kloset Duduk Bh 371,200
Wasthafel warna Bh 224,000
Wasthafel cuci piring logam Bh 163,000
Urinoir lengkap Bh 1,955,000
Bak Mandi fiber Bh 829,400
Reservoir fiber = 1 m3 Bh 1,333,333
Reservoir fiber = 2 m3 Bh 3,000,000
Reservoir Stainless stell = 1 m3 Bh 4,250,000
Stop Kran 3/4 Bh 14,200
Kran Air 3/4 Bh 27,700
POMPA AIR -
Air Ltr 100
Mesin Pompa -
Pompa Mesin Bh 500,000
Mesin Pompa Jet Pump Setara Zimisu -
Pompa Mesin jet Pump Tarikan 30 m Bh 1,700,000
Pompa Mesin jet Pump Tarikan 40 m Bh 2,566,700
Pompa Mesin jet Pump Tarikan 50 m Bh 2,883,300
Mesin Pompa Setara Groundfos -
Centrifugal Type CM-4 (debit 0.6 ltr/det ; head 50 m) Bh 8,250,000
Centrifugal Type CM-4 (debit 1.5 ltr/det ; head 50 m) Bh 10,425,000
Submersible Pump SP 2A Bh 11,250,000
Submersible Pump SP 3A Bh 12,100,000
Stabilizer 5 KVA Bh 3,450,000
Kontrol Panel Bh 3,033,300
Kabel Power M 17,300
Kabel Sensor M 12,700
BAHAN FINISHING/CAT -
Cat Tembok -
Cat Dasar Kg 24,280
Cat Kilap Kg 23,700
Cat Kayu -
Cat Dasar Kg 27,700
Cat Kilap Ltr 53,000
Politur Kg 47,000
Meni 4 Kg 20,300
Minyak Cat Ltr 33,300
Cat Atap -
Cat Dasar Kg 89,000
Cat Kilap Ltr 75,000
Lem Seng Ltr 16,000
Amplas/Kertas Gosok Lbr 3,700
Dempul Kg 38,300
Residu 10 ltr 55,000
Kuas Besar Bh 15,000
Kuas Kecil Bh 10,000
Plamur Kg 16,800
Gerobak Dorong Bh 385,000
-
BAHAN INSTALASI LISTRIK -
Kabel Listrik -
1 Type NYA (Full) -
1 mm Roll 304,000
2 mm Roll 407,000
2 Type NYY -
2 X 1 mm Roll 653,000
2 X 2 mm Roll 807,500
2 X 4 mm Roll 677,500
3 Lampu TL -
1 X 20 W Bh 97,000
2 X 20 W Bh 126,000
1 X 40 W Bh 120,000
2 X 40 W Bh 153,000
4 Lampu Pijar -
25 W Bh 40,700
40 W Bh 64,900
60 W Bh 106,600
100 W Bh 191,000
Lampu Taman Mercury Bh 379,500
5 Lampu Pijar -
Lampu Sorot 30 Watt Bh 65,000
Lampu Sorot 50 Watt Bh 91,000
Lampu Sorot 100 Watt Bh 135,000
6 Saklar Phase -
Tunggal Putih Bh 26,000
Tunggal Hitam Bh 21,000
Double Putih Bh 29,000
Double Hitam Bh 24,000
7 Stop Kontak -
Hitam Bh 29,000
Putih Bh 31,000
8 Zekering Kast Lokal Biasa -
Lokal 2 Group Automat Bh 86,000
Lokal 3 Group Biasa Bh 8,500
Fitting Bh 18,500
-
NO JENIS BAHAN SATUAN -
UPAH KERJA -
Pekerja :
Pekerja Tak Terlatih Org/hr 65,000
Pekerja Kurang Terlatih Org/hr 70,000
Pekerja Terampil Org/hr 75,000
Tukang :
Tukang Kayu Org/hr 85,000
Tukang Batu Org/hr 85,000
Tukang Cat Org/hr 85,000
Tukang Listrik Org/hr 85,000
Tukang Pipa Org/hr 85,000
Tukang Besi Org/hr 85,000
Kepala Tukang
Kepala Tukang Kayu Org/hr 100,000
Kepala Tukang Batu Org/hr 100,000
Kepala Tukang Listrik Org/hr 100,000
Kepala Tukang Cat Org/hr 100,000
Kepala Tukang Pipa Org/hr 100,000
Kepala Tukang Besi Org/hr 100,000
Faisal,ST
Team Leader
ITEM PEKERJAAN URAIAN VOLUME SAT
LA = 1.280
GALIAN TANAH PONDASI LB = 0.890 91.140 M3
T = 0.700
LA = 0.940
URUGAN PASIR BWH PONDASI LB = 0.900 10.800 M3
T = 0.100
LA = 0.800
PAS.BATU KOSONG LB = 0.700 16.800 M3
T = 0.200
LA = 0.250
PAS.BATU KALI LB = 0.600 35.700 M3
T = 0.700
P = 33.210
URUGAN PASIR BW SAL AIR L = 0.500 1.661 M3
T = 0.100
P = 73.120
PAS.BT BAT SAL.AIR = 2.000 43.872 M2
T = 0.300
P = 73.120
PLESTERAN SALURAN AIR = 69.464 M2
T = 0.950
P = 73.120
RABAT DASAR SALURAN L = 0.500 1.828 M3
T = 0.050
P = 30.000
URUGAN PASIR BAWAH RABAT L = 0.540 1.620 M3
T = 0.100
P = 30.000
RABAT KELL BANGUNAN L = 0.540 0.810 M3
T = 0.050
P = 27.000
URUGAN TANAH BWH LANTAI L = 9.580 79.500 M3
T = 0.200
P = 27.000
URUGAN PASIR BWH LANTAI L = 9.580 6.460 M3
T = 0.100
P = 27.000
RABAT BWH LANTAI L = 9.580 12.933 M3
RABAT BWH LANTAI 12.933 M3
T = 0.050
P = 120.000
SLOOF BETON 15 X 20 CM L = 0.200 6.000 M3
T = 0.250
BESI TUL 12 MM
= 720.000
= 639.360 639.360 KG
=
BESI TUL 8 MM
= 800.000
= 600.000 133.200 KG
= 133.200
=
BEKISTING ( 2 X PAKAI )
= 48.000
24.000 M2
= 0.000
P = 0.200
KOLOM BETON 20 X 20 CM L = 0.300 10.440 M3
T = 6.000
BESI TUL 12 MM
= 1044.000
= 927.072 927.072 KG
= 174
BEKISTING ( 2 X PAKAI )
= 174.000
43.500 M2
=
P = 0.200
KOLOM BETON 20 X 20 CM L = 0.200 2.208 M3
T = 3.450
BESI TUL 12 MM
= 331.200
= 294.106 294.106 KG
= 55.2
BEKISTING ( 2 X PAKAI )
= 44.800
14.933 M2
=
P = 0.150
KOLOM BETON 15 X 15 CM L = 0.150 2.138 M3
T = 5.000
BESI TUL 12 MM
= 570.000
= 351.690 351.690 KG
= 80
BEKISTING ( 2 X PAKAI )
= 24.000
8.000 M2
=
P = 148.400
RINGBALK ATAS 15/25 L = 0.150 5.565 M3
T = 0.250
BESI TUL 12 MM
= 890.400
= 549.377 549.377 KG
= 148.400
BESI TUL 8 MM
= 989.333
= 643.067 142.761 KG
= 142.761
=
BEKISTING ( 2 X PAKAI )
= 74.200
18.550 M2
=
P = 148.400
RINGBALK TENGAH 15/25 L = 0.150 5.565 M3
T = 0.250
BESI TUL 12 MM
= 890.400
790.675 KG
= 790.675 790.675 KG
= 148.400
BESI TUL 8 MM
= 989.333
= 643.067 142.761 KG
= 142.761
=
BEKISTING ( 2 X PAKAI )
= 74.200 18.550 M2
P = 100.000
BALOK SELASAR TERAS L = 0.150 3.750 M3
T = 0.250
BESI TUL 12 MM
= 600.000
= 532.800 532.800 KG
= 100.000
BESI TUL 8 MM
= 666.667
= 466.667 103.600 KG
= 103.600
=
BEKISTING ( 2 X PAKAI )
= 50.000
25.000 M2
=
P = 70.430
KUDA -KUDA BETON 15/15 L = 0.150 1.585 M3
T = 0.150
BESI TUL 12 MM
= 281.720
= 250.167 250.167 KG
= 70.430
BESI TUL 8 MM
= 469.533
= 258.243 102.006 KG
= 102.006
=
BEKISTING ( 2 X PAKAI )
= 21.129
10.565 M2
=
PLESTERAN 1272.000 M2
ACIAN 1272.000 M2
P = 34.210
PEKERJAAN KUDA-KUDA KAYU
L = 0.120 1.445 M3 0.328416
KLS II
T = 0.080
P = 138.600 0.0328416
PEKERJAAN KUDA-KUDA KAYU
L = 0.100 0.728 M3
KLS II
T = 0.050 0.3612576
P = 20.100
BALOK SKOR+REUTER L = 0.100 0.106 M3
T = 0.050 0.693
PROPILAN 15.340 M1 0
PROPILAN 9.700 M1 0
JALUSI 3.510 M2 0
174
1145.964
55.2
339.038 1485.002
58.433
80
416.810 755.848
22.933
148.400
5.565
692.138
148.400
5.565
933.436
100.000
5.335
636.400
35.565
988.573
5.335
70.430
0.328416 2.278 14,808,335
0.0328416
0.3612576
0.693 0.03465
0.1005 0.005025
0 9,782,650 -
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
1 PANJANG BANGUNAN 231
4
ITEM PEKERJAAN URAIAN VOLUME SAT
LA = 1.000
GALIAN TANAH PONDASI LB = 1.000 231.000 M3
T = 1.000
LA = 1.000
URUGAN PASIR BWH PONDASI LB = 1.000 23.100 M3
T = 0.100
LA = 1.000
PAS.BATU KOSONG LB = 1.000 46.200 M3
T = 0.200
LA = 0.300
PAS.BATU KALI LB = 1.000 270.270 M3
T = 1.800
P = 33.210
URUGAN PASIR BW SAL AIR L = 0.500 1.661 M3
T = 0.100
P = 73.120
PAS.BT BAT SAL.AIR = 2.000 43.872 M2
T = 0.300
P = 73.120
PLESTERAN SALURAN AIR = 69.464 M2
T = 0.950
P = 73.120
RABAT DASAR SALURAN L = 0.500 1.828 M3
T = 0.050
P = 144.000
URUGAN PASIR BAWAH RABAT L = 0.800 5.760 M3
T = 0.050
P = 144.000
RABAT KELL BANGUNAN L = 0.800 11.520 M3
T = 0.100
P =
URUGAN TANAH BWH LANTAI L = 621.000 M3
T =
P = 0.000
URUGAN PASIR BWH LANTAI L = 0.000 31.050 M3
T = 0.100
P = 0.000
RABAT BWH LANTAI L = 0.000 31.050 M3
T = 0.050
P = 231.000
SLOOF BETON 20 X 25 CM L = 0.200 11.550 M3
T = 0.250
BESI TUL 12 MM
= 1386.000
= 1230.768 1230.768 KG
=
BESI TUL 8 MM
= 1540.000
= 1001.000 222.222 KG
= 222.222
=
BEKISTING ( 2 X PAKAI )
= 115.500
28.875 M2
= 0.000
P = 0.250
KOLOM BETON 0,25 X 0,3CM L = 0.300 13.050 M3
T = 6.000
BESI TUL 12 MM
= 1044.000
= 927.072 927.072 KG
=
BESI TUL 8 MM
= 1160.000
= 870.000 193.140 KG
= 193.140
=
BEKISTING ( 2 X PAKAI )
= 174.000
29.000 M2
=
P = 0.150
KOLOM BETON 15 X 15CM L = 0.150 2.295 M3
T = 6.000
BESI TUL 12 MM
= 408.000
= 362.304 362.304 KG
=
BESI TUL 8 MM
= 680.000
= 374.000 83.028 KG
= 83.028
=
BEKISTING ( 2 X PAKAI )
= 61.200
15.300 M2
=
P = 0.250
KOLOM TERAS 25/30 L = 0.300 3.600 M3
T = 3.000
BESI TUL 12 MM
= 288.000
= 255.744 255.744 KG
=
BESI TUL 8 MM
= 320.000
= 240.000 53.280 KG
= 53.280
=
BEKISTING ( 2 X PAKAI )
= 48.000
16.000 M2
=
P = 231.000
RINGBALK TENGAH 0,15*0,25 L = 0.250 8.663 M3
T = 0.150
BESI TUL 12 MM
= 924.000
= 820.512 820.512 KG
=
BESI TUL 8 MM
= 1540.000
= 847.000 188.034 KG
= 188.034
=
BEKISTING ( 2 X PAKAI )
= 115.500
28.875 M2
=
P = 177.000
RINGBALK ATAS 0,15*0,25 L = 0.250 6.638 M3
T = 0.150
BESI TUL 12 MM
= 708.000
= 436.836 436.836 KG
=
BESI TUL 8 MM
= 1180.000
= 649.000 144.078 KG
= 144.078
=
BEKISTING ( 2 X PAKAI )
= 88.500
22.125 M2
=
P = 70.430
KUDA -KUDA BETON 15/15 L = 0.150 1.585 M3
T = 0.150
BESI TUL 12 MM
= 281.720
= 250.167 250.167 KG
=
BESI TUL 8 MM
= 469.533
= 258.243 102.006 KG
= 102.006
=
BEKISTING ( 2 X PAKAI )
= 21.129
10.565 M2
=
PLESTERAN 1272.000 M2
ACIAN 1272.000 M2
P = 34.210
PEKERJAAN KUDA-KUDA KAYU
L = 0.120 1.445 M3
KLS II
T = 0.080
P = 138.600
PEKERJAAN KUDA-KUDA KAYU
L = 0.100 0.728 M3
KLS II
T = 0.050
P = 20.100
BALOK SKOR+REUTER L = 0.100 0.106 M3
T = 0.050
PROPILAN 15.340 M1
PROPILAN 9.700 M1
JALUSI 3.510 M2
174
1120.212
102
445.332 1565.544
44.300
48.000
5.185
309.024
231.000
8.663
1008.546
177.000
6.743
580.914
26.565
661.197
5.185
70.430
0.0328416
0.3612576
0.693 0.03465
0.1005 0.005025
0 9,782,650 -
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
REALISASI KEMAJUAN FISIK
II PEKERJAAN PONDASI
1 Pekerjaan Pasangan batu kosong M3 430,026.00
2 Pekerjaan pasangan pondasi batu kali 1pc : 5 ps M3 746,810.00
Sub.Jumlah Pekerjaan Pondasi
`
III PEKERJAAN STRUKTUR
1 Beton Sloof 15/20
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 183,650.00
2 Beton Kolom 15/15
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 356,055.00
3 Ringbalk Beton 15/15
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 356,055.00
5 Pek.Cor Plat Beton
- Cor Beton M3 956,050.00
- Pembesian Kg 12,535.50
- Bekisting M2 356,055.00
6 Rabat Keliling Bangunan M2 956,050.00
Sub.Jumlah Pekerjaan Struktur
IV PEKERJAAN TEMBOK DAN PLESTERAN
1 Pas.Dinding 1 : 5 1/2 Bata M2 107,119.50
2 Plesteran Dinding 1 : 4 M2 42,240.00
3 Pek.Acian M2 29,392.06
4 Pek.Plesteran Ciprat M2 39,810.68
Sub.Jumlah Pekerjaan Tembok dan Plesteran
V PEKERJAAN ATAP
1 Pekerjaan Rangka Kuda - Kuda Kayu Kls II M3 11,412,716.00
1 Pekerjaan Balok Gording Kayu Kls II M3 10,636,230.00
2 Pekerjaan Atap Galvalum 0,30 mm Warna M2 93,158.24
3 Pek Nok dan Talang Atap Galvalum 0,30 Warna M' 74,973.38
4 Pekerjaan Listplank M' 45,600.00
5 Pekerjaan Pembongkaran Ls 3,000,000.00
Sub.Jumlah Pekerjaan Atap
IX PEKERJAAN ELEKTRIKAL
1 Stop Kontak Bh 39,690.00
2 Pek.Instalasi Titik Nyala Titik 125,000.00
3 Sakelar Tunggal Titik 34,115.00
4 Sakelar Ganda Bh 37,460.00
5 MCB Box Bh 125,000.00
6 Lampu TL 18 WATT Bh 65,000.00
Sub.Jumlah Pekerjaan Elektrikal
REALISASI LAPANGAN
JUMLAH HARGA JUMLAH HARGA PROGRESS
BOBOT (%) VOLUME SAT BOBOT (%)
(RP) (RP)
- M3 -
M3
19,600,000.00 100.000 112.000 M3 19,600,000.00 100.000 100%
- - - M3 - - -
19,600,000.00 100.000 19,600,000.00 100.000
- M3 - -
- - - M3 - -
- - - -
`
- -
- - - M3 - -
- - - Kg - -
- - - M2 - -
- - - M3 - -
- - - Kg - -
- - - M2 - -
- - -
- - - M3 - -
- - - Kg - -
- - - M2 - -
- - -
- - M3 -
- - Kg -
- - M2 -
- - M2 -
- - - -
- - - M2 - -
- - - M2 - -
- - - M2 - -
- M2 -
- - - -
- - - M3 - -
- - - M3 - -
- - - M2 - -
- - - M' - -
- - - M' - -
- Ls -
- - , - -
- - - M2 - -
- M2 -
- M2 -
- M' -
- - - - -
- - - M2 - -
- - - M2 - -
- - - M' - -
- - - -
- - - M3 - -
- - - M2 - -
- - - M2 - -
- - - M2 - -
- - M2 -
- - - BH - -
- - - BH - -
- - - BH - -
- - - BH - -
- - - BH - -
- - - Bh - -
- - - -
- -
- Bh -
- Titik -
- Titik -
- Bh -
- Bh -
- Bh -
- -
- - - M2 - -
- - - M2 - -
- - - M2 - -
- - - M2 - -
- - - M2 - -
- - - -
- - - Bh - -
- - - Bh - -
- - - Bh - -
- - - Bh - -
- - - Bh - -
- - - -
19,600,000.00 100.000 19,600,000.00 100.000
HAMKA,S.Pd,MM A.PATILANGI,A.Md
8 198701 1 002 Inspector