19200.00
105700.00
64800.00
16000.00
3750.00
15000.00
235,450.00
Sl.No Description Units No's Length bredth depth
1.1 Earth work excavation CUM
1
a Excavation & backfilling 1 1 3.3 7 2.3
TOTAL
Reinforcement MT
1 Reinforcement MT
TOTAL
53.13
53.13
0.128
0.138
2.871
3.137
4.62
5.0325
3.102
2.31
15.0645
1.765
1.765
0.216
0.054
1.9764
1.62
3.8664
1.47
PROJECT NAME : 100 MW Solar MBNGR
LOCCATION/STRUCTURE : Box Culvert
Bar bending schedule for -Box culvert
No of
Bar Dia Spacing Bars
Description Tot No.
S.No (1) Shape of Bar (2) (in mm) c/c (in
(3) (7)
(4) mm) (5) (6)
bottom slab
200.00 200.00 10 200 1x33 33
1 bottom steel
2940
bottom slab
200.00 200.00 12 200 1x33 33
2 top steel
2940
300
300
300
300
300
1125
1125
top slab to
8 700.00 wall top 12 200 1x33 33
corner
1040
top slab to
8 700.00 wall top 12 200 1x33 33
corner
1040
bottom slab
8A 700.00 to bottom 12 200 1x33 33
corner
1040
bottom slab
8A 700.00 to bottom 12 200 1x33 33
corner
1040
Slab top
9 475.00 475 12 200 1x33 33
steel
2940
slab bottom
10 12 200 1x33 33
Steel
2000
slab bottom
11 800.00 12 200 2x33 66
Steel
20
Distribution
12 10 200 2X15 30
bar
6600
Total Wt
Total
No of Total
Length Length Unit WT
Columns/ Weight Remarks
Rmt (8) Rmt ( KG) (10)
10 mm 12mm Rafts (11) (12)
(9=8x7)