QATAR POWER TRANSMISSION SYSTEM EXPANSION

PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7


CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 1 -132kV GIS


ENGINEER CONSULTANT
VOLUME FILE SL. NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 C10 CT TEST REPORT

1.1 2 C20 CT TEST REPORT

3 C30 CT TEST REPORT

1 C40 CT TEST REPORT

1.2 2 C50 CT TEST REPORT

3 C60 CT TEST REPORT

1 C70 CT TEST REPORT


1.3
2 C80 CT TEST REPORT

1 C11 CT TEST REPORT


1.4
2 C21 CT TEST REPORT

1 C12 CT (T1,T2)TEST REPORT

2 C22 CT (T1,T2)TEST REPORT


1.5
1 3 C13 CT (T1,T2)TEST REPORT

4 C23 CT (T1,T2)TEST REPORT

1 C10 VT TEST REPORT

2 C20 VT TEST REPORT

3 C30 VT TEST REPORT

4 C40 VT TEST REPORT

5 C50 VT TEST REPORT

1.6 6 C60 VT TEST REPORT

7 C70 VT TEST REPORT

8 C80 VT TEST REPORT

MAIN BUS 1 VT(C166) & MAIN BUS 2 VT(C266) TEST


9
REPORT
RESERVE BUS 1 VT(C366) & RESERVE BUS 2 VT (C466)
10
VT TEST REORT

Page 1 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 1 -132kV GIS


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
SF6 GAS FILLING & SF6 GAS QUALITY MEASUREMENT
1
TEST REPORT
2 FUNCTION TEST FOR SF6 MONITORING REPORTS
FUNCTION & TIMING TEST FOR THREE POSITION
3
SWITCHES & EARTH SWITCH REPORT
1 1.7 4 CIRCUIT BREAKER TEST REPORT

5 INDICATION CIRCUIT CHECKS TEST REPORT


MAIN & RESERVE BUSBAR CONTACT RESISTANCE TEST
6
REPORT
HIGH VOLTAGE - PD & PD COUPLER SENSITIVITY
7
MEASUREMENT TEST REPORT

VOLUME 2 -132kV LCC


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 ICT TEST REPORT(C10-C80),C11,C21,C12,C22,C13,C23,

AMMETER TEST REPORT(C10-


2
C80),C11,C21,C12,C22,C13,C23
2.1 3 VOLTMETER TEST REPORT(C10-C80),C12,C22,

CONTROL RELAY (SELF RESET ) TEST REPORT(C10-C80),


4
C11,C21,C12,C22,C13,C23

1 UNDER VOLTAGE RELAY TEST REPORT

2.2 2 DC CHANGE OVER SCHEME CHECK TEST REPORT

3 AC/DC CIRCUIT CHECK TEST REPORT

1 LOCAL INTERLOCKING CHECKS TEST REPORT (C10-C80)

2 LOCAL INTERLOCKING CHECKS TEST REPORT C11&C21


2
2.3 3 LOCAL INTERLOCKING CHECKS TEST REPORT C12

4 LOCAL INTERLOCKING CHECKS TEST REPORT C22

5 LOCAL INTERLOCKING CHECKS TEST REPORT C13&C23

BCU SYNC CHECK TEST REPORT (C10-


1
C80),C12,C22,C13,C23
2.4 LOCAL SYNC CHECK TEST REPORT (C10-
2
C80),C12,C22,C13,C23
RELAY COMPONENT TEST REPORT BCU A201 -
1
(6MD85_C10-C80)
RELAY COMPONENT TEST REPORT BCU-
2
A201(6MD85_C11,C21,C13,C23,C12,C22)
2.5 BI VERIFICATION TEST REPORT BCU A201 (6MD85_C10-
3
C80)
BI VERIFICATION TEST REPORT BCU A201
4
(6MD85_C11,C21,C13,C23,C12,C22)

Page 2 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 3 -132kV PROTECTION SYSTEM


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
AC/DC CIRCUIT CHECK TEST REPORT (C10-C80),
1
C11,C21,C12,C22,C13,C23
MASTER TRIP RELAY TEST REPORT -7PG15 -(C10-C80),
2
C12,C22,C13,C23
3.1 3 MASTER TRIP RELAY TEST REPORT -7PG18 -C11,C21

TRIP CIRCUIT SUPERVISION RELAY TEST REPORT(C10-


4
C80), (C12,C22,C13,C23,C11 & C21)

RELAY COMPONENT TEST REPORT M1-F871(7SD522-


1
C10)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
2
C20)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
3
C30)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
4
C40)
3.2 RELAY COMPONENT TEST REPORT M1-F871(7SD522-
5
C50)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
6
C60)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
7
C70)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
8
C80)
3 RELAY COMPONENT TEST REPORT M2-F872(P545-C10)
1
-ALSTOM
RELAY COMPONENT TEST REPORT M2-F872(P545-C20)-
2
ALSTOM
RELAY COMPONENT TEST REPORT M2-F872(RED670-
3
C30) -ABB
RELAY COMPONENT TEST REPORT M2-F872(RED670-
4
C40)- ABB
3.3 RELAY COMPONENT TEST REPORT M2-F872(P545-C50)-
5
SCHNEIDER
RELAY COMPONENT TEST REPORT M2-F872(P545-C60)-
6
SCHNEIDER
RELAY COMPONENT TEST REPORT M2-F872(P545-C70)-
7
SCHNEIDER
RELAY COMPONENT TEST REPORT M2-F872(P545-C80)-
8
SCHNEIDER
RELAY COMPONENT TEST REPORT M1 F871 (7UT613-
1
C11,C21)
RELAY COMPONENT TEST REPORT M2 F872 (P633-
2
C11,C21)
RELAY COMPONENT TEST REPORT F873(7SJ61 -
3.4 3
C11,C21)-HV REF 87NH
RELAY COMPONENT TEST REPORT F511 (7SJ161-
4
C11,C21, C12,C22,C13,C23)

5 RELAY COMPONENT TEST REPORT A251 (7SJ64-C12)

Page 3 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 3-132kV PROTECTION SYSTEM


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
BI VERIFICATION TEST REPORT M1 F871 (7SD522_C10-
1
C80)
BI VERIFICATION TEST REPORT M2 F872 (P545_C10-
2
C80)
BI VERIFICATION TEST REPORT M1 F871
3
(7UT613_C11,C21)
BI VERIFICATION TEST REPORT M2 F872
3.5 4
(P633_C11,C21)

5 BI VERFICATION TEST REPORT F873 (C11,C21)

BI VERFICATION TEST REPORT F511 (7SJ61_C11,C21,


6
C12,C22,C13,C23)

7 BI VERIFICATION TEST REPORT A251(7SJ64-C12)

1 VT SECONDARY INJECTION TEST REPORT (C10-C80)

VT SECONDARY INJECTION TEST REPORT - C12 (MAIN


2
BUS 1 & 2 VT)
VT SECONDARY INJECTION TEST REPORT -C22
3
(RESERVE BUS 1 & 2 VT)
3.6
4 CT SECONDARY INJECTION TEST REPORT -(C10-C80)

5 CT SECONDARY INJECTION TEST REPORT -(C11,C21)

CT SECONDARY INJECTION TEST REPORT -


6
(C12,C22,C13,C23)
3
1 CT PRIMARY INJECTION TEST REPORT - (C10-C80)

3.7 2 CT PRIMARY INJECTION TEST REPORT - C11,C21

3 CT PRIMARY INJECTION REPORT -(C12,C22,C13,C23)

1 TRIP LOGIC TEST REPORT - (C10-C80)

2 TRIP LOGIC TEST REPORT -C11,C21


3.8
3 TRIP LOGIC TEST REPORT - (C12,C22,C13,C23)

4 132KV RESTRAIN TRIP BLOCK MATRIX

1 132KV BB RP AC/DC CIRCUIT CHECKS TEST REPORT

2 DC CHANGEOVER SCHEME CHECKS TEST REPORT

7PG15 & 7PG 18 MASTER TRIP RELAY TEST REPORT


3
(C10-C80), C12,C22,C13, C23,C11&C21
3.9
132kV BUS BAR PROTECTION RELAY (7SS52) TEST
4
REPORT

5 132kV BUS BAR SENSITIVITY & STABILITY TEST REPORT

6 132kV BUS BAR TRIP TOPOLOGY CHECKS TEST REPORT

Page 4 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 3 -132kV PROTECTION SYSTEM


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
TRIP CIRCUIT SUPERVISION CHECK TEST REPORT (C10-
1
C80)

TRIP CIRCUIT SUPERVISION CHECK TEST REPORT


2
(C12,C22,C13,C23,C11 & C21)
3 3.10 TRIP COIL CURRENT MEASUREMENT TEST REPORT
3
(C10-C80)

TRIP COIL CURRENT MEASUREMENT TEST REPORT


4
(C12,C22,C13,C23,C11 & C21)

VOLUME 4 - 66kV GIS


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

1 B10 CT TEST REPORT

4.1 2 B20 CT TEST REPORT

3 B30 CT TEST REPORT

1 B40 CT TEST REPORT

4.2 2 B50 CT TEST REPORT

3 B60 CT TEST REPORT

1 B12 CT (T1,T2) TEST REPORT

2 B22 CT (T1,T2)TEST REPORT


4.3
3 B13 CT (T1,T2) TEST REPORT

4 B23 CT (T1,T2) TEST REPORT


4
1 B18 CT TEST REPORT
4.4
2 B28 CT TEST REPORT

1 B11 CT TEST REPORT

2 B21 CT TEST REPORT


4.5
3 B31 CT TEST REPORT

4 B41 CT TEST REPORT

1 B10 VT TEST REPORT

2 B20 VT TEST REPORT


4.6
3 B30 VT TEST REPORT

4 B40 VT TEST REPORT

Page 5 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 4 - 66kV GIS


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
5 B50 VT TEST REPORT

6 B60 VT TEST REPORT

7 B12 MAIN BUS VT TEST REPORT (B166 & B266)


4.6
8 B22 RESERVE BUS VT TEST REPORT(B366 & B466)

9 B18 VT TEST REPORT

10 B28 VT TEST REPORT


SF6 GAS FILLING & SF6 GAS QUALITY MEASUREMENT
4 1
TEST REPORT
2 FUNCTION TEST FOR SF6 MONITORING REPORTS
FUNCTION & TIMING TEST FOR THREE POSITION
3
SWITCHES & EARTH SWITCH REPORT
4.7 4 CIRCUIT BREAKER TEST REPORT

5 INDICATION CIRCUIT CHECKS TEST REPORT


MAIN & RESERVE BUSBAR CONTACT RESISTANCE TEST
6
REPORT
HIGH VOLTAGE - PD & PD COUPLER SENSITIVITY
7
MEASUREMENT TEST REPORT

VOLUME 5 - 66kV LCC


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
ICT TEST REPORT- (B10-B60),
1
B11,B21,B31,B41,B12,B22,B13,B23,B18,B28
AMMETER TEST REPORT-(B10-B60),
2
5.1 B11,B21,B31,B41,B12,B22,B13,B23,B18,B28
VOLTMETER TEST REPORT-(B10-B60),
3
B12,B22,B18,B28
CONTROL RELAY (SELF) TEST REPORT(B10-
4
B60,B18,B28,B11,B21,B31,B41,B12,B22,B13&B23)
1 (UNDER/OVER) VOLTAGE RELAY TEST REPORT
AC/DC CIRCUIT CHECK TEST REPORT(B10-
5.2 2
B60,B18,B28,B11,B21,B31,B41,B12,B22,B13,B23)
5 3 DC CHANGE OVER SCHEME CHECK TEST REPORT

1 LOCAL INTERLOCKING CHECKS TEST REPORT (B10-B60)

LOCAL INTERLOCKING CHECKS TEST REPORT (B11-B21-


2
B31-B41)

5.3 3 LOCAL INTERLOCKING CHECKS TEST REPORT -B12, B22

4 LOCAL INTERLOCKING CHECKS TEST REPORT - B13, B23

5 LOCAL INTERLOCKING CHECKS TEST REPORT-B18 ,B28)

Page 6 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 5 - 66kV LCC


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

BCU SYNCH CHECK TEST REPORT(B10-


1
B60),B13,B23,B12,B22,B18&B28
5.4
LOCAL SYNCH CHECK TEST REPORT (B10-
2
B60),B13,B23,B12,B22,B18&B28

5 RELAY COMPONENT TEST REPORT BCU A201 -


1
(6MD85_B10-B60)
RELAY COMPONENT TEST REPORT BCU A201 - 6MD85 -
2
B11,B21,B31,B41,B12,B22,B13,B23,B18,B28
5.5 BI VERIFICATION TEST REPORT BCU A201 (6MD85_B10-
3
B60)
BI VERIFICATION TEST REPORT BCU A201 6MD85 -
4
B11,B21,B31,B41,B12,B22,B13,B23,B18,B28

VOLUME 6 - 66kV PROTECTION SYSTEM


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

AC/DC CIRCUIT CHECK TEST REPORT (B10-B60),B11,


1
B21, B31, B41, B12, B22, B13, B23, B18,B28

MASTER TRIP RELAY TEST REPORT -7PG15 -(B10-


2
B60)B12, B22, B13, B23
6.1
MASTER TRIP RELAY TEST REPORT-7PG18-
3
B11,B21,B31,B41,B18,B28
TRIP RELAY TEST REPORT (SELF RESET)-7PG15-B18,
4
B28
TRIP CIRCUIT SUPERVISION RELAY TEST REPORT (B10-
5
B60),B11, B21, B31, B41, B12, B22, B13, B23, B18,B28
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
1
B10)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
2
B20)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
3
B30)
6 6.2 RELAY COMPONENT TEST REPORT M1-F871(7SD522-
4
B40)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
5
B50)
RELAY COMPONENT TEST REPORT M1-F871(7SD522-
6
B60)

1 RELAY COMPONENT TEST REPORT M2-F872(P545-B10)

2 RELAY COMPONENT TEST REPORT M2-F872(P545-B20)

3 RELAY COMPONENT TEST REPORT M2-F872(P545-B30)


6.3
4 RELAY COMPONENT TEST REPORT M2-F872(P545-B40)

5 RELAY COMPONENT TEST REPORT M2-F872(P545-B50)

6 RELAY COMPONENT TEST REPORT M2-F872(P545-B60)

Page 7 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 6 - 66kV PROTECTION SYSTEM


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
RELAY COMPONENT TEST REPORT F871(7UT613-
1
B11,B21,B31,B41)
RELAY COMPONENT TEST REPORT F511(50/51/87NH)
2
7SJ61-B11,B21,B31,B41
RELAY COMPONENT TEST REPORT F511(51) 7SJ61-
3
B12,B22,B13,B23
RELAY COMPONENT TEST REPORT F871(87NL) (7SJ611)-
6.4 4
B18,B28
5 RELAY COMPONENT TEST REPORT F671(67)- B18,B28
RELAY COMPONENT TEST REPORT F511(50N) 7SJ61-
6
B18,B28
7 RELAY COMPONENT TEST REPORT A251 (7SJ164-B12)

1 BI VERIFICATION TEST REPORT F871(7SD522-B10-B60)

2 BI VERIFICATION TEST REPORT F872(P545-B10-B60)


BI VERIFICATION TEST REPORT F871(7UT613-
3
B11,B21,B31,B41)
BI VERIFICATION TEST REPORT F511(50/51/87NH)
4
7SJ61-B11,B21,B31,B41
6.5 5
BI VERIFICATION TEST REPORT F511(51) 7SJ61-
B12,B22,B13,B23
BI VERIFICATION TEST REPORT F871(87NL) (7SJ611)-
6
B18,B28
BI VERIFICATION TEST REPORT F671(67) & F511(50N)-
7
B18,B28
6
8 BI VERIFICATION TEST REPORT A251 (7SJ164-B12)

1 VT SECONDARY INJECTION TEST REPORT - B10 -B60

VT SECONDARY INJECTION TEST REPORT -B12 (MAIN


2
BUS VT 1 & 2)
VT SECONDARY INJECTION TEST REPORT -B22
3
(RESERVE BUS VT 1 & 2 )

4 VT SECONDARY INJECTION TEST REPORT - B18,B28

6.6
5 CT SECONDARY INJECTION TEST REPORT -(B10-B60)

CT SECONDARY INJECTION TEST REPORT -


6
(B11,B21,B31,B41)
CT SECONDARY INJECTION TEST REPORT -
7
(B12,B22,B13,B23)

8 CT SECONDARY INJECTION TEST REPORT -B18,B28

1 CT PRIMARY INJECTION TEST REPORT - (B10-B60)

CT PRIMARY INJECTION TEST REPORT -


6.7 2
B11,B21,B31,B41,B18,B28

3 CT PRIMARY INJECTION REPORT -(B12,B22,B13,B23)

Page 8 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 6 - 66kV PROTECTION SYSTEM


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 TRIP LOGIC TEST REPORT - (B10-B60)

2 TRIP LOGIC TEST REPORT -B11,B21,B31,B41

6.8 3 TRIP LOGIC TEST REPORT - (B12,B22,B13,B23)

4 TRIP LOGIC TEST REPORT - B18,B28

5 66kV RESTRAIN TRIP BLOCK MATRIX

1 66kV BB RP AC/DC CIRCUIT CHECKS TEST REPORT

2 DC CHANGEOVER SCHEME CHECKS TEST REPORT

7PG15 & 7PG18 MASTER TRIP RELAY TEST REPORT


3 (B10-B60), B12,B22,B13,
6.9 B23,B18,B28,B11,B21,B31,B41
66kV BUS BAR PROTECTION RELAY (7SS52) TEST
4
REPORT

5 66kV BUS BAR SENSITIVITY & STABILITY TEST REPORT

6 66kV BUS BAR TRIP TOPOLOGY CHECKS TEST REPORT

TRIP CIRCUIT SUPERVISION CHECK TEST REPORT (B10-


1
B60)

TRIP CIRCUIT SUPERVISION CHECK TEST REPORT


2
(B12,B22,B13,B23,B11,B21,B31,B41 ,B18 ,B28)
6.10
TRIP COIL CURRENT MEASUREMENT TEST REPORT
3
(B10-B60)
TRIP COIL CURRENT MEASUREMENT TEST REPORT
4
(B12,B22,B13,B23,B11,B21,B31,B41, B18,B28)

VOLUME 7 -11kV SWITCHGEAR-A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 A10 CT TEST REPORT

2 A20 CT TEST REPORT

7.1 3 A30 CT TEST REPORT

4 A40 CT TEST REPORT

5 A50 CT TEST REPORT


7
1 A60 CT TEST REPORT

2 A70 CT TEST REPORT

7.2 3 A80 CT TEST REPORT

4 A90 CT TEST REPORT

5 A100 CT TEST REPORT

Page 9 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 7 -11kV SWITCHGEAR-A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 A110 CT TEST REPORT

2 A120 CT TEST REPORT

7.3 3 A130 CT TEST REPORT

4 A140 CT TEST REPORT

5 A150 CT TEST REPORT

1 A160 CT TEST REPORT

2 A170 CT TEST REPORT

7.4 3 A180 CT TEST REPORT

4 A190 CT TEST REPORT

5 A200 CT TEST REPORT

1 A210 CT TEST REPORT

2 A220 CT TEST REPORT

7.5 3 A18 CT TEST REPORT

4 A28 CT TEST REPORT

5 A12 CT TEST REPORT

1 A10,A20 VT TEST REPORT

2 A30-A200 VT TEST REPORT

7.6 3 A210,A220VT TEST REPORT

4 A18,A28 VT TEST REPORT

5 A12 VT TEST REPORT

1 A10,A20 ICT TEST REPORT

2 A30- A200 ICT TEST REPORT

7.7 3 A210,A220 ICT TEST REPORT

4 A18,A28 ICT TEST REPORT

5 A12 ICT TEST REPORT

1 AMMETER TEST REPORT

2 VOLTMETER TEST REPORT


7.8
3 AC/DC CIRCUIT CHECKS TEST REPORT

4 UNDER VOLTAGE RELAY TEST REPORT

Page 10 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 7 -11kV SWITCHGEAR-A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 CIRCUIT BREAKER TEST REPORT

BUSBAR & EARTHBAR CONTACT RESISTANCE TEST


2
REPORT
7.9
3 BUSBAR HV & PD TEST REPORT

4 MECHANICAL OPERATION CHECK TEST REPORT

1 LOCAL INTERLOCK CHECK TEST REPORT A10,A20

2 LOCAL INTERLOCK CHECK TEST REPORT A30 to A200

7.10 3 LOCAL INTERLOCK CHECK TEST REPORT A210,A220

4 LOCAL INTERLOCK CHECK TEST REPORT A18,A28

5 LOCAL INTERLOCK CHECK TEST REPORT A12

VOLUME- 8 11kV PROTECTION -A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 AC/DC CIRCUIT CHECK TEST REPORT A10,A20

2 AC/DC CIRCUIT CHECK TEST REPORT A30 to A200

3 AC/DC CIRCUIT CHECK TEST REPORT A210,A220

8.1 4 AC/DC CIRCUIT CHECK TEST REPORT A18,A28

5 AC/DC CIRCUIT CHECK TEST REPORT A12

6 LSP AC/DC CIRCUIT CHECKS TEST REPORT(SWGR-A)

7 DC CHANGE OVER SCHEME CHECKS REPORT

MASTER TRIP RELAY TEST REPORT 7PG15 -A10-


1
A220,A12

8 2 MASTER TRIP RELAY TEST REPORT 7PG18 - A18,A28

TRIP CIRCUIT SUPERVISION RELAY TEST REPORT -


3
8.2 A10,A20,A30-A220,A18,A28,A12

4 TRIP RELAY (SELF RESET) TEST REPORT A10,A20

5 TRIP RELAY (SELF RESET) TEST REPORT A18,A28

6 LSP TRIP RELAY (SELF RESET) TEST REPORT(SWGR-A)

1 SOLKAR (F871) RELAY TEST REPORT( A30-A200)

PILOT WIRE SUPERVISION (F871A)RECEIVING END


8.3 2
RELAY TEST REPORT (A30-A220)

GUARD RELAY COMPONENT TEST REPORT 7SJ801


3
F501-(A30-A220)

Page 11 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME-8 11kV PROTECTION -A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 RELAY COMPONENTTEST REPORT 7SJ8022(F502)
RELAY COMPONENT TEST REPORT 7SJ61(F511)-
2
A10,A20,A18,A28
RELAY COMPONENT TEST REPORT 7SJ61 (F871)-
3
A10,A20,A18,A28
RELAY COMPONENT TEST REPORT 7SJ62 (F671)-
4
A18,A28
REALY COMPONENT TEST REPORT A101(SIGMA) NER
8.4 5
MONITORING RELAY- A18, A28

6 RELAY COMPONENT TEST REPORT 7SJ61 (F511)- A12

7 RELAY COMPONENT TEST REPORT 7SJ64 (A251)- A12


RELAY COMPONENT TEST REPORT 7SJ8042 (A252)-
8
A12
RELAY COMPONENT TEST REPORT 7SJ62( F811) - LSP
9
(SWGR-A)
RELAY COMPONENT TEST REPORT 6MD85 (A201 BCU )-
1
A10,A20
RELAY COMPONENT TEST REPORT 6MD85(A201 BCU)-
2
(A30-A200)
RELAY COMPONENT TEST REPORT 6MD85(A201 BCU)-
8.5 3
A210,A220
RELAY COMPONENT TEST REPORT 6MD85 (A201 BCU )-
4
A18,A28
RELAY COMPONENT TEST REPORT 6MD85 (A201 BCU )-
5
A12
6MD85(A201) BI VERIFICATION TEST REPORT -
1
8 A10,A20
6MD85(A201) BI VERIFICATION TEST REPORT - A30-
2
A200
6MD85(A201) BI VERIFICATION TEST REPORT -
8.6 3
A210,A220
6MD85(A201) BI VERIFICATION TEST REPORT -
4
A18,A28
5 6MD85(A201) BI VERIFICATION TEST REPORT - A12

1 7SJ61(F511) BI VERIFICATION TEST REPORT - A10,A20

2 7SJ61(F871) BI VERIFICATION TEST REPORT - A10,A20


7SJ801(F501) BI VERIFICATION TEST REPORT -(A30-
3
A220)
7SJ8022(F502) BI VERIFICATION TEST REPORT -(A30-
4
A220)
7SJ61(F511-50N) BI VERIFICATION TEST REPORT -
5
A18,A28
8.7 6 7SJ62(F671) BI VERIFICATION TEST REPORT - A18,A28

7 7SJ61(F871) BI VERIFICATION TEST REPORT - A18,A28

8 7SJ61(F511) BI VERIFICATION TEST REPORT - A12

9 7SJ64(A251) BI VERIFICATION TEST REPORT - A12

10 7SJ8042(A252) BI VERIFICATION TEST REPORT -A12


7SJ62(F811) BI VERIFICATION TEST REPORT -LSP
11
(SWGR-A)

Page 12 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME- 8 11kV PROTECTION -A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 VT SECONDARY INJECTION TEST REPORT - A10,A20
VT SECONDARY INJECTION TEST REPORT - (A30 to
2
A200)
8.8 3 VT SECONDARY INJECTION TEST REPORT - A210,A220

4 VT SECONDARY INJECTION TEST REPORT - A18,A28

5 VT SECONDARY INJECTION TEST REPORT - A16,A26

1 LOCAL SYNC CHECK TEST REPORT - A30 to A200

2 LOCAL SYNC CHECK TEST REPORT A210,A220

8.9 3 LOCAL SYNC CHECK TEST REPORT - A18,A28

4 LOCAL SYNC CHECK TEST REPORT - A12


BCU SYNC CHECK TEST REPORT (A30-
5
A220),A18,A28,A12
1 CT SECONDARY INJECTION TEST REPORT - A10, A20

2 CT SECONADRY INJECTION TEST REPORT - A30,A200

8.10 3 CT SECONDARY INJECTION TEST REPORT - A210,A220

4 CT SECONDARY INJECTION TEST REPORT - A18, A28

5 CT SECONDARY INJECTION TEST REPORT-A12


8
1 CT PRIMARY INJECTION TEST REPORT-A10,A20

2 CT PRIMARY INJECTION TEST REPORT-A30 to A200

8.11 3 CT PRIMARY INJECTION TEST REPORT -A210,A220

4 CT PRIMARY INJECTION TEST REPORT -A18,A28

5 CT PRIMARY INJECTION TEST REPORT - A12

1 TRIP CIRCUIT SUPERVISION CHECKS TEST -A10,A20


TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT - A30
2
to A200
TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT
3
A210,A220
TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT -
4
A18,A28
5 TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT -A12
8.12 TRIP COIL CURRENT MEASUREMENT TEST REPORT -
6
A10, A20
TRIP COIL CURRENT MEASUREMENT TEST REPORT -
7
A30 to A200
TRIP COIL CURRENT MEASUREMENT TEST REPORT -
8
A210,A220
TRIP COIL CURRENT MEASUREMENT TEST REPORT -
9
A18,A28
10 TRIP COIL CURRENT MEAUREMENT TEST REPORT - A12

Page 13 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME- 8 11kV PROTECTION -A


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
VOLTAGE SELECTION SCHEME CHECK TEST REPORT-
1
LSP
2 LOAD SHEDDING SCHEME CHECK TEST REPORT -LSP

3 TRIP LOGICK CHECKS TEST REPORT A10-A20

4 TRIP LOGIC CHECKS TEST REPORT (A30-A200)

5 TRIP LOGIC CHECKS TEST REPORT A210,A220


8.13
6 TRIP LOGIC CHECKS TEST REPORT -A18,A28

7 TRIP LOGIC CHECKS TEST REPORT A12

8 TRIP LOGIC CHECKS TEST REPORT -LVAC


BREAKER FAILURE SCHEME CHECK TEST REPORT(SWGR-
9
A)
BREAKER FAILURE & BUSBAR TRIP SCHEME CHECK
8 10
TEST REPORT(SWGR-A)
BUSBAR MASTER TRIP RELAY TEST REPORT -
1
BB.RP1,BB.RP2(SWGR-A)
CT SUPERVISION RELAY COMPONENT TEST REPORT -
2
BB.RP1,BB.RP2(SWGR-A)
BUSBAR RELAY 7SJ61(F87Z) COMPONENT TEST
3
REPORT - -BB.RP1,BB.RP2(SWGR-A)
BUSBAR AC/DC CIRCUIT CHECK TEST REPORT -
4
BB.RP1,BB.RP2(SWGR-A)
BUSBAR DC CHANGE OVER TEST REPORT -
8.14 5
BB.RP1,BB.RP2(SWGR-A)
BUSBAR RELAY 7SJ61(F87Z) BI VERIFICATION TEST
6
REPORT - -BB.RP1,BB.RP2(SWGR-A)
BUSBAR SENSITIVITY TEST REPORT -
7
BB.RP1,BB.RP2(SWGR-A)
BUSBAR STABILITY TEST REPORT -
8
BB.RP1,BB.RP2(SWGR-A)
9 BB HIGH IMPEDANCE CT LEAD RESISTANCE(SWGR-A)

VOLUME 9 -11kV SWITCHGEAR-B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 A310 CT TEST REPORT

2 A320 CT TEST REPORT

9.1 3 A330 CT TEST REPORT

4 A340 CT TEST REPORT


9
5 A350 CT TEST REPORT

1 A360 CT TEST REPORT

9.2 2 A370 CT TEST REPORT

3 A380 CT TEST REPORT

Page 14 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 9 -11kV SWITCHGEAR-B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
4 A390 CT TEST REPORT
9.2
5 A400 CT TEST REPORT

1 A410 CT TEST REPORT

2 A420 CT TEST REPORT

9.3 3 A430 CT TEST REPORT

4 A440 CT TEST REPORT

5 A450 CT TEST REPORT

1 A460 CT TEST REPORT

2 A470 CT TEST REPORT

9.4 3 A480 CT TEST REPORT

4 A490 CT TEST REPORT

5 A500 CT TEST REPORT

1 A38 CT TEST REPORT

9.5 2 A48 CT TEST REPORT

3 A32 CT TEST REPORT

1 A310 to A480 VT TEST REPORT

2 A490,A500 VT TEST REPORT


9.6
3 A38,A48 VT TEST REPORT

4 A32,A36, A46 VT TEST REPORT

1 A310 to A390 ICT TEST REPORT

2 A400 to A480 ICT TEST REPORT

9.7 3 A490,A500 ICT TEST REPORT

4 A38,A48 ICT TEST REPORT

5 A32 ICT TEST REPORT

1 AMMETER TEST REPORT

2 VOLTMETER TEST REPORT


9.8
3 AC/DC CIRCUIT CHECKS TEST REPORT

4 UNDER VOLTAGE RELAY TEST REPORT

Page 15 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 9 -11kV SWITCHGEAR-B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 CIRCUIT BREAKER TEST REPORT
BUSBAR & EARTHBAR CONTACT RESISITANCE TEST
2
REPORT
9.9
3 BUSBAR HV & PD TEST REPORT

4 MECHANICAL OPERATION CHECK TEST REPORT


9
1 LOCAL INTERLOCK CHECKS TEST REPORT A310-A480

2 LOCAL INTERLOCK CHECKS TEST REPORT A490,A500


9.10
3 LOCAL INTERLOCK CHECKS TEST REPORT A38,A48

4 LOCAL INTERLOCK CHECK TEST REPORT A32

VOLUME 10-11kV PROTECTION -B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 AC/DC CIRCUIT CHECK TEST REPORT A310 to A480

2 AC/DC CIRCUIT CHECK TEST REPORT A490,A500

3 AC/DC CIRCUIT CHECK TEST REPORT A38,A48


10.1
4 AC/DC CIRCUIT CHECK TEST REPORT A32

5 LSP AC/DC CIRCUIT CHECKS TEST REPORT(SWGR-B)

6 DC CHANGE OVER SCHEME CHECKS REPORT


MASTER TRIP RELAY TEST REPORT 7PG15 - A310-
1
A480,A32
2 MASTER TRIP RELAY TEST REPORT 7PG18- A38,A48
TRIP CIRCUIT SUPERVISION RELAY TEST REPORT - A310-
10.2 3
A500,A32,A38,A48
10 4 TRIP RELAY (SELF RESET) TEST REPORT A38,A48

5 LSP TRIP RELAY (SELF RESET) TEST REPORT(SWGR-B)

1 SOLKAR (F871) RELAY TEST REPORT( A310 to A500)


PILOT WIRE SUPERVSION (F871A)RECEVING END
10.3 2
RELAY TEST REPORT (A310-A500)
GUARD RELAY COMPONENT TEST REPORT 7SJ801 F501-
3
(A310-A500)
RELAY COMPONENTTEST REPORT 7SJ8022(F502)-
1
(A310-A500)
RELAY COMPONENT TEST REPORT 7SJ61(F511)-
2
A38,A48
RELAY COMPONENT TEST REPORT 7SJ61 (F871)-
10.4 3
A38,A48
RELAY COMPONENT TEST REPORT 7SJ62 (F671)-
4
A38,A48
REALY COMPONENT TEST REPORT A101(SIGMA) NER
5
MONITORING RELAY- A38,A48

Page 16 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 10-11kV PROTECTION -B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
6 RELAY COMPONENT TEST REPORT 7SJ161 (F511)- A32

7 RELAY COMPONENT TEST REPORT 7SJ164 (A251)- A32


10.4 RELAY COMPONENT TEST REPORT 7SJ8042 (A252)-
8
A32
RELAY COMPONENT TEST REPORT 7SJ62( F811) -
9
LSP(SWGR-B)
RELAY COMPONENT TEST REPORT 6MD85(A201 BCU)-
1
(A310-A480)
RELAY COMPONENT TEST REPORT 6MD85(A201 BCU)-
2
A490,A500
10.5 RELAY COMPONENT TEST REPORT 6MD85 (A201 BCU )-
3
A38,A48
RELAY COMPONENT TEST REPORT 6MD85 (A201 BCU )-
4
A32
6MD85(A201) BI VERIFICATION TEST REPORT - A310
1
to A480
6MD85(A201) BI VERIFICATION TEST REPORT - A490,
2
A500
10.6 6MD85(A201) BI VERIFICATION TEST REPORT -
3
A38,A48
4 6MD85(A201) BI VERIFICATION TEST REPORT - A32
7SJ801(F501) BI VERIFICATION TEST REPORT -(A310-
1
A500)
7SJ8022(F502) BI VERIFICATION TEST REPORT -(A310-
2
A500)
3 7SJ61(F511) BI VERIFICATION TEST REPORT - A38,A48
10
4 7SJ62(F671) BI VERIFICATION TEST REPORT - A38,A48

10.7 5 7SJ61(F871) BI VERIFICATION TEST REPORT - A38,A48

6 7SJ61(F511) BI VERIFICATION TEST REPORT - A32

7 7SJ64(A251) BI VERIFICATION TEST REPORT - A32

8 7SJ8042(A252) BI VERIFICATION TEST REPORT -A32


7SJ62(F811) BI VERIFICATION TEST REPORT -LSP(SWGR-
9
B)
VT SECONDARY INJECTION TEST REPORT - (A310 to
1
A480)
2 VT SECONDARY INJECTION TEST REPORT - A490,A500
10.8
3 VT SECONDARY INJECTION TEST REPORT - A38,A48

4 VT SECONDARY INJECTION TEST REPORT A32,A36,A46

1 LOCAL SYNC CHECK TEST REPORT - A310 to A480

2 LOCAL SYNC CHECK TEST REPORT A490,A500

10.9 3 LOCAL SYNC CHECK TEST REPORT - A38,A48

4 LOCAL SYNCH CHECK TEST REPORT - A32


BCU SYNCH CHECK TEST REPORT (A310-
5
A500,A38,A48,A32)

Page 17 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 10-11kV PROTECTION -B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
CT SECONADRY INJECTION TEST REPORT - A310 to
1
A480
2 CT SECONADRY INJECTION TEST REPORT - A490,A500
10.10
3 CT SECONDARY INJECTION TEST REPORT - A38, A48

4 CT SECONDARY INJECTION TEST REPORT-A32

1 CT PRIMARY INJECTION TEST REPORT-A310 to A480

2 CT PRIMARY INJECTION TEST REPORT -A490,A500


10.11
3 CT PRIMARY INJECTION TEST REPORT -A38,A48

4 CT PRIMARY I NJECTION TEST REPORT - A32


TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT -
1
A310 to A480
TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT
2
A490,A500
TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT -
3
A38,A48
4 TRIP CIRCUIT SUPERVISION CHECKS TEST REPORT -A32
10.12 TRIP COIL CURRENT MEASUREMENT TEST REPORT -
5
A310 to A480
TRIP COIL CURRENT MEASUREMENT TEST REPORT -
6
A490,A500
TRIP COIL CURRENT MEASUREMENT TEST REPORT -
10 7
A38,A48
8 TRIP COIL CURRENT MEAUREMENT TEST REPORT - A32
VOLTAGE SELECTION SCHEME CHECK TEST REPORT-
1
LSP
2 LOAD SHEDDING SCHMEME CHECK TEST REPORT -LSP

3 TRIP LOGIC CHECKS TEST REPORT (A310-A480)

4 TRIP LOGIC CHECKS TEST REPORT A490,A500


10.13
5 TRIP LOGIC CHECKS TEST REPORT -A38,A48

6 TRIP LOGIC CHECKS TEST REPORT A32


BREAKER FAILURE SCHEME CHECK TEST REPORT(SWGR-
7
B)
BREAKER FAILURE & BUSBAR TRIP SCHEME CHECK
8
TEST REPORT(SWGR-B)
BUSBAR MASTER TRIP RELAY TEST REPORT -
1
BB.RP1,BB.RP2(SWGR-B)
CT SUPERVISION RELAY COMPONENT TEST REPORT -
2
BB.RP1,BB.RP2(SWGR-B)
BUSBAR RELAY 7SJ61(F87Z) COMPONENT TEST
10.14 3
REPORT - -BB.RP1,BB.RP2(SWGR-B)
BUSBAR AC/DC CIRCUIT CHECK TEST REPORT -
4
BB.RP1,BB.RP2(SWGR-B)
BUSBAR DC CHANGEOVER TEST REPORT -
5
BB.RP1,BB.RP2(SWGR-B)

Page 18 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 10-11kV PROTECTION -B


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
BUSBAR RELAY 7SJ61(F87Z) BI VERIFICATION TEST
6
REPORT - BB.RP1,BB.RP2(SWGR-B)
BUSBAR SENSITIVITY TEST REPORT -
7
BB.RP1,BB.RP2(SWGR-B)
10 10.14 BUSBAR STABILITY TEST REPORT -
8
BB.RP1,BB.RP2(SWGR-B)
9 BB HIGH IMPEDANCE -CT LEAD RESISTANCE(SWGR-B)

VOLUME 11 -160MVA POWER TRANSFORMER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 160MVA TRANSFORMER -1 TEST REPORT
CAPACITANCE AND TAN DELTA MEASUREMENT TEST
2
REPORT
3 SFRA KIT RESULTS
160MVA TRANSFORMER -1 MECHANICAL
4
PROTECTION BI CHECKS TEST REPORT
160MVA TRANSFORMER -1 RTCC SIGNAL CHECK TEST
5
REPORT
RTCC1, TCC1, OLTC1- AC/DC & TCC CHANGEOVER
6
CHECKS TEST REPORT
7 RTCC1 VOLTMETER TEST REPORT
11.1
8 RTCC1 TAPCON COMPONENT TEST REPORT

9 RTCC1 FUNCTIONAL CHECK TEST REPORT

10 160MVA TRANSFORMER -1 STABILITY TEST REPORT

11 160MVA TRANSFORMER-1 BUSHING CT TEST REPORT


11 160MVA TRANSFORMER-1 BUSHING CT SEC INJECTION
12
TEST REPORT
13 U/V RELAY TEST REPORT
160MVA TRANSFORMER-1 BUSHING CT PRIMARY
14
INJECTION TEST REPORT
1 160MVA TRANSFORMER-2 TEST REPORT
CAPACITANCE AND TAN DELTA MEASUREMENT TEST
2
REPORT
3 SFRA KIT RESULTS
160MVA TRANSFORMER -2 MECHANICAL
4
PROTECTION BI CHECKS TEST REPORT
11.2 160MVA TRANSFORMER -2 RTCC SIGNAL CHECK TEST
5
REPORT
RTCC2, TCC2, OLTC2- AC/DC & TCC CHANGEOVER
6
CHECKS TEST REPORT
7 RTCC2 VOLTMETER TEST REPORT

8 RTCC2 TAPCON COMPONENT TEST REPORT

Page 19 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 11 -160MVA POWER TRANSFORMER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
9 RTCC2 FUNCTIONAL CHECK TEST REPORT

10 160MVA TRANSFORMER -2 STABILITY TEST REPORT

11 160MVA TRANSFORMER -2 BUSHING CT TEST REPORT


160MVA TRANSFORMER-2 BUSHING CT SEC
12
INJECTION TEST REPORT
11 11.2
13 U/V RELAY TEST REPORT
160MVA TRANSFORMER-2 BUSHING CT PRIMARY
14
INJECTION TEST REPORT
15 160MVA (1 &2 )CT LEAD RESISTANCE(HV&LV)
160MVA TRANSFORMER RTCC 1 & 2 PARALLEL
16
OPERATION CHECK TEST REPORT

VOLUME 12 -40MVA POWER TRANSFORMER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 40MVA TRANSFORMER-1- TEST REPORT
CAPACITANCE AND TAN DELTA MEASUREMENT TEST
2
REPORT
3 SFRA KIT RESULTS
40MVA TRANSFORMER -1 MECHANICAL PROTECTION
4
BI CHECKS TEST REPORT
40MVA TRANSFORMER -1 RTCC SIGNAL CHECK TEST
5
REPORT
RTCC1, TCC1, OLTC1- AC/DC & TCC CHANGEOVER
6
CHECKS TEST REPORT
12.1
7 RTCC1 VOLTMETER TEST REPORT

8 RTCC1 TAPCON COMPONENT TEST REPORT

9 RTCC1 FUNCTIONAL CHECKS TEST REPORT

10 40MVA TRANSFORMER -1 STABILITY TEST REPORT

11 40MVA TRNASFORMER-1 NCT TEST REPORT

12 U/V RELAY TEST REPORT

1 40MVA TRANSFORMER-2- TEST REPORT


CAPACITANCE AND TAN DELTA MEASUREMENT TEST
2
REPORT
3 SFRA KIT RESULTS
40MVA TRANSFORMER -2 MECHANICAL PROTECTION
12.2 4
BI CHECKS TEST REPORT
40MVA TRANSFORMER -2 RTCC SIGNAL CHECK TEST
5
REPORT
RTCC2, TCC2, OLTC2- AC/DC & TCC CHANGEOVER
6
CHECKS TEST REPORT
7 RTCC2 VOLTMETER TEST REPORT

Page 20 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 12 -40MVA POWER TRANSFORMER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
8 RTCC2 TAPCON COMPONENT TEST REPORT

9 RTCC2 FUNCTIONAL CHECK TEST REPORT

10 40MVA TRANSFORMER -2 STABILITY TEST REPORT


12.2
11 40MVA TRNASFORMER-2 BUSHING CT TEST REPORT

12 U/V RELAY TEST REPORT


40MVA TRANSFORMER RTCC-1 & 2 PARALLEL
13
OPERATION CHECK TEST REPORT
1 40MVA TRANSFORMER-3 TEST REPORT
CAPACITANCE AND TAN DELTA MEASUREMENT TEST
2
REPORT
3 SFRA KIT RESULTS
40MVA TRANSFORMER -3 MECHANICAL PROTECTION
4
BI CHECKS TEST REPORT
40MVA TRANSFORMER -3 RTCC SIGNAL CHECK TEST
5
REPORT
RTCC3, TCC3, OLTC3- AC/DC & TCC CHANGEOVER
6
12.3 CHECKS TEST REPORT
7 RTCC3 VOLTMETER TEST REPORT

8 RTCC3 TAPCON COMPONENT TEST REPORT

12 9 RTCC3 FUNCTIONAL CHECK TEST REPORT

10 40MVA TRANSFORMER -3 STABILITY TEST REPORT

11 40MVA TRANSFORMER-3 NCT TEST REPORT

12 U/V RELAY TEST REPORT

1 40MVA TRANSFORMER-4 TEST REPORT


CAPACITANCE AND TAN DELTA MEASUREMENT TEST
2
REPORT
3 SFRA KIT RESULTS
40MVA TRANSFORMER -4 MECHANICAL PROTECTION
4
BI CHECKS TEST REPORT
40MVA TRANSFORMER -4 RTCC SIGNAL CHECK TEST
5
REPORT
RTCC4, TCC4, OLTC4- AC/DC & TCC CHANGEOVER
12.4 6
CHECKS TEST REPORT
7 RTCC4 VOLTMETER TEST REPORT

8 RTCC4 TAPCON COMPONENT TEST REPORT

9 RTCC4 FUNCTIONAL CHECK TEST REPORT

10 40MVA TRANSFORMER -4 STABILITY TEST REPORT

11 40MVA TRANSFORMER-4 NCT TEST REPORT

Page 21 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 12 -40MVA POWER TRANSFORMER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
12 U/V RELAY TEST REPORT
40MVA TRANSFORMER RTCC-3 & 4 PARALLEL
12 12.4 13
OPERATION CHECK TEST REPORT
B11, B21, B31, B41- 40MVA CT LEAD RESISTANCE (HV
14
REF & LV REF)

VOLUME 13- 11kV NER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 NER1 TEST REPORT & OMICRON KIT RESULTS

2 NER 1 AC CHECKS TEST REPORT

3 NER 1 CT SECONDARY INJECTION TEST REPORT

4 NER1 CT PRIMARY INJECTION TEST REPORT

5 NER 2 TEST REPORT & OMICRON KIT RESULTS

6 NER 2 AC CHECKS TEST REPORT

7 NER 2 CT SECONDARY INJECTION TEST REPORT

8 NER2 CT PRIMARY INJECTION TEST REPORT


13 13.1
9 NER 3 TEST REPORT & OMICRON KIT RESULTS

10 NER 3 AC CHECKS TEST REPORT

11 NER 3 CT SECONDARY INJECTION TEST REPORT

12 NER3 CT PRIMARY INJECTION TEST REPORT

13 NER 4 TEST REPORT & OMICRON KIT RESULTS

14 NER 4 AC CHECKS TEST REPORT

15 NER 4 CT SECONDARY INJECTION TEST REPORT

16 NER 4 CT PRIMARY INJECTION TEST REPORT

Page 22 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME 14- 1600kVA AUXILIARY TRANSFORMER


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 AUX. TRANSFORMER 1 TEST REPORT

2 AUX. TR1 TCC AC/DC CIRCUIT CHECKS TEST REPORT

3 AUX. TR1 NCT SECONDARY INJECTION TEST REPORT

4 AUX. TR1 NCT PRIMARY INJECTION TEST REPORT

5 AUX. TR1 STABILITY TEST REPORT

14 14.1 6 AUX. TRANSFORMER 2 TEST REPORT

7 AUX. TR2 TCC AC/DC CHECKS TEST REPORT

8 AUX. TR2 NCT SECONDARY INJECTION TEST REPORT

9 AUX. TR2 NCT PRIMARY INJECTION TEST REPORT

10 AUX. TR2 STABILITY TEST REPORT

11 AUX TR 1 & TR 2 LEAD RESISTANCE

VOLUME -15 415V LVAC & 110V LVDC


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 LVAC INCOMER 1 CT TEST REPORT

2 LVAC INCOMER 2 CT TEST REPORT

3 LVAC BUS SECTION CT TEST REPORT


15.1
4 LVAC DG INCOMER CT TEST REPORT

5 LVAC OUT GOING FEEDERS CT TEST REPORT

6 LVAC I/C - I & II, BUS SECTION VT TEST REPORT

1 LVAC MCCB TEST REPORT

15 2 LVAC CIRCUIT BREAKER TEST REPORT


LVAC CIRCUIT BREAKER PROTECTION RELAY TEST
3
REPORT
4 LVAC AMMETER AND VOLTMETER TEST REPORT
LVAC UNDER VOLTAGE & OVER VOLTAGE RELAY TEST
15.2 5
REPORT
6 LVAC BB CONTACT RESISTANCE TEST REPORT

7 LVAC IR VALUE & HIGH VOLTAGE TEST REPORT

8 LVAC AC/DC CIRCUIT CHECKS TEST REPORT

9 LVAC INTERLOCK & FUNCTIONAL CHECK TEST REPORT

Page 23 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -15 415V LVAC & 110V LVDC


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

10 LVAC CT SECONDARY INJECTION TEST REPORT

11 LVAC CT PRIMARY INJECTION TEST REPORT


15.2
12 LVAC VISUAL INSPECTION CHECKS TEST REPORT

LVAC SYNCHRO CHECK RELAY TEST REPORT-


13
RMS(2SY212)

1 LVDC MCCB/MCB TEST REPORT

15 2 LVDC AMMETER AND VOLTMETER TEST REPORT

LVDC UNDER VOLTAGE AND OVER VOLTAGE,EARTH


3
FAULT RELAY TEST REPORT
15.3 4 LVDC BB CONTACT RESISTANCE TEST REPORT

5 LVDC IR VALUE & HIGH VOLTAGE TEST REPORT

6 LVDC AC/DC CIRCUIT CHECKS REPORT


LVDC ALARM,FUNCTIONAL AND INTERLOCK CHECKS
7
TEST REPORT

VOLUME -16 110V BATTERY CHARGER & 240V UPS


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
1 BATTERY CHARGER 1 & 2 TEST REPORT

16 16.1 2 BATTERY BANK -1 & 2 TEST REPORT

3 UPS TEST REPORT

VOLUME -17 SCS


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

1 SCS CAP AC/DC CIRCUIT CHECKS TEST REPORT

RELAY COMPONENT TEST REPORT A201 BCU


2 (6MD85_SCS CAP)
17 17.1 BINARY INPUT VERIFICATION TEST REPORT A201 BCU
3 (6MD85 _SCS CAP)

DC CHANGEOVER SCHEME CHECKS TEST REPORT SCS


4 CAP

Page 24 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -18 132kV RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
RELAY FINAL SETTING TEST REPORT M1-F871(7SD522-
1 C10-C80)
18.1
RELAY FINAL SETTING TEST REPORT M2-F872
2 (P545_C10-C80)
RELAY FINAL SETTING TEST REPORT F871
1 (7UT613_C11&C21)
RELAY FINAL SETTING TEST REPORT F872
2 (P633_C11&C21)
RELAY FINAL SETTING TEST REPORT F873
18.2 3 (7SJ61_C11&C21)
RELAY FINAL SETTING TEST REPORT F511
4 (7SJ61_C13&C23)
RELAY FINAL SETTING TEST REPORT F511
5 (7SJ61_C11,C21, C12&C22)
RELAY FINAL SETTING VERIFICATION REPORT M1-F871
1 (7SD522_C10-C80)
18.3
RELAY FINAL SETTING VERIFICATION REPORT M2-F872
2 (C10-C80)
RELAY FINAL SETTING VERIFICATION REPORT F871
1 (7UT613_C11&C21)
RELAY FINAL SETTING VERIFICATION REPORT F872
2 (P633_C11&C21)
RELAY FINAL SETTING VERIFICATION REPORT F873
3 (7SJ61_C11&C21)
18 18.4
RELAY FINAL SETTING VERIFICATION REPORT F511
4 (7SJ61_C13&C23)
RELAY FINAL SETTING VERIFICATION REPORT F511
5 (7SJ61_C12&C22)
RELAY FINAL SETTING VERIFICATION REPORT A251
6 (7SJ64_C12)
RELAY FINAL SETTING VERIFICATION REPORT - A201
1 (C10-C80)
RELAY FINAL SETTING VERIFICATION REPORT - A201
2 (C11-C21)
18.5
RELAY FINAL SETTING VERIFICATION REPORT - A201
3 (C12,C22,C13,C23)
132kV BUSBAR RELAY FINAL SETTING VERIFICATION
4 TEST REPORT

18.6 FIXED AND VARIABLE SETTING DOCUMENT FOR 132kV


1 FEEDERS & 160 MVA POWER TRANSFORMER

18.7 1 FIXED AND VARIABLE SETTING DOCUMENT FOR 66kV


FEEDERS & 40 MVA POWER TRANSFORMER

1 FIXED SETTING DOCUMENT FOR 11kV FEEDERS &


18.8 1600kVA AUX TRANSFORMER
LVAC,LVDC&COMM SERVICE FINAL SETTING
2
DOCUMENT

Page 25 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -19 66kV RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
RELAY FINAL SETTING TEST REPORT M1-F871(7SD522-
1 B10 to B60)
19.1 RELAY FINAL SETTING TEST REPORT M2-F872(P545-
2 B10 to B60)
RELAY FINAL SETTING TEST REPORT F871(7UT613-
1 B11,B21,B31,B41)
RELAY FINAL SETTING TEST REPORT
2 F511(7SJ161_B11,B21,B31,B41)
RELAY FINAL SETTING TEST REPORT F511(7SJ61-
3 B12,B22,B13,B23)
RELAY FINAL SETTING TEST REPORT
19.2 4 F511(50N)(7SJ61_B18,B28)
RELAY FINAL SETTING TEST REPORT
5 F871(87NL)(7SJ61_B18,B28)
RELAY FINAL SETTING TEST REPORT
6 F671(7SJ62_B18,B28)
RELAY FINAL SETTING TEST REPORT FOR 160MVA CB
7 T1 & T2 AVR TAPCON

RELAY FINAL SETTING VERIFICATION REPORT M1


19.3 1 F871(7SD522-B10,B60)
RELAY FINAL SETTING VERIFICATION REPORT M2
2 F872(P545-B10,B60)

RELAY FINAL SETTING VERIFICATION REPORT


19 1 F871(7UT613-B11,B21,B31,B41)

RELAY FINAL SETTING VERIFICATION REPORT


2 F511(7SJ61_B11,B21,B31,B41)

RELAY FINAL SETTING VERIFICATION REPORT


3 F511(50N),F871(87NL)(7SJ61_B18,B28)

RELAY FINAL SETTING VERIFICATION REPORT


19.4 4 F671(67)(7SJ62_B18,B28)

RELAY FINAL SETTING VERIFICATION REPORT


5 F511(7SJ61-B12,B22,B13,B23)
RELAY FINAL SETTING VERIFICATION REPORT
6 A251(7SJ64_B12)
66kV BUSBAR RELAY FINAL SETTING VERIFICATION
7 REPORT

RELAY FINAL SETTING VERIFICATION REPORT FOR


8 160MVA CB T1 & T2 AVR TAPCON
RELAY FINAL SETTING VERIFICATION REPORT - A201
1 (B10-B60)
RELAY FINAL SETTING VERIFICATION REPORT - A201
19.5 2 (B18-B28)
RELAY FINAL SETTING VERIFICATION REPORT - A201
3 (B11,B21,B31,B41)

Page 26 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -19 66kV RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
RELAY FINAL SETTING VERIFICATION REPORT - A201
19 19.5 4
(B12,B22,B13,B23)

VOLUME -20 11kV -A RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
RELAY FINAL SETTING TEST REPORT FOR F501(7SJ801-
1 (A30-A220)
20.1
RELAY FINAL SETTING TEST REPORT FOR F502(7SJ802-
2 (A30-A220)
RELAY FINAL SETTING TEST REPORT FOR F511(7SJ61-
1 (A10/A20/A18/A28)

RELAY FINAL SETTING TEST REPORT FOR F671(7SJ62-


2 (A18/A28)

RELAY FINAL SETTING TEST REPORT FOR F871(7SJ61-


3 (A10/A20/A18/A28)

RELAY FINAL SETTING TEST REPORT FOR F511(7SJ61-


4 A12)
RELAY FINAL SETTING TEST REPORT FOR
20.2 5 F811(LSP)(SWGR-A)

6 RELAY FINAL SETTING TEST REPORT FOR F87Z1 R,Y,B

7 RELAY FINAL SETTING TEST REPORT FOR F87Z2 R,Y,B


RELAY FINAL SETTING TEST REPORT FOR 40MVA BA
8 T1,T2 AVR TAPCON
20 RELAY FINAL SETTING TEST REPORT FOR A101 SIGMA
9 RELAY (A18,A28)

10 RELAY FINAL SETTING TEST REPORT CT SUPERVISION


RELAY (11kV BB.RP1 & BB.RP2)(SWGR-A)

1 RELAY FINAL SETTING VERIFICATION REPORT FOR


F501(7SJ801- A30 to A220)
20.3
2 RELAY FINAL SETTING VERIFICATION REPORT FOR
F502(7SJ802- A30 to A220)

RELAY FINAL SETTING VERIFICATION REPORT


1 F511(7SJ61-A10/A20/A18/A28)

RELAY FINAL SETTING VERIFICATION REPORT


2 F871(7SJ61-A10/A20/A18/A28)
20.4
RELAY FINAL SETTING VERIFICATION REPORT
3 F671(7SJ62-A18/A28)

RELAY FINAL SETTING VERIFICATION REPORT


4
F511(7SJ61-A12)

Page 27 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -20 11kV -A RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

RELAY FINAL SETTING VERIFICATION REPORT


5
F811(7SJ62-LSP)(SWGR-A)

6 RELAY FINAL SETTING VERIFICATION REPORT FOR


F87Z1 R,Y,B (7SJ61 - 11kV BBRP1)

7 RELAY FINAL SETTING VERIFICATION REPORT F87Z2


20.4 R,Y,B (7SJ61-11kV BBRP2)
20
8 RELAY FINAL SETTING VERIFICATION REPORT FOR
40MVA BA T1,T2 AVR TAPCON
RELAY FINAL SETTING VERIFICATION REPORT -A251
9 (7SJ640_A12)
RELAY FINAL SETTING VERIFICATION REPORT - A252-
10 (7SJ804 _A12)

20.5 1 RELAY FINAL SETTING VERIFICATION REPORT - BCU


A201 (6MD85_A10 to A220, A18,A28,A12)

VOLUME -20 11kV -B RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE
RELAY FINAL SETTING TEST REPORT FOR F501(7SJ801-
1 (A310-A500)
20.6
RELAY FINAL SETTING TEST REPORT FOR F502(7SJ802-
2 (A310-A500)
RELAY FINAL SETTING TEST REPORT FOR F511(7SJ61-
1 (A38/A48)
RELAY FINAL SETTING TEST REPORT FOR F671(7SJ62-
2 (A38/A48)
RELAY FINAL SETTING TEST REPORT FOR F871(7SJ61-
3 (A38/A48)
RELAY FINAL SETTING TEST REPORT FOR F511(7SJ61-
4 A32)
RELAY FINAL SETTING TEST REPORT FOR F811(7SJ62-
20 5 LSP)(SWGR-B)
RELAY FINAL SETTING TEST REPORT FOR F87Z3
20.7 6 R,Y,B(7SJ61-11kV BB.RP1)
RELAY FINAL SETTING TEST REPORT FOR F87Z4
7 R,Y,B(7SJ61-11kV BB.RP2)

RELAY FINAL SETTING TEST REPORT FOR 40MVA BA


8 T3,T4 AVR TAPCON
RELAY FINAL SETTING TEST REPORT FOR A101 SIGMA
9 RELAY (A38,A48)

RELAY FINAL SETTING TEST REPORT FOR CT


SUPERVISION RELAY (11kV BB.RP1 & BB.RP2)(SWGR-
10 B)

Page 28 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -20 11kV -B RELAY FINAL SETTING


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

RELAY FINAL SETTING VERIFICATION REPORT FOR


1
F501(7SJ801- A310 to A500)
20.8
RELAY FINAL SETTING VERIFICATION REPORT FOR
2
F502(7SJ802- A310 to A500)

RELAY FINAL SETTING VERIFICATION REPORT


1
F511(7SJ61-A38/A48)
RELAY FINAL SETTING VERIFICATION REPORT
2
F871(7SJ61-A38/A48)
RELAY FINAL SETTING VERIFICATION REPORT
3
F671(7SJ62-A38/A48)
RELAY FINAL SETTING VERIFICATION REPORT
4
F511(7SJ61-A32)
20 5
RELAY FINAL SETTING VERIFICATION REPORT
F811(7SJ62-LSP)(SWGR-B)
20.9
RELAY FINAL SETTING VERIFICATION REPORT FOR
6
F87Z3 R,Y,B (7SJ61 - 11kV BBRP1)
RELAY FINAL SETTING VERIFICATION TEST REPORT
7
F87Z4 R,Y,B (7SJ61-11kV BBRP2)
RELAY FINAL SETTING VERIFICATION REPORT FOR
8
40MVA BA T3,T4 AVR TAPCON
RELAY FINAL SETTING VERIFICATION REPORT -A251
9
(7SJ640_A32)
RELAY FINAL SETTING VERIFICATION REPORT - A252-
10
(7SJ804 _A32)

RELAY FINAL SETTING VERIFICATION REPORT - FBCU


20.10 1
(A201-6MD85_A310 to 500, A38,A48,A32)

Page 29 of 30
QATAR POWER TRANSMISSION SYSTEM EXPANSION
PHASE 12 SUBSTATIONS PACKAGES S1, S2, S6 S7
CONTRACT NO: GTC/643A/2014
SIEMENS CONSORTIUM
SIEMENS AG - SIEMENS WLL INDEX
SITE ACCEPTANCE TEST REPORTS
132/66/11kV WAKRAH SUBSTATION

VOLUME -21 MISCELLANEOUS REPORTS


ENGINEER CONSULTANT
VOLUME FILE SL.NO DESCRIPTION STATUS
SIGNATURE SIGNATURE

1 PROTECTION END TO END TEST REPORT M1 F871

2 PROTECTION END TO END TEST REPORT M2 F872

3 FIBER OPTIC PATCH CORD TESTING REPORT

FIBER OPTIC PATCH CORD CABLE TESTING FOR M1 &


4 M2
21 21.1
5 OVERALL STABILITY TEST REPORT

6 PROTECTION CHECK LIST

7 ENERGISATION TEST REPORT

8 LOAD STAGGERING TEST REPORT

Page 30 of 30