PRESUPUESTO DE OBRA

OBRA : LA CASTELLANA
PROPIETARIO: ARTECO
UBICACIN: SURCO

DESCRIPCIN DE PARTIDAS PRESUPUESTO


UND CANT UNIT PARCIAL TOTAL

E STR U CTU RAS

OBRAS PROVISIONALES 169,241.46


Oficinas de Contratista GLB 1.00 5,200.00 5,200.00
SS.HH Porttiles MES 10.00 1,900.00 19,000.00
Comedor para Obreros GLB 1.00 6,000.00 6,000.00
Almacen y depsito GLB 1.00 7,500.00 7,500.00
Guardiana MES 13.00 5,553.00 72,189.00
Instalacin elctrica provisional GLB 1.00 22,244.86 22,244.86
Instalacin de agua provisional GLB 1.00 6,983.86 6,983.86
Instalacin de desage provisional GLB 1.00 3,500.00 3,500.00
Poza de agua Provisional GLB 1.00 750.00 750.00
Duchas y Vestuarios GLB 1.00 20,873.74 20,873.74
Sealizacin GLB 1.00 5,000.00 5,000.00

OBRAS PRELIMINARES 470,489.25


Movilizacin y desmovilizacin GLB 1.00 7,000.00 7,000.00
Topografa Permanente MES 8.50 14,628.92 124,345.82
Limpieza permanente en obra MES 10.00 7,840.31 78,403.10
Limpieza Dptos para Entrega DPT 197.00 280.89 55,335.33
Transporte Vertical y horizontal en Obra MES 7.00 28,000.00 196,000.00
Montaje y desmontaje de equipo Winche y Elevador GLB 1.00 7,000.00 7,000.00
Cerco Perimetral de Obra ML 185.00 13.00 2,405.00

MOVIMIENTO DE TIERRAS 776,838.80


Excavacin Masiva M3 15,041.36 15.00 225,620.40
Excavacin Manual M3 1,833.2 30.67 56,223.32
Eliminacin de material excedente M3 8,189.72 12.03 98,522.33
Eliminacin de desmonte durante obra M3 5,740.31 18.50 106,195.74
Nivelacin interior y compactacin M2 3,047.50 30.89 94,137.28
Relleno con material externo M3 899.74 33.72 30,339.23
Muro Pantalla GLB 1.00 165,800.50 165,800.50
CIMIENTOS 405,703.46
Acero de refuerzo fy= 4200 kg/cm2 G60 de zapatas KG 1,112.16 3.44 3,825.83
Acero de refuerzo fy= 4200 kg/cm2 G60 de v.c KG 18,857.85 3.44 64,871.00
Acero de refuerzo fy= 4200 kg/cm2 G60 de platea KG 43,703.82 3.44 150,341.14
Concreto fc=50kg/cm2 SOLADOS M3 42.50 220.00 9,350.00
Concreto de cimientos corridos M3 91.07 242.12 22,049.87
Concreto premezclado f'c= 210 kg/cm2 en zapatas M3 25.67 286.31 7,349.58
Concreto premezclado f'c= 210 kg/cm2 en v.c M3 154.88 266.25 41,236.80
Concreto premezclado f'c= 210 kg/cm2 en platea M3 307.15 267.41 82,134.98
Encofrado y desencofrado de zapata aislada M2 76.41 26.11 1,995.07
Encofrado y desencofrado de viga de cimentacin M2 606.07 25.23 15,291.15
Encofrado y desencofrado de platea M2 285.75 25.40 7,258.05
SOTANOS CASCO 1,725,959.03
Acero de refuerzo fy=4200kg/cm2 G60 cisterna KG 14,516.21 3.44 49,935.76
Acero de refuerzo fy=4200 Kg/cm2 G60 muro KG 15,100.00 3.44 51,944.00
Acero de refuerzo fy=4200kg/cm2 G60 placas KG 68,595.00 3.44 235,966.80
Acero de refuerzo fy=4200kg/cm2 G60 columnas KG 7,576.00 3.44 26,061.44
Acero de refuerzo fy=4200kg/cm2 G60 vigas KG 21,000.00 3.44 72,240.00
Acero de refuerzo fy=4200kg/cm2 G60 escaleras KG 2,000.00 3.44 6,880.00
Acero de refuerzo fy=4200kg/cm2 G60 losa macisa KG 3,500.00 3.44 12,040.00
Acero de refuerzo fy=4200kg/cm2 G60 losa aligerada KG 38,721.15 3.44 133,200.76
Encofrado y desencofrado de cisterna M2 1,843.03 26.08 48,066.22
Encofrado y desencofrado de muro M2 2,350.00 26.56 62,416.00
Encofrado y desencofrado de placas M2 6,000.00 25.40 152,400.00
Encofrado y desencofrado de columnas M2 300.00 25.45 7,635.00
Encofrado y desencofrado vigas M2 954.00 26.20 24,994.80
Encofrado y desencofrado de escaleras M2 122.69 32.23 3,954.30
Encofrado y desencofrado de losa maciza M2 512.54 27.00 13,838.58
Encofrado y desencofrado de losa aligerada M2 4,100.00 26.66 109,306.00
Concreto f'c=210kg/cm2 en cisterna M3 246.88 295.72 73,007.35
Concreto Premezclado f'c=210 Kg/cm2 en Muro M3 366.00 286.18 104,741.88
Concreto Premezclado f'c=210kg/cm2 en placas M3 800.00 296.32 237,056.00
Concreto Premezclado f'c=210kg/cm2 en columna M3 36.00 284.45 10,240.20
Concreto Premezclado f'c=210kg/cm2 en vigas M3 110.00 283.35 31,168.50
Concreto Premezclado f'c=210kg/cm2 en escalera M3 20.00 295.75 5,915.00
Concreto Premezclado f'c=210kg/cm2 en losa maciza M3 66.00 298.14 19,677.24
Concreto Premezclado f'c=210kg/cm2 en losa aligerada E=20cm. M3 380.00 298.14 113,293.20
Ladrillo de techo 30x30x15cm UND 43,000.00 2.56 110,080.00
Juntas de Tecnopor M2 2,200.00 4.50 9,900.00
EDIFICIOS CASCO 4,383,300.94
Acero de refuerzo fy=4200 kg/cm2 G60 en C.M KG 942.22 3.44 3,241.24
Acero de Refuerzo fy=4200 Kg/cm2 G60 muro KG 3,067.38 3.44 10,551.79
Acero de refuerzo fy=4200kg/cm2 G60 placas KG 200,140.36 3.44 688,482.84
Acero de refuerzo fy=4200kg/cm2 G60 columnas KG 1,600.77 3.44 5,506.65
Acero de refuerzo fy=4200kg/cm2 G60 vigas KG 46,004.68 3.44 158,256.10
Acero de refuerzo fy=4200kg/cm2 G60 escaleras KG 5,510.88 3.44 18,957.43
Acero de refuerzo fy=4200kg/cm2 G60 losa macisa KG 109,221.25 3.44 375,721.10
Acero de refuerzo fy=4200kg/cm2 G60 losa aligerada KG 13,000.00 3.44 44,720.00
Encofrado y desencofrado de muro M2 619.41 26.56 16,451.53
Encofrado y desencofrado de placas M2 34,287.50 25.40 870,902.50
Encofrado y desencofrado de columnas M2 126.31 25.45 3,214.59
Encofrado y desencofrado vigas M2 2,587.16 26.20 67,783.59
Encofrado y desencofrado de escaleras M2 613.45 32.23 19,771.49
Encofrado y desencofrado de losa maciza M2 12,889.92 27.00 348,027.84
Encofrado y desencofrado de losa aligerada M2 1,475.80 26.66 39,344.83
Encofrado y desencofrado en Cuarto de Mquinas M2 115.51 27.19 3,140.72
Concreto Premezclado f'c=210 Kg/cm2 en Muro M3 123.06 286.18 35,217.31
Concreto Premezclado f'c=210kg/cm2 en placas M3 3,198.06 296.32 947,649.14
Concreto Premezclado f'c=210kg/cm2 en columna M3 12.49 284.45 3,552.78
Concreto Premezclado f'c=210kg/cm2 en vigas M3 336.33 283.35 95,299.11
Concreto Premezclado f'c=210kg/cm2 en escalera M3 101.10 295.75 29,900.33
PRESUPUESTO DE OBRA
OBRA : LA CASTELLANA
PROPIETARIO: ARTECO
UBICACIN: SURCO

DESCRIPCIN DE PARTIDAS PRESUPUESTO


UND CANT UNIT PARCIAL TOTAL
Concreto Premezclado f'c=210kg/cm2 en losa maciza M3 1,814.27 298.14 540,906.46
Concreto Premezclado f'c=210kg/cm2 en losa aligerada E=20cm. M3 131.21 298.14 39,118.95
Concreto Premezclado F'c=210Kg/cm2 en Cuarto de Mquinas M3. 13.43 288.73 3,877.64
Ladrillo de techo 30x30x15cm UND 4,000.00 2.56 10,240.00
Juntas de Tecnopor M2 770.00 4.50 3,465.00

ALBAILERIA 907,174.94
Ladrillo blanco silico calcreo P7 M2 2,492.09 63.05 157,125.96
Ladrillo blanco silico calcreo P10 M2 10,110.38 68.09 688,415.57
Muro de ladrillo KK cabeza M2 547.90 70.00 38,353.00
Parapeto de 0.10 m ML 1,285.50 18.11 23,280.41

REVOQUES Y ENLUCIDOS 454,089.32


Vestidura de derrames ML 3,215.48 8.60 27,653.13
Forjado y pulido de p/c de escalera UND 638.00 40.85 26,062.30
Forjado y revestimiento de escalera ML 372.11 27.05 10,065.58
Forjado en descanso de escalera M2 272.09 19.30 5,251.34
Solaqueo de Placas y vigas departamentos M2 42,301.88 5.69 240,697.70
Solaqueo de Stano M2 6,162.96 5.20 32,047.39
Solaque de cieloraso M2 13,577.87 3.00 40,733.61
Tarrajeo frotachado de muros interiores M2 1,375.80 15.00 20,637.00
Tarrajeo impermeabilizado de cisterna M2 1,077.90 25.75 27,755.93
Tarrajeo impermeabilizado de Jardineras M2 335.40 24.66 8,270.96
Tarrajeo Pulido de Sardineles ML 337.20 24.62 8,301.86
Albaileria en Bancos de Medidores UND 6.00 1,102.09 6,612.54

PISOS Y PODIOS 348,531.02


Rectificacin de pisos M2 14,477.82 4.20 60,806.84
Contrapiso M2 1,747.80 15.71 27,457.94
Limpieza y colocacin de puntos para contrapiso M2 1,747.80 2.76 4,823.93
Piso frotachado y bruado @ 10cm en rampa M2 1,729.85 8.64 14,945.90
Piso de cemento pulido M2 5,662.96 8.35 47,285.72
Piso Cemento Pulido Impermiabilizado Parque Central M2 909.60 32.02 29,125.39
Impermeablizacin piso de adoquin M2 180.46 29.62 5,345.23
Impermeabilizacin en jardineras con manta M2 335.40 33.50 11,235.90
Sardinel de Ducha ML 356.60 19.69 7,021.45
Sardinel de Concreto H=0.07cm ML 337.20 43.55 14,685.06
Jardinera de Concreto H=60cm ML 121.00 52.88 6,398.48
Banca de Concreto UND 6.00 507.56 3,045.36
Tablero de Concreto M2 8.15 120.20 979.63
Caja para Vlvula UND 1,045.00 14.21 14,849.45
Piso de Concreto de Stano M3 207.80 319.18 66,325.60
Piso de Adoquin de Concreto c/cama de arena M2 380.46 51.58 19,624.13
Huellas de Concreto en Estacionamiento UND 33.00 350.00 11,550.00
Piso de Caucho para gimnasio M2 55.00 55.00 3,025.00

CERAMICO 439,658.71
Porcelanato de 0.60 x 0.60 en Lobby M2 208.30 60.44 12,589.65
Cermico Celima Grecia Hueso 0.30x0.30 M2 1,181.09 38.74 45,755.43
Cermico Celima Stone Hueso 0.45x0.45 M2 3,124.70 39.99 124,956.75
Cermico Celima Granilla Blanca 0.30x0.30 M2 1,172.51 39.80 46,665.90
Cermico Celima Amrica Blanco 0.30x0.30 M2 2,905.50 39.60 115,057.80
Cermico Celima Marron 0.40x0.40 M2 283.50 40.27 11,416.55
Cermico Celima Granilla Gris 0.30x.30 M2 52.80 39.19 2,069.23
Contrazocalo celima cermico marron ML 235.70 8.93 2,104.80
Contrazocalo Celima Stone Hueso ML 2,053.54 10.09 20,720.22
Contrazcalo Celima Grecia Hueso 30x30 ML 1,785.00 9.00 16,065.00
Contrazcalo Celima Granilla Blanca 30x30 ML 2,047.50 9.85 20,167.88
Contrazcalo Celima Granilla Gris 0.30x.30 ML 84.50 9.85 832.33
Contrazcalo en Lobby ML 207.25 15.67 3,247.61
Contrazocalo de cermico en ares comunes ML 1,721.50 9.85 16,956.78
Contrazcalo de escalera ML 116.98 9.00 1,052.80

PINTURA 823,250.96
Empastado de interiores M2 38,301.87 5.00 191,509.35
Pintura de Fachada M2 11,260.70 7.50 84,455.25
Escarchado y Planchado de Fachada M2 11,260.70 8.50 95,715.95
Pintura de Paredes con Oleo Mate cambio a Latex M2 7,454.90 7.20 53,675.28
Pintura en cielo raso con oleo mate cambio a Latex M2 2,958.50 7.20 21,301.20
Pintura con Vencelatex a Latex M2 5,473.97 7.20 39,412.58
Pintura de cielo raso con Sinolip a Latex M2 521.15 7.20 3,752.28
Pintura de muro texturado M2 24.50 35.00 857.50
Escarchado de cielo raso M2 9,804.40 8.75 85,788.50
Pintado con Latex M2 4,767.57 7.20 34,326.50
Colomural Color Hueso M2 33,124.24 6.00 198,745.44
PIntado de Numeracin de Estacionamiento UND 219.00 20.65 4,522.35
Pintura de linea de trfico ML 1,743.60 5.27 9,188.77
PRESUPUESTO DE OBRA
OBRA : LA CASTELLANA
PROPIETARIO: ARTECO
UBICACIN: SURCO

DESCRIPCIN DE PARTIDAS PRESUPUESTO


UND CANT UNIT PARCIAL TOTAL
VINILICO 120,220.65
Piso Vinlico Color Haya e=1.5mm M2 4,935.40 18.00 88,837.18
Junta en Cambio de Piso ML 1,346.93 23.30 31,383.47

CARPINTERIA DE MADERA 726,299.24


Puerta Principal Contraplacada c/ruteado pintada al latex acrlico UND 202.00 257.40 51,994.80
Puerta Interior Contraplacada Interiores pintada latex acrlico UND 1,260.00 229.50 289,170.00
Puerta de Areas Comunes pintada latex acrlico UND 133.00 223.17 29,681.61
Puerta de Ductos de melamine UND 87.00 436.40 37,966.80
Mueble de Melamine en Cocina (incl. lavad inox) UND 197.00 588.24 115,883.28
Puerta de Estacionamiento P11 UND 1.00 5,800.00 5,800.00
Puerta de Estacionamiento P12 UND 1.00 5,500.00 5,500.00
Puerta de Estacionamiento P13 UND 2.00 4,950.00 9,900.00
Puerta de Estacionamiento P14 UND 1.00 9,500.00 9,500.00
Contrazocalo de Trupan pintado al duco ML 13,895.50 10.50 145,902.75
Bancas de madera UND 6.00 750.00 4,500.00
Trabajos de Enchape y Muebles en Loby GLB 1.00 10,500.00 10,500.00
Mueble en Sala de Computo GLB 1.00 10,000.00 10,000.00

CERRAJERIA 78,973.00
Cerradura Puerta Principal UND 202.00 31.50 6,363.00
Cerradura Puerta Interior UND 1,460.00 26.50 38,690.00
Bisagra de 3 1/2" x 3 1/2" UND 7,180.00 3.20 22,976.00
Bisagra Pesada de 3 1/2" x 3 1/2" UND 152.00 22.00 3,344.00
Cierrapuertas Cortafuego UND 38.00 125.00 4,750.00
Barra Antipnico UND 2.00 380.00 760.00
Cerradura para Puerta Cortafuego UND 38.00 55.00 2,090.00

ALFOMBRA 103,740.00
Piso de Alfombra Boucle M2 5,460.00 19.00 103,740.00

VIDRIOS, CRISTALES Y SIMILARES 571,289.95


Mampara de Vidrio Crudo Incoloro M2 936.46 185.54 173,750.79
Mampara de Vidrio Templado Incoloro M2 112.28 345.00 38,736.60
Ventana de cristal crudo incoloro con marco de Aluminio M2 1,880.85 118.60 223,068.81
Puertas Ventanas de Vidrio Crudo UND 200.00 295.00 59,000.00
Celosia Quiebravista M2 392.50 195.50 76,733.75

APARATOS SANITARIOS 262,760.35


Inodoro Sifon Jet Bone UND 361.00 182.50 65,882.50
Lavatorio Malibu c/pedestal Color Bone UND 342.00 96.68 33,064.56
Lavatorio Amazonas Blanco en lavandera UND 197.00 144.36 28,438.92
Mezcladora de Lavatorio 4" PZA 342.00 76.23 26,070.66
Mezcladora de ducha PZA 335.00 74.86 25,078.10
Llave esferica 1/2" para lavadero de ropa PZA 394.00 10.04 3,955.76
Kit de Accesorios de Baos UND 361.00 43.75 15,793.75
Inodoro con Tanque Alto PZA 2.00 320.70 641.40
Urinario PZA 1.00 194.70 194.70
Instalacin de Aparatos Sanitarios PZA 1,096.00 35.00 38,360.00
Instalacin de Griferas PZA 1,264.00 20.00 25,280.00

CARPINTERIA METALICA 350,648.96


Puertas Metlica P-10 UND 2.00 1,250.00 2,500.00
Puerta Metlicas Acopio UND 3.00 1,090.00 3,270.00
Puertas cortafuego UND 38.00 1,250.00 47,500.00
Escalera de Gato a Azotea UND 3.00 700.00 2,100.00
Baranda Metlicas en Terraza ML 818.60 137.00 112,148.20
Pasamano metlico en Pasamano de escalera Areas Comunes ML 389.50 111.80 43,546.10
Escalera de departametnos duplex ML 80.85 121.95 9,859.66
Reja en Estacionamiento ML 72.50 920.00 66,700.00
Carpinteria Metlica para Ascensor GLB 1.00 8,000.00 8,000.00
Motor y Sistema de Puerta Levadiza UND 5.00 3,950.00 19,750.00
Carpinteria metalica en ductos de basura ML 41.00 375.00 15,375.00
Poste Metlico UND 10.00 1,000.00 10,000.00
Juego de Nio UND 8.00 900.00 7,200.00
Ducto de basura UND 3.00 900.00 2,700.00

COBERTURA 63,771.64
Cobertura Ladrillo Pastelero M2 1,255.70 30.55 38,361.64
Drywall Cielo Raso Baos M2 27.00 210.00 5,670.00
Drywall en ductos de ascensor UND 84.00 235.00 19,740.00

EXTERIORES Y OTROS 55,846.51


Gras en Exteriores M2 130.76 16.28 2,128.77
Tierra de Cultivo M3 69.95 49.24 3,444.34
Grass Artificial M2 728.60 69.00 50,273.40

CORNISA 146,597.53
Cornisa de poliestireno ML 13,895.50 10.55 146,597.53
PRESUPUESTO DE OBRA
OBRA : LA CASTELLANA
PROPIETARIO: ARTECO
UBICACIN: SURCO

DESCRIPCIN DE PARTIDAS PRESUPUESTO


UND CANT UNIT PARCIAL TOTAL
INSTALACIONES SANITARIAS
RED DE AGUA FRIA 452,955.15
Tuberia de PVC C-10 de 1/2" empotrado ML 1,092.52 5.50 6,008.86
Tuberia de PVC C-10 de 3/4" empotrado ML 1,522.36 7.30 11,113.23
Tuberia de PVC C-10 de 1" empotrado ML 2,429.04 10.50 25,504.92
Tuberia de PVC C-10 de 1 1/4" Empotrado ML 10.00 14.50 145.00
Tuberia de PVC C-10 de 1 1/2" empotrado ML 3.50 15.10 52.85
Tuberia de PVC C-10 de 2" empotrado ML 95.00 18.50 1,757.50
Tuberia de PVC C-10 de 3" empotrado ML 40.00 27.10 1,084.00

ALIMENTADORES DE AGUA FRIA


Tuberia de PVC C-10 de 4" empotrado ML 25.00 30.87 771.75
Tuberia de PVC C-10 de 3" S/P adosado ML 10.00 54.19 541.90
Tuberia de PVC C-10 de 2 1/2" S/P adosada ML 10.00 40.67 406.70
Tuberia de PVC C-10 de 2" CR adosada ML 115.00 30.87 3,550.05

SALIDA DE AGUA FRIA


Salida de Agua Fria PVC C-10 de 1/2" PTO 1,850.00 36.06 66,711.00
Salida de Agua Fria PVC C-10 en calentador elctrico PTO 197.00 36.39 7,168.83
Salida de Agua Fria PVC C-10 p/grifo de riego PTO 10.00 36.14 361.40
Medidores de Agua UND 197.00 330.50 65,108.50

VALVULAS
Vlvula Esfrica de Bronce de 1" UND 197.00 94.78 18,671.66
Vlvula Esfrica de Bronce de 3/4" UND 197.00 75.50 14,873.50
Vlvula Esfrica de Bronce de 1/2" UND 1,295.00 61.50 79,642.50
Vlvula Esfrica de Bronce de 1 1/4" UND 2.00 165.50 331.00
Estacin Reductora de Presin UND 33.00 1,550.00 51,150.00

EQUIPOS DE BOMBEO
Vlvulas y accesorios para Cisterna UND 1.00 8,000.00 8,000.00
Lineas de Subcin, impulsin, rebose GLB 1.00 30,000.00 30,000.00
Suministro e Instalacin de Equipo de Bombeo de Agua GLB 1.00 60,000.00 60,000.00

RED DE AGUA CALIENTE 64,889.36


Tubera PVC para agua caliente de 1/2" ML 3,028.13 8.50 25,739.06

SALIDA DE AGUA CALIENTE


Salida de agua caliente en aparatos sanitarios PTO 680.00 40.80 27,744.00
Salida de agua caliente en calentador elctrico PTO 197.00 57.90 11,406.30

RED DE DESAGUE 260,719.39


Tubera PVC SAL de 6" enterrada ML 15.00 40.42 606.30
Tubera PVC SAL de 4" enterrada ML 192.68 18.96 3,653.21
Tubera PVC SAL de 2" enterrada ML 110.16 9.87 1,087.28
Tubera PVC SAL de 2" empotrada ML 835.38 9.30 7,769.03
Tubera PVC SAL de 4" empotrada ML 115.21 13.93 1,604.88
Tubera PVC SAL de 6" empotrada ML 413.83 18.60 7,697.24
Tubera PVC SAL de 4" colgadas ML 87.21 24.24 2,113.97
Tubera PVC SAL de 6" colgadas ML 142.75 45.88 6,549.37
Montante Tubera PVC SAL de 3" adosada ML 45.90 21.23 974.46
Montante Tubera PVC SAL de 4" adosada ML 464.32 28.03 13,014.89
Montante Tubera PVC SAL de 6" adosada ML 628.83 57.50 36,157.73
Montante Ventilacin PVC SAL de 2" adosada ML 115.21 16.04 1,847.97
Montante Ventilacin PVC SAL de 3" adosada ML 344.25 20.98 7,222.37
Montante Ventilacin PVC SAL de 4" adosada ML 436.78 75.50 32,976.89
Salida de Desage PVC SAL 2" UND 988.00 32.50 32,110.00
Salida de Desage PVC SAL 4" UND 378.00 44.50 16,821.00
Salida de Ventilacin PVC SAL 2" UND 948.00 29.80 28,250.40
Sumidero de Bronce de 2" UND 536.00 12.20 6,539.20
Sumidero de Bronce de 3" UND 20.00 15.50 310.00
Sumidero de Bronce de 4" UND 10.00 18.50 185.00
Registro de Bronce de 2" UND 404.00 12.20 4,928.80
Registro de Bronce de 3" UND 2.00 15.50 31.00
Registro de Bronce de 4" UND 364.00 18.50 6,734.00
Registro de Bronce de 6" UND 9.00 23.50 211.50
Registro de Bronce de 4" Tipo Dado UND 10.00 32.00 320.00
Registro de Bronce de 6" Tipo Dado UND 15.00 46.50 697.50
Sombreros de Ventilacin de 2" UND 4.00 17.80 71.20
Sombreros de Ventilacin de 3" UND 14.00 23.18 324.52
Sombreros de Ventilacin de 4" UND 35.00 28.70 1,004.50
Sombreros de Ventilacin de 6" UND 24.00 54.30 1,303.20
Caja de Registro 12"x24" c/tapa concreto UND 14.00 265.00 3,710.00
Caja de Registro 24"x24" c/tapa concreto UND 10.00 395.70 3,957.00
Suministro e Instalacin de Equipo de Desage GLB 1.00 20,000.00 20,000.00
Linea de Implusin de desague UND 1.00 4,000.00 4,000.00
Prueba Hidrulica del Sistema de Desague UND 1.00 5,935.00 5,935.00

-82,517.51
PRESUPUESTO DE OBRA
OBRA : LA CASTELLANA
PROPIETARIO: ARTECO
UBICACIN: SURCO

DESCRIPCIN DE PARTIDAS PRESUPUESTO


UND CANT UNIT PARCIAL TOTAL
DEDUCTIVO DE MEJORAS DE SISTEMAS
Cambio de estimado a Polifusin GLB 1.00 -69,444.44 (69,444.44)
Por mejoras del sistema de instalaciones sanitarias GLB 1.00 -13,073.07 (13,073.07)

SISTEMA CONTRA INCENDIO 307,637.44

REDES DE DISTRIBUCION
Tubera de acero SCH-40 de 4" ML 217.50 152.50 33,168.75
Tubera de acero SCH-40 de 3" ML 37.50 89.50 3,356.25
Tubera de acero SCH-40 de 2 1/2" ML 217.50 75.50 16,421.25
Tubera de acero SCH-40 de 2" ML 56.25 64.50 3,628.13
Tubera de acero SCH-40 de 1 1/2" ML 146.25 56.80 8,307.00
Tubera de acero SCH-40 de 1 1/4" ML 151.13 45.65 6,898.86
Tubera de acero SCH-40 de 1" ML 223.88 38.45 8,607.99

MONTANTES
Tubera de acero SCh-40 de 4" adosada ML 101.25 152.80 15,471.00
Tubera de acero SCh-40 de 2" adosada ML 22.50 58.70 1,320.75

PRUEBAS
Prueba del Sistema ACI GLB 1.00 3,500.00 3,500.00

ROCEADORES
Rociador de 1/2" Standar UND 178.00 42.60 7,582.80
Estacin controladora de Rociadores UND 4.00 1,895.50 7,582.00

VALVULAS
Vlvula Siamesa de 4" x 2 1/2"x2 1/2" UND 2.00 881.55 1,763.10
Vlvula Check de 4" UND 2.00 522.00 1,044.00
Vlvula Angular de 2 1/2" UND 35.00 645.42 22,589.70

VARIOS
Gabinetes Contraincendio UND 38.00 801.45 30,455.10
Junta de Dilatacin de 4" UND 3.00 878.50 2,635.50
Suministro e Instalacin de Equipo Contraincendio GLB 1.00 30,000.00 30,000.00
Equipo de Control de Alarma Contraincendio GLB 1.00 80,000.00 80,000.00

SISTEMA DE BOMBEO CONTRAINCENDIO


Linea de succin de 6" GLB 1.00 3,690.49 3,690.49
Linea de impulsin de 6" GLB 1.00 4,471.10 4,471.10
Linea de prueba de 4" GLB 1.00 4,914.28 4,914.28
Linea de alivio de 3" GLB 1.00 6,373.21 6,373.21
Linea Sensora de Cobre de 1/2" GLB 1.00 909.21 909.21
Linea de Succin de 2" GLB 1.00 1,038.39 1,038.39
Linea de impulsin de 1 1/2" GLB 1.00 999.37 999.37
Linea de sensora de cobre 1/2" GLB 1.00 909.21 909.21

INSTALACIONES ELECTRICAS
TUBERIAS DE PVC- SAP 137,848.48
Tuberia Pvc Sap de 100 mm ML 58.50 17.07 998.60
Tubera Pvc Sap de 80 mm ML 230.00 14.44 3,321.20
Tuberia Pvc Sap de 65 mm ML 52.50 13.43 705.08
Tubera Pvc Sap de 55 mm ML 34.76 12.04 418.51
Tubera Pvc Sap de 40 mm ML 117.00 10.52 1,230.84
Tubera Pvc Sap de 35 mm ML 3,055.00 7.85 23,981.75
Tuberia Pvc Sap de 25 mm ML 7,367.60 6.90 50,836.44
Tubera Pvc Sap de 20 mm ML 9,238.70 6.10 56,356.07

CABLES Y ALAMBRES TW Y THW 469,097.17


Cable NYY de 185 mm2 ML 165.00 75.60 12,474.00
Cable NYY de 120 mm2 ML 67.50 48.50 3,273.75
Cable NYY de 95 mm2 ML 645.00 34.60 22,317.00
Cable NYY de 70 mm2 ML 154.00 31.10 4,789.40
Cable NYY de 50 mm2 ML 55.00 22.50 1,237.50
Cable NYY de 35 mm2 ML 115.00 15.70 1,805.50
Cable NYY de 25 mm2 ML 42.00 11.75 493.50
Alambre THW de 1x120 mm2 ML 63.34 46.70 2,957.98
Alambre THW de 1x95 mm2 ML 23.67 36.76 870.11
Alambre THW de 1x70 mm2 ML 213.65 27.65 5,907.42
Alambre THW de 1x35 mm2 ML 65.60 13.34 875.10
Alambre THW de 1x25 mm2 ML 4,354.70 9.65 42,022.86
Alambre THW de 1x16 mm2 ML 25,840.70 6.00 155,044.20
Alambre THW de 1x10 mm2 ML 12,957.80 3.03 39,262.13
Alambre THW de 1x6 mm2 ML 12,238.95 2.10 25,701.80
Alambre THW de 1x4 mm2 ML 413.50 1.65 682.28
Cable TW de 6mm2 ML 6,225.60 1.72 10,708.03
Cable TW de 4mm2 ML 76,451.50 1.16 88,683.74
Cable TW de 2.5mm2 ML 58,812.80 0.85 49,990.88
PRESUPUESTO DE OBRA
OBRA : LA CASTELLANA
PROPIETARIO: ARTECO
UBICACIN: SURCO

DESCRIPCIN DE PARTIDAS PRESUPUESTO


UND CANT UNIT PARCIAL TOTAL

SALIDA DE DISTRIBUCION Y COMUNICACIONES 590,869.04


Salida de Centro de Luz en techo o pared PTO 2,993.00 48.69 145,729.17
Salida para telfono externo PTO 197.00 39.36 7,753.92
Salida para Intercomunicador PTO 197.00 39.98 7,876.06
Salida para Cocina elctrica PTO 197.00 56.43 11,116.71
Salida para calentador elctrico PTO 197.00 76.49 15,068.53
Salida para Lavadora-Secadora PTO 197.00 76.70 15,109.90
Salida para Timbre PTO 198.00 42.39 8,393.22
Salida para campanilla ( no incl. equipo) PTO 198.00 30.27 5,993.46
Salida para TV por Cable PTO 397.00 39.44 15,657.68
Salida para chapa elctrica y directorio (No inc. cables) PTO 3.00 122.63 367.89
Salida para tomacorriente bipolar doble PTO 2,919.00 53.60 156,458.40
Salida para tomacorriente doble con linea a tierra PTO 552.00 55.69 30,740.88
Salida para interruptor simple PTO 2,296.00 39.46 90,600.16
Salida para interruptor doble PTO 10.00 42.60 426.00
Salida para conmutacin PTO 392.00 46.66 18,290.72
Salida para varios PTO 633.00 35.96 22,762.68
Salida para detector Temperatura PTO 233.00 39.94 9,306.02
Salida para detector Humo PTO 396.00 39.74 15,737.04
Salida para luz de emergencia PTO 150.00 58.65 8,797.50
Salida para puerta levadiza PTO 7.00 101.38 709.66
Salida para bombas de agua PTO 6.00 101.51 609.06
Salida para bomba Jockey PTO 2.00 116.31 232.62
Salida para bomba de agua contraincendio. PTO 2.00 116.37 232.74
Salida para control de cisterna PTO 6.00 97.92 587.52
Salida para bomba sumidero PTO 4.00 94.41 377.64
Salida para ascensor PTO 6.00 117.76 706.56
Salida para farola de poste PTO 10.00 122.73 1,227.30

CAJAS DE PASE 32,798.51


Caja de Pase 2000x1000x200 UND 1.00 373.50 373.50
Caja de Pase 1900x800x200 UND 1.00 310.61 310.61
Caja de Pase 1400x800x200 UND 1.00 305.40 305.40
Caja de Pase 900x500x120 UND 2.00 232.00 464.00
Caja de Pase 800x500x120 UND 2.00 250.00 500.00
Caja de Pase 700x500x120 UND 1.00 200.00 200.00
Caja de Pase 650x350x120 UND 33.00 130.00 4,290.00
Caja de Pase 600x600x200 UND 25.00 113.00 2,825.00
Caja de Pase 300x300x120 UND 25.00 65.00 1,625.00
Caja de Pase 300x300x100 UND 18.00 60.00 1,080.00
Caja de Pase 250x250x150 UND 15.00 32.00 480.00
Caja de Pase 150x150x120 UND 35.00 22.00 770.00
Caja de Pase FG Octogonal UND 46.00 11.25 517.50
Canaleta de FG en Stano ML 115.50 165.00 19,057.50

TABLEROS ELECTRICOS 182,199.17


Tablero de General T.G inc. colocacin. UND 1.00 12,404.64 12,404.64
Tablero de Servicio Generales TSG Edificio B UND 1.00 13,935.50 13,935.50
Tablero de Servicio Generales TSG Edificio A UND 1.00 12,875.50 12,875.50
Tablero de Distribucin TD1 UND 85.00 578.31 49,156.35
Tablero de Distribucin TD2 UND 112.00 579.37 64,889.44
Tablero de Distribucin Bomba Contra-incendio UND 1.00 3,233.17 3,233.17
Tablero de Distribucin Bomba de Agua UND 2.00 3,486.14 6,972.28
Tablero de Bomba de Desague UND 2.00 2,902.00 5,804.00
Tablero de Emergencia UND 2.00 2,049.30 4,098.60
Tablero de Luminarias Estacionamiento UND 3.00 2,943.23 8,829.69

DEDUCTIVO -60,000.00
Por mejoras del sistema elctrico GLB 1.00 -60,000.00 (60,000.00)

VARIOS 53,745.00
Pozo de Tierra UND 5.00 1,469.00 7,345.00
Luminarias GLB 1.00 15,000.00 15,000.00
Equipo para directorio de comunicacin GLB 1.00 30,000.00 30,000.00
Buzon Electrico de Concreto UND 4.00 350.00 1,400.00

EQUIPAMIENTO 746,381.20
Ascensor GLB 1.00 560,000.00 560,000.00
Sistema de extraccin de Monxido GLB 1.00 125,000.00 125,000.00
Sealtica GLB 1.00 5,000.00 5,000.00
Sistema de Ventilacin Mecnica UND 358.00 98.90 35,406.20
Ventana de ducto de ventilacin UND 358.00 25.00 8,950.00
Luces de Emergencia UND 185.00 65.00 12,025.00

SEGURIDAD 214,510.28
Seguridad GLB 1.00 214,510.28 214,510.28

COSTO DIRECTO S/. 16,755,518.41


C
OBRA

Actividades Dur. Inicio Termino Recurso (S/.)

PROYECTO PASEO EL MIRADOR II 680 das 06-04-14 07-06-16 37,382,867.05

Inicio del proyecto 0

Obras provisionales 373,373.74

Oficinas de Contratista #ADDIN? 07-07-14 23-07-14 5,500.00

SS.HH Porttiles #ADDIN? 07-07-14 23-07-14 30,400.00

Comedor para Obreros #ADDIN? 07-07-14 23-07-14 6,500.00

Almacen y depsito #ADDIN? 07-07-14 23-07-14 8,000.00

Guardiana #ADDIN? 07-07-14 07-06-16 220,800.00

Instalacin elctrica provisional #ADDIN? 07-07-14 23-07-14 60,000.00

Instalacin de agua provisional #ADDIN? 07-07-14 23-07-14 7,500.00

Instalacin de desage provisional #ADDIN? 07-07-14 23-07-14 4,000.00

Poza de agua Provisional #ADDIN? 07-07-14 23-07-14 800.00

Duchas y Vestuarios #ADDIN? 07-07-14 23-07-14 20,873.74

Sealizacin #ADDIN? 07-07-14 23-07-14 9,000.00

Obras Preliminares 1,478,252.03

Movilizacin y desmovilizacin #ADDIN? 07-07-14 07-06-16 7,000.00

Topografa Permanente #ADDIN? 07-07-14 07-06-16 294,500.00

Limpieza permanente en obra #ADDIN? 08-09-14 07-06-16 85,000.00

Limpieza Dptos para Entrega #ADDIN? 12-08-15 06-01-16 143,031.63

Transporte Horizontal y Vertical (c/grua) #ADDIN? 01-11-14 10-12-15 560,000.00

Montaje Y Desmontaje De Grua #ADDIN? 01-11-14 20-12-15 100,000.00

Montaje y desmontaje de equipo Winche y Elevador #ADDIN? 06-04-14 20-12-15 7,000.00

Transporte Horizontal Y Vertical (s/grua) #ADDIN? 01-11-14 10-12-15 279,315.40

Cerco Perimetral de Obra #ADDIN? 07-07-14 23-07-14 2,405.00

Movimiento de tierras 1,578,548.03

Excavacin Masiva #ADDIN? 28-07-14 13-10-14 556,497.00

Excavacin Manual #ADDIN? 28-07-14 13-10-14 98,844.04

Eliminacin de material excedente #ADDIN? 06-10-14 11-04-16 624,249.21

Eliminacin de desmonte durante obra #ADDIN? 06-10-14 04-04-16 138,750.00

Nivelacin interior y compactacin #ADDIN? 18-08-14 29-09-14 159,331.05

Relleno con material externo #ADDIN? 06-10-14 10-10-14 876.74

Muro Pantalla (Anclaje) 660,000.00

Muro Pantalla #ADDIN? 21-07-14 06-10-14 660,000.00

Estructura en muro pantalla 648,274.38

Acero, Enc, C #ADDIN? 28-07-14 13-10-14 648,274.38

Sotano 1,702,855.19

Acero, Enc, C #ADDIN? 20-10-14 08-12-14 1,702,855.19

Cisternas 176,255.55

Estructura de cisterna #ADDIN? 03-11-14 24-11-14 176,255.55

Edificio A - CASCO #ADDIN? 5,061,709.41

Casco 1 piso #ADDIN? 15-12-14 22-12-14 266,405.76

Casco 2 piso #ADDIN? 22-12-14 29-12-14 266,405.76

Casco 3 piso #ADDIN? 29-12-14 05-01-15 266,405.76

Casco 4 piso #ADDIN? 05-01-15 12-01-15 266,405.76

Casco 5 piso #ADDIN? 12-01-15 19-01-15 266,405.76

Casco 6 piso #ADDIN? 19-01-15 26-01-15 266,405.76

Casco 7 piso #ADDIN? 26-01-15 02-02-15 266,405.76

Casco 8 piso #ADDIN? 02-02-15 09-02-15 266,405.76

Casco 9 piso #ADDIN? 09-02-15 16-02-15 266,405.76

Casco 10 piso #ADDIN? 16-02-15 23-02-15 266,405.76

Casco 11 piso #ADDIN? 23-02-15 02-03-15 266,405.76

Casco 12 piso #ADDIN? 02-03-15 09-03-15 266,405.76

Casco 13 piso #ADDIN? 09-03-15 16-03-15 266,405.76

Casco 14 piso #ADDIN? 16-03-15 23-03-15 266,405.76

Casco 15 piso #ADDIN? 23-03-15 30-03-15 266,405.76

Casco 16 piso #ADDIN? 30-03-15 06-04-15 266,405.76

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 7 DE 34


C
OBRA

Actividades Dur. Inicio Termino Recurso (S/.)

Casco 17 piso #ADDIN? 06-04-15 13-04-15 266,405.76

Casco 18 piso #ADDIN? 13-04-15 20-04-15 266,405.76

Casco 19 piso #ADDIN? 20-04-15 27-04-15 266,405.76

Edificio B - CASCO 4,488,685.71

Casco 1 piso #ADDIN? 27-04-15 04-05-15 249,371.43

Casco 2 piso #ADDIN? 04-05-15 11-05-15 249,371.43

Casco 3 piso #ADDIN? 11-05-15 18-05-15 249,371.43

Casco 4 piso #ADDIN? 18-05-15 25-05-15 249,371.43

Casco 5 piso #ADDIN? 25-05-15 01-06-15 249,371.43

Casco 6 piso #ADDIN? 01-06-15 08-06-15 249,371.43

Casco 7 piso #ADDIN? 08-06-15 15-06-15 249,371.43

Casco 8 piso #ADDIN? 15-06-15 22-06-15 249,371.43

Casco 9 piso #ADDIN? 22-06-15 29-06-15 249,371.43

Casco 10 piso #ADDIN? 29-06-15 06-07-15 249,371.43

Casco 11 piso #ADDIN? 06-07-15 13-07-15 249,371.43

Casco 12 piso #ADDIN? 13-07-15 20-07-15 249,371.43

Casco 13 piso #ADDIN? 20-07-15 27-07-15 249,371.43

Casco 14 piso #ADDIN? 27-07-15 03-08-15 249,371.43

Casco 15 piso #ADDIN? 03-08-15 10-08-15 249,371.43

Casco 16 piso #ADDIN? 10-08-15 17-08-15 249,371.43

Casco 17 piso #ADDIN? 17-08-15 24-08-15 249,371.43

Casco 18 piso #ADDIN? 24-08-15 31-08-15 249,371.43

Edificio C - CASCO 1,839,547.39

Casco 1 piso #ADDIN? 07-09-15 12-09-15 119,970.48

Casco 2 piso #ADDIN? 12-09-15 17-09-15 119,970.48

Casco 3 piso #ADDIN? 17-09-15 22-09-15 119,970.48

Casco 4 piso #ADDIN? 22-09-15 27-09-15 119,970.48

Casco 5 piso #ADDIN? 27-09-15 02-10-15 119,970.48

Casco 6 piso #ADDIN? 02-10-15 07-10-15 119,970.48

Casco 7 piso #ADDIN? 07-10-15 12-10-15 119,970.48

Casco 8 piso #ADDIN? 12-10-15 17-10-15 119,970.48

Casco 9 piso #ADDIN? 17-10-15 22-10-15 119,970.48

Casco 10 piso #ADDIN? 22-10-15 27-10-15 119,970.48

Casco 11 piso #ADDIN? 27-10-15 01-11-15 119,970.48

Casco 12 piso #ADDIN? 01-11-15 06-11-15 119,970.48

Casco 13 piso #ADDIN? 06-11-15 11-11-15 119,970.48

Casco 14 piso #ADDIN? 11-11-15 16-11-15 119,970.48

Casco 15 piso #ADDIN? 16-11-15 21-11-15 39,990.16

Casco 16 piso #ADDIN? 21-11-15 26-11-15 39,990.16

Casco 17 piso #ADDIN? 26-11-15 01-12-15 39,990.16

Casco 18 piso #ADDIN? 01-12-15 06-12-15 39,990.16

ACABADOS #ADDIN? 12,732,544.04

Solaqueo y tarrajeo #ADDIN? 12-01-15 25-01-16 1,526,784.74

Tabiqueria #ADDIN? 19-01-15 01-02-16 2,837,331.35

Cermicos #ADDIN? 26-01-15 08-02-16 848,122.28

Pisos, podios y rectificacin de pisos #ADDIN? 02-02-15 15-02-16 492,401.39

Cableados #ADDIN? 09-02-15 22-02-16 572,686.60

Carpinteria metlica colocacin #ADDIN? 16-02-15 29-02-16 363,397.67

Pintura #ADDIN? 23-02-15 07-03-16 1,450,449.13

Carpinteria de madera #ADDIN? 02-03-15 14-03-16 966,695.94

Vidrios y mamparas #ADDIN? 09-03-15 21-03-16 1,360,399.80

Cocina (muebles de melamine) #ADDIN? 16-03-15 28-03-16 210,232.50

Aparatos sanitarios #ADDIN? 23-03-15 04-04-16 479,828.67

Alfombra #ADDIN? 30-03-15 11-04-16 234,415.61

Papel colomural #ADDIN? 06-04-15 18-04-16 329,841.11

Tableros #ADDIN? 20-04-15 02-05-16 244,160.14

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 8 DE 34


C
OBRA

Actividades Dur. Inicio Termino Recurso (S/.)

Colocacin de cornisas #ADDIN? 27-04-15 09-05-16 287,890.98

Piso laminado #ADDIN? 04-05-15 16-05-16 330,096.17

Contrazocalo de Madera #ADDIN? 11-05-15 23-05-16 197,809.96

Instalaciones 4,924,311.15

Instalaciones sanitarias - pvc y valvulas #ADDIN? 21-09-15 21-03-16 1,216,778.79

Instalaciones sanitarias-bombas #ADDIN? 28-09-15 28-03-16 450,621.95

Instalaciones electricas #ADDIN? 05-10-15 04-04-16 1,481,520.18

Inst. electricas alimentadores y Tableros #ADDIN? 12-10-15 11-04-16 817,977.94

Instalacion agua containcendio #ADDIN? 19-10-15 18-04-16 855,829.41

Puertas cortafuego #ADDIN? 26-10-15 25-04-16 101,582.88

reas comunes 1,718,510.43

Obras exteriores #ADDIN? 09-11-15 09-05-16 168,847.46

Coberturas #ADDIN? 16-11-15 16-05-16 90,576.81

Equipamiento #ADDIN? 23-11-15 23-05-16 899,261.27

Instalaciones y acabados #ADDIN? 07-12-15 06-06-16 559,824.89

Termino de Obras 06-06-16

37,382,867

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 9 DE 34


CONTROL DE AVANCE META
FO-DTC-11

Recurso (S/.) Ponderacin


AVANCE REAL DE
Actividades Dur. Inicio Termino
ACTIVIDADES ANT.
Por Agrupacin Por Actividad

PROYECTO PASEO EL MIRADOR II 680 das 06-04-14 07-06-16 37,382,867.05 100.00% 100.00%

EJECUCION DE PROYECTO

Obras provisionales 373,373.74 1.00%

Oficinas de Contratista #ADDIN? 07-07-14 23-07-14 5,500.00 0.01% 100.00%

SS.HH Porttiles #ADDIN? 07-07-14 23-07-14 30,400.00 0.08% 100.00%

Comedor para Obreros #ADDIN? 07-07-14 23-07-14 6,500.00 0.02% 100.00%

Almacen y depsito #ADDIN? 07-07-14 23-07-14 8,000.00 0.02% 100.00%

Guardiana #ADDIN? 07-07-14 07-06-16 220,800.00 0.59% 13.10%

Instalacin elctrica provisional #ADDIN? 07-07-14 23-07-14 60,000.00 0.16% 100.00%

Instalacin de agua provisional #ADDIN? 07-07-14 23-07-14 7,500.00 0.02% 100.00%

Instalacin de desage provisional #ADDIN? 07-07-14 23-07-14 4,000.00 0.01% 100.00%

Poza de agua Provisional #ADDIN? 07-07-14 23-07-14 800.00 0.00% 100.00%

Duchas y Vestuarios #ADDIN? 07-07-14 23-07-14 20,873.74 0.06% 60.00%

Sealizacin #ADDIN? 07-07-14 23-07-14 9,000.00 0.02% 100.00%

Obras Preliminares 1,478,252.03 3.95%

Movilizacin y desmovilizacin #ADDIN? 07-07-14 07-06-16 7,000.00 0.02% 60.00%

Topografa Permanente #ADDIN? 07-07-14 07-06-16 294,500.00 0.79% 11.50%

Limpieza permanente en obra #ADDIN? 08-09-14 07-06-16 85,000.00 0.23% 25.50%

Limpieza Dptos para Entrega #ADDIN? 12-08-15 06-01-16 143,031.63 0.38% 0.00%

Transporte Horizontal y Vertical (c/grua) #ADDIN? 01-11-14 10-12-15 560,000.00 1.50% 33.00%

Montaje Y Desmontaje De Grua #ADDIN? 01-11-14 20-12-15 100,000.00 0.27% 50.00%

Montaje y desmontaje de equipo Winche y Elevador #ADDIN? 06-04-14 20-12-15 7,000.00 0.02% 0.00%

Transporte Horizontal Y Vertical (s/grua) #ADDIN? 01-11-14 10-12-15 279,315.40 0.75% 30.00%

Cerco Perimetral de Obra #ADDIN? 07-07-14 23-07-14 2,405.00 0.01% 80.00%

Movimiento de tierras 1,578,548.03 4.22%

Excavacin Masiva #ADDIN? 28-07-14 13-10-14 556,497.00 1.49% 98.00%

Excavacin Manual #ADDIN? 28-07-14 13-10-14 98,844.04 0.26% 55.00%

Eliminacin de material excedente #ADDIN? 06-10-14 11-04-16 624,249.21 1.67% 98.00%

Eliminacin de desmonte durante obra #ADDIN? 06-10-14 04-04-16 138,750.00 0.37% 31.00%

Nivelacin interior y compactacin #ADDIN? 18-08-14 29-09-14 159,331.05 0.43% 50.00%

Relleno con material externo #ADDIN? 06-10-14 10-10-14 876.74 0.00% 0.00%

Muro Pantalla (Anclaje) 660,000.00 1.77%

Muro Pantalla #ADDIN? 21-07-14 06-10-14 660,000.00 1.77% 100.00%

Estructura en muro pantalla 648,274.38 1.73%

Acero, Enc, C #ADDIN? 28-07-14 13-10-14 648,274.38 1.73% 98.00%

Sotano 1,702,855.19 4.56%

Acero, Enc, C #ADDIN? 20-10-14 08-12-14 1,702,855.19 4.56% 73.00%

Cisternas 176,255.55 0.47%

Estructura de cisterna #ADDIN? 03-11-14 24-11-14 176,255.55 0.47% 65.00%

Edificio A - CASCO 5,061,709.41 13.54%

Casco 1 piso #ADDIN? 15-12-14 22-12-14 266,405.76 0.71% 100.00%

Casco 2 piso #ADDIN? 22-12-14 29-12-14 266,405.76 0.71% 100.00%

Casco 3 piso #ADDIN? 29-12-14 05-01-15 266,405.76 0.71% 100.00%

Casco 4 piso #ADDIN? 05-01-15 12-01-15 266,405.76 0.71% 100.00%

Casco 5 piso #ADDIN? 12-01-15 19-01-15 266,405.76 0.71% 100.00%

Casco 6 piso #ADDIN? 19-01-15 26-01-15 266,405.76 0.71% 100.00%

Casco 7 piso #ADDIN? 26-01-15 02-02-15 266,405.76 0.71% 100.00%

Casco 8 piso #ADDIN? 02-02-15 09-02-15 266,405.76 0.71% 100.00%

Casco 9 piso #ADDIN? 09-02-15 16-02-15 266,405.76 0.71% 100.00%

Casco 10 piso #ADDIN? 16-02-15 23-02-15 266,405.76 0.71% 100.00%

Casco 11 piso #ADDIN? 23-02-15 02-03-15 266,405.76 0.71% 100.00%

Casco 12 piso #ADDIN? 02-03-15 09-03-15 266,405.76 0.71% 100.00%

Casco 13 piso #ADDIN? 09-03-15 16-03-15 266,405.76 0.71% 100.00%

Casco 14 piso #ADDIN? 16-03-15 23-03-15 266,405.76 0.71% 100.00%

Casco 15 piso #ADDIN? 23-03-15 30-03-15 266,405.76 0.71% 100.00%

Casco 16 piso #ADDIN? 30-03-15 06-04-15 266,405.76 0.71% 100.00%

Casco 17 piso #ADDIN? 06-04-15 13-04-15 266,405.76 0.71% 100.00%

Casco 18 piso #ADDIN? 13-04-15 20-04-15 266,405.76 0.71% 100.00%

Casco 19 piso #ADDIN? 20-04-15 27-04-15 266,405.76 0.71% 50.00%

Edificio B - CASCO 4,488,685.71 12.01%

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 10 DE 34


CONTROL DE AVANCE META
FO-DTC-11

Recurso (S/.) Ponderacin


AVANCE REAL DE
Actividades Dur. Inicio Termino
ACTIVIDADES ANT.
Por Agrupacin Por Actividad

Casco 1 piso #ADDIN? 27-04-15 04-05-15 249,371.43 0.67% 0.00%

Casco 2 piso #ADDIN? 04-05-15 11-05-15 249,371.43 0.67% 0.00%

Casco 3 piso #ADDIN? 11-05-15 18-05-15 249,371.43 0.67% 0.00%

Casco 4 piso #ADDIN? 18-05-15 25-05-15 249,371.43 0.67% 0.00%

Casco 5 piso #ADDIN? 25-05-15 01-06-15 249,371.43 0.67% 0.00%

Casco 6 piso #ADDIN? 01-06-15 08-06-15 249,371.43 0.67% 0.00%

Casco 7 piso #ADDIN? 08-06-15 15-06-15 249,371.43 0.67% 0.00%

Casco 8 piso #ADDIN? 15-06-15 22-06-15 249,371.43 0.67% 0.00%

Casco 9 piso #ADDIN? 22-06-15 29-06-15 249,371.43 0.67% 0.00%

Casco 10 piso #ADDIN? 29-06-15 06-07-15 249,371.43 0.67% 0.00%

Casco 11 piso #ADDIN? 06-07-15 13-07-15 249,371.43 0.67% 0.00%

Casco 12 piso #ADDIN? 13-07-15 20-07-15 249,371.43 0.67% 0.00%

Casco 13 piso #ADDIN? 20-07-15 27-07-15 249,371.43 0.67% 0.00%

Casco 14 piso #ADDIN? 27-07-15 03-08-15 249,371.43 0.67% 0.00%

Casco 15 piso #ADDIN? 03-08-15 10-08-15 249,371.43 0.67% 0.00%

Casco 16 piso #ADDIN? 10-08-15 17-08-15 249,371.43 0.67% 0.00%

Casco 17 piso #ADDIN? 17-08-15 24-08-15 249,371.43 0.67% 0.00%

Casco 18 piso #ADDIN? 24-08-15 31-08-15 249,371.43 0.67% 0.00%

Edificio C - CASCO 1,839,547.39 4.92%

Casco 1 piso #ADDIN? 07-09-15 12-09-15 119,970.48 0.32% 0.00%

Casco 2 piso #ADDIN? 12-09-15 17-09-15 119,970.48 0.32% 0.00%

Casco 3 piso #ADDIN? 17-09-15 22-09-15 119,970.48 0.32% 0.00%

Casco 4 piso #ADDIN? 22-09-15 27-09-15 119,970.48 0.32% 0.00%

Casco 5 piso #ADDIN? 27-09-15 02-10-15 119,970.48 0.32% 0.00%

Casco 6 piso #ADDIN? 02-10-15 07-10-15 119,970.48 0.32% 0.00%

Casco 7 piso #ADDIN? 07-10-15 12-10-15 119,970.48 0.32% 0.00%

Casco 8 piso #ADDIN? 12-10-15 17-10-15 119,970.48 0.32% 0.00%

Casco 9 piso #ADDIN? 17-10-15 22-10-15 119,970.48 0.32% 0.00%

Casco 10 piso #ADDIN? 22-10-15 27-10-15 119,970.48 0.32% 0.00%

Casco 11 piso #ADDIN? 27-10-15 01-11-15 119,970.48 0.32% 0.00%

Casco 12 piso #ADDIN? 01-11-15 06-11-15 119,970.48 0.32% 0.00%

Casco 13 piso #ADDIN? 06-11-15 11-11-15 119,970.48 0.32% 0.00%

Casco 14 piso #ADDIN? 11-11-15 16-11-15 119,970.48 0.32% 0.00%

Casco 15 piso #ADDIN? 16-11-15 21-11-15 39,990.16 0.11% 0.00%

Casco 16 piso #ADDIN? 21-11-15 26-11-15 39,990.16 0.11% 0.00%

Casco 17 piso #ADDIN? 26-11-15 01-12-15 39,990.16 0.11% 0.00%

Casco 18 piso #ADDIN? 01-12-15 06-12-15 39,990.16 0.11% 0.00%

ACABADOS 12,732,544.04 34.06%

Solaqueo y tarrajeo #ADDIN? 12-01-15 25-01-16 1,526,784.74 4.08% 27.00%

Tabiqueria #ADDIN? 19-01-15 01-02-16 2,837,331.35 7.59% 21.50%

Cermicos #ADDIN? 26-01-15 08-02-16 848,122.28 2.27% 14.00%

Pisos, podios y rectificacin de pisos #ADDIN? 02-02-15 15-02-16 492,401.39 1.32% 6.00%

Cableados #ADDIN? 09-02-15 22-02-16 572,686.60 1.53% 0.00%

Carpinteria metlica colocacin #ADDIN? 16-02-15 29-02-16 363,397.67 0.97% 6.00%

Pintura #ADDIN? 23-02-15 07-03-16 1,450,449.13 3.88% 3.00%

Carpinteria de madera #ADDIN? 02-03-15 14-03-16 966,695.94 2.59% 0.00%

Vidrios y mamparas #ADDIN? 09-03-15 21-03-16 1,360,399.80 3.64% 0.00%

Cocina (muebles de melamine) #ADDIN? 16-03-15 28-03-16 210,232.50 0.56% 0.00%

Aparatos sanitarios #ADDIN? 23-03-15 04-04-16 479,828.67 1.28% 0.00%

Alfombra #ADDIN? 30-03-15 11-04-16 234,415.61 0.63% 0.00%

Papel colomural #ADDIN? 06-04-15 18-04-16 329,841.11 0.88% 0.00%

Tableros #ADDIN? 20-04-15 02-05-16 244,160.14 0.65% 0.00%

Colocacin de cornisas #ADDIN? 27-04-15 09-05-16 287,890.98 0.77% 0.00%

Piso laminado #ADDIN? 04-05-15 16-05-16 330,096.17 0.88% 0.00%

Contrazocalo de Madera #ADDIN? 11-05-15 23-05-16 197,809.96 0.53% 0.00%

Instalaciones 4,924,311.15 13.17%

Instalaciones sanitarias - pvc y valvulas #ADDIN? 21-09-15 21-03-16 1,216,778.79 3.25% 26.60%

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 11 DE 34


OBRA: PASEO EL MIRADOR II

AVANCE REAL DE AVANCE PONDERADO


AVANCE REAL DE
ACTIVIDADES
ACTIVIDADES ACUM
ACTUAL. Por Agrupacin Por Actividad

31.21% 31.21%

0.46%

100.00% 0.01%

100.00% 0.08%

100.00% 0.02%

100.00% 0.02%

0.25% 13.35% 0.08%

100.00% 0.16%

100.00% 0.02%

100.00% 0.01%

100.00% 0.00%

60.00% 0.03%

100.00% 0.02%

1.03%

60.00% 0.01%

11.50% 0.09%

1.00% 26.50% 0.06%

0.00% 0.00%

1.00% 34.00% 0.51%

50.00% 0.13%

0.00% 0.00%

30.00% 0.22%

80.00% 0.01%

3.57%

98.00% 1.46%

55.00% 0.15%

98.00% 1.64%

1.00% 32.00% 0.12%

50.00% 0.21%

0.00% 0.00%

1.77%

100.00% 1.77%

1.70%

98.00% 1.70%

3.42%

2.00% 75.00% 3.42%

0.31%

65.00% 0.31%

13.54%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

100.00% 0.71%

50.00% 100.00% 0.71%

0.00%

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 12 DE 34


OBRA: PASEO EL MIRADOR II

AVANCE REAL DE AVANCE PONDERADO


AVANCE REAL DE
ACTIVIDADES
ACTIVIDADES ACUM
ACTUAL. Por Agrupacin Por Actividad

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

3.77%

2.00% 29.00% 1.18%

0.50% 22.00% 1.67%

1.00% 15.00% 0.34%

1.00% 7.00% 0.09%

6.00% 6.00% 0.09%

6.00% 0.06%

3.00% 6.00% 0.23%

1.00% 1.00% 0.03%

1.50% 1.50% 0.05%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

0.00% 0.00%

2.50% 2.50% 0.02%

0.00% 0.00%

0.00% 0.00%

1.64%

1.00% 27.60% 0.90%

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 13 DE 34


ARTECO FLUJOS PARA CURVA S

Id
Actividades Dur. Inicio Termino Recurso (S/.)

0 PROYECTO ARTECO LA CAMPIA 342 das 07-06-11 09-07-12 16,755,518.41

1 Inicio del proyecto

1.1 Obras provisionales 169,241.46

1,1,1 Oficinas de Contratista 5 das 07-06-11 12-06-11 5,200.00

1,1,2 SS.HH Porttiles 5 das 07-06-11 12-06-11 19,000.00

1,1,3 Comedor para Obreros 94 das 07-06-11 23-09-11 6,000.00

1,1,4 Almacen y depsito 5 das 07-06-11 12-06-11 7,500.00

1,1,5 Guardiana 342 das 07-06-11 09-07-12 72,189.00

1,1,6 Instalacin elctrica provisional 94 das 07-06-11 23-09-11 22,244.86

1,1,7 Instalacin de agua provisional 94 das 07-06-11 23-09-11 6,983.86

1,1,8 Instalacin de desage provisional 94 das 07-06-11 23-09-11 3,500.00

1,1,9 Poza de agua Provisional 5 das 07-06-11 12-06-11 750.00

1,1,10 Duchas y Vestuarios 5 das 07-06-11 12-06-11 20,873.74

1,1,11 Sealizacin 94 das 07-06-11 23-09-11 5,000.00

1.2 Obras Preliminares 470,489.25

1,2,1,1 Movilizacin 5 das 07-06-11 12-06-11 3,500.00

1,2,1,2 desmovilizacin 7 das 02-07-12 09-07-12 3,500.00

1,2,2 Topografa Permanente 219 das 07-06-11 16-02-12 124,345.82

1,2,3 Limpieza permanente en obra 257 das 07-06-11 01-04-12 78,403.10

1,2,4 Limpieza Dptos para Entrega 143 das 21-01-12 05-07-12 55,335.33

1,2,5 Transporte Vertical y horizontal en Obra 185 das 07-07-11 07-02-12 196,000.00

1,2,6 Montaje y desmontaje de equipo Winche y Ele 7 das 05-09-11 12-09-11 7,000.00

1,2,7 Cerco Perimetral de Obra 5 das 07-06-11 12-06-11 2,405.00

1.3 Stano 3,398,554.34

1,3,1 Excavacin Masiva 7 das 08-06-11 15-06-11 225,620.40

1,3,2 Excavacin Manual 18 das 15-07-11 04-08-11 56,223.32

1,3,3 Eliminacin de material excedente 7 das 08-06-11 15-06-11 98,522.33

1,3,4 Eliminacin de desmonte durante obra 341 das 07-06-11 07-07-12 106,195.74

1,3,5 Nivelacin interior y compactacin 13 das 12-07-11 26-07-11 94,137.28

1,3,6 Relleno con material externo 13 das 12-07-11 26-07-11 30,339.23

1,3,7 Muro pantalla 25 das 14-06-11 12-07-11 165,800.50

1,3,8 Acero cimientos 26 das 19-07-11 17-08-11 219,037.98

1,3,9 Encofrado cimientos 25 das 23-07-11 21-08-11 24,544.26

1,3,10 Concreto cimientos 25 das 27-07-11 24-08-11 162,121.23

1,3,11 Acero Sotanos 75 das 18-07-11 12-10-11 588,268.76

1,3,12 Encofrado sotanos 75 das 18-07-11 12-10-11 422,610.90

1,3,13 Concreto sotanos 76 das 18-07-11 13-10-11 595,099.37

1,3,14 Aligerado sotanos 55 das 05-08-11 07-10-11 119,980.00

1,3,15 Casco piso 1 Bloques A y B 29 das 28-09-11 31-10-11 490,053.05

1.4 Edificio A - CASCO 1,325,510.204

1,4,2 Casco 2 piso 4 das 17-10-11 20-10-11 112,212.50

1,4,3 Casco 3 piso 4 das 20-10-11 24-10-11 112,212.50

1,4,4 Casco 4 piso 4 das 24-10-11 27-10-11 112,212.50

1,4,5 Casco 5 piso 4 das 27-10-11 31-10-11 112,212.50

1,4,6 Casco 6 piso 4 das 31-10-11 3-11-11 112,212.50

1,4,7 Casco 7 piso 4 das 3-11-11 7-11-11 112,212.50

1,4,8 Casco 8 piso 4 das 7-11-11 10-11-11 112,212.50

1,4,9 Casco 9 piso 4 das 10-11-11 14-11-11 112,212.50

1,4,10 Casco 10 piso 4 das 14-11-11 17-11-11 112,212.50

1,4,11 Casco 11 piso 4 das 17-11-11 21-11-11 112,212.50

1,4,12 Casco 12 piso 4 das 21-11-11 24-11-11 112,212.50

1,4,13 Casco 13 piso 4 das 24-11-11 28-11-11 73,201.13

1,4,14 Casco 14 piso 4 das 28-11-11 1-12-11 17,971.53

1.5 Edificio B - CASCO 2,567,737.69

1,5,2 Casco 2 piso 5 das 07-12-11 12-12-11 179,277.01

1,5,3 Casco 3 piso 5 das 12-12-11 16-12-11 179,277.01

1,5,4 Casco 4 piso 5 das 16-12-11 21-12-11 179,277.01

1,5,5 Casco 5 piso 5 das 21-12-11 26-12-11 179,277.01

1,5,6 Casco 6 piso 5 das 26-12-11 30-12-11 179,277.01

1,5,7 Casco 7 piso 5 das 30-12-11 04-01-12 179,277.01

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 14 DE 34


ARTECO FLUJOS PARA CURVA S

Id
Actividades Dur. Inicio Termino Recurso (S/.)

1,5,8 Casco 8 piso 5 das 04-01-12 09-01-12 179,277.01

1,5,9 Casco 9 piso 5 das 09-01-12 13-01-12 179,277.01

1,5,10 Casco 10 piso 5 das 13-01-12 18-01-12 179,277.01

1,5,11 Casco 11 piso 5 das 18-01-12 23-01-12 179,277.01

1,5,12 Casco 12 piso 5 das 23-01-12 27-01-12 179,277.01

1,5,13 Casco 13 piso 5 das 27-01-12 01-02-12 179,277.01

1,5,14 Casco 14 piso 5 das 01-02-12 06-02-12 179,277.01

1,5,15 Casco 15 piso 5 das 06-02-12 10-02-12 179,277.01

1,5,16 Casco 16 piso 5 das 10-02-12 15-02-12 57,859.57

1.6 Edificio A- ACABADOS 2,061,515.3372

1,6,1 Solaqueo y tarrajeo 52 das 31-10-11 29-12-11 168,013.05

1,6,2 Tabiqueria 47 das 05-11-11 29-12-11 335,654.73

1,6,3 Cermicos 40 das 21-11-11 05-01-12 162,673.72

1,6,4 Pisos, podios y rectificacin de pisos 40 das 28-11-11 12-01-12 128,956.48

1,6,5 Cableados 70 das 17-11-11 06-02-12 55,271.58

1,6,6 Carpinteria metlica colocacin 70 das 19-11-11 08-02-12 129,740.11

1,6,7 Empastado de cielo raso y muros 83 das 22-11-11 25-02-12 161,746.93

1,6,8 Sellado y escarchado 73 das 10-12-11 03-03-12 69,320.11

1,6,9 Hojas y Marco de puertas 73 das 13-12-11 06-03-12 134,287.93

1,6,10 Vidrios y mamparas 69 das 20-12-11 08-03-12 211,377.28

1,6,11 Acabados de puertas 69 das 24-12-11 13-03-12 57,551.97

1,6,12 Muebles 69 das 27-12-11 15-03-12 42,876.81

1,6,13 Aparatos sanitarios 69 das 29-12-11 17-03-12 97,221.33

1,6,14 Alfombra 69 das 31-12-11 20-03-12 38,383.80

1,6,15 Papel colomural 69 das 03-01-12 22-03-12 73,535.81

1,6,16 Tableros 69 das 05-01-12 24-03-12 42,196.94

1,6,17 Colocacin de cornisas 69 das 11-01-12 30-03-12 54,241.08

1,6,18 Piso vinlico 69 das 14-01-12 03-04-12 44,481.64

1,6,19 Contrazocalo de Madera 69 das 21-01-12 10-04-12 53,984.02

1.7 Edificio B- ACABADOS 3,510,147.74

1,7,1 Solaqueo y tarrajeo 73 das 06-01-12 30-03-12 286,076.27

1,7,2 Tabiqueria 73 das 10-01-12 03-04-12 571,520.21

1,7,3 Cermicos 73 das 14-01-12 07-04-12 276,984.99

1,7,4 Pisos, podios y rectificacin de pisos 73 das 17-01-12 10-04-12 219,574.54

1,7,5 Cableados 91 das 14-01-12 28-04-12 94,111.07

1,7,6 Carpinteria metlica colocacin 92 das 17-01-12 02-05-12 220,908.84

1,7,7 Empastado de cielo raso y muros 110 das 19-01-12 25-05-12 275,406.93

1,7,8 Sellado y escarchado 96 das 11-02-12 01-06-12 118,031.54

1,7,9 Hojas y Marco de puertas 96 das 14-02-12 04-06-12 228,652.42

1,7,10 Vidrios y mamparas 92 das 21-02-12 06-06-12 359,912.67

1,7,11 Acabados de puertas 92 das 25-02-12 11-06-12 97,993.89

1,7,12 Muebles 92 das 28-02-12 13-06-12 73,006.47

1,7,13 Aparatos sanitarios 92 das 01-03-12 15-06-12 165,539.02

1,7,14 Alfombra 92 das 03-03-12 18-06-12 65,356.20

1,7,15 Papel colomural 92 das 06-03-12 20-06-12 125,209.63

1,7,16 Tableros 92 das 08-03-12 22-06-12 71,848.85

1,7,17 Colocacin de cornisas 92 das 13-03-12 27-06-12 92,356.44

1,7,18 Piso vinlico 92 das 15-03-12 29-06-12 75,739.01

1,7,19 Contrazocalo de Madera 92 das 20-03-12 04-07-12 91,918.73

1.8 Instalaciones 2,831,812.76

1,8,1 Instalaciones sanitarias - pvc y valvulas 226 das 08-08-11 26-04-12 578,046.40

1,8,2 Instalaciones sanitarias-bombas 81 das 10-02-12 14-05-12 118,000.00

1,8,3 Instalaciones electricas 222 das 08-08-11 21-04-12 755,261.03

1,8,4 Inst. electricas alimentadores y Tableros SG 46 das 27-01-12 20-03-12 143,511.12

1,8,5 Inst. electricas alimentadores y Tableros SG 50 das 16-04-12 12-06-12 244,356.78

1,8,6 Instalacion agua containcendio BLOQUE A 28 das 15-02-12 17-03-12 113,825.85

1,8,7 Instalacion agua containcendio BLOQUE B 36 das 28-05-12 07-07-12 193,811.58

1,8,8 Instalacion sistema monoxido 45 das 03-05-12 23-06-12 125,000.00

1,8,9 Ascensores BLOQUE A 47 das 25-01-12 19-03-12 224,000.00

1,8,9 Ascensores BLOQUE B 48 das 03-05-12 27-06-12 336,000.00

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 15 DE 34


ARTECO FLUJOS PARA CURVA S

Id
Actividades Dur. Inicio Termino Recurso (S/.)

1.9 reas comunes 420,509.63

1,9,1 Jardines 11 das 10-05-12 22-05-12 55,846.51

1,9,3 Carpinteria de madera areas comunes 25 das 11-04-12 09-05-12 25,000.00

1,9,4 Coberturas 11 das 10-05-12 22-05-12 63,771.64

1,9,5 Sealetica, ventilacin, luces de emergencia 11 das 10-05-12 22-05-12 61,381.20

1,9,6 Seguridad 342 das 07-06-11 09-07-12 214,510.28

Termino de Obras

REV.:1, FECHA REV.: 30.03.07 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 16 DE 34


FLUJOS PARA CURVA S

Id JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO
Actividades Dur. Inicio Termino Recurso (S/.)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

0 PROYECTO ARTECO EL MIRADOR 342 das 07-06-11 09-07-12 16,755,518.41

1.1 Obras provisionales 169,241.46

1,1,1 Oficinas de Contratista 5 das 07-06-11 12-06-11 5,200.00 5200.0


1,1,2 SS.HH Porttiles 5 das 07-06-11 12-06-11 19,000.00 19000.0
1,1,3 Comedor para Obreros 94 das 07-06-11 23-09-11 6,000.00 1468.1 1531.9 1531.9 1468.1
1,1,4 Almacen y depsito 5 das 07-06-11 12-06-11 7,500.00 7500.0
1,1,5 Guardiana 342 das 07-06-11 09-07-12 72,189.00 4854.8 5065.9 5065.9 6332.4 5065.9 5065.9 6332.4 5065.9 5065.9 6332.4 5065.9 5065.9
1,1,6 Instalacin elctrica provisional 94 das 07-06-11 23-09-11 22,244.86 5442.9 5679.5 5679.5 5442.9
1,1,7 Instalacin de agua provisional 94 das 07-06-11 23-09-11 6,983.86 1708.8 1783.1 1783.1 1708.8
1,1,8 Instalacin de desage provisional 94 das 07-06-11 23-09-11 3,500.00 856.4 893.6 893.6 856.4
1,1,9 Poza de agua Provisional 5 das 07-06-11 12-06-11 750.00 750.0
1,1,10 Duchas y Vestuarios 5 das 07-06-11 12-06-11 20,873.74 20873.7
1,1,11 Sealizacin 94 das 07-06-11 23-09-11 5,000.00 1223.4 1276.6 1276.6 1223.4
1.2 Obras Preliminares 470,489.25

1,2,1,1 Movilizacin 5 das 07-06-11 12-06-11 3,500.00 3500.0


1,2,1,2 desmovilizacin 7 das 02-07-12 09-07-12 3,500.00

1,2,2 Topografa Permanente 219 das 07-06-11 16-02-12 124,345.82 13059.2 13626.9 13626.9 17033.7 13626.9 13626.9 17033.7 13626.9 9084.6
1,2,3 Limpieza permanente en obra 257 das 07-06-11 01-04-12 78,403.10 7016.6 7321.7 7321.7 9152.1 7321.7 7321.7 9152.1 7321.7 7321.7 9152.1
1,2,4 Limpieza Dptos para Entrega 143 das 21-01-12 05-07-12 55,335.33 2708.7 9287.0 11608.8 9287.0 9287.0
1,2,5 Transporte Vertical y horizontal en Obra 185 das 07-07-11 07-02-12 196,000.00 22248.6 25427.0 31783.8 25427.0 25427.0 31783.8 25427.0 8475.7
1,2,6 Montaje y desmontaje de equipo Winche y Elevador 7 das 05-09-11 12-09-11 7,000.00 7000.0
1,2,7 Cerco Perimetral de Obra 5 das 07-06-11 12-06-11 2,405.00 2405.0
1.3 Stano 3,398,554.34

1,3,1 Excavacin Masiva 7 das 08-06-11 15-06-11 225,620.40 225620.4


1,3,2 Excavacin Manual 18 das 15-07-11 04-08-11 56,223.32 43729.3 12494.1
1,3,3 Eliminacin de material excedente 7 das 08-06-11 15-06-11 98,522.33 98522.3
1,3,4 Eliminacin de desmonte durante obra 341 das 07-06-11 07-07-12 106,195.74 7162.8 7474.2 7474.2 9342.7 7474.2 7474.2 9342.7 7474.2 7474.2 9342.7 7474.2 7474.2
1,3,5 Nivelacin interior y compactacin 13 das 12-07-11 26-07-11 94,137.28 94137.3
1,3,6 Relleno con material externo 13 das 12-07-11 26-07-11 30,339.23 30339.2
1,3,7 Muro pantalla 25 das 14-06-11 12-07-11 165,800.50 112744.3 53056.2
1,3,8 Acero cimientos 26 das 19-07-11 17-08-11 219,037.98 92669.9 126368.1
1,3,9 Encofrado cimientos 25 das 23-07-11 21-08-11 24,544.26 6872.4 17671.9
1,3,10 Concreto cimientos 25 das 27-07-11 24-08-11 162,121.23 25939.4 136181.8
1,3,11 Acero Sotanos 65 das 27-07-11 10-10-11 588,268.76 0.0 94123.0 188246.0 235307.5 70592.3
1,3,12 Encofrado sotanos 65 das 30-07-11 13-10-11 422,610.90 0.0 67617.7 135235.5 169044.4 50713.3
1,3,13 Concreto sotanos 65 das 30-07-11 13-10-11 595,099.37 0.0 93963.1 187926.1 234907.6 78302.5
1,3,14 Aligerado sotanos 55 das 05-08-11 07-10-11 119,980.00 43629.1 65443.6 10907.3
1,3,15 Casco piso 1 Bloques A y B 29 das 28-09-11 31-10-11 490,053.05 67593.5 405561.1 16898.4
1.4 Edificio A - CASCO 1,325,510.204

1,4,2 Casco 2 piso 4 das 17-10-11 20-10-11 112,212.50 112212.5


1,4,3 Casco 3 piso 4 das 20-10-11 24-10-11 112,212.50 112212.5
1,4,4 Casco 4 piso 4 das 24-10-11 27-10-11 112,212.50 112212.5
1,4,5 Casco 5 piso 4 das 27-10-11 31-10-11 112,212.50 84159.4 28053.1
1,4,6 Casco 6 piso 4 das 31-10-11 3-11-11 112,212.50 112212.5
1,4,7 Casco 7 piso 4 das 3-11-11 7-11-11 112,212.50 112212.5
1,4,8 Casco 8 piso 4 das 7-11-11 10-11-11 112,212.50 112212.5

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 17 DE 34


FLUJOS PARA CURVA S

Id JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO
Actividades Dur. Inicio Termino Recurso (S/.)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

1,4,9 Casco 9 piso 4 das 10-11-11 14-11-11 112,212.50 112212.5


1,4,10 Casco 10 piso 4 das 14-11-11 17-11-11 112,212.50 112212.5
1,4,11 Casco 11 piso 4 das 17-11-11 21-11-11 112,212.50 112212.5
1,4,12 Casco 12 piso 4 das 21-11-11 24-11-11 112,212.50 112212.5
1,4,13 Casco 13 piso 4 das 24-11-11 28-11-11 73,201.13 73201.1
1,4,14 Casco 14 piso 4 das 28-11-11 1-12-11 17,971.53 17971.5
1.5 Edificio B - CASCO 2,567,737.69

1,5,2 Casco 2 piso 5 das 07-12-11 12-12-11 179,277.01 179277.0


1,5,3 Casco 3 piso 5 das 12-12-11 16-12-11 179,277.01 179277.0
1,5,4 Casco 4 piso 5 das 16-12-11 21-12-11 179,277.01 179277.0
1,5,5 Casco 5 piso 5 das 21-12-11 26-12-11 179,277.01 179277.0
1,5,6 Casco 6 piso 5 das 26-12-11 30-12-11 179,277.01 179277.0
1,5,7 Casco 7 piso 5 das 30-12-11 04-01-12 179,277.01 71710.8 107566.2
1,5,8 Casco 8 piso 5 das 04-01-12 09-01-12 179,277.01 179277.0
1,5,9 Casco 9 piso 5 das 09-01-12 13-01-12 179,277.01 179277.0
1,5,10 Casco 10 piso 5 das 13-01-12 18-01-12 179,277.01 179277.0
1,5,11 Casco 11 piso 5 das 18-01-12 23-01-12 179,277.01 179277.0
1,5,12 Casco 12 piso 5 das 23-01-12 27-01-12 179,277.01 179277.0
1,5,13 Casco 13 piso 5 das 27-01-12 01-02-12 179,277.01 71710.8 107566.2
1,5,14 Casco 14 piso 5 das 01-02-12 06-02-12 179,277.01 179277.0
1,5,15 Casco 15 piso 5 das 06-02-12 10-02-12 179,277.01 179277.0
1,5,16 Casco 16 piso 5 das 10-02-12 15-02-12 57,859.57 57859.6
1.6 Edificio A- ACABADOS 2,061,515.3372

1,6,1 Solaqueo y tarrajeo 52 das 31-10-11 29-12-11 168,013.05 77544.5 90468.6


1,6,2 Tabiqueria 47 das 05-11-11 29-12-11 335,654.73 135690.2 199964.5
1,6,3 Cermicos 40 das 21-11-11 05-01-12 162,673.72 24401.1 122005.3 16267.4
1,6,4 Pisos, podios y rectificacin de pisos 40 das 28-11-11 12-01-12 128,956.48 96717.4 32239.1
1,6,5 Cableados 70 das 17-11-11 06-02-12 55,271.58 7106.3 23687.8 18950.3 5527.2
1,6,6 Carpinteria metlica colocacin 70 das 19-11-11 08-02-12 129,740.11 12974.0 55602.9 44482.3 16680.9
1,6,7 Empastado de cielo raso y muros 83 das 22-11-11 25-02-12 161,746.93 9743.8 58462.7 46770.2 46770.2
1,6,8 Sellado y escarchado 73 das 10-12-11 03-03-12 69,320.11 18042.2 22790.2 22790.2 5697.5
1,6,9 Hojas y Marco de puertas 73 das 13-12-11 06-03-12 134,287.93 31272.5 44149.5 44149.5 14716.5
1,6,10 Vidrios y mamparas 69 das 20-12-11 08-03-12 211,377.28 33697.8 73522.5 73522.5 30634.4
1,6,11 Acabados de puertas 69 das 24-12-11 13-03-12 57,551.97 5838.6 20018.1 20018.1 11677.2
1,6,12 Muebles 69 das 27-12-11 15-03-12 42,876.81 3107.0 14913.7 14913.7 9942.4
1,6,13 Aparatos sanitarios 69 das 29-12-11 17-03-12 97,221.33 4227.0 33816.1 33816.1 25362.1
1,6,14 Alfombra 69 das 31-12-11 20-03-12 38,383.80 556.3 13350.9 13350.9 11125.7
1,6,15 Papel colomural 69 das 03-01-12 22-03-12 73,535.81 24511.9 25577.7 23446.2
1,6,16 Tableros 69 das 05-01-12 24-03-12 42,196.94 12842.5 14677.2 14677.2
1,6,17 Colocacin de cornisas 69 das 11-01-12 30-03-12 54,241.08 12577.6 18866.5 22797.0
1,6,18 Piso vinlico 69 das 14-01-12 03-04-12 44,481.64 8380.6 15471.9 19339.8 1289.3
1,6,19 Contrazocalo de Madera 69 das 21-01-12 10-04-12 53,984.02 5476.6 18777.0 23471.3 6259.0

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 18 DE 34


FLUJOS PARA CURVA S

Id JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO
Actividades Dur. Inicio Termino Recurso (S/.)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

1.7 Edificio B- ACABADOS 3,510,147.74

1,7,1 Solaqueo y tarrajeo 73 das 06-01-12 30-03-12 286,076.27 78377.1 94052.5 113646.7
1,7,2 Tabiqueria 73 das 10-01-12 03-04-12 571,520.21 133093.7 187897.1 234871.3 15658.1
1,7,3 Cermicos 73 das 14-01-12 07-04-12 276,984.99 49326.1 91063.6 113829.4 22765.9
1,7,4 Pisos, podios y rectificacin de pisos 73 das 17-01-12 10-04-12 219,574.54 33086.6 72188.9 90236.1 24063.0
1,7,5 Cableados 91 das 14-01-12 28-04-12 94,111.07 13444.4 24820.5 31025.6 24820.5
1,7,6 Carpinteria metlica colocacin 92 das 17-01-12 02-05-12 220,908.84 26413.0 57628.4 72035.5 57628.4 7203.5
1,7,7 Empastado de cielo raso y muros 110 das 19-01-12 25-05-12 275,406.93 22533.3 60088.8 75111.0 60088.8 57585.1
1,7,8 Sellado y escarchado 96 das 11-02-12 01-06-12 118,031.54 15983.4 36884.9 29507.9 29507.9
1,7,9 Hojas y Marco de puertas 96 das 14-02-12 04-06-12 228,652.42 26199.8 71453.9 57163.1 57163.1
1,7,10 Vidrios y mamparas 92 das 21-02-12 06-06-12 359,912.67 19560.5 117362.8 93890.3 93890.3
1,7,11 Acabados de puertas 92 das 25-02-12 11-06-12 97,993.89 1065.2 31954.5 25563.6 25563.6
1,7,12 Muebles 92 das 28-02-12 13-06-12 73,006.47 23012.9 19045.2 19045.2
1,7,13 Aparatos sanitarios 92 das 01-03-12 15-06-12 165,539.02 48582.1 43184.1 43184.1
1,7,14 Alfombra 92 das 03-03-12 18-06-12 65,356.20 17759.8 17049.4 17049.4
1,7,15 Papel colomural 92 das 06-03-12 20-06-12 125,209.63 31302.4 32663.4 32663.4
1,7,16 Tableros 92 das 08-03-12 22-06-12 71,848.85 16400.3 18743.2 18743.2
1,7,17 Colocacin de cornisas 92 das 13-03-12 27-06-12 92,356.44 17065.9 24093.0 24093.0
1,7,18 Piso vinlico 92 das 15-03-12 29-06-12 75,739.01 12348.8 19758.0 19758.0
1,7,19 Contrazocalo de Madera 92 das 20-03-12 04-07-12 91,918.73 10990.3 23978.8 23978.8
1.8 Instalaciones 2,831,812.76

1,8,1 Instalaciones sanitarias - pvc y valvulas 226 das 08-08-11 26-04-12 578,046.40 46039.1 76731.8 61385.5 61385.5 76731.8 61385.5 61385.5 76731.8 56270.0
1,8,2 Instalaciones sanitarias-bombas 81 das 10-02-12 14-05-12 118,000.00 20395.1 43703.7 34963.0 18938.3
1,8,3 Instalaciones electricas -pvc-cajas 222 das 08-08-11 21-04-12 755,261.03 61237.4 102062.3 81649.8 81649.8 102062.3 81649.8 81649.8 102062.3 61237.4
1,8,4 Inst. electricas alimentadores y TSG BOQUE A 46 das 27-01-12 20-03-12 143,511.12 6239.6 74875.4 62396.1
1,8,5 Inst. electricas alimentadores y TSG BOQUE B 50 das 16-04-12 12-06-12 244,356.78 58645.6 117291.3
1,8,6 Instalacion agua containcendio BLOQUE A 28 das 15-02-12 17-03-12 113,825.85 40652.1 73173.8
1,8,7 Instalacion agua containcendio BLOQUE B 36 das 28-05-12 07-07-12 193,811.58

1,8,8 Instalacion sistema monoxido 45 das 03-05-12 23-06-12 125,000.00 58333.3


1,8,9 Ascensores BLOQUE A 47 das 25-01-12 19-03-12 224,000.00 19063.8 114383.0 90553.2
1,8,9 Ascensores BLOQUE B 48 das 03-05-12 27-06-12 336,000.00 147000.0
1.9 reas comunes 420,509.63

1,9,1 Jardines 11 das 10-05-12 22-05-12 55,846.51 55846.5


1,9,3 Carpinteria de madera areas comunes 25 das 11-04-12 09-05-12 25,000.00 16000.0 9000.0
1,9,4 Coberturas 11 das 10-05-12 22-05-12 63,771.64 63771.6
1,9,5 Sealetica, ventilacin, luces de emergencia 11 das 10-05-12 22-05-12 61,381.20 61381.2
1,9,6 Seguridad 342 das 07-06-11 09-07-12 214,510.28 14426.1 15053.4 15053.4 18816.7 15053.4 15053.4 18816.7 15053.4 15053.4 18816.7 15053.4 15053.4

COSTO DIRECTO 16,755,518.4 553,334.9 684,402.9 1,040,162.9 1,061,251.7 1,253,877.8 1,388,104.5 2,000,973.6 2,122,012.4 2,014,540.9 1,882,635.3 881,209.3 1,037,871.2

GASTOS GENERALES 1,633,663.0 53,950.1 66,729.3 101,415.9 103,472.0 122,253.1 135,340.2 195,094.9 206,896.2 196,417.7 183,556.9 85,917.9 101,192.4

UTILIDADES 600,000.0 19,814.4 24,507.9 37,247.3 38,002.5 44,900.2 49,706.8 71,653.1 75,987.4 72,138.9 67,415.5 31,555.3 37,165.2
SUBTOTAL 18,989,181.5 627,099.4 775,640.1 1,178,826.1 1,202,726.3 1,421,031.1 1,573,151.4 2,267,721.6 2,404,895.9 2,283,097.6 2,133,607.7 998,682.6 1,176,228.9

IMPUESTO IGV (13,5%) 2,563,539.5 84,658.4 104,711.4 159,141.5 162,368.0 191,839.2 212,375.4 306,142.4 324,661.0 308,218.2 288,037.0 134,822.1 158,790.9
TOTAL PRESUPUESTO 21,552,721.0 711,757.9 880,351.5 1,337,967.6 1,365,094.3 1,612,870.3 1,785,526.8 2,573,864.0 2,729,556.9 2,591,315.8 2,421,644.8 1,133,504.7 1,335,019.8

TOTAL ACUMULADO 16,755,518.4 553,334.9 1,237,737.8 2,277,900.7 3,339,152.4 4,593,030.2 5,981,134.7 7,982,108.2 10,104,120.6 12,118,661.6 14,001,296.9 14,882,506.2 15,920,377.5

AVANCE MESUAL % 100% 3.3% 4.1% 6.2% 6.3% 7.5% 8.3% 11.9% 12.7% 12.0% 11.2% 5.3% 6.2%

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 19 DE 34


FLUJOS PARA CURVA S

Id JUNIO JULIO AGOSTO SEPTIEMBRE OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO
Actividades Dur. Inicio Termino Recurso (S/.)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12

AVANCE ACUM. % 100% 3.3% 7.4% 13.6% 19.9% 27.4% 35.7% 47.6% 60.3% 72.3% 83.6% 88.8% 95.0%

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 20 DE 34


FLUJOS PARA CURVA S

JUNIO JULIO
M13 M14

6332.4 1477.6

3500.0

11608.8 1547.8

9342.7 1868.5

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 21 DE 34


FLUJOS PARA CURVA S

JUNIO JULIO
M13 M14

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 22 DE 34


FLUJOS PARA CURVA S

JUNIO JULIO
M13 M14

6147.5
16672.6
35208.8
13847.0
11903.2
30588.7
13497.5
28580.5
17962.2
27104.6
23874.3
29973.5 2997.3

68419.9

161509.7 32301.9
66666.7

189000.0

18816.7 4390.6

787,057.1 48,083.8

76,738.1 4,688.2

28,183.8 1,721.8
891,979.0 54,493.8

120,417.2 7,356.7
1,012,396.2 61,850.4

16,707,434.6 16,755,518.4

4.7% 0.3%

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 23 DE 34


FLUJOS PARA CURVA S

JUNIO JULIO
M13 M14

99.7% 100.0%

REV.:1, FECHA REV.: 15.08.11 CDIGO DOC. ASOCIADO: PG-DTC-02 PGINA: 24 DE 34


CURVA CONTROL DE AVANCE
FO-DTC-12

NOMBRE DE
PROYECTO: PASEO EL MIRADOR II Fecha de Trmino Meta : Sunday 05/06/2016
LA OBRA:

Semanas de contrato 101

Total Costo de Obra Programado Semanas


Mes Semana ( S/. ) Av. Programado Avance Real Av. Reprogramado Adelanto ( + ) Adelanto (+)
Atraso (-)
Fecha del Fecha al Semanal Acumulado Semanal Acum Semanal Acum Semanal Acum Atraso ( - ) Dias adelanto
07/07/14 0 0 0.00% 0.00% 0.00% 0.00%
Julio 07-07-14 13-07-14 31,556.28 31,556 0.08% 0.08% 0.65% 0.65% 0.57% 0.57 4.0
14-07-14 20-07-14 28,056.28 59,613 0.08% 0.16% 0.65% 1.30% 1.14% 1.15 8.1
21-07-14 27-07-14 28,056.28 87,669 0.08% 0.23% 0.65% 1.95% 1.72% 1.73 12.1
28-07-14 03-08-14 27,254.61 114,923 0.07% 0.31% 0.65% 2.60% 2.29% 2.32 16.2
Agosto 04-08-14 10-08-14 27,254.61 142,178 0.07% 0.38% 0.43% 3.03% 2.65% 2.68 18.7
11-08-14 17-08-14 73,629.36 215,807 0.20% 0.58% 0.96% 3.99% 3.41% 3.45 24.1
18-08-14 24-08-14 73,629.36 289,437 0.20% 0.77% 0.63% 4.62% 3.85% 3.88 27.2
25-08-14 31-08-14 51,833.11 341,270 0.14% 0.91% 0.41% 5.03% 4.12% 4.16 29.1
Setiembre 01-09-14 07-09-14 60,070.11 401,340 0.16% 1.07% 0.19% 5.22% 4.15% 4.19 29.3
08-09-14 14-09-14 168,035.33 569,375 0.45% 1.52% 0.15% 5.37% 3.85% 3.89 27.2
15-09-14 21-09-14 222,058.19 791,434 0.59% 2.12% 0.66% 6.03% 3.91% 3.95 27.7
22-09-14 28-09-14 222,058.19 1,013,492 0.59% 2.71% 0.27% 6.30% 3.59% 3.62 25.4
29-09-14 05-10-14 222,058.19 1,235,550 0.59% 3.31% 0.59% 6.89% 3.58% 3.62 25.3
Octubre 06-10-14 12-10-14 177,439.77 1,412,990 0.47% 3.78% 0.41% 7.30% 0.41% 3.52% 3.56 24.9
13-10-14 19-10-14 314,601.76 1,727,591 0.84% 4.62% 0.22% 7.52% 1.22% 4.21% 4.26 29.8
20-10-14 26-10-14 253,467.26 1,981,059 0.68% 5.30% 0.25% 7.77% 3.99% 4.03 28.2
27-10-14 02-11-14 253,467.26 2,234,526 0.68% 5.98% 0.47% 7.99% 0.69% 2.01% 2.03 14.2
Noviembre 03-11-14 09-11-14 275,499.20 2,510,025 0.74% 6.71% 0.41% 8.18% 0.66% 1.47% 1.48 10.4
10-11-14 16-11-14 185,646.04 2,695,671 0.50% 7.21% 0.52% 8.51% 1.30% 1.31 9.2
17-11-14 23-11-14 185,646.04 2,881,317 0.50% 7.71% 0.35% 8.86% 1.15% 1.16 8.1
24-11-14 30-11-14 96,465.17 2,977,782 0.26% 7.97% 0.28% 9.14% 1.17% 1.19 8.3
Diciembre 01-12-14 07-12-14 133,961.36 3,111,744 0.36% 8.32% 0.39% 9.53% 1.21% 1.22 8.5
08-12-14 14-12-14 133,961.36 3,245,705 0.36% 8.68% 0.45% 9.98% 1.30% 1.31 9.2
15-12-14 21-12-14 133,961.36 3,379,666 0.36% 9.04% 0.91% 10.89% 1.85% 1.87 13.1
22-12-14 28-12-14 160,531.72 3,540,198 0.43% 9.47% 0.46% 11.35% 1.88% 1.90 13.3
29-12-14 04-01-15 293,734.60 3,833,933 0.79% 10.26% 0.76% 12.11% 1.85% 1.87 13.1
Enero 05-01-15 11-01-15 348,734.60 4,182,667 0.93% 11.19% 0.89% 13.00% 1.81% 1.83 12.8
12-01-15 18-01-15 348,734.60 4,531,402 0.93% 12.12% 0.81% 13.81% 1.69% 1.71 11.9
19-01-15 25-01-15 402,757.46 4,934,159 1.08% 13.20% 1.35% 15.16% 1.96% 1.98 13.9
26-01-15 01-02-15 347,757.46 5,281,917 0.93% 14.13% 1.13% 16.29% 2.16% 2.18 15.3
Febrero 02-02-15 08-02-15 347,757.46 5,629,674 0.93% 15.06% 1.11% 17.40% 2.34% 2.36 16.5
09-02-15 15-02-15 386,155.40 6,015,830 1.03% 16.09% 1.41% 18.81% 2.72% 2.74 19.2
16-02-15 22-02-15 393,485.82 6,409,316 1.05% 17.15% 1.30% 20.11% 2.96% 2.99 21.0
23-02-15 01-03-15 465,267.02 6,874,583 1.24% 18.39% 1.53% 21.64% 3.25% 3.28 23.0
Marzo 02-03-15 08-03-15 536,779.68 7,411,362 1.44% 19.83% 1.26% 22.90% 3.07% 3.11 21.7
09-03-15 15-03-15 536,779.68 7,948,142 1.44% 21.26% 1.08% 23.98% 2.72% 2.75 19.2
16-03-15 22-03-15 528,542.67 8,476,685 1.41% 22.68% 1.22% 25.20% 2.52% 2.55 17.8
23-03-15 29-03-15 476,521.91 8,953,207 1.27% 23.95% 0.90% 26.10% 2.15% 2.17 15.2
30-03-15 05-04-15 243,416.87 9,196,623 0.65% 24.60% 0.25% 26.35% 1.75% 1.77 12.4
Abril 06-04-15 12-04-15 443,221.19 9,639,845 1.19% 25.79% 1.35% 27.70% 1.91% 1.93 13.5
13-04-15 19-04-15 378,728.08 10,018,573 1.01% 26.80% 0.91% 28.61% 1.81% 1.83 12.8
20-04-15 26-04-15 404,627.31 10,423,200 1.08% 27.88% 0.49% 29.10% 1.22% 1.23 8.6
27-04-15 03-05-15 463,423.02 10,886,623 1.24% 29.12% 1.12% 30.22% 1.10% 1.11 7.8
Mayo 04-05-15 10-05-15 497,918.12 11,384,541 1.33% 30.45%
11-05-15 17-05-15 522,554.08 11,907,095 1.40% 31.85% 31.21% 31.21% -0.64% -0.65 -4.5
18-05-15 24-05-15 536,132.82 12,443,228 1.43% 33.29%
25-05-15 31-05-15 567,227.67 13,010,456 1.52% 34.80%
Junio 01-06-15 07-06-15 519,637.44 13,530,093 1.39% 36.19%
08-06-15 14-06-15 535,963.02 14,066,056 1.43% 37.63%
15-06-15 21-06-15 543,502.25 14,609,558 1.45% 39.08%
22-06-15 28-06-15 549,083.05 15,158,641 1.47% 40.55%
29-06-15 05-07-15 555,663.42 15,714,305 1.49% 42.04%
Julio 06-07-15 12-07-15 563,208.47 16,277,513 1.51% 43.54%
13-07-15 19-07-15 567,729.84 16,845,243 1.52% 45.06%
20-07-15 26-07-15 567,729.84 17,412,973 1.52% 46.58%

REV.:1, FECHA REV.: 02.11.07 CDIGO DOC. ASOCIADO: PG-DTC-03 PGINA: 25 DE 34


0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
80.00%
90.00%
100.00%
07-07-14
14-07-14
21-07-14
28-07-14
04-08-14
11-08-14
18-08-14
25-08-14
01-09-14
08-09-14
15-09-14
22-09-14
29-09-14
06-10-14
13-10-14
20-10-14
27-10-14
Avance Real:
03-11-14
10-11-14
17-11-14
24-11-14
01-12-14
31.21%

08-12-14 Dias de adelanto: -4.2 dias


Avance proyectado: 31.85%

15-12-14
22-12-14
29-12-14
05-01-15
12-01-15
19-01-15
26-01-15
02-02-15
09-02-15
16-02-15
23-02-15
02-03-15
09-03-15
16-03-15
23-03-15
30-03-15
06-04-15
13-04-15
20-04-15
27-04-15
04-05-15
11-05-15
18-05-15
25-05-15
01-06-15
08-06-15
15-06-15
22-06-15
29-06-15
06-07-15
13-07-15
20-07-15
27-07-15
03-08-15
10-08-15
Curva Avance Acumulado

17-08-15
META 23 MESES (ETAPA I - II)

24-08-15
OBRA: PASEO EL MIRADOR II

31-08-15
07-09-15
14-09-15
21-09-15
28-09-15
05-10-15
12-10-15
19-10-15
26-10-15
02-11-15
09-11-15
16-11-15
23-11-15
30-11-15
07-12-15
14-12-15
21-12-15
28-12-15
04-01-16
11-01-16
18-01-16
25-01-16
01-02-16
08-02-16
15-02-16
22-02-16
29-02-16
07-03-16
14-03-16
21-03-16
28-03-16
04-04-16
11-04-16
18-04-16
25-04-16
02-05-16
09-05-16
16-05-16
23-05-16
30-05-16
ANEXO A
EJEMPLOS PARA EL CONTROL DE AVANCE Y CLCULO DEL KPI

1.- INICIO CONTRACTUAL


Se considera como "INICIO CONTRACTUAL" aquella fecha especificada en el contrato desde el cual se comienza a contabilizar el plazo de la obra y generalmente corresponde a la fecha de en
puede ser otro hito dependiendo del contrato). Al inicio de la obra, una vez definida la fecha de inicio contractual, se debe ingresar esta fecha en el casillero de la primera fila del cuadro FO-DTC
Avance' en la columna (c) de manera que para esa fecha el avance programado sea 0% (no es necesario colocar fecha en la columna (b) de esta fila). Las siguientes filas deben contener la
avance.

2.- TRMINO CONTRACTUAL

Se considera como "TRMINO CONTRACTUAL" aquella fecha de trmino de la obra estipulada en el contrato o la ltima fecha aprobada oficialmente por el mandante. Cabe sealar que el
necesariamente coincide con el trmino programtico (por ej. La obra puede alcanzar el 100% 1 semana antes de la fecha contractual y dejar 1 semana para trmites de recepcin que no aport
permiten entregar la obra en la fecha contractual).
La fecha de trmino contractual de la obra debe estar ingresada en el casillero indicado en la parte superior del formulario FO-DTC-12 'Curva Control de Avance'.

3.- SEMANAS DE ATRASO ADELANTO DE UNA OBRA.


Al trmino de cada semana, con los datos de Avance Real Acumulado y Avance Programado se calcularn las semanas de adelanto atraso que presenta la obra. Este clculo se hace automtic
frmula preestablecida en la planilla FO-DTC-12. Esta frmula bsicamente calcula la distancia horizontal entre la curva de avance programado y la curva de avance real a la fecha de control, es
semanas de atraso. La obra solamente debe completar los datos de avance real acumulado a la fecha.

4.- SEMANAS DE SALDO DE UNA OBRA.


El clculo de las semanas de saldo de una obra se hace en forma automtica en la columna (l), a travs de una frmula que calcula cuntas semanas faltan para alcanzar la fecha de trmino con
que esta fecha est ingresada en el casillero correspondiente para que funcione la frmula). Las semanas de saldo se expresarn en nmeros con decimales. Los decimales variarn segn el da
termine la obra. Por ejemplo, si la fecha de trmino contractual es un jueves, el decimal ser 0,57. Si es un domingo, el decimal ser 0. En la tabla siguiente se presenta un ejemplo con los saldos

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 27 DE 34
ANEXO A
EJEMPLOS PARA EL CONTROL DE AVANCE Y CLCULO DEL KPI

Nota: La ltima semana que contiene el 100% de avance programado debiera tener un saldo de semanas de 0.

5.- CLCULO DEL KPI


El KPI se calcula automticamente mediante una frmula en la columna (m) de la planilla FO-DTC-12. Esta frmula divide las semana de adelanto o atraso (columna (k)) por el saldo de semanas
mayor a cero indica un adelanto. Un KPI menor a cero indica un atraso. El KPI tiene una meta que vara en el tiempo. En el primer tercio temporal de la obra la meta es que el KPI no sea inferior
tercio la meta es -10% y en el ltimo tercio -5%. La columna (o) de la planilla FO-DTC-12 indica la meta y la columna (p) indica si se est cumpliendo o no. A continuacin se muestra un cuadro d

EJEMPLO CONTROL DE AVANCE Y KPI

Semana Total Costo de Obra ($) Avance Programado Avance Real Semanas
Adelanto ( + ) Etapa
Mes Adelanto (-) Sem saldo KPI
Medicin KPI
Atraso (+)
Fecha del Fecha al Semanal Acum Semanal Acum Semanal Acum Atraso ( - )
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n)
Ene 1-ene-07 0 0 0.00% 0.00% 0.00% 0.00% 0.00% 0.0 18.43 0.0% 1 Tercio
01-01-07 07-01-07 100,000 100,000 0.48% 0.48% 0.58% 0.58% 0.10% 0.1 17.57 0.6% 1 Tercio
08-01-07 14-01-07 200,000 300,000 0.95% 1.43% 1.14% 1.72% 0.29% 0.2 16.57 0.9% 1 Tercio
15-01-07 21-01-07 400,000 700,000 1.90% 3.33% 1.27% 2.99% -0.34% -0.2 15.57 -1.1% 1 Tercio
22-01-07 28-01-07 800,000 1,500,000 3.80% 7.13% 2.75% 5.74% -1.39% -0.4 14.57 -2.5% 1 Tercio

Feb 29-01-07 04-02-07 1,100,000 2,600,000 5.23% 12.35% 2.19% 7.93% -4.42% -0.8 13.57 -6.2% 1 Tercio
05-02-07 11-02-07 1,300,000 3,900,000 6.18% 18.53% 5.33% 13.26% -5.27% -0.9 12.57 -6.8% 1 Tercio
12-02-07 18-02-07 1,500,000 5,400,000 7.13% 25.65% 8.56% 21.82% -3.83% -0.5 11.57 -4.6% 2 Tercio
19-02-07 25-02-07 1,700,000 7,100,000 8.08% 33.73% 1.63% 23.45% -10.28% -1.3 10.57 -12.4% 2 Tercio

Mar 26-02-07 04-03-07 1,800,000 8,900,000 8.55% 42.28% 1.60% 25.05% -17.23% -2.1 9.57 -21.8% 2 Tercio
05-03-07 11-03-07 2,000,000 10,900,000 9.50% 51.78% 0.0 8.57 2 Tercio
12-03-07 18-03-07 2,000,000 12,900,000 9.50% 61.28% 0.0 7.57 2 Tercio
19-03-07 25-03-07 1,800,000 14,700,000 8.55% 69.83% 0.0 6.57 2 Tercio

Abr 26-03-07 01-04-07 1,700,000 16,400,000 8.08% 77.91% 0.0 5.57 2 Tercio
02-04-07 08-04-07 1,500,000 17,900,000 7.13% 85.04% 0.0 4.57 E. Final
09-04-07 15-04-07 1,400,000 19,300,000 6.65% 91.69% 0.0 3.57 E. Final
16-04-07 22-04-07 1,000,000 20,300,000 4.75% 96.44% 0.0 2.57 E. Final
23-04-07 29-04-07 700,000 21,000,000 3.33% 99.76% 0.0 1.57 E. Final

May 30-04-07 06-05-07 50,000 21,050,000 0.24% 100.00% 0.0 1 E. Final


07-05-07 13-05-07 0 21,050,000 0.00% 100.00% 0.0 0 E. Final

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 28 DE 34
ANEXO A
EJEMPLOS PARA EL CONTROL DE AVANCE Y CLCULO DEL KPI

6.- REPROGRAMACIN

Una reprogramacin sera cualquier modificacin al programa que modifique fechas, agregue o quite actividades o cambie la secuencia constructiva, modificando la distribucin del avance progra
Una reprogramacin tiene que estar aprobada por el mandante para que quede oficializada y se pueda modificar el Avance Programado en el formulario FO-DTC-12. Hay 2 tipos de reprogramaci

a) Reprogramacin sin modificar la fecha de trmino contractual. Esto se debe a una recuperacin de atrasos que son de responsabilidad de Tecsa o a una aceleracin para recuperar
responsabilidad del mandante o a aumentos de obras/obras extraordinarias que se agregan al proyecto sin modificar el plazo. En estos casos la fecha final y las semanas de saldo no v
es la distribucin del avance programado en el tiempo.

b) Reprogramacin con modificacin de plazos. Esto se debe a que el mandante otorga una ampliacin de plazo por alguna razn o el mandante solicita adelantar la fecha de trmino c
antes. En los dos casos hay un cambio en la cantidad de semanas del proyecto y por lo tanto en el saldo de semanas a partir de la fecha de reprogramacin. La distribucin del avance
vara.

En ambos tipos de reprogramacin, se debe conservar los datos histricos de avance programado, avance real, semanas de atraso, semanas de saldo y KPI hasta la fecha que se realiza la repro
la fecha de reprogramacin debe partir una nueva curva de avance programado comenzando con el mismo valor que el avance real de esa semana (ver grfico siguiente) y de ah para adelante
nuevos % de avance programado y de semanas de saldo. A continuacin se presenta un ejemplo de reprogramacin:

EJEMPLO REPROGRAMACIN:

Curva Avance Acumulado


100.00%

90.00%

80.00%
Av ance Programado Avance Real
70.00%
Reprogramac in

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%

14/01/07

28/01/07

11/02/07

04/03/07

11/03/07

18/03/07

25/03/07

08/04/07
01/01/07

07/01/07

21/01/07

04/02/07

18/02/07

25/02/07

01/04/07
REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 29 DE 34
ANEXO A
EJEMPLOS PARA EL CONTROL DE AVANCE Y CLCULO DEL KPI

EJEMPLO DE CAMBIO DE SEMANAS DE SALDO EN UNA REPROGRAMACIN:

Se presenta como ejemplo una obra que contempla como fecha de trmino contractual 08/05/2007 (Martes), por aumento de plazo su nueva fecha de trmino contractual cambia al da 01/06/200
reprogramacin se efecta durante la semana del 23/04/2007 al 29/04/2007.

Semana SEMANAS SALDO


Considera
Previa
Fecha del Fecha al aumento de
modificacin
plazo
4/2/2007 4/8/2007 4.29 4.29
4/9/2007 4/15/2007 3.29 3.29
4/16/2007 4/22/2007 2.29 2.29
4/23/2007 4/29/2007 1.29 4.71 Barra indica el comienzo de una reprogramacin y una redefinicin en las semanas de s
4/30/2007 5/6/2007 0.29 3.71
5/7/2007 5/13/2007 0 2.71
5/14/2007 5/20/2007 1.71
5/21/2007 5/27/2007 0.71
5/28/2007 6/3/2007 0

KPI plazos

- OBRAS REPROGRAMADAS QUE NO AFECTAN SU PLAZO CONTRACTUAL: se conservarn los KPI histricos y las semanas de adelanto atraso ya registradas por la obra a la fecha
a partir de la semana en la cual se reprogram la obra, se comenzarn a registrar los nuevos datos (semanas de adelanto atraso) que permitan calcular el KPI segn la situacin actual.

- OBRAS CON AUMENTO DE PLAZO: se conservarn los KPI histricos y las semanas de adelanto atraso ya registradas por la obra a la fecha en la cual se aprob el aum
partir de la fecha en la cual se registr la modificacin en el plazo contractual, se analizar en que etapa (tercio del plazo temporal) se ubican las semanas a trmino de
aplicar los criterios de medicin y calcular los nuevos KPI.

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 30 DE 34
ANEXO A
CONTROL DE AVANCE Y CLCULO DEL KPI

e comienza a contabilizar el plazo de la obra y generalmente corresponde a la fecha de entrega de terreno (pero
ontractual, se debe ingresar esta fecha en el casillero de la primera fila del cuadro FO-DTC-12 'Curva Control de
sario colocar fecha en la columna (b) de esta fila). Las siguientes filas deben contener las semanas que llevan

l contrato o la ltima fecha aprobada oficialmente por el mandante. Cabe sealar que el trmino contractual no
a antes de la fecha contractual y dejar 1 semana para trmites de recepcin que no aportan al avance pero que

rior del formulario FO-DTC-12 'Curva Control de Avance'.

n las semanas de adelanto atraso que presenta la obra. Este clculo se hace automticamente mediante una
al entre la curva de avance programado y la curva de avance real a la fecha de control, es decir calcula las

de una frmula que calcula cuntas semanas faltan para alcanzar la fecha de trmino contractual (es importante
as de saldo se expresarn en nmeros con decimales. Los decimales variarn segn el da de la semana que
un domingo, el decimal ser 0. En la tabla siguiente se presenta un ejemplo con los saldos de semana:

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 31 DE 34
ANEXO A
CONTROL DE AVANCE Y CLCULO DEL KPI

semanas de 0.

sta frmula divide las semana de adelanto o atraso (columna (k)) por el saldo de semanas (columna (l)). Un KPI
en el tiempo. En el primer tercio temporal de la obra la meta es que el KPI no sea inferior a -15%. En el segundo
y la columna (p) indica si se est cumpliendo o no. A continuacin se muestra un cuadro de ejemplo.

Meta del
Cumplimiento
KPI

(o) (p)
-15% Cumple
-15% Cumple
-15% Cumple
-15% Cumple
-15% Cumple
-15% Cumple
-15% Cumple
-10% Cumple
-10% No cumple
-10% No cumple
-10%
-10%
-10%
-10%
-5%
-5%
-5%
-5%
-5%
-5%

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 32 DE 34
ANEXO A
CONTROL DE AVANCE Y CLCULO DEL KPI

ividades o cambie la secuencia constructiva, modificando la distribucin del avance programado en el tiempo.
modificar el Avance Programado en el formulario FO-DTC-12. Hay 2 tipos de reprogramacin:

acin de atrasos que son de responsabilidad de Tecsa o a una aceleracin para recuperar un atraso que es de
proyecto sin modificar el plazo. En estos casos la fecha final y las semanas de saldo no varan y lo que cambia

mpliacin de plazo por alguna razn o el mandante solicita adelantar la fecha de trmino contractual y finalizar
en el saldo de semanas a partir de la fecha de reprogramacin. La distribucin del avance programado tambin

nce real, semanas de atraso, semanas de saldo y KPI hasta la fecha que se realiza la reprogramacin. A partir de
mo valor que el avance real de esa semana (ver grfico siguiente) y de ah para adelante deben ingresarse los
rogramacin:

Curva Avance Acumulado


100.00%

90.00%

80.00%
Av ance Programado Avance Real
70.00%
Reprogramac in

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
14/01/07

28/01/07

11/02/07

04/03/07

11/03/07

18/03/07

25/03/07

08/04/07

22/04/07

06/05/07
01/01/07

07/01/07

21/01/07

04/02/07

18/02/07

25/02/07

01/04/07

15/04/07

29/04/07

13/05/07

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 33 DE 34
ANEXO A
CONTROL DE AVANCE Y CLCULO DEL KPI

tes), por aumento de plazo su nueva fecha de trmino contractual cambia al da 01/06/2007 (Viernes). Esta

dica el comienzo de una reprogramacin y una redefinicin en las semanas de saldo.

los KPI histricos y las semanas de adelanto atraso ya registradas por la obra a la fecha de reprogramacin, y
os (semanas de adelanto atraso) que permitan calcular el KPI segn la situacin actual.

adelanto atraso ya registradas por la obra a la fecha en la cual se aprob el aumento de plazo. A
ar en que etapa (tercio del plazo temporal) se ubican las semanas a trmino de la obra para poder

REV. ANEXO:0, FECHA REV. ANEXO: 02.11.07 CDIGO DOC. ASOCIADO: PG-STC-03 PGINA: 34 DE 34