PART. ESPECIFICACIONES N DE
N VECES LARGO
3.0.0 ARQUITECTURA
3.1.0 MUROS Y TABIQUES DE ALBAILERIA
3.1.1 MUROS DE ADOBE
3.1.1.3 DE SOGA
EJE A-A ENTRE 1 Y 2 1 3.26
EJE A-A ENTRE 2 Y 3 1 3.83
EJE B-B ENTRE 1 Y 2 1 4.42
EJE C-C ENTRE 1 Y2 1 3.52
EJE D-D ENTRE 1 Y 2 1 3.52
EJE 1-1 ENTRE A Y B 1 2
EJE 1-1 ENTRE B Y C 1 3.53
EJE 1-1 ENTRE C Y D 1 2.31
EJE 2-2 ENTRE B Y C 1 3.53
EJE 3-3 ENTRE A Y B 1 2.85
EJE 3-3 ENTRE B Y C 1 3.78
ADOBE
EJE B-B ENTRE 2-3 1 0.90
1 2.37
EJE C-C ENTRE 2-3 1 0.90
1 2.37
EJE 2-2 ENTRE B-C 1 2.51
EJE 3-3 ENTRE B Y C 1 2.31
FORMATO DE METRADO
72.47 M2
5.7 M2
22.02 M2
- 2.30 2.07 0.75 - 2.10 0.5
- 2.30 5.45 5.45
- 2.30 2.07 2.07
- 2.30 5.45 5.45
- 2.50 6.28 0.90 - 2.10 4.39
- 2.50 5.78 1.25 - 1.30 4.16
cantidad
24.0384615 x metro
25
cantidad
48.0769231 x metro
49
cantidad
24.0384615 x metro
25
COSTO DIRECTO
GASTOS GENERALES 7.5%
UTILIDAD 6%
TOTAL PRESUPUESTO
PRESUPUESTO ADICIONAL N 01
COSTO DIRECTO
GASTOS GENERALES 7.5%
UTILIDAD 6%
TOTAL PRESUPUESTO
PRESUPUESTO ADICIONAL N 02
ITEM DESCRIPCION
COSTO DIRECTO
GASTOS GENERALES 7.5%
UTILIDAD 6%
TOTAL PRESUPUESTO
TO DEDUCTIVO N 01
PRESUPUESTO
UNID. METRADO P. UNIT. P. PARCIAL
S/. 1,024.86
S/. 76.86
S/. 61.49
S/. 1,163.22
TO ADICIONAL N 01
PRESUPUESTO
UNID. METRADO P. UNIT. P. PARCIAL
S/. 2,422.30
S/. 181.67
S/. 145.34
S/. 2,749.31
TO ADICIONAL N 02 ANALISIS DE
PRESUPUESTO ITEM
UNID. METRADO P. UNIT. P. PARCIAL
03.04
M2 33.06 44.72 1478.44
S/. 1,478.44
S/. 110.88
S/. 88.71
S/. 1,678.03
ANALISIS DE COSTO UNITARIOS
15
9.1
0.02
2.03
10.29
7.68
0.6
44.72