20 - 21 SEPTEMBER 2016
MAEPS, SERDANG
______________________________________________________________
AGREED MINUTES
1. Member present:
Attendance
Position in
No Name Country Day 1 Day 2
Delegation
KUNJUNG
1 ID JURY CHAIR
MASEHAT
NGUYEN QUANG
2 VN CHIEF EXPERT
HUY
SOMBOON DEPUTY CHIEF
3 TH
SANGTHEERATHITI EXPERT
PICHITKACHENTR
4 TH EXPERT
KANEEKUL
KYAW MYAT
5 KHAING MYN EXPERT
EDDIE L. EXPERT
11 PH
CABALTERA
MAHEFAD ISMAIL EXPERT
12 IN
1
TRI WINAHYU EXPERT
13 ID
HARIYADI
Vanthong EXPERT
14 LAO
PHOTHICHAK
Phonesack EXPERT
15 LAO
XAYYALATH
VU THANH TUYEN EXPERT
16 VN
MAZLAN EXPERT
18 MY
ABDULLAH
Secretariat
1. Worshop Manager:
2. Secretariat:
2
2. Introduction and General issues
No Matters Action
1. Guidelines for the Chief Expert refer to World skills 2015 at Sao Paolo
competition Brazil method to direction this competition. The
method is new and different from Asean skill
previously. The differences are:
1. The participant only given layout drawing
except schematic diagram.
2. Participant only can see the sample
demonstration board 30 minute 2 day before
competition day.
3. The test project including programming,
mechanical work, electrical installation and
commissioning.
4. Participant only given the operation of the
project, their need to design the circuit
diagram and programming.
5. Participant need to identify and proficient with
the components functional and operation.
2. Overall time for the The participants has given to 3 day (18hours) to
competition completing their project. 14 hours for design and
installation, 3 hours for programming and 1 hour for
fault finding and total 18 hours.
No Matters Action
1. The test project All the experts check the entire test project that
review made agreement from TCM1. Host country provides
more specific information about the size,
characteristics and standards of some supplies and
equipment related to the test project. The function
of KNX and Siemens logo was prepared by the
sponsor.
2. Workstation software KNX was prepared the software and computer. The
and materials version of programming software was informed to the
expert. The infrastructure list was given.
3
3. Module 1 Day 1 (20/9/16)
(Drawing) Discuss on changing item:
- Same level for SW1 to SW4
- Roof Design (Change position L3 & change
dimention of PVC Conduit for PIR and L2)
- Change position for flexible conduit (SW1 use
Flexible conduit & SW2 use PVC Conduit)
- Rotate 90o POS 5a and cable POS 5b use left side
Day 2 (21/9/16)
Final:
- Only change for the SW1 to SW4 make a same
level (others is same with TCM 1)
- No need prepare bend for metal conduit
- Rotate 90o POS 5a and cable POS 5b use left side
KNX Installation:
- Line 0: USB Interface, SW1, SW2, PIR
- Line 1: SW3, SW4, Line coupler and other KNX
devices
Installation :
L1+L3 = DALI
P1+P2 = Energy Switch Actuator
L2,L4 = Output Switch Actuator
L5,L6 = Dim 2T
Shutter = Shutter
4. Module 2 Day 1 (20/9/16)
(Motor control H1 indicates power supply for control circuit
functions and B2 & B4 = Up --> Process Up H2&H5 Blink 1s
programming) then reach L1, H2&H5 ON, 5 second delay
B3 & B5 = Down--> Process Up H4&H7 Blink 1s
then reach L2 H4&H7 ON, no need delay
O/L (MPS) --> H3 ON
B1 H6 ON
Note :
If Emergency stop push in the middle of process all
will be off, then Emergency stop normal door can
up or down (same situation with overload)
4
4. Discussion of Test Project
No Matters Action
1. Test project The Test project has 3 module. Module 1 is electrical
management installation, module 2 for motor control and module 3
for installation testing.
5. Competition Management
No Matters Action
1. The competition time The participants has given 18 hours to completing
table their project. The divided of timing:
Day 1: given time is 6 hours for installation.
Day 2: given 5 hours installation and 1 hour fault
finding.
Day 3: 3 hours installation, 3 hours programming.
5
5.2. Distribution of Experts responsibility
No Matters Action
1. Marking Group The experts are divided into 4 group:
Group 1
- Wiring Bay 1-5
1. Malaysia
2. Singapore
3. Indonesia
4. Cambodia
Group 2
- Wiring Bay 6-9
1. Myanmar
2. LAO PDR
3. Philippines
4. Thailand
Group 3
- Wiring Bay 1-5
1. Philippines
2. LAO PDR
3. Indonesia
4. Cambodia
Group 4
- Wiring Bay 1-5
1. Vietnam
2. Singapore
3. Thailand
4. Malaysia
6
a. Competition area and facilities
No Matters Action
1. Location and layouts Was ready for Asean Skill Competition 2016 and
of the whole update at CIS
competition area
2. Layout of the skill Was prepared and ready for Asean Skill Competition
area: 700m2 2016 also update at CIS
No Matters Action
1. Assessment allocation For electrical installation will using objective marking
and judgment to evaluating the test project. For
judgments marking has 10 item to be judging.
No Matters Action
1. Refer to OHS Refer to host country regulation. Participant must
Regulations as ASC prepared their owned PPE requirement. Organizer
2016 Standard of will give eyewear, wall plug and half leather glove.
Health and Safety.
Document is attached.
No Matters Action
1. Discussion of materials The infrastructure list prepared by the Competition
and equipment Organizer. Materials quantity and type (refer to IL)
suggested is attached prepared by organizer. Sponsor equipments and
tools must be use during the competition. The list of
equipment and tool has been prepared and set up
for each wiring bay on CIS forum.
7
8. Skill Promotion
No Matters Action
1. The content is Upgrade KNX skills to advance level in programming
proposed and agreed operations.
by all experts in
attached document.
9. Sustainability policy
No Matters Action
1. TECHNICAL - Updated
DESCRIPTION
3. COMPETITION - Updated
SCHEDULE
8
11. Letter of information
.. .
(KUNJUNG MASEHAT) (Nguyen Quang Huy) (SOMBOON SANGTHEERATHITI)
(Indonesia) (Vietnam) (Thailand)
.. .
( VU THANH TUYEN ) ( PHICHITKACHENTR ) ( BUN HEANG )
( Vietnam ) ( Thailand ) ( Cambodia )
...
( CHY VANNY ) (CHENG SHING HAUR ) ( WINSTON CHENG )
( Cambodia ) ( Singapore ) ( Singapore )
...
( HENRY J. OCAMPO ) (EDDIE L. CABALTERA ) ( MAHEFUD ISMAIL )
( Philippines ) ( Philippines ) ( Indonesia )
...
(TRI WINAHYU HARIYADI) (KYAW MYAT KHAING ) ( Vanthong PHOTHICHAK )
(Indonesia ) ( MYANMAR ) ( LAO PDR )
...
(Phonesack XAYYALATH) ( ZAKARIA ISMAIL ) ( MAZLAN ABDULLAH )
(LAO PDR ) ( Malaysia ) ( Malaysia )