9
61
89
90 90 90 90 90 89
SITE INFORMATION
Site ID NE Site Name Long Lat TP Tower Type
PBR165 PKB WBBC 77 101.396159 0.450204 TP-Protelindo Greenfield
BKG021 Kampus UIN SUSKA 101.35881 0.46243 Non TP Greenfield
PBR433 Split BKG051D 101.365991 0.464314 TP-TBG Rooftop
BKG020 Simp_Baru 101.367938 0.485729 Non TP Greenfield
PBR887 Ikhlas Panam 101.37245 0.45671 Non TP Greenfield
PBR392 Perum Griya Arya 101.386108 0.453465 TP-DMT Bts Hotel
PBR484 MTC Panam Pekanbaru 101.3854 0.465 TP-DMT Rooftop
Swap DCS Indoor Swap 2G Swap 4G New 4G New 3G City / Town Cluster Plan
x Kota Pekanbaru Cluster_1
x x Kota Pekanbaru Cluster_1
Kota Pekanbaru Cluster_1
x x Kota Pekanbaru Cluster_1
x Kota Pekanbaru Cluster_1
x Kota Pekanbaru Cluster_1
Kota Pekanbaru Cluster_1
1091486969 1091219575-22
1091486905 1091219575-19
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486969 1091219575-22
1091486905 1091219575-19
0 1 0 0 0
Remark Rectification Rectification Start Rectification Finish Remark Rectification Plan ATP
19-Apr-17
0 0 0
Remark LOM Start Install Finish Install Remark Instalation OA Plan OA Actual Remark Swap Rectification Start
0 0 0 0 0
Rectification Finish Remark Rectification Plan ATP Actual ATP Remark ATP
SITE INFORMATION
Site ID NE Site Name Long Lat TP Tower Type
BKG039 Perum Garuda Permai 101.35174 0.478278 Non TP Greenfield
PBR191 Teluju 2 Alt A 101.485722 0.4952 Non TP Greenfield
MS Zone-1 Swap 3G Swap 3G Indoor
Zaman Syafril, Helpdesk / 085271283654 ; 081261724724 x x
Tridaya Hasby, Eka / 085274970009 ; 08117533209 ; 081364554487 x x
Swap DCS Swap DCS Indoor Swap 2G Swap 4G New 4G New 3G City / Town Cluster Plan
x x x Kota Pekanbaru Cluster_12
x x Kota Pekanbaru Cluster_9
Propose DBS3910 available
(outdoor)
Propose 2pcs mcb 80A
Propose 3pcs RRU Available
GSM, Propose
Propose DBS3910
3pcs RRU DCS, Propose 3pcs RRU
(indoor)
3G
Propose 2pcs mcb 80A
Propose
Propose 1pcs
3pcs busbar LGB, Propose
1pcs busbar
RRU DCS, Propose INSTALLATION MILESTONE
3G Propose BCC 1pcs
MGB, Propose
3pcs RRU
busbar UGB,
DRM Done / Installation Remark PR Number Instalation PO Number Instalation Permit Status PIC Team
Propose 1pcs busbar
grounding cable 80m IGB, Propose
1pcs busbar MGB 1091219625-2 / 10912120 Apr - 7 Mei Team 6
1091480520 / 10914805
Use existing
Propose BCCantenna
cable grounding 50m
Use antenna existing 1091480514 / 10914801091219625-1 / 1091218 Apr - 24 Apr Team 5,4,8
TION MILESTONE
MOS Plan MOS Actual Remark Start Install Finish Install Remark Instalation Swap Plan
8-Apr-17 8-Apr-17 New LTEReuse
(Replace OpticAntenna
Sec3) 9-Apr-17 13-Apr-17 LTE OnlyReuse
Done
Bracket Existing Bracket
8-Apr-17 11-Apr-17 3G 12-Apr-17 13-Apr-17 Existing Antenna 3G
Finish by Team 4 Finish by Team 4
Swap Actual OA Remark Swap PR Number Dismantle PO Number Dismantle Dismantle Actual
Dismantle Inbound Remark Rectification Rectification Start Rectification Finish Remark Rectification Plan ATP
Actual ATP PUNCHLIST Clearing PUNCHLIST