A pleasant day to you. The company, Rising Phoenix Inc.is intended to conduct a construction
project of a 30-hectare shock-resistant airport, nine years of construction starting April 20, 2017
and will be finished on April 20, 2026. The company is intended to conduct this project to ease
transportation and importing and exporting of goods by the means of aircrafts, to have more job
opportunities/works and promote tourism.

The company, Rising Phoenix Incorporated is founded at the Bonifacio Global City in year 1990.
It is founded by Engineer Richard C. Meneses (1941-2001). Engr. Erick Gonzales took the place
as an Executive President when former President Engr. Meneses passed away. Rising Phoenix Inc.
holds a great history as it once become the Best Construction Company. Because of the
quality/standards of the building that company constructed was high and best. It was recognized
as the 2005 Best Constructor in the whole nation and takes the 3rd place at the International
Competition in year 2008. Rising Phoenix Incorporated commits itself to develop and build
structures such as factories and infrastructures through the unity of company stakeholders and has
vision to build infrastructures that will help in developing a better future for the next generations.

Nowadays, Rising Phoenix is one of the renown constructing company in the whole nation. This
company has over qualified workers. They have excellent engineers (Civil, Architects,
Mechanical, Electrical, Structural) and staffs that makes the company function well.

If you want something to clear and if there is something you want to ask, please contact us on 991-
0051, 0975-689-1611(TM), 0939-256-1717(SMART) OR email us on risingphoenix@gmail.com.

We have attached the copy of our proposed project and the companys profile with its team
members for further understanding the whole company.

We hope that you and our company will have good partnership especially in creating high quality
infrastructures for better future.

Truly yours, TEAM MEMBERS:

ARCH. DREXLER JOHN BACLIG ENGR. JEFF KYZER LAGUA


TEAM MANAGER
ENGR. LEOMAR SAIREZ

ENGR. JHON ALEX CORRADO


I. GENERAL INFORMATION

NAME: Drexler John Baclig


COMPANY: Rising Phoenix Inc.
PROJECT TEAM MANAGER ADDRESS: Bonifacio Global City, Makati City
QUALIFICATION: B.S. Architecture
CONTACT DETAIL: 0921-646-4732
NAME: Jeff Kyzer Lagua
COMPANY: Rising Phoenix Inc.
ADDRESS: Bonifacio Global City, Makati City
QUALIFICATION: B.S. Structural Engineering
CONTACT DETAIL: 0925-656-9393
NAME: Jhon Alex Corrado
PROJECT TEAM MEMBERS COMPANY: Rising Phoenix Inc.
ADDRESS: Bonifacio Global City, Makati City
QUALIFICATION: B.S. Electrical Engineering
CONTACT DETAIL: 0931-346-8383
NAME: Leomar Sairez
COMPANY: Rising Phoenix Inc.
ADDRESS: Bonifacio Global City, Makati City
QUALIFICATION: B.S. Civil and Mechanical Engr.
CONTACT DETAIL: 0991-436-4374

II. SUMMARY OF PROPOSAL

TITLE OF PROPOSAL Construction of Shock-Resistant Airport in Baler,


Aurora

PROJECT DURATION Nine Years

To increase the economic profit


GOALS AND OBJECTIVES To attract more tourist (tourism)
To have more job opportunities

Government, people(citizen), investors, importers and


exporters are the one who will benefit the project. They
have notice that citizens need more jobs. The province

STAKEHOLDER DEMAND needs to develop its economic and believe that tourism
AND PROJECT RELEVANCE is a best way. The province needs a faster transportation
too.
The project will increase the level of tourism and the
economic.
METHODOLOGY

Once a year a competition for engineering


students is held. Drexler Baclig as
representative of University of the Philippines,
Alex Corrado for UST, Kyzer Lagua for UP-
Diliman, and Leomar Sairez for ADMU.

A. ORGANIZATION OF THE TEAM The four math wizards represent the


Philippines for the International competition
and started to became close friends. After their
study, they organized to join a renowned
company. Engr. Baclig was chosen to be the
Team Manager as he has the potential. The
other three engineers became members of the
team led by Engr. Baclig.
The project is a construction of shock-resistant
B. PROJECT DESIGN airport that which can reduce the impacts and
shocks of an earthquake, and to have an airport
in province of Aurora
C. SCHEDULE OF ACTIVITIES (See Table 1 in the succeeding page)
MONTHLY REPORT
Every 28th of the month
YEARLY REPORT
D. DELIVERABLES Every 14th of April
ACCOMPLISHMENT REPORT
Monthly and Yearly report of the
construction finished
FINAL OUTPUT
April 20, 2026

PROPOSED BUDGET

(See Table 2 in the succeeding page)

BENEFICIARIES

Beneficiaries of the proposed project are the people and government of Aurora that can
increase their economic profits, tourism and job opportunities. Also, investors,
entrepreneurs, importers and exporters may attract to invest.

PUBLICATION PLAN

The newly constructed sock-resistant airport will be in the different media such as social
media, television broadcast, newspapers, radio and webpages.
TABLE 1. SCHEDULE OF ACTIVITIES
April July Oct May Aug Nov. Nov. March
2017 to 2018 to to 2019 2024 2025 July
ACTIVITIES to Oct to Aug Nov. to to to 2026
July 2018 May 2019 2019 Nov. March June
2018 2019 2024 2025 2026
Search for
investors and
sponsors

Getting
Projects
Permit

Floor
Planning

Budget
Planning

Hiring
Builders and
Shipment

Construction
Period
Finishing

Hiring for
Workers

Advertising

Blessing and
Opening
TABLE 2. PROPOSED BUDGET
CONSTRUCTION SALARY/COST TOTAL FOR 9

WORKERS UNITS PER DAY YEARS

(1,500 WORKERS) () ()

Foremen 100 500 1,460,000.00

H 400 450 1,314,000.00

Workers 1,000 400 1,168,000.00

Foods 2,400 (if per month) 1500 345,600,000.00

TOTAL: 349,542,000.00

MATERIAL UNITS COST PER UNIT TOTAL COST

(HIGH QUALITY) () ()

PLYWOOD 1,000 pcs. 350 350,000.00

WOODS 50,000 board feet 8 400,000.00

CEMENTS 1,000 trucks 75,000 75,000,000.00

STEEL BARS 500 trucks 60,000 30,000,000.00

TILES 50,000 pcs (2x2 ft.) 80 4,000,000.00

GLASS 2,500 pcs (3x3 m.) 1,500 3,750,000.00

C.R. 50 pcs 5,000 250,000.00

ASPHALT 500 drums 10,000 5,000.000.00

PAINT 500 drums (different 50,000 25,000,000.00

colors)

TOTAL: 143,750,000.00

143,750,000.00
+ 349,542,000.00
TOTAL COST: 493,292,000.00
COMPANYS PROFILE

History:

The company, Rising Phoenix Incorporated is founded at the Bonifacio Global City in year

1990. It is founded by Engineer Richard C. Meneses (1941-2001). Engr. Erick Gonzales took the

place as an Executive President when former President Engr. Meneses passed away.

Rising Phoenix Inc. holds a great history as it once become the Best Construction

Company. Because of the quality/standards of the building that company constructed was high

and best. It was recognized as the 2005 Best Constructor in the whole nation and takes the 3rd

place at the International Competition in year 2008.

Once a year a competition for engineering students is held. Drexler Baclig as representative

of University of the Philippines, Alex Corrado for UST, Kyzer Lagua for UP- Diliman, and Leomar

Sairez for ADMU.

The four math wizards represent the Philippines for the International competition and

started to became close friends. After their study, they organized to apply a job to a renowned

company, the Rising Phoenix Inc.

The four engineers were become a part of the company and Engr. Baclig was chosen to be

the Team Manager as he has the potential. The other three engineers became members of the team

led by Engr. Baclig.