Anda di halaman 1dari 2

THAI BINH THERMAL POWER PLANT PROJECT & TRASMISSION LINES CONSTRUCTION PROJECT

Weekly Report No. 83 - Site Progress Photos (June 11-17, 2017)


E. BOP AREA

Date Taken: 17-Jun-17 Location: Unit 2 Boiler/Bunker Area #1 Date Taken: 17-Jun-17 Location: Unit 2 Ball Mills Area #2

Work Description: Installation of BLR drain piping Unit#2 Work Description: Installation of CCCW piping at Ball Mill#2 area

Date Taken: 17-Jun-17 Location: Unit 2 Coal Bunker Area #3 Date Taken: 17-Jun-17 Location: Unit 2 Boiler Area #4

Work Description: Installation of Instrument Air piping at Coal Bunker#2 Work Description: Installation of N2 piping at Boiler #2

Date Taken: 17-Jun-17 Location: Unit 2 Boiler Area #5 Date Taken: 17-Jun-17 Location: Near Unit 2 Boiler Area #6

Work Description: Installation of Service Air piping at BLR#2 Work Description: Insulation of SCAH drain Unit#2
THAI BINH THERMAL POWER PLANT PROJECT & TRASMISSION LINES CONSTRUCTION PROJECT

Weekly Report No. 83 - Site Progress Photos (June 11-17, 2017)


E. BOP AREA

Date Taken: 17-Jun-17 Location: Unit 2 Boiler Area #7 Date Taken: 17-Jun-17 Location: Unit 2 Boiler to ESP/FGD Area #8

Work Description: Insulation of steam piping at BLR2 Work Description: Insulation of Auxiliary steam supply to FGD&ESP

Date Taken: 17-Jun-17 Location: Yard piping trench area #9 Date Taken: 17-Jun-17 Location: Pipe Rack @ Unit 2 #10

Work Description: Installation of discharge piping for Boiler blowdown water Work Description: FRP raw water Unit#2 installation

Date Taken: 14-Jun-17 Location: Unit 2 Economizer Area #11 Date Taken: 15-Jun-17 Location: East of Gypsum Dewatering Bldg. #12
Work Description: Installation of ash conveyor piping Work Description: Installation of Pipe for Fire Fighting Underground Line 13A

Anda mungkin juga menyukai