Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 1 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 2 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
1. Overview
The Job Risk Assessment and Control (JRAC) aims to capture all hazards associated with the (insert job title).
Once the hazards are identified and the risks are ranked with current controls, the hazards are reviewed to assess what necessary controls are required to reduce the risk to an acceptable level/ to ensure
that the risk are well-managed so that the jobs could be carried out safely. The action plan then formulated to ensure controls are implemented into the workplace/ activities.
2. Objectives
This risk assessment aims to identify the hazards and risk associated with the specific task (insert job title) within PT OKI project site in the stated location above.
To ensure that all involved employee understand with the identified hazards/ risk and they get a clear and systematic guidance to implement the designated controls.
3. Scope
This risk assessment and controls will be applied to all PT OKI staff, contractors, and crew who involved with the(insert job title) within PT OKI project site(insert full address).
4. Stakeholders
All below persons are involved and responsible in this JRAC development and implementations within the above project site:
PT OKIProject Management
PT OKI Workplace Manager
PT OKI Crew and Contractors
PT OKI HSE Department
5. Risk Assessment Methodology
The JRAC methodology will be used, utilising PT OKI Risk Assessment Matrix as seen on the section-17, page-XX of this document.
Consideration is given to the hierarchy of controls with the intention to utilised controls as high up the order as possible and as appropriate to the degree of hazards and achievability.
Risk control criteria aims to implement engineering or higher controls for risk identified as high or above.
Procedural or PPE controls alone are not acceptable for this level of risk.
6. Reference
Indonesian Law No. 1 Year 1970
Indonesian Law No. 13 Year 2003
PT OKI HSSE Policy
PT OKI PSMS Manual
PT OKI CSMS Manual
PT OKI Specific Procedure
7. Job Risk Assessment And Control Summary
All workplace hazards have been identified and the risk controls have been set for each particular area and work steps. The process involved stake holders.
Below chart of summary will tells all related hazards, controls, and the actions requied on the time defined. (See page XX to XX)
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 2 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 3 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
Page 4 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
- Pasang tanda yang mengingatkan agar
- Terperosok kedalam pile (banyak tiang - Lubang pile / tiang pancang yang sering HSSE and all
tidak terperosok (pasang sign board / 4 (C) H(8) 2 (D) L(21) emplyoment
Continue
pancang yang rata dengan tanah) dilalui agar ditutup / barikade
barikade)
- Pasang barikade disekitar parit
- Hanya rigger yang berkompeten yang
diperbolehkan untuk memasang
scaffolding
- Memberikan penerangan lampu yang
cukup, untuk menghindari
terperosoknyapekerja jika bekerja malam
hari
- Senantiasa menggunakan APD dan baju - Sediakan tempat untuk berteduh
- Terpapar panas terik matahari 1 (A) M(15) 1 (E) L(25) TRUBA Continue
lengan panjang sementara
- Pergunakan pelembab kulit untuk
melindungi kulit
- Hanya scaffolder yang berkompeten yang - Memakai pelindung mata bagi yang
- Mata terkena kawat scaffolding 2 (E) L(23) 1 (E) L(25) TRUBA Continue
memasang scaffolding mengikat
- Tekuk ujung kawat supaya tidak tajam
- Pegang ujung kawat untuk menghindari
agar ujung kawat tidak mengarah ke mata
- Pastikan scaffolding sebelum digunakan
sudah dilakukan pengecekan dan sudah
terpasang tagging
- Material yang dinaikkan agar segera
- Scaffolding roboh - Tidak menumpuk material diatas scaffolding 5 (C) E(5) 2 (D) L(21) TRUBA Continue
dipasang dan hindari penumpukan material
- Memastikan kondisi kelayakan seluruh
material scaffolding sebelum digunakan
(tidak rusak)
- emastikan metode pemasangan sesuai
dengan SOP
- Tidak tergesa-gesa saat menaikkan dan
memasang material scaffolding
- Tidak menumpuk material scaffolding di
bagian manapun pada konstruksi perancah
- Memastikan seluruh sambungan pipa dan
ikatan papan telah terkunci dengan baik
dan benar
- Menggunakan base plat untuk tempat
berpijak scaffolding
- Yang memasang scaffolding harus orang
yang berpengalaman dan sudah familiar
- Lakukan pengecekan tanah tempat
landasan perancah / gantungan scaffold
pada shell jika menggunakan tri angle
scaffold
- Lakukan pengecekan terhadap scaffolding
sebelum dipergunakan
- Pasang tagging pada scaffolding sebagai
alat informasi kondisi scaffolding
- Cek posisi cantolan scaffolding (jika
menggunakan tri angle scaffold) yang
menggantung pada shell masih kuat
- Pastikan sisi bawah sudah menyentuh
pada shell agar scaffolding tidak goyah jika
menggunakan tri angle scaffolding
- Pada saat bekerja harus banyak
mengkonsumsi air minum, untuk - Memastikan seluruh tim yang bekerja
- Dehidrasi 3 (D) M(17) 1 (D) L(24) TRUBA Continue
menghindari penurunan konsentrasi akibat dalam kondisi yang sehat
kekurangan cairan dalam tubuh
- Mensosialisasikan kepada seluruh
karyawan agar selalu rutin untuk minum
jika sudah merasa haus
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 4 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 5 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
- enyediakan air minum yang cukup dilokasi
kerja
PENGANGKATAN ROCKW0LL DAN - Menggunakan APD yang sesuai terutama - Memposisikan anggota tubuh pada posisi
3
CLADDING
- Tangan terjepit 2 (D) L(21) 1 E L(25) Zulmahji Continue
sarung tangan yang aman
- Tingkatkan komunikasi antar sesama
teman saat akan memasukkan sling dan
sackle
- Terkilir - Perhatikan pijakan saat akan memasang 2 (C) M(18) - Tingkatkan house keeping dilokasi kerja 1 E L(25) Zulmahji Continue
- Tidak terburu-buru dalam bekerja dan tidak
bercanda secara berlebihan
-
- Tidak diijinkan melakukan pengangkatan - Rencana pengangkatan material harus
- Material jatuh / membentur sesuatu saat kondisi cuaca buruk seperti angin 4 (D) H(12) sudah di buat dan sudah disetujui oleh 2 E L(23) Zulmahji Continue
kencang, badai, hujan, petir dan lain-lain pihak terkait
- Beban diangkat dengan posisi/keadaan
seimbang dan pastikan posisi material
yang akan diangkat sudah terikat dengan
baik dan benar
- Pergunakan alat komunikasi Radio jika
tidak bisa berkomunikasi secara langsung
dengan jelas (posisi jauh)
- Sediakan tag line untuk mengarahkan
plate/ material yang diangkat
- Pergunakan alat yang dipakai untuk
mengangkat yang masih layak pakai
- Pasang ada pengamaan untuk
mengantisipasi material yang diangkat
terlepas
- Tidak melakukan pengangkatan material
ketika cuaca buruk seperti angin kencang,
turun hujan, dll
- Pastikan lantai kerja perancah sudah rapat
-
- Tangan terjepit, terperosok, jatuh dari atas - Menggunakan APD yang sesuai terutama - Memposisikan anggota tubuh pada posisi
4. 2 (D) L(21) 1 E L(25) Sardi Continue
PEMASANGAN ROCKWALL DAN scaffolding sarung tangan yang aman
CLADDING - Melakukan tool box meeting sebelum
bekerja
- Tingkatkan house keeping dan koordinasi
dengan tim lainnya mengenai lubang yang
atau apapun yang bisa menimbulkan
resiko kerja
- Kaitkan fullbody harness pada tempat yang
kokoh dan mampu menahan jika jatuh
- Cek scaffolding secara rutin dan selain
scaffolder dilarang melakukan perubahan
struktur scaffolding
- Bising akibat suara bor saat pemasangan - Pakai ear plug saat melakukan penyetelan - Orang yang tidak berkepentingan agar
3 (A) H (6) 2 (E) L (23) Sardi Continue
Cladding shell tidak berada dilokasi pekerjaan
- Lakukan penyetelan secara bergantian,
sehingga terpaparnya bunyi tidak terlalu
lama
- Pasang signboard untuk mengingatkan
kepada karyawan yang berada di tangki
- Sosialisasikan risiko yang ada pada saat
toolbox meeting dan safety talk
- Pastikan bagi pekerja diatas ketinggian - Jangan memaksakan diri bila kondisi tubuh
- Jatuh dari ketinggian 5 (C) E (5) 2 (E) L(23) Sardi Continue
harus menggunakan full body harness tidak fit
- Sarapan pagi secara teratur sebelum
bekerja
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 5 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 6 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
- Jangan mengkonsumsi minuman atau
obat-obatan yang bisa mempengaruhi
tubuh
- Pakai full body harness dan cantolkan
pada tempat yang kokoh
- Tersedia akses naik turun tangga untuk
memudahkan proses pelepasan sling
- Sediakan life line sebagai tempat untuk
mencantolkan full body harness saat naik
- Memastikan berjalan dan berdiri pada
posisi yang sepenuhnya aman
- Sebelum naik keatas scaffolding, pastikan
lumpur pada sepatu sudah bersih sehingga
tidak licin
- Pasang peringatan bahwa diatas ada orang - Konsentrasi saat melakukan pekerjaan dan
- Kejatuhan material 3 (C) H (13) 1 (E) L (25) Sardi Continue
bekerja focus dengan keadaan sekitar
- Jangan berada tepat dibawah orang yang
juga melakukan aktivitas pekerjaan diatas
lokasi kerja
- Menghentikan pekerjaan sementara sampai H - Jika mendung dan langit sudah gelap agar
- Turun hujan dan disertai petir 5 (E)
(11)
2 (E) L (23) Sardi Continue
hujan berhenti bersiap-siap untuk turun
- Adanya personel yang menegaskan dan
mengingatkan agar segera turun / tiup pluit
- Jangan berada di ruang terbuka saat ada
petir
-
- Tabung bertekanan harus diletakkan pada
- Maksimalkan pemakaian fire blanket setiap H
5 Pengelasan Support dan pin - Kebakaran, tabung bertekanan meledak 5 (E)
(11)
posisi berdiri dan terikat kuat serta 2 (E) L (23) Sardi Continue
ada pemotongan maupun pengelasan
dipasangpenutup tabung
- Tempatkan material mudah terbakar dan
meledak jauh dari area pemotongan
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 6 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 7 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
- Penyediaan sign board pada lokasi kerja
yang menyatakan bahaya kebakaran
- Penyediaan APAR di sekitar area
pemotongan
- Jauhkan tabung dari bahan-bahan yang
panas (sumber panas)
- Wajib menggunakan alat pelindung jatuh & - Hanya welder yang berkompeten yang
- Terjatuh, terpeleset, tergelincir dari
mengaitkannya pada support yang kokoh 5 (C) E (5) diperbolehkan untuk melakukan 2 (E) L (23) Sardi Continue
ketinggian
selama proses pekerjaan pengelasan
- Pastikan sepatu tidak mengandung lumpur
sehingga tidak licin saat akan naik
- Memastikan berjalan dan berdiri pada
posisi yang sepenuhnya aman
- Pekerjaan di ruang terbatas agar
- Pergunakan masker sebagai pelindung dikomunikasikan sistem izin kerja kepada
- Terhirup asap pengelasan dan gas beracun 5 (C) E (5) 2 (E) L (23) Sardi Continue
pernafasan pihak client dan disetujui oleh pihak-pihak
yang berwenang
- Fungsikan blower untuk mengatasi sirkulasi
udara dilokasi kerja
- Jika diperlukan, lakukan pengajuan gas test
kepada client
- Pergunakan alat pelindung pernafasan
- Pastikan sirkulasi udara sudah bagus dan
jika diperlukan pergunakan ventilasi
untuksirkulasi udara
- Wajib menggunakan alat pelindung jatuh & - Hanya rigger yang berkompeten yang
MEMBONGKAR SCAFFOLDING (DIATAS - Terjatuh, terpeleset, tergelincir dari
10.
KETINGGIAN)
mengaitkannya pada support yang kokoh 5 (C) E (5) diperbolehkan untuk melakukan 2 (E) L (23) TRUBA Belum dibongkar
ketinggian
selama proses pekerjaan pembongkaran scaffolding
- Pastikan sepatu tidak mengandung lumpur
sehingga tidak licin saat akan naik
- Memastikan berjalan dan berdiri pada
posisi yang sepenuhnya aman
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 7 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 8 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
- Maksimalkan penggunaan ganjal pada saat
- Tertimpa, terjepit,dan terhimpit material - Selalu menggunakan safety hand glove 2 D L(21) menumpuk material yang berpotensi 1 (E) L (25) TRUBA Belum dibongkar
terjepit
- - -
- Saat melakukan penurunan material (pipa
dan clamp), harus dengan instruksi
bersamaan danselalu berkoordinasi
dengan sesesama rekan kerja
- Menurunkan material harus dengan
instruksi secara bersamaan dan selalu
berkoordinasi dengan sesama rekan
- Pada saat bekerja harus banyak
- Mensosialisasikan kepada seluruh
mengkonsumsi air minum, untuk
- Dehidrasi 2 (D) L (21) karyawan agar selalu rutin untuk minum 1 (E) L (25) TRUBA Belum dibongkar
menghindari penurunan konsentrasi akibat
jika sudah merasa haus
kekurangan cairan dalam tubuh
- Memastikan seluruh tim yang bekerja
dalam kondisi yang sehat
- Menyediakan air minum yang cukup
dilokasi kerja
- Cek kondisi scaffolding sebelum ditempati / - Pembongkaran scaffolding harus dilakukan
- Scaffolding yang dibongkar roboh 5 (C) E (5) 2 (E) L (23) TRUBA Belum dibongkar
sebelum dibongkar oleh orang yang familiar
- Pastikan pembukaan clamp dan material
scaffolding sudah sesuai urutan dan kaidah
pembongkaran scaffolding
- Tidak tergesa-gesa saat menurunkan
material scaffolding
- Tidak menumpuk material scaffolding di
bagian manapunpada konstruksi perancah
- Cek posisi cantolan scaffolding (jika
menggunakan tri angle scaffold) yang
menggantung pada shell masih kuat
- Pastikan sisi bawah sudah menyentuh
pada shell agar scaffolding tidak goyah jika
menggunakan tri angle scaffolding
- Material jatuh (alat kerja, pipa, clamp, dan - Pastikan material diatas ketinggian - Sediakan tali pada alat kerja untuk
5 (C) E (5) 2 (E) L (23) TRUBA Belum dibongkar
papan) ditempatkan pada posisi yang aman menghindari alat jatuh dari ketinggian
- Lakukan pengikatan material yang berada
diatas ketinggian jika memungkinkan
- Konsentrasi dalam memegang material
- Tidak melemparkan material dari atas saat
pembongkaran
- Jangan melintas dibawah orang yang - Pasang signboard dan barikade agar orang
- Kejatuhan material 5 (C) E (5) 2 (E) L (23) TRUBA Belum dibongkar
melakukan pekerjaan dibawah mngerti
- Sediakan kaleng untuk tempat baut dan
material kecil
- Mensosialisasikan bahaya dan risiko pada
saat tool box meeting
- Menurunkan material harus dengan
instruksi secara bersamaan dan selalu
berkoordinasi dengan sesama rekan
- Tidak melepas material scaffolding bila
belum terpegangsepenuhnya oleh rekan
yang berada di bawahnya
- Mengikat material dengan kuat saat akan
menurunkannya
- Tidak tergesa-gesa saat membongkar dan
menurunkanmaterial scaffolding
- Pastikan lokasi sekitar pembongkaran tidak
- Terkena sengatan listrik 5 (D) H (7) - Pakai APD yang kering dan tidak basah 2 (E) L (23) TRUBA Belum dibongkar
ada jalur kabel yang terkelupas
- Lakukan pengecekan secara rutin terhadap
peralatan listrik yang berada di sekitar
pembongkaran
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 8 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 9 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
- Perhatikan rambu-rambu tentang bahaya
listrik dilokasi kerja
- Jika ada kabel yang rusak maka segera
menginformasikan kepada pihak electrician
- Membuang sampah anorganik pada tempat M - Pastikan tidak membuang kawat
- Pencemaran tanah 3 (E)
(20)
1 (E) L (25) TRUBA Belum dibongkar
yang sesuai seperti kawat, plastik, dll scaffolding sembarangan
- Sosialisasi kepada seluruh karyawan agar
tidak membuang sampah sembarangan
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 9 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 10 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
9. Unquantified Hazards
State/ describe if any
10. Action Plan
To ensure that all prioritized hazards are properly controled when the job is undertaken, below is the plan of actions required:
No Name and Org.Role Item and Reason for Non-Consensus Signature Date
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 10 of 11
Project No. P-OkiPL1
OKI PULP & PAPER MILL PROJECT
Document No. P-OkiPL1-100-15-FRM-0010
[OKIPL1]
Revision 00
Page 11 of 11
Job Risk Assessment and Control (JRAC) Form
Issue Date June 12, 2014
Consequences
This document is confidential, and shall not be reproduced in whole or without the prior written consent of the APP Global Projects Group.
Form GPG-100-01-PRA Dec 20, 2013
Page 11 of 11