6 P-4/16-I Extra for every 50 ft. additional lead or part thereof Cft 54.45
for earthwork soft, ordinary, hard and very hard.
7 P-4/17-a Transportation of earth all types when the total Cft 2719.60
distance including the lead covered in the item of
work, is more than 1000 ft upto 1/4 mile.
P-4/17-b For every 330 ft. additional lead or part thereof, Cft 16.45
beyond 1/4 mile upto one mile.
P-4/17-c For every 1/4 (400 m) additional lead or part Cft 163.90
thereof, beyond 1 mile upt 5 mile.
P-4/17-d For every 1/2 mile additional lead or part thereof, Cft 145.85
beyond 5 mile.
8 P-4/21-b Execavation in foundation of buildings, bridges Cft 5995.45
and other structure i/c dagbelling, dressing,
refilling around structure with excavated earth,
watering and ramming, lead upto one chain and
and lift upto 5 ft.in ordinary soil
359292875.xlsx : Rt
9 P-5/25-I Compaction of earthwork with power road roller, I/c Cft
ploughing, mixing, moistening earth to optimum
moisture conten in layers, etc. complete 95 % to
100 % maximum modified AASHO dry density.
P-1/3-d Cement concrete brick or stone ballast 1-1/2" to 2" % Cft 4119.05
gauge in foundation and plinth, Ratio 1:6:12.
P-1/3-e Cement concrete brick or stone ballast 1-1/2" to 2" % Cft 4119.05
gauge in foundation and plinth, Ratio 1:6:18.
15 P-2/5-f Plain cement concrete ratio 1:2:4, I/c placing % Cft 5504.65
compacting, finishing and curing, complete (I/c
screening and washing of stone aggregate),
complete in all respects
16 P-2/6-a (3) Providing and laying reinforced cement concrete, P. Cft 128.00
i/c prestressed concrete i/c forms, moulds,
shuttering, lifting, compacting, etc. Type C nominal
mixture 1:2:4, complete in all respects
20 40 a/Ch-6 Breaking brick ballast, screening and stacking. 2" % Cft 1775.40
ring.
Chapter No. 7 - Brick Work
21 P-1/4- I Pacca brick work in foundation and plinth in % Cft 3617.10
cement sand mortar, Ratio 1:4
P-1/4- I Pacca brick work in foundation and plinth in % Cft 3617.10
cement sand mortar, Ratio 1:6
22 P-3/7-I Pacca brick work other than building upto 10' % Cft 4171.75
height in 1:4 cement sand mortar.
P-3/7-I Pacca brick work other than building upto 10' % Cft 4171.75
height in 1:5 cement sand mortar.
359292875.xlsx : Rt
P-3/7-I Pacca brick work other than building upto 10' % Cft 4171.75
height in 1:6 cement sand mortar.
23 P-6/30 Supplying and filling sand under floor or plugging % Cft 236.70
in wells.
28 P-2/7-b 1/2" thick cement plaster 1:2 upto 20' height. % Sft 1196.70
29 P-2/8-b 1/2" thick cement plaster 1:3 upto 20' height. % Sft 1196.70
30 P-2/9-b 1/2" thick cement plaster 1:4 upto 20' height. % Sft 1196.70
31 P-2/11-b 1/2" thick cement plaster 1:5 upto 20' height. % Sft 1196.70
32 P-3/18-a Cement pointing struck joint on wall upto 20' % Sft 1357.20
height. (1:2)
33 P-3/18-b Cement pointing struck joint on wall upto 20' % Sft 1357.20
height. (1:3)
Chapter No. 13 - Painting
34 P-2/5-d I Preparing surface and painting guard bars, gates % Sft 321.35
of iron bars, grating, railing (including standards,
braces, etc.) and in similar open work. Priming
coat
P-2/5-d ii Each subsequent coat of paint. % Sft 145.20
35 P-3/5-e I&II Preparing surface and painting of fillet, framing % Lft 257.15
skirting pipes gutters and similar linear work not
exceeding 6" grit Priming coat.
Each subsequent coat of paint. % Sft 96.80
36 P-4/10 Writing letters or figures, per letter per inch height. P. No. 10.10
359292875.xlsx : Rt
8-a (3)/Ch-18 3rd coat using 14 Lbs. Bitumen and 1.50 Cft bajri % Sft 66.25
for % Sft area complete in all respects.
44 P-4/9-a Resurfacing of road using 20 lbs bitumen and 2.00
Cft bajri nominal size1/2" for %sft area complete
I/c supply of bitumen & bajri/crushed stone
aggregate of approved quality i/c cleaning of road
surface, heating and spraying of bitumen and
spreading bajri/ crushed stone aggregate and
rolling with road roller I/c its operation cost, fuel
and hire charges etc. complete I/c carriage of all
material to site of work
I using 22 lbs bitumen and 2.50 Cft bajri nominal % Sft 83.90
size1/2" for %sft
II using 20 lbs bitumen and 2.00 Cft bajri nominal % Sft 83.90
size3/8"" for %sft
45 P-4/10 Providing and laying plant premixed bitumenous Per inch
thickness Per
carpet I/c compaction and finishing to required 100 Sft
camber, grade and density, complete.
3 % Bitumen 805.85
3.50 % Bitumen 805.85
4 % Bitumen 805.85
4.50 % Bitumen 805.85
5 % Bitumen 805.85
5.50 % Bitumen 805.85
6 % Bitumen 805.85
46 P-5/13 Providing and fixing G.I. Pipe railing as per Per Rft of 3 97.60
rows of Pipes
standard drawing.
47 P-5/17 Providing and fixing Rain water out let of A.C. Each 40.15
pipe.
48 P-5/18-I Providing and fixing RCC Kilometer Stone, Each 2394.75
complete in all respects.
P-5/18-iv-b Providing and fixing Sign posts Each 743.85
(Warning/Direction/Informatory), complete in all
respects.
49 P-5/19 Providing and laying dry brick soling in proper % Cft 3038.90
camber and sand cushion, etc complete in all
respects.
Chapter No. 20 - Surface Drainage
50 P-1/3-a Pacca brick on edge, laid in reimbursement, in 1:3 % Sft 2393.40
cement sand mortar on sides of drain, complete.
359292875.xlsx : Rt
30th June 2017)
Composite Rate
4935.90
4753.10
5054.85
359292875.xlsx : Rt
596.75
12102.40
10158.05
9216.65
20721.60
331.65
1913.50
11630.30
9995.20
17210.00
16337.00
17764.60
17266.15
359292875.xlsx : Rt
16891.60
1556.70
12425.55
660.00
3865.00
1933.50
2035.80
1804.45
1711.15
1633.25
1841.50
1729.00
459.05
270.75
361.35
200.00
10.70
2241.70
3982.30
3627.25
1395.40
3608.35
5515.65
29.80
1642.25
1424.55
1020.60
762.70
359292875.xlsx : Rt
581.95
899.55
815.00
2258.55
2427.95
2597.4
2766.8
2936.1
3105.65
3275.05
701.25
344.50
4662.55
4207.85
13913.30
7946.35
97.95
r.maurdu@gmail.com)
359292875.xlsx : Rt
Mean
RD B.S. I.S. F.S. H.O.I. R.L. Remarks
Bottom
B.M 3.01 103.01 100.00
359292875.xlsx : D1 : 9
Left 3.73 99.28
359292875.xlsx : D1 : 10
64 + 00 Centre 3.73 99.28 99.28 99.28
Right 3.73 99.28
Left 3.73 99.28
359292875.xlsx : D1 : 11
Left 3.73 99.28
359292875.xlsx : D1 : 12
130 + 00 Centre 3.73 99.28 99.28 99.28
Right 3.73 99.28
Left 3.73 99.28
359292875.xlsx : D1 : 13
Left 3.73 99.28
0.51 -0.51
359292875.xlsx : D1 : 14
PUNJAB HIGHWAY DEPARTMENT
Highway Sub Division (M&R) Layyah
DISTRICT LAYYAH
MAJOR HEAD.
MINOR HEAD.
359292875.xlsx : T1
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR, LENGHT 1.8 KM.
3 Providing and laying Road edging 3" wide, 9" deep brick on end, complete in all respects 5700.00 Rft 29.80 P.Rft 169860/-
4 Providing and laying Base course of crushed stone aggregate of approved quality and grade, 11910.00 Cft 10566.15 % Cft 1258428/-
complete in all respects.
5 Tripple surface treatment using 67 lbs. Bitumen and 7.5 Cft Bajri for 100 Sft area, complete in all 35732.00 Sft 3120.23 % Sft 1114921/-
respects.
ROAD STRUCTURE.
6 Re-Construction of 2' Span RCC Slab Culverts, complete in all respects. 1.00 No. 139300.00 Each 139300/-
7 Construction of Inauguration pillar, complete in all respects. 1.00 No. 15200.00 Each 15200/-
Total: 2790922/-
Deduct Cost of Old Material: 23744/-
Net Quantity 2767178/-
Add 3 % contingencies on Rs: 2790922/- 83015/-
Total: 2850193/-
Say: 2850000/-
359292875.xlsx : C1
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
ROAD STRUCTURE.
359292875.xlsx : Q1 : 17
Sub Engineer. Highway Sub Division (M&R)
Layyah
359292875.xlsx : Q1 : 18
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
ANALYSIS OF RATE
1 SUB BASE COARSE MATERIAL OF CRUSHED STONE AGGREGATE.
Unit 100 Cft.
Rates as per MRS- BI-ANNUAL PERIOD (1ST January 2017 TO 30th June 2017) of item 3 a ii/Ch-18 = Rs: 3608.35
Carriage charges from Sakhi Sarwar to site of work.
Total lead 122.00+47.00+16 + 1.8 /2 185.9 Say 186.00 Km
Carriage from 0 to 10.00 Km (item 1/Ch-1) = Rs: 566.95
Carriage from 11 to 186 Km = 176 Km @ Rs. 20.3 Per Km (item 1/Ch-1) = Rs: 3572.80
Carriage from 201 to 186 Km = 0 Km @ Rs. 3.25 Per Km (item 1/Ch-1) = Rs: 0.00
Carriage from 251 to 186 Km = 0 Km @ Rs. 2 Per Km (item 1/Ch-1) = Rs:
Total: = Rs: 4139.75
Additional Carriage for Loose Material: = 1 x 4139.75 x 20/100 = Rs: 827.95
Total Carriage: = Rs: 4967.70
Total Rate of Sub Base Course. (3608.35+4967.7) = Rs: 8576.05
Per % Cft
3 T.S.T Using 67 lbs. Bitumen and 7.5 Cft bajri for 100 Sft area complete.
Unit 100 Sft.
Rates as per MRS- BI-ANNUAL PERIOD (1ST January 2017 TO 30th June 2017) of item 8-a (1)-i/Ch-18 = Rs: 2769.20
Carriage charges from Kirana Hill to site of work.
Total lead 280.44+16 + 1.8 /2 297.34 Say 297.00 Km
Carriage from 0 to 10.00 Km (item 1/Ch-1) = Rs: 566.95
Carriage from 11 to 200 Km = 190 Km @ Rs. 20.3 Per Km (item 1/Ch-1) = Rs: 3857.00
Carriage from 201 to 250 Km = 50 Km @ Rs. 3.25 Per Km (item 1/Ch-1) = Rs: 162.50
Carriage from 251 to 297 Km = 47 Km @ Rs. 2 Per Km (item 1/Ch-1) = Rs: 94.00
Total Carriage rate of TST = Rs: 4680.45
4 D.S.T Using 32 lbs. Bitumen and 3.50 Cft bajri for 100 Sft area complete.
Unit 100 Sft.
Rates as per MRS- BI-ANNUAL PERIOD (1ST January 2017 TO 30th June 2017) of item 8-a (1)-ii/Ch-18 = Rs: 1344.65
Carriage charges from Kirana Hill to site of work.
Total lead 280.44+16 + 1.8 /2 297.34 Say 297.00 Km
Carriage from 0 to 10.00 Km (item 1/Ch-1) = Rs: 566.95
Carriage from 11 to 200 Km = 190 Km @ Rs. 20.3 Per Km (item 1/Ch-1) = Rs: 3857.00
Carriage from 201 to 250 Km = 50 Km @ Rs. 3.25 Per Km (item 1/Ch-1) = Rs: 162.50
359292875.xlsx : An1
Carriage from 251 to 297 Km = 47 Km @ Rs. 2 Per Km (item 1/Ch-1) = Rs: 94.00
Total Carriage rate of TST = Rs: 4680.45
i) Labour Rate for Relaying of Sub Base (item 3 a ii/Ch-18) = Rs: 2456.35
ii) Breaking bricks into bats of 1 inch to 2 inch size (item 40 a/Ch-6) = Rs: 1775.40
iii) Cost of 25 Cft sand @ Rs.1556.7 - 236.7 = 1320 x 25 / 100 = = Rs: 330.00
Total = Rs: 4561.75
Per % Cft
359292875.xlsx : An1
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
359292875.xlsx : EW1
98 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
100 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
102 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
104 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
106 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
108 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
110 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
112 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
114 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
116 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
118 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
120 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
122 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
124 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
126 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
128 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
130 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
132 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
134 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
136 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
138 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
140 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
142 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
144 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
146 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
148 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
150 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
152 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
154 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
156 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
158 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
160 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
162 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
164 + 00 100.00 99.28 0.72 13.65 13.65 200.0 2730 "
Total: 223860 Cft
Deduct Existing Earth: 0 "
Net Qty: 223860 Cft
359292875.xlsx : EW1
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
EXISTING EARTHWORK.
0 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 0.0 0 Cft
2 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
4 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
6 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
8 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
10 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
12 + 00 99.28 99.28 0.00 ( 19.00 + 19.00 )/2 0.00 0.00 200.0 0 "
14 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
16 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
18 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
20 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
22 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
24 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
26 + 00 99.28 99.28 0.00 ( 17.00 + 17.00 )/2 0.00 0.00 200.0 0 "
28 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
30 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
32 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
34 + 00 99.28 99.28 0.00 ( 22.00 + 22.00 )/2 0.00 0.00 200.0 0 "
36 + 00 99.28 99.28 0.00 ( 20.00 + 20.00 )/2 0.00 0.00 200.0 0 "
38 + 00 99.28 99.28 0.00 ( 19.00 + 19.00 )/2 0.00 0.00 200.0 0 "
40 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
42 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
44 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
46 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
48 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
50 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
52 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
54 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
56 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
58 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
60 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
62 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
64 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
66 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
68 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
70 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
72 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
74 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
76 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
78 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
80 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
82 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
84 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
86 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
88 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
90 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
92 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
94 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
96 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
98 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
100 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
102 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
104 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
106 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
108 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
110 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
112 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
359292875.xlsx : Ex
114 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
116 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
118 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
120 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
122 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
124 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
126 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
128 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
130 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
132 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
134 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
136 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
138 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
140 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
142 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
144 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
146 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
148 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
150 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
152 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
154 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
156 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
158 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
160 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
162 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
164 + 00 99.28 99.28 0.00 ( 18.00 + 18.00 )/2 0.00 0.00 200.0 0 "
Total: 0 Cft
359292875.xlsx : Ex
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
359292875.xlsx : Cl-24
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
359292875.xlsx : Dr
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
359292875.xlsx : Cr
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
359292875.xlsx : Toe
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
359292875.xlsx : Pl
Layyah
359292875.xlsx : Pl
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR,
LENGHT 1.8 KM.
SCHEDULE OF OLD MATERIAL.
1 Brick Bats
Received from Item No. 1 above = 1069.00 Cft
Take 60% wastage in Shape of Brick bats.
1x 1069.00 x 60% = 641 Cft
Total = 641 Cft
@Rs. 1000.00 Per % Cft Rs. 6410/-
2 Old unserviceable Bricks
Remainging 40% Quantity. ( 1069.0 - 641.0 ) = 428 Cft
Total = 428 Cft
Total No. of Bricks. 1x 428.0 x 1350 / 100 = 5778 No.
Total = 5778 No.
@Rs. 3000.00 Per Nos. Rs. 17334/-
Time Limit: 3
MONTHS
3 MONTHS
2 SHAKEEL 6.00
3 MUDDASAR 4.00
Err:509
Err:509
Err:509
Err:509 #NAME?
Err:509
359292875.xlsx...Reg-P...35
DATED: 30-06-2007
Unit of
Sr. Specification of Quantity
Description of Items Measure
No. Pay Item in Unit
ment
1 2 3 4 5
1 18-1 Dismantling brick or flagged flooring without concrete foundation. 10.69 % Sft
2 17-1 (a) 411-5 & Compaction of earthwork with power road roller, I/c ploughing, mixing, Err:509 Cft
202-3 moistening earth to optimum moisture conten in layers, etc. complete 95 %
to 100 % maximum modified AASHO dry density.
3 411-1 to 411-13 & Earthwork in ordinary soil for embankment, lead upto 100 ft (30 m) i/c 18.525 Cft
301-1 & 202-3 plouging and mixing with blade grade or disc harrow or other suitable
equipment and compaction by mechanical means at optimum moisture
content and dressing to designed section to achieve 85% to maximum
modified AASHO dry density, complete in all respects.
5 501-1 to 501-6 Relaying of Old Material used as Sub Base Course (Brick Soling), complete Err:509 % Cft
in all respects.
6 501-1 to 501-6 Providing and laying Sub base course of crushed stone aggregate of Err:509 % Cft
approved quality and grade i/c placing, mixing, spreading and compaction of
Sub Base Material to required depth, camber, grade to achieve 100%
maximum modified AASHO dry density, i/c carriage of all material to site of
work, except gravel and agrregates, complete in all respects.
7 552-1 to 552-5 Providing and laying Road edging 3" wide, 9" deep brick on end, complete 5700.00 P.Rft
in all respects.
8 501-1 to 501-6 Providing and laying Base course of crushed stone aggregate of approved 119.10 % Cft
quality and grade and supply and spreading of stone screening i/c placing,
mixing, spreading and compaction of Base Course Material to requird depth,
camber, grade to achieve 100% maximum modified AASHO dry density, i/c
carriage of all material to site of work, except crushed stone agrregates,
complete in all respects.
9 612-1 to 612-6 Tripple surface treatment using 79 Lbs. Bitumen and 9.75 Cft bajri for % Sft 357.32 % Sft
area i/c supply of bitumen and bajri / crushed stone agrregate of approved
quality, i/c cleaning of road surface heating and spraying bitumen, spreading
bajri and rolling with Road Roller (including its opertion cost, fuel and hire
charges etc) etc. complete i/c carriage of all material to site of work,
complete in all respects.
10 612-1 to 612-6 Tripple surface treatment using 67 Lbs. Bitumen and 7.50 Cft bajri for % Sft Err:509 % Sft
area i/c supply of bitumen and bajri / crushed stone agrregate of approved
quality, i/c cleaning of road surface heating and spraying bitumen, spreading
bajri and rolling with Road Roller (including its opertion cost, fuel and hire
charges etc) etc. complete i/c carriage of all material to site of work,
complete in all respects.
ROAD STRUCTURE
CONSTRUCTION OF 2' SPAN RCC SLAB CULVERT 1 No.
Err:509
Err:509
Err:509
11 17-1 to 17-5 Excavation in foundation of buildings, bridges and other structure i/c Err:509 Cft
dagbelling, dressing, refilling around structure with excavated earth,
watering and ramming, lead upto one chain and and lift upto 5 ft.in ordinary
soil.
12 20-1 Cement concrete brick or stone ballast 1-1/2" to 2" guage in foundation and 2.6550 % Cft
plinth, Ratio 1:4:8.
13 21-1 to 21-4 Pacca brick work in foundation and plinth in cement sand mortar, Ratio 1:4. Err:509 % Cft
359292875.xlsx...Reg-P...36
14 851-5 Fabrication of mild steel reinforcement for cement concrete i/c cutting Err:509 % Kg
bending laying in position making joints and fastening I/c cost of binding
wire and labour charge for binding of steel reinforcement (also includes
removal of rust from bars). Deformed bars.
15 20-4 Providing and laying reinforced cement concrete i/c prestressed concrete Err:509 P. Cft
using coarse sand screened graded and washed agrregate in required shape
and design i/c forms, moulds, shuttering, lifting, compacting, curing,
rendering and finishing exposed surface, complete (but excluding the cost of
steel reinforcement, its fabrication and placing in position, etc.)
(i) Reinforcement cement concrete in roof, slab, beam, column, lintel, grider
and other structural members, laid in situ of precast laid in position or
prestressed members cast in situ, Type-C normal mixture 1:2:4, complete in
all respect.
16 20-1 Cement concrete brick or stone ballast 1-1/2" to 2" gauge in foundation and Err:509 % Cft
plinth, Ratio 1:6:12.
17 17-1 Pacca brick on edge, laid in reimbursement, in 1:3 cement sand mortar on Err:509 % Sft
sides of drain, complete.
18 17-1 Construction of Punjab Standard drain of cement concrete 1:2 :5, with Err:509 P.Rft
cement concrete bedding ratio 1:6:12, complete, laid to lines, grades, slopes
and shapes rendering exposed surface of concrete with 1:1 cement sand
mortar, " (6 mm) thick, as per Engineers drawing excluding excavation
Type I, complete in all respects.
19 - Cement concrete brick or stone ballast 1-1/2" to 2" gauge in foundation and Err:509 % Cft
plinth, Ratio 1:6:18.
20 - Pacca brick work in foundation and plinth in cement sand mortar, Ratio 1:6 Err:509 % Cft
21 - Providing and fixing RCC Kilometer Stone, complete in all respects. Err:509 Each
22 - Providing and fixing Sign posts, complete in all respects. Err:509 Each
Err:5 Err:509 Err:509 Err:509 Err:509
09
23 941-1 to 941-5 Construction of Inauguration Pillar, complete in all respects. 1.00 Each
BID SCHEDULE
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR, LENGHT 1.8 KM.
1 18-1 Dismantling brick or flagged flooring without concrete foundation. 10.690 % Sft
2 17-1 (a) 411-5 & Compaction of earthwork with power road roller, I/c ploughing, mixing, moistening earth to Err:509 Cft
202-3 optimum moisture conten in layers, etc. complete 95 % to 100 % maximum modified AASHO
dry density.
3 411-1 to 411-13 Earthwork in ordinary soil for embankment, lead upto 100 ft (30 m) i/c plouging and mixing 18.525 Cft
& 301-1 & 202- with blade grade or disc harrow or other suitable equipment and compaction by mechanical
3 means at optimum moisture content and dressing to designed section to achieve 85% to
maximum modified AASHO dry density, complete in all respects.
5 501-1 to 501-6 Relaying of Old Material used as Sub Base Course (Brick Soling), complete in all respects. Err:509 % Cft
6 501-1 to 501-6 Providing and laying Sub base course of crushed stone aggregate of approved quality and Err:509 % Cft
grade i/c placing, mixing, spreading and compaction of Sub Base Material to required depth,
camber, grade to achieve 100% maximum modified AASHO dry density, i/c carriage of all
material to site of work, except gravel and agrregates, complete in all respects.
7 552-1 to 552-5 Providing and laying Road edging 3" wide, 9" deep brick on end, complete in all respects. 5700.000 P.Rft
8 501-1 to 501-6 Providing and laying Base course of crushed stone aggregate of approved quality and 119.100 % Cft
grade and supply and spreading of stone screening i/c placing, mixing, spreading and
compaction of Base Course Material to requird depth, camber, grade to achieve 100%
maximum modified AASHO dry density, i/c carriage of all material to site of work, except
crushed stone agrregates, complete in all respects.
359292875.xlsx...BID....37
Sr. Specification Quantity in Unit of Rates Quoted by the Contractor
Description of Items
No. of Pay Item Unit Measurement In Figures In Words
1 2 3 4 5 6 7
9 612-1 to 612-6 Tripple surface treatment using 79 Lbs. Bitumen and 9.75 Cft bajri for % Sft area i/c 357.320 % Sft
supply of bitumen and bajri / crushed stone agrregate of approved quality, i/c cleaning of
road surface heating and spraying bitumen, spreading bajri and rolling with Road Roller
(including its opertion cost, fuel and hire charges etc) etc. complete i/c carriage of all
material to site of work, complete in all respects.
10 612-1 to 612-6 Tripple surface treatment using 67 Lbs. Bitumen and 7.50 Cft bajri for % Sft area i/c Err:509 % Sft
supply of bitumen and bajri / crushed stone agrregate of approved quality, i/c cleaning of
road surface heating and spraying bitumen, spreading bajri and rolling with Road Roller
(including its opertion cost, fuel and hire charges etc) etc. complete i/c carriage of all
material to site of work, complete in all respects.
ROAD STRUCTURE
CONSTRUCTION OF 2' SPAN RCC SLAB CULVERT 1 No.
Err:509
Err:509
Err:509
11 17-1 to 17-5 Excavation in foundation of buildings, bridges and other structure i/c dagbelling, dressing, Err:509 Cft
refilling around structure with excavated earth, watering and ramming, lead upto one chain
and and lift upto 5 ft.in ordinary soil.
12 20-1 Cement concrete brick or stone ballast 1-1/2" to 2" guage in foundation and plinth, Ratio 2.6550 % Cft
1:4:8.
13 21-1 to 21-4 Pacca brick work in foundation and plinth in cement sand mortar, Ratio 1:4. Err:509 % Cft
14 851-5 Fabrication of mild steel reinforcement for cement concrete i/c cutting bending laying in Err:509 % Kg
position making joints and fastening I/c cost of binding wire and labour charge for binding of
steel reinforcement (also includes removal of rust from bars). Deformed bars.
15 20-4 Providing and laying reinforced cement concrete i/c prestressed concrete using coarse sand Err:509 P. Cft
screened graded and washed agrregate in required shape and design i/c forms, moulds,
shuttering, lifting, compacting, curing, rendering and finishing exposed surface, complete
(but excluding the cost of steel reinforcement, its fabrication and placing in position, etc.)
(i) Reinforcement cement concrete in roof, slab, beam, column, lintel, grider and other
structural members, laid in situ of precast laid in position or prestressed members cast in
situ, Type-C normal mixture 1:2:4, complete in all respect.
16 20-1 Cement concrete brick or stone ballast 1-1/2" to 2" gauge in foundation and plinth, Ratio Err:509 % Cft
1:6:12.
17 17-1 Pacca brick on edge, laid in reimbursement, in 1:3 cement sand mortar on sides of drain, Err:509 % Sft
complete.
359292875.xlsx...BID....38
Sr. Specification Quantity in Unit of Rates Quoted by the Contractor
Description of Items
No. of Pay Item Unit Measurement In Figures In Words
1 2 3 4 5 6 7
18 17-1 Construction of Punjab Standard drain of cement concrete 1:2 :5, with cement concrete Err:509 P.Rft
bedding ratio 1:6:12, complete, laid to lines, grades, slopes and shapes rendering exposed
surface of concrete with 1:1 cement sand mortar, " (6 mm) thick, as per Engineers
drawing excluding excavation Type I, complete in all respects.
19 - Cement concrete brick or stone ballast 1-1/2" to 2" gauge in foundation and plinth, Ratio Err:509 % Cft
1:6:18.
20 - Pacca brick work in foundation and plinth in cement sand mortar, Ratio 1:6 Err:509 % Cft
21 - Providing and fixing RCC Kilometer Stone, complete in all respects. Err:509 Each
22 - Providing and fixing Sign posts, complete in all respects. Err:509 Each
23 941-1 to 941-5 Construction of Inauguration Pillar, complete in all respects. 1.00 Each
359292875.xlsx...BID....39
359292875.xlsx...Comp!...40
COMPARATIVE STATEMENT
REHABILITATION OF FLOOD AFFECTED ROAD FROM HAZARA MORE TO BASTI LOTHAR, LENGHT 1.8 KM.
1 Dismantling brick or flagged flooring without 10.69 % Sft 482.90 5162/- 521.53 5575/- 511.87 5472/- 502.22 5369/- 497.39 5317/-
concrete foundation.
2 Compaction of earthwork with power road roller, Err:509 Cft Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
I/c ploughing, mixing, moistening earth to
optimum moisture conten in layers, etc. complete
95 % to 100 % maximum modified AASHO dry
density.
3 Earthwork in ordinary soil for embankment, lead 18.525 Cft 4753.10 88051/- 5133.35 95095/- 5038.29 93334/- 4943.22 91573/- 4895.69 90693/-
upto 100 ft (30 m) i/c plouging and mixing with
blade grade or disc harrow or other suitable
equipment and compaction by mechanical means
at optimum moisture content and dressing to
designed section to achieve 85% to maximum
modified AASHO dry density, complete in all
respects.
4 Err:509 Err:509 Cft Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
5 Relaying of Old Material used as Sub Base Err:509 % Cft Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Course (Brick Soling), complete in all respects.
359292875.xlsx...Comp!...41
6 Providing and laying Sub base course of crushed Err:509 % Cft Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
stone aggregate of approved quality and grade i/c
placing, mixing, spreading and compaction of Sub
Base Material to required depth, camber, grade to
achieve 100% maximum modified AASHO dry
density, i/c carriage of all material to site of work,
except gravel and agrregates, complete in all
respects.
7 Providing and laying Road edging 3" wide, 9" 5700.00 P.Rft 29.80 169860/- 32.18 183426/- 31.59 180063/- 30.99 176643/- 30.69 174933/-
deep brick on end, complete in all respects.
8 Providing and laying Base course of crushed 119.10 % Cft 10566.15 1258428/- 11411.44 1359103/- 11200.12 1333934/- 10988.80 1308766/- 10883.13 1296181/-
stone aggregate of approved quality and grade
and supply and spreading of stone screening i/c
placing, mixing, spreading and compaction of
Base Course Material to requird depth, camber,
grade to achieve 100% maximum modified
AASHO dry density, i/c carriage of all material to
site of work, except crushed stone agrregates,
complete in all respects.
9 Tripple surface treatment using 79 Lbs. Bitumen 357.32 % Sft 3120.23 1114921/- 3369.85 1204115/- 3307.44 1181814/- 3245.04 1159518/- 3213.84 1148369/-
and 9.75 Cft bajri for % Sft area i/c supply of
bitumen and bajri / crushed stone agrregate of
approved quality, i/c cleaning of road surface
heating and spraying bitumen, spreading bajri
and rolling with Road Roller (including its opertion
cost, fuel and hire charges etc) etc. complete i/c
carriage of all material to site of work, complete
in all respects.
359292875.xlsx...Comp!...42
10 Tripple surface treatment using 67 Lbs. Bitumen Err:509 % Sft Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
and 7.50 Cft bajri for % Sft area i/c supply of
bitumen and bajri / crushed stone agrregate of
approved quality, i/c cleaning of road surface
heating and spraying bitumen, spreading bajri
and rolling with Road Roller (including its opertion
cost, fuel and hire charges etc) etc. complete i/c
carriage of all material to site of work, complete
in all respects.
ROAD STRUCTURE
CONSTRUCTION OF 2' SPAN RCC SLAB
CULVERT 1 No.
Err:509
Err:509
Err:509
11 Excavation in foundation of buildings, bridges and Err:509 Cft 5995.45 Err:509 6475.09 Err:509 6355.18 Err:509 6235.27 Err:509 6175.31 Err:509
other structure i/c dagbelling, dressing, refilling
around structure with excavated earth, watering
and ramming, lead upto one chain and and lift
upto 5 ft.in ordinary soil.
12 Cement concrete brick or stone ballast 1-1/2" to 2.6550 % Cft 12102.40 32132/- 13070.59 34702/- 12828.54 34060/- 12586.50 33417/- 12465.47 33096/-
2" guage in foundation and plinth, Ratio 1:4:8.
13 Pacca brick work in foundation and plinth in Err:509 % Cft 17210.00 Err:509 18586.80 Err:509 18242.60 Err:509 17898.40 Err:509 17726.30 Err:509
cement sand mortar, Ratio 1:4.
14 Fabrication of mild steel reinforcement for cement Err:509 % Kg 9995.20 Err:509 10794.82 Err:509 10594.91 Err:509 10395.01 Err:509 10295.06 Err:509
concrete i/c cutting bending laying in position
making joints and fastening I/c cost of binding
wire and labour charge for binding of steel
reinforcement (also includes removal of rust from
bars). Deformed bars.
359292875.xlsx...Comp!...43
15 Providing and laying reinforced cement concrete Err:509 P. Cft 331.65 Err:509 358.18 Err:509 351.55 Err:509 344.92 Err:509 341.60 Err:509
i/c prestressed concrete using coarse sand
screened graded and washed agrregate in
required shape and design i/c forms, moulds,
shuttering, lifting, compacting, curing, rendering
and finishing exposed surface, complete (but
excluding the cost of steel reinforcement, its
fabrication and placing in position, etc.)
(i) Reinforcement cement concrete in roof, slab,
beam, column, lintel, grider and other structural
members, laid in situ of precast laid in position or
prestressed members cast in situ, Type-C normal
mixture 1:2:4, complete in all respect.
16 Cement concrete brick or stone ballast 1-1/2" to Err:509 % Cft 10158.05 Err:509 10970.69 Err:509 10767.53 Err:509 10564.37 Err:509 10462.79 Err:509
2" gauge in foundation and plinth, Ratio 1:6:12.
17 Pacca brick on edge, laid in reimbursement, in Err:509 % Sft 7946.35 Err:509 8582.06 Err:509 8423.13 Err:509 8264.20 Err:509 8184.74 Err:509
1:3 cement sand mortar on sides of drain,
complete.
18 Construction of Punjab Standard drain of cement Err:509 P.Rft 97.95 Err:509 105.79 Err:509 103.83 Err:509 101.87 Err:509 100.89 Err:509
concrete 1:2 :5, with cement concrete bedding
ratio 1:6:12, complete, laid to lines, grades,
slopes and shapes rendering exposed surface of
concrete with 1:1 cement sand mortar, " (6 mm)
thick, as per Engineers drawing excluding
excavation Type I, complete in all respects.
19 Cement concrete brick or stone ballast 1-1/2" to Err:509 % Cft 9216.65 Err:509 9953.98 Err:509 9769.65 Err:509 9585.32 Err:509 9493.15 Err:509
2" gauge in foundation and plinth, Ratio 1:6:18.
20 Pacca brick work in foundation and plinth in Err:509 % Cft 16337.00 Err:509 17643.96 Err:509 17317.22 Err:509 16990.48 Err:509 16827.11 Err:509
cement sand mortar, Ratio 1:6
21 Providing and fixing RCC Kilometer Stone, Err:509 Each 4662.55 Err:509 5035.55 Err:509 4942.30 Err:509 4849.05 Err:509 4802.43 Err:509
complete in all respects.
22 Providing and fixing Sign posts, complete in all Err:509 Each 4207.85 Err:509 4544.48 Err:509 4460.32 Err:509 4376.16 Err:509 4334.09 Err:509
respects.
23 Construction of Inauguration Pillar, complete in all 1.00 Each 15200.00 15200/- 16416.00 16416/- 16112.00 16112/- 15808.00 15808/- 15656.00 15656/-
respects.
TOTAL: Err:509 Err:509 Err:509 Err:509 Err:509
359292875.xlsx...Comp!...44
From
The District Officer Roads,
Highway Division, Layyah.
To
Err:509
GOVT. CONTRACOR
Ward No.5, Multan Road,
Layyah.
No. Dated:
Reference: Your Tender Dated: 30-06-2007 and voluntarily undertaking Dated: NIL
Err:509
Specifi
Unit of
Sr. cation Quantity
Description of Items Measur- Rates
No. of Pay in Unit
ement
Item
1 2 3 4 5 6
5 501-1 to Relaying of Old Material used as Sub Base Err:509 % Cft Err:509
501-6 Course (Brick Soling), complete in all respects.
Specifi
Unit of
Sr. cation Quantity
Description of Items Measur- Rates
No. of Pay in Unit
ement
Item
1 2 3 4 5 6
6 501-1 to Providing and laying Sub base course of Err:509 % Cft Err:509
501-6 crushed stone aggregate of approved quality
and grade i/c placing, mixing, spreading and
compaction of Sub Base Material to required
depth, camber, grade to achieve 100%
maximum modified AASHO dry density, i/c
carriage of all material to site of work, except
gravel and agrregates, complete in all respects.
7 552-1 to Providing and laying Road edging 3" wide, 9" 5700.000 P.Rft #NAME?
552-5 deep brick on end, complete in all respects.
8 501-1 to Providing and laying Base course of crushed 119.100 % Cft #NAME?
501-6 stone aggregate of approved quality and grade
and supply and spreading of stone screening
i/c placing, mixing, spreading and compaction
of Base Course Material to requird depth,
camber, grade to achieve 100% maximum
modified AASHO dry density, i/c carriage of all
material to site of work, except crushed stone
agrregates, complete in all respects.
ROAD STRUCTURE
CONSTRUCTION OF 2' SPAN RCC SLAB
CULVERT 1 No.
Err:509
Err:509
Err:509
11 17-1 to Excavation in foundation of buildings, bridges Err:509 Cft #NAME?
17-5 and other structure i/c dagbelling, dressing,
refilling around structure with excavated earth,
watering and ramming, lead upto one chain and
and lift upto 5 ft.in ordinary soil.
12 20-1 Cement concrete brick or stone ballast 1-1/2" to 2.6550 % Cft #NAME?
2" guage in foundation and plinth, Ratio 1:4:8.
13 21-1 to Pacca brick work in foundation and plinth in Err:509 % Cft #NAME?
21-4 cement sand mortar, Ratio 1:4.
Specifi
Unit of
Sr. cation Quantity
Description of Items Measur- Rates
No. of Pay in Unit
ement
Item
1 2 3 4 5 6
14 851-5 Fabrication of mild steel reinforcement for Err:509 % Kg #NAME?
cement concrete i/c cutting bending laying in
position making joints and fastening I/c cost of
binding wire and labour charge for binding of
steel reinforcement (also includes removal of
rust from bars). Deformed bars.
16 20-1 Cement concrete brick or stone ballast 1-1/2" to Err:509 % Cft #NAME?
2" gauge in foundation and plinth, Ratio 1:6:12.
IV). Compaction / Laboratory testing of all the component shall be watched by you / Sub-Engineer
Incharge as per standing instructions at specific intervals for each layer of the work item.
2 The Assistant Accounts Officer (Roads) office of the District Accounts Officer, Layyah for information.
3 Head Clerk (Local) for preparation of relevant contract agreement on production of Stamp Duty.
4 Accounts Branch (Local).