P.8
P.7
Kebun
U
Pemukiman
S
Kebun
P.5
Kebun
P.2 P.3
Sawah
P.4
P.1 Kebun
P.0
Sawah
Kebun
Sawah
P
Kebun DA
SA
B. P
86 P.5 LAN P.6 ADA
U S
US B.
85
0 1 2 3 4 5 6 7 8 9 10 m
+ 79.00 meter
PATOK HEKTOMETER
Hm 0 Hm 1 Hm 2 Hm 3
HECTOMETER STONE
NOMOR PROFIL
P.1 P.2 P.3 P.4 P.5 P.6 P.7 P.8
P.0
PROFILE NUMBER
116.6
150.6
184.9
231.4
283.0
335.7
JARAK PROFIL/DISTANCE BETWEEN TWO PROFILE
28.7
73.1
0.0
BED LEVEL
TRASE SALURAN R X Y L
ALIGNMENT TL a
ELEVASI DASAR SALURAN PEMBUANG SISI KIRI
BED LEVEL SIDE DRAIN LEFT SIDE
ELEVASI DASAR SALURAN PEMBUANG SISI KANAN
BED LEVEL SIDE DRAIN RIGHT SIDE
TIPE BANGUNAN
TYPE OF STRUCTURE
Q v k
DIMENSI SALURAN DAN DATA TAMBAHAN b h w
CANAL DIMENSION AND ADDITIONAL DATA m I A