Area : QUARRY CRUSHING & OLBC

No. Name Equipment & Jan


Equipment Instruction text 1
Apron Feeder & Hopper
211_HP1 Hopper Limestone
211_AF1 Apron Feeder
1. Drive
1.a. Pelepasan
Longgarkan torque support
Longgarkan shrink disc
Lepaskan gearbox, torque support dan shrink disc dari shaft pin
1.b Pemasangan
Letakkan shrink disc, torque support dan gearbox diatas shaft pin pada shaft pengger
Jika dibutuhkan,baut torque support diatas gearbox dan kencangkan baut dengan nila
Sambungkan tirque support ke bracket
2. Drive Shaft
2.a Pelepasan
Lepaskan drive
Kendorkan rantai tractor
Buka rantai tractor di dalam area drive shaft
Lepaskan Pull cord switch bracket
Lepaskan rail pelumasan
Lepaskan guide plates
Lepaskan baut dan drive shaft bearing guides
Lepaskan shims
Gunakan crane/chain block yang sesuai untuk mengangkat drive shaft dari mesin dan
Lepaskan bearing
Kendorkan shrick disc
Tarik keluar sprocket dari shaft
Kendorkan bantalan roda dan lepaskan dari drive shaft
2.b Pemasangan
Dorong/masukkan support wheel pada drive shaft, pastikan pada posisi yang tepat
Dorong/masukkan sprockets pada drive shaft
Pastikan Chain sprockets dengan shrink disc sesuai dengan posisi yang diminta pada
Pasang bearing sesuai dengan posisi yang ditentukan pada drive shaft
Gunakan crane/chain block yang sesuai untuk menempatkan rangkaian drive shaft de
Pasangkan drive shaft bearing guide dengan baut. Pastikan bearing housing terpasan
Kencangkan baut sesuai dengan nilai pengencangan yang ditentukan
Pas-kan guide plates
Pasang rail pelumasan dan hubungkan kembali semua jalur pelumasan
Pasang kembali pull cord switch bracket
Tempatkan rantai pada sprockets dan hubungkan kembali
3. Tensioning shaft
3.1 Pelepasan
Lepaskan cover pengaman
Lepaskan Pull cord switch bracket
Kendorkan/Lepaskan hood/penutup
Kendorkan tractor chain
Buka tractor chain di dalam area tensioning shaft area
Lepaskan screw pengencang
Lepaskan baut dan tensioning shaft bearing guides
Gunakan crane/chain block yang sesuai untuk mengangkat tensioning shaft keluar da
Lepaskan bearing
Kendorkan ring untuk menarik chain sprocket dan spacer ring off the tensioning shaft
3.2 Pemasangan
Tempatkan spacer ring pada floating bearing disamping tensioning shaft
Dorong chain sprocket dan masukkan ke tensioning shaft
Tetapkan posisi chain sprocket pada tensioning shaft dengan rings
Pasang bearing sesuai posisi yang diinginkan pada shaft

211_AF1_GB1 Gearbox
Coupling
211_AF1_GB2 Gearbox
Coupling
211_SX1 Spillage Conveyor
211_SX1_M1 Geared Motor
Coupling
211_HP2 Hopper clay
211_AF2 Apron Feeder
211_AF2_GB1 Gearbox
Coupling
211_SX2 Spillage Conveyor
211_SX2_M1 Geared Motor
Coupling
211_WQ1 Roller Screen
Gearbox
Coupling
Crusher
211_CR1
Impact Crusher
1. JAW
1.a. Open JAW
Matikan motor penggerak crusher & LOTO
Buka pengunci sistem JAW
Lepaskan scrupe pengunci yang berada pada kanan, kiri dan atas cover crusher
Hidupkan hydraulic untuk Jaw dan buka Jaw
Matikan hydraulic dan aman terhadap restrat
1.b. Close the JAW
Bersihkan permukaan yang bersentuhan
Hidupkan hydraulic
Tutup Jaw
Matikan hydraulic
Pasang kembali baut pengunci dan kencangkan sesuai dengan pengetatan yang diizinkan
Kunci kembali pengunci system JAW
2. Impact Walls

211_CR1_GB1 Gear box


Coupling
211_CR1_T1 Belt driving
211_HS1 Hydraulic device
211_HS1_LU1 Lubrication system
Belt conveyor
Belt conveyor
211_BC1
211_BC1_M1 Gearmotor
Coupling
211_BC1_a1 Safety devices
Belt conveyor
211_BC2
211_BC2_GB1 Gearbox
Coupling
211_BC2_a1 Safety devices
Bag filter # 1
Bag filter
211_BF1
Pulse valve(with solenoid)
211_SC1 Screw conveyor
211_SC1_M1 Gearmotor
Coupling
211_SC2 Screw conveyor
211_SC2_M1 Gearmotor
Coupling
211_RF1 Rotary feeder
211_RF1_M1 Gear motor
Coupling
211_RF1 Rotary feeder
211_RF1_M1 Gear motor
Coupling
211_FN1 Fan
Coupling
211_VA1 Inlet valve
211_BV1 Manual Butterfly damper
211_BV2 Manual Butterfly damper
211_BV3 Manual Butterfly damper
211_BV4 Manual Butterfly damper
211_BV5 Manual Butterfly damper
211_BV6 Manual Butterfly damper
211_BV7 Manual Butterfly damper
211_BR1 Traveling crane
Compressed air pipe
211_TK1 Air Tank
211_CP1 Compressed air pipe
- b.cock off valve
- c.Manometer
Legend : O Date of planning implementation
The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

January February March April May June July August


2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

a shaft penggerak
baut dengan nilai pengencangan yang diijinkan

t dari mesin dan tempatkan pada lantai yang aman

si yang tepat

ng diminta pada drive shaft

an drive shaft dengan rumah bearing pada belt frame. Pastikan kancing guide rail kedalam bearing housing grooves
ousing terpasang dengan aman
g shaft keluar dari mesin, dan letakan pada lantai yang aman

tensioning shaft
yang diizinkan
CHEDULE

No : ______________
September October November December
REMARKS
36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
A

Area : QUARRY CRUSHING & OLBC


No. Name Equipment & January February March
Equipment Instruction text 1 2 3 4 5 6 7 8 9 10 11
Belt Conveyor #1
291_BC1 Belt conveyor
291_BC1_GB1 Gear box
Coupling
291_BC1_b Safety devices
291_WB1 Belt scale
291_MS1 Magnetic Separator
Coupling
Bag Filter #1
291_BF1 Bag Filter
291_RF1 Rotary feeder
291_RF1_M1 Gear motor
Coupling
291_FN1 Fan
Coupling
291_VA1 Inlet damper
291_BV1 Electrical Butterfly valve
291_BV2 Manual Butterfly valve
291_BV3 Manual Butterfly valve
2-Way Distribution Gate
291_MW1 2-Way Distribution Gate
291_MW2 2-Way Distribution Gate
291_MW1_M1 pneumatic Push rod
291_MW1_M2 pneumatic Push rod
Belt Conveyor #2
291_BC2 Belt conveyor
291_BC2_GB1 Gear box
291_BC2_b Hydraulic coupling
291_BC2_c Safety devices
Bag Filter #2
291_BF2 Bag filter
291_RF2 Rotary feeder
291_RF2_M1 Gearmotor
Coupling
291_FN2 Fan
Coupling
291_VA2 Inlet damper
291_BV4 Manual Butterfly valve
291_BV5 Electric Butterfly valve
291_BV6 Manual Butterfly valve
291_BV7 Manual Butterfly valve
291_BV8 Manual Butterfly valve
Storage bin & Needle gate
291_3B1 Storage bin
291_NG1 Needle gate
291_NG2 Needle gate
Belt Conveyor #3
291_BC3 Belt conveyor
291_BC3_GB1 Gearbox
Coupling
291_BC4 Belt conveyor
291_BC4_GB1 Gear box(wit backstop)
291_BC4_b Coupling
291_BC4_c Safety devices
291_MS2 Magnetic Separator
Coupling
Belt Conveyor #4
291_BC5 Belt conveyor
291_BC5_GB1 Gear box
Coupling
291_WB2 Belt scale
Bag Filter #3
291_BF3 Bag filter
291_RF3 Rotary feeder
291_RF3_M1 Gearmotor
Coupling
291_FN3 Fan
Coupling
291_VA3 Inlet damper
291_BV9 Manual Butterfly valve
291_BVA Manual Butterfly valve
Air compressor
291_CP1 Air compressor set
291_TK1 Air tank
291_AP1 Compressed air pipe

Legend : O Date of planning implementation


The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation

Manager
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

March April May June July August September October


12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Manager Superintendent Foreman
________________ ________________ ________________
No : ______________
October November December
REMARKS
44 45 46 47 48 49 50 51 52
Inspector
________________
A

Area : QUARRY CRUSHING & OLBC


No. Name Equipment & January February March
Equipment Instruction text 1 2 3 4 5 6 7 8 9 10 11
Belt Conveyor #1
29A_BC1 Belt conveyor
29A_BC1_GB1 Gear box
Coupling
29A_BC1_GB2 Gear box
Coupling
29A_BC1_GB3 Gear box
Coupling
Disc brake
29A_BC1_b Safety devices
Electric hoist
29A_EH1 Electric hoist
29A_EH2 Electric hoist

Legend : O Date of planning implementation


The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation

Manager

________________
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

March April May June July August September October


12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Manager Superintendent Foreman

________________ ________________ ________________


No : ______________
October November December
REMARKS
44 45 46 47 48 49 50 51 52

Inspector

________________
A

Area : QUARRY CRUSHING & OLBC


No. Name Equipment & January February March
Equipment Instruction text 1 2 3 4 5 6 7 8 9 10 11

291_NG3 Needle gate


291_NG3_M1 Pneumatic Push rod
291_MW3 2-way valve
291_MW3_M1 Pneumatic Push rod
Belt conveyor
291_BC6 Belt conveyor
291_BC6_GB1 Gear box
291_BC1_b Hydraulic coupling
291_BC1_c Safety devices
Stacker
291_ST1 Stacker
291_ST1_BC1 Stacker Belt Conveyor
291_ST1_GB1 Gear box
Coupling
Bag filter
291_BF4 Bag filter
291_RF4 Rotary feeder
291_RF4_M1 Gearmotor
Coupling
291_FN4 Fan
Coupling
291_VA4 Inlet damper
291_BVD Manual Butterfly valve
291_BVE Electrical Butterfly valve
291_BVF Electrical Butterfly valve

Legend : O Date of planning implementation


The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation

Manager
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

March April May June July August September October


12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Manager Superintendent Foreman


________________ ________________ ________________
No : ______________
October November December
REMARKS
44 45 46 47 48 49 50 51 52

Inspector
________________
A

Area : ADD/CORR. CRUSHING & CONVEYING


No. Name Equipment & January February March
Equipment Instruction text 1 2 3 4 5 6 7 8 9 10 11 12 13
Wobbler Feeder & Hopper
221_HP1 Hopper
221_WQ1 Wobbler Feeder
221_WQ1_GB1 Gear box
Coupling
Crusher
221_CR1 Roller crusher

221_CR1_GB1 Gear box


Coupling
221_CR1_GB2 Gear box
Coupling
221_CR1_M1 Motor
221_CR1_M2 Motor
221_CR1_M3 Motor
221_CR1_M4 Motor(For Lubrication Unit)
221_CR1_M5 Motor(For Hydraulic station)
221_CR1_T1 Belt driving
221_CR1_T2 Belt driving
Bag filter # 1
Bag filter
221_BF1
Pulse valve(with solenoid)
221_SC1 Screw conveyor
221_SC1_M1 Gear motor
Coupling
221_RF1 Rotary feeder
221_RF1_M1 Gear motor
Coupling
221_FN1 Fan
Coupling
221_VA1 Inlet valve
221_BV1 Manual Butterfly damper
221_BV2 Manual Butterfly damper
221_BV3 Manual Butterfly damper
Belt conveyor
Belt conveyor
221_BC1
221_BC1_M1 Motor
221_BC1_GB1 Gear motor
Coupling
221_BC1_a1 Safety devices
Bag filter # 2
221_BF2 Bag filter
Pulse valve(with solenoid)
221_RF2 Rotary feeder
221_RF2_M1 Gear motor
Coupling
221_FN2 Fan
Coupling
221_VA2 Inlet valve
221_BV4 Manual Butterfly damper
221_BV5 Manual Butterfly damper
221_BR1 Bridge Crane
Compressed air pipe
221_TK1 Air Tank
221_AP1 Compressed air pipe
- b.cock off valve
- c.Manometer
Legend : O Date of planning implementation
The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation Manager

________________
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

April May June July August September October November


14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47
Superintendent Foreman Inspe

___________ ________________ ________________ ________


No : ______________
November December
REMARKS
48 49 50 51 52
Inspector

________________
A

Area : QUARRY CRUSHING & OLBC


No. Name Equipment & January February March
Equipment Instruction text 1 2 3 4 5 6 7 8 9 10 11
231_AF1 Apron Feeder
231_AF1_GB1 Gear box
Coupling
231_BF1 Bag filter
231_RF1 Rotary feeder
231_RF1_M1 Geared Motor
Coupling
231_FN1 Fan
Coupling
231_VA1 Inlet valve
231_BV1 Manual Butterfly Damper
231_BV2 Manual Butterfly Damper
Belt conveyor
231_BC1 Belt conveyor
231_BC1_GB1 Gear box
Coupling
231_BC1_b1 Safety devices
231_BC2 Belt conveyor
231_BC2_GB1 Gear box
231_BC2_Y1 Hydraulic coupling
231_BC2_N1 Hold back device
231_BC2_b1 Safety devices
231_BC3 Belt conveyor
231_BC3_GB1 Gearbox
Coupling
231_BC3_Z1 Brake
231_BC3_b1 Safety devices
Bag filter
231_BF2 Bag filter
231_RF2 Rotary feeder
231_RF2_M1 Gear Motor
Coupling
231_FN2 Fan
Coupling
231_VA2 Inlet valve
231_BV3 Manual Butterfly Damper
231_BV6 Manual Butterfly Damper
231_BV7 Manual Butterfly Damper
231_BVA Manual Butterfly Damper
231_BVB Electric butterfly Damper
231_BVC Electric butterfly Damper
231_BF3 Bag filter
231_RF3 Rotary feeder
231_RF3_M1 Gear Motor
Coupling
231_FN3 Fan
Coupling
231_VA3 Inlet valve
231_BV4 Manual Butterfly Damper
231_BV8 Manual Butterfly Damper
231_BF4 Bag filter
231_RF4 Rotary feeder
231_RF4_M1 Gear Motor
Coupling
231_FN4 Fan
Coupling
231_VA4 Inlet valve
231_BV5 Manual Butterfly Damper
231_BV9 Manual Butterfly Damper
231_BVD Manual Butterfly Damper

231_AP1 Compressed air pipe

Legend : O Date of planning implementation


The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation

Manager

________________
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

March April May June July August September October


12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Manager Superintendent Foreman

________________ ________________ ________________


No : ______________
October November December
REMARKS
44 45 46 47 48 49 50 51 52
Inspector

________________
A

Area : QUARRY CRUSHING & OLBC


No. Name Equipment & January February March
Equipment Instruction text 1 2 3 4 5 6 7 8 9 10 11
Belt conveyor
231_BC4 Belt conveyor
231_BC4_GB1 Gear box
231_BC4_GB2 Gear box
231_BC4_Y1 High speed coupling
231_BC4_Y2 High speed coupling
231_BC4_b1 Safety devices
Stacker
231_ST1 Stacker
231_ST1_a1 Belt conveyor for stacker
231_ST1_GB1 Gear box
231_ST1_Y1 Coupling
231_ST1_b1 Devices of lubricating of jib arm
231_ST1_c1 Moving devices
231_ST1_GB2 Gear box ( for Moving devices)
Coupling
231_ST1_GB3 Gear box ( for Moving devices)
Coupling
231_ST1_GB4 Gear box ( for Moving devices)
Coupling
231_ST1_GB5 Gear box ( for Moving devices)
Coupling
231_ST1_M7 Dynamical cable disc

Legend : O Date of planning implementation


The actual situation with the production increase planned maintenance
execute before planning implementation
execute after planning implementation

Manager

________________
ANNUAL PLANNING REPAIR SCHEDULE
Year : 2016

March April May June July August September October


12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43

Manager Superintendent Foreman

________________ ________________ ________________


No : ______________
October November December
REMARKS
44 45 46 47 48 49 50 51 52