CUADRO RESUMEN
MONTOS MONTOS
SALDOS
CONCEPTO RECALCULADOS EFECTUADOS
S/. S/. S/.
5.2. LAUDO ARBITRAL (AMPLIACION DE PLAZO No. 02) 710,177.74 0.00 710,177.74
5.3. LAUDO ARBITRAL (AMPLIACIN DE PLAZO No. 05) 2,501,192.35 0.00 2,501,192.35
ADELANTOS OTORGADOS
Adelanto Directo N1 5,521,476.26 5,521,476.26 5,521,476.26 1,049,080.49 6,570,556.75 20/07/2006
Adelanto de Materiales N1 1,371,976.49 1,371,976.49 1,371,976.49 260,675.53 1,632,652.02 22/09/2009
Adelanto de Materiales N2 728,863.85 728,863.85 728,863.85 138,484.13 867,347.98 30/12/2006
Saldo del Adelanto de Materiales 111,328.32 111,328.32 111,328.32 21,152.38 132,480.70 30/12/2006
Saldo del Adelanto de Materiales 420,312.04 420,312.04 420,312.04 79,859.29 500,171.33 19/02/2007
Adelanto de Materiales N2 1,790,000.00 1,790,000.00 1,790,000.00 340,100.00 2,130,100.00 18/04/2007
Adelanto de Materiales N2 840,336.13 840,336.13 840,336.13 159,663.86 999,999.99 26/05/2007
VALORIZ. CONTRACTUALES
Val 1 Jul.06 45,796.26 91.59 -9,159.25 0.00 0.00 0.00 36,728.60 0.00 36,728.60 6,978.43 43,707.03 27/08/2006
Val 2 Ago.06 1,980,767.21 15,846.14 -396,153.44 0.00 0.00 0.00 1,600,459.91 0.00 1,600,459.91 304,087.38 1,904,547.29 25/09/2006
Val 3 Set.06 1,955,137.28 15,641.10 -391,027.46 0.00 0.00 0.00 1,579,750.92 0.00 1,579,750.92 300,152.67 1,879,903.59 11/09/2008
Set.06 102,372.04 0.00 0.00 0.00 0.00 0.00 102,372.04 0.00 102,372.04 19,450.69 121,822.73 11/09/2008
Val 4 Oct.06 1,827,063.91 38,764.14 -365,412.78 -185,883.81 -2,122.35 0.00 1,312,409.11 0.00 1,312,409.11 249,357.73 1,561,766.84 29/11/2006
Val 5 Nov.06 3,746,265.41 58,477.13 -749,253.08 -296,933.45 -2,543.49 0.00 2,756,012.52 0.00 2,756,012.52 523,642.38 3,279,654.90 15/12/2006
Val 6 Dic.06 3,734,469.44 41,079.16 -746,893.89 -345,437.86 -2,222.90 0.00 2,680,993.95 0.00 2,680,993.95 509,388.85 3,190,382.80 05/02/2007
Val 7 Ene.07 2,273,212.57 13,639.28 -447,735.47 -34,535.44 902.07 0.00 1,805,483.01 0.00 1,805,483.01 343,041.77 2,148,524.78 26/02/2007
Val 8 Feb.07 276,165.49 552.33 -55,233.10 -652.07 328.77 0.00 221,161.42 0.00 221,161.42 42,020.67 263,182.09 30/03/2007
Val 9 Mar.07 440,487.98 880.98 -88,097.60 -41,176.80 524.39 0.00 312,618.95 0.00 312,618.95 59,397.60 372,016.55 12/05/2007
Val 10 Abr.07 851,321.70 2,553.97 -170,264.34 -96,716.91 844.57 0.00 587,738.99 0.00 587,738.99 111,670.41 699,409.40 25/05/2007
Val 11 May.07 285,703.44 571.41 -57,140.69 -49,019.07 340.12 0.00 180,455.21 0.00 180,455.21 34,286.49 214,741.70 05/07/2007
Val 12 Jun.07 743,887.54 5,951.10 -148,777.51 -358,715.31 0.00 0.00 242,345.82 0.00 242,345.82 46,045.71 288,391.53 30/08/2007
Val 13 Jul.07 958,557.97 13,981.14 0.00 -665,885.13 0.00 0.00 306,653.98 0.00 306,653.98 58,264.26 364,918.24 20/03/2008
VALORIZ. ADICIONALES
Val. N1 Adicional N1 Feb.07 225,004.42 1,125.02 -45,000.88 -93,980.80 574.67 0.00 87,722.43 0.00 87,722.43 16,667.26 104,389.69 23/12/2008
Val. N2 Adicional N1 Mar.07 385,782.56 1,157.35 -96,203.06 -197,965.86 0.00 0.00 92,770.99 0.00 92,770.99 17,626.49 110,397.48 12/05/2006
Val. N1 Adicional N2 Feb.07 39,250.83 -157.00 -7,850.17 -3,538.25 31.12 0.00 27,736.53 0.00 27,736.53 5,269.94 33,006.47 27/03/2007
Val. N1 Adicional N3 Feb.07 957,051.33 -6,699.36 -191,410.27 -5,454.85 380.16 0.00 753,867.01 0.00 753,867.01 143,234.73 897,101.74 30/03/2007
Val. N1 Adicional N4 Feb.07 4,280,180.67 -12,840.54 -856,036.13 -181,704.84 6,814.22 0.00 3,236,413.38 0.00 3,236,413.38 614,918.54 3,851,331.92 30/03/2007
Val. N2 Adicional N4 Mar.07 862,569.45 -84,531.81 -172,513.89 -32,827.33 0.00 0.00 572,696.42 0.00 572,696.42 108,812.32 681,508.74
Val. N3 Adicional N4 Abr.07 747,665.48 -72,523.55 -149,533.10 -33,629.39 32,857.02 0.00 524,836.46 0.00 524,836.46 99,718.93 624,555.39
Val. N4 Adicional N4 May.07 871,072.93 -87,107.29 -174,214.59 -459,208.25 18,201.52 0.00 168,744.32 0.00 168,744.32 32,061.42 200,805.74
Val. N5 Adicional N4 Jun.07 1,225,829.34 -112,776.30 -20,955.87 -920,826.54 23,662.78 0.00 194,933.41 0.00 194,933.41 37,037.35 231,970.76
Val. N6 Adicional N4 Jul.07 1,492,093.62 14,920.94 0.00 -792,114.16 0.00 0.00 714,900.40 0.00 714,900.40 135,831.08 850,731.48
Val. N1 Adicional N5 May.07 710,345.45 14,206.91 -142,069.09 -297,271.52 0.00 0.00 285,211.75 0.00 285,211.75 54,190.23 339,401.98
Val. N2 Adicional N5 Jun.07 268,362.37 6,709.06 0.00 -224,021.91 0.00 0.00 51,049.52 0.00 51,049.52 9,699.41 60,748.93
Val. N3 Adicional N5 Jul.07 105,480.38 2,953.45 0.00 -60,686.63 0.00 0.00 47,747.20 0.00 47,747.20 9,071.97 56,819.17
Val. N1 Adicional N6 Jul.07 117,691.95 235.38 0.00 0.00 0.00 0.00 117,927.33 0.00 117,927.33 22,406.19 140,333.52 23/12/2008
TOTAL 42,887,659.26 -127,298.27 -5,480,935.66 -5,378,186.18 78,572.67 0.00 31,979,811.82 31,979,811.82 6,076,164.24 38,055,976.06
Objeto: "Rehabilitacion y Mejoramiento de la Carretera Tacna Tarata Candarave Umalso"
Tramo: Km 57+000 - Km 72+000
VAL N 01 - JUL. 06 VAL N 02 - AGOS. 06 VAL N 03 - SET. 06 VAL N 04 - OCT. 06 VAL N 05 - NOV. 06
ITEM DESCRIPCION UND METRADO P.U. PARCIAL
METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL
01.00.00 OBRAS PRELIMINARES 838,750.57 32,544.28 97,619.48 130,978.07 28,378.49 28,730.53
01.01.00 MOVILIZACION Y DESMOVILIZACION GLB 1.00 629,609.98 629,609.98 0.03 20,708.92 0.08 48,878.98 0.11095 69,855.86 0.02294 14,443.32 0.02691 16,944.76
01.02.00 TRAZO Y REPLANTEO GLB 1.00 116,960.28 116,960.28 0.10 11,696.03 0.36 42,105.70 0.47 54,971.33 0.07 8,187.22 0.00
01.03.00 MANTENIMIENTO DE TRANSITO GLB 1.00 92,471.57 92,180.31 0.00151 139.33 0.07175 6,634.80 0.06652 6,150.88 0.06216 5,747.95 0.12745 11,785.77
02.00.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01 CORTE EN MATERIAL SUELTO M3 0.00 3.84 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02 CORTE EN ROCA FIJA M3 0.00 21.27 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03 CORTE EN ROCA SUELTA M3 0.00 13.60 0.00 0.00 0.00 0.00 0.00 0.00
02.02.00 RELLENO CON MATERIAL PROPIO M3 0.00 9.76 0.00 0.00 0.00 0.00 0.00 0.00
02.03.00 PERFILADO Y COMPACTACION EN ZONA DE CORTE M2 0.00 1.57 0.00 0.00 0.00 0.00 0.00 0.00
03.00.00 PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.00 SUB BASE GRANULAR M3 0.00 24.62 0.00 0.00 0.00 0.00 0.00 0.00
03.02.00 BASE GRANULAR M3 0.00 39.33 0.00 0.00 0.00 0.00 0.00 0.00
03.03.00 IMPRIMACION BITUMINOSA M3 0.00 1.54 0.00 0.00 0.00 0.00 0.00 0.00
03.04.00 CARPETA ASFALTICA EN CALIENTE M3 0.00 138.33 0.00 0.00 0.00 0.00 0.00 0.00
03.05.00 GEOMALLA ESTRUCTURAL PROVISION Y COLOCACION M2 0.00 7.65 0.00 0.00 0.00 0.00 0.00 0.00
03.06.00 CEMENTO ASFALTICO GLN 0.00 6.06 0.00 0.00 0.00 0.00 0.00 0.00
03.07.00 ASFALTO LIQUIDO GLN 0.00 6.14 0.00 0.00 0.00 0.00 0.00 0.00
03.08.00 FILLER KG 0.00 0.54 0.00 0.00 0.00 0.00 0.00 0.00
03.09.00 ADITIVO MEJORADOR DE ADHERENCIA KG 0.00 11.95 0.00 0.00 0.00 0.00 0.00 0.00
04.00.00 OBRAS DE ARTE Y DRENAJE 3,107,444.05 0.00 0.00 73,882.20 0.00 276,534.72
04.01.00 LIMPIEZA DE CAUCES ENCAUZAMIENTO M3 112.50 6.17 694.13 0.00 0.00 0.00 0.00 0.00
04.02.00 DEMOLICION DE ESTRUCTURAS M3 770.00 73.34 56,471.84 0.00 0.00 0.00 0.00 17.60 1,290.78
04.03.00 EXCAVACION PARA ESTRUCTURAS M3 7,596.31 29.87 226,901.78 0.00 0.00 606.27 18,109.28 0.00 1,496.60 44,703.44
04.04.00 ALIVIADERO EN ALCANTARILLAS M2 1,368.35 63.50 86,890.23 0.00 0.00 0.00 0.00 0.00
04.05.00 RELLENO DE ESTRUCTURAS M3 2,360.30 32.49 76,686.15 0.00 0.00 41.85 1,359.71 0.00 579.39 18,824.38
04.06.00 ENCOFRADO Y DESENCOFRADO M2 2,240.08 32.09 71,884.17 0.00 0.00 0.00 0.00 681.14 21,857.78
04.07.00 ACERO DE REFUERZO KG 0.00 3.97 0.00 0.00 0.00 0.00 0.00 0.00
04.08.00 CONCRETO CICLOPEO f'c= 140 Kg/cm2 M3 0.00 204.59 0.00 0.00 0.00 0.00 0.00 0.00
04.09.00 CONCRETO f'c= 175 Kg/cm2 M3 549.36 262.70 144,316.87 0.00 0.00 84.70 22,250.69 0.00 78.52 20,627.20
04.10.00 CONCRETO f'c= 210 Kg/cm2 M3 0.00 291.86 0.00 0.00 0.00 0.00 0.00 0.00
04.11.00 ALCANTARILLA TMC f 36" E=1.5 mm M 644.40 420.48 270,957.31 0.00 0.00 76.49 32,162.52 0.00 222.90 93,724.99
04.12.00 ALCANTARILLA TMC f 48" E=1.5 mm M 13.01 582.11 7,573.25 0.00 0.00 0.00 0.00 11.39 6,630.23
04.13.00 ALCANTARILLA TMC f 60" E=1.5 mm M 76.44 824.51 63,025.54 0.00 0.00 0.00 0.00 0.00
04.16.00 CUNETAS TRIANGULARES REVESTIDAS M 6,749.16 87.34 589,471.63 0.00 0.00 0.00 0.00 0.00
04.17.00 CUNETAS RECTANGULARES REVESTIDAS M 0.00 144.69 0.00 0.00 0.00 0.00 0.00 0.00
04.18.00 CANAL PROVISIONAL DURANTE LA CONSTRUCCION M 220.00 10.31 2,268.20 0.00 0.00 0.00 0.00 0.00
04.19.00 GAVION TIPO CAJA M3 10,656.95 141.72 1,510,302.95 0.00 0.00 0.00 0.00 486.00 68,875.92
05.00.00 TRANSPORTES 0.00 0.00 0.00 0.00 0.00 0.00
05.01.00 TRANSPORTE ELIMINACION DE MATERIAL EXCEDENTE DE CO M3KM 0.00 2.50 0.00 0.00 0.00 0.00 0.00 0.00
05.02.00 TRANSPORTE ELIMINACION DE MATERIAL EXCEDENTE DE CO M3KM 0.00 1.05 0.00 0.00 0.00 0.00 0.00 0.00
05.03.00 TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 M3KM 0.00 3.49 0.00 0.00 0.00 0.00 0.00 0.00
05.04.00 TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 M3KM 0.00 1.16 0.00 0.00 0.00 0.00 0.00 0.00
05.05.00 TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM M3KM 0.00 4.78 0.00 0.00 0.00 0.00 0.00 0.00
05.06.00 TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM M3KM 0.00 1.46 0.00 0.00 0.00 0.00 0.00 0.00
06.00.00 SEALIZACION 142,686.01 0.00 0.00 0.00 0.00 0.00
06.01.00 DEMARCACION EN EL PAVIMENTO M2 5,521.85 8.66 47,819.22 0.00 0.00 0.00 0.00 0.00
06.02.00 SEALES REGLAMENTARIAS UND 2.00 408.00 816.00 0.00 0.00 0.00 0.00 0.00
06.03.00 SEALES PREVENTIVAS (0.75 m x 0.75 m) UND 105.00 300.55 31,557.75 0.00 0.00 0.00 0.00 0.00
06.04.00 SEAL INFORMATIVO M2 1.60 379.62 607.39 0.00 0.00 0.00 0.00 0.00
06.05.00 TUBO D=3" SEALES INFORMATIVAS M2 11.60 81.34 943.54 0.00 0.00 0.00 0.00 0.00
06.06.00 CIMENTACION SEALES INFORMATIVAS M3 2.52 440.59 1,110.29 0.00 0.00 0.00 0.00 0.00
06.07.00 GUARDAVIAS (Incluye Terminal) M 200.00 146.00 29,200.00 0.00 0.00 0.00 0.00 0.00
06.08.00 TACHAS REFLECTIVAS BIDIRECCIONALES UND 3,012.00 9.71 29,246.52 0.00 0.00 0.00 0.00 0.00
06.09.00 POSTES KILOMETRICOS UND 14.00 98.95 1,385.30 0.00 0.00 0.00 0.00 0.00
Objeto: "Rehabilitacion y Mejoramiento de la Carretera Tacna Tarata Candarave Umalso"
Tramo: Km 57+000 - Km 72+000
VAL N 01 - JUL. 06 VAL N 02 - AGOS. 06 VAL N 03 - SET. 06 VAL N 04 - OCT. 06 VAL N 05 - NOV. 06
ITEM DESCRIPCION UND METRADO P.U. PARCIAL
METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL
07.00.00 MEDIO AMBIENTE 165,161.21 0.00 2,119.33 27,369.74 5,059.06 3,889.97
07.01.00 CAMPAMENTO 0.00 2,027.40 0.00 0.00 0.00 0.00 0.00
07.01.01 DEMOLICION DE PISOS DE CONCRETO M2 300.00 4.16 1,248.00 0.00 0.00 0.00 0.00 0.00
07.01.02 ELIMINACION DE DESMONTE M3 60.00 9.54 572.40 0.00 0.00 0.00 0.00 0.00
07.01.03 ESCARIFICADO DE SUELO COMPACTO M2 300.00 0.69 207.00 0.00 0.00 0.00 0.00 0.00
07.02.00 PATIO DE MAQUINAS 0.00 - 22,100.42 0.00 0.00 20,708.40 0.00 0.00
07.02.01 IMPERMEABILIZACION DE PISOS CANALETAS DE CONDUCC M2 180.00 41.72 7,509.60 180.00 7,509.60 0.00 0.00
07.02.02 PLANTA DE TRATAMIENTO DE AGUAS UND 1.00 11,826.54 11,826.54 1.00 11,826.54 0.00 0.00
07.02.03 TANQUE / TRANSICION UND 1.00 1,372.26 1,372.26 1.00 1,372.26 0.00 0.00
07.02.04 ELIMINACION DE DESMONTE EST 1.00 190.70 190.70 0.00 0.00 0.00
07.02.05 DEMOLICION DE PISOS DE CONCRETO M2 180.00 4.16 748.80 0.00 0.00 0.00
07.02.06 ELIMINACION DE DESMONTE M3 36.00 9.12 328.32 0.00 0.00 0.00
07.02.07 ESCARIFICADO DE SUELO COMPACTO M2 180.00 0.69 124.20 0.00 0.00 0.00
07.03.00 CANTERA DE LECHO DE RIO 0.00 - 54,076.66 0.00 0.00 0.00 0.00 830.98
07.03.01 DELIMITACION DE AREA EN CAMPO KM 2.00 1,138.33 2,276.66 0.00 0.00 0.73 830.98
07.03.02 RECUPERACION MORFOLOGICA M2 70,000.00 0.74 51,800.00 0.00 0.00 0.00
07.04.00 PLANTA DE ASFALTO 0.00 - 55,480.45 0.00 0.00 0.00 0.00 0.00
07.04.01 EXCAVACION Y ACOPIO DE TIERRA VEGETAL M3 400.00 3.27 1,308.00 0.00 0.00 0.00
07.04.02 IMPERMEABILIZACION DE PISOS CANALETAS DE CONDUCC M2 750.00 44.00 33,000.00 0.00 0.00 0.00
07.04.03 PLANTA DE TRATAMIENTO DE AGUAS UND 1.00 11,826.54 11,826.54 0.00 0.00 0.00
07.04.04 TANQUE / TRANSICION UND 1.00 1,372.26 1,372.26 0.00 0.00 0.00
07.04.05 DEMOLICION DE PISOS DE CONCRETO M2 750.00 3.96 2,970.00 0.00 0.00 0.00
07.04.06 ELIMINACION DE DESMONTE M3 130.00 9.12 1,185.60 0.00 0.00 0.00
07.04.07 DEMOLICION DE ESTRUCTURAS DE CONCRETO M3 30.00 91.29 2,738.70 0.00 0.00 0.00
07.04.08 ELIMINACION DE RESIDUOS, LUBRICANTES, COMBUSTIBLES EST 1.00 199.60 199.60 0.00 0.00 0.00
07.04.09 ESCARIFICADO DE SUELO COMPACTADO M2 1,275.00 0.69 879.75 0.00 0.00 0.00
07.04.10 REVEGETACION M2 0.00 11.51 0.00 0.00 0.00 0.00
07.05.00 POLVORIN 0.00 - 144.30 0.00 0.00 112.64 0.00 0.00
07.05.01 EXCAVACION Y ACOPIO DE TIERRA VEGETAL M3 30.00 3.43 102.90 32.84 112.64 0.00 0.00
07.05.02 ESCARIFICADO DE SUELO COMPACTADO M2 60.00 0.69 41.40 0.00 0.00 0.00
07.05.03 REVEGETACION M2 0.00 11.51 0.00 0.00 0.00 0.00
07.06.00 BOTADEROS 0.00 - 4,830.59 0.00 2,119.33 0.00 2,759.07 0.00
07.06.01 DELIMITACION DE AREA EN CAMPO KM 2.52 1,138.33 2,868.59 1.00 1,138.33 0.00 1.52 1,730.26 0.00
07.06.02 EXCAVACION Y ACOPIO DE TIERRA VEGETAL M3 600.00 3.27 1,962.00 300.00 981.00 0.00 314.62 1,028.81 0.00
07.06.03 CONFORMACION DE BOTADEROS / COMPACTACION M3 0.00 1.50 0.00
07.06.04 RECUPERACION MORFOLOGICA M2 0.00 0.74 0.00 0.00 0.00 0.00 0.00
07.06.05 REVEGETACION M2 0.00 7.50 0.00 0.00 0.00 0.00 0.00
07.07.00 SEALES AMBIENTALES 0.00 - 10,401.46 0.00 0.00 6,548.70 0.00 0.00
07.07.01 SEALES PROVISIONALES UND 15.00 436.58 6,548.70 15.00 6,548.70 0.00 0.00
07.07.02 SEALES DEFINITIVAS UND 4.00 963.19 3,852.76 0.00 0.00 0.00
07.11.00 CANALES DE IRRIGACION 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00
07.11.01 TRAZO Y REPLANTEO KM 0.00 676.18 0.00 0.00 0.00 0.00
07.11.02 PERFILADO Y OMPACTACION DE BERMA M2 0.00 2.63 0.00 0.00 0.00 0.00
07.11.03 CANAL DE CONCRETO 0.40 x 0.40 M 0.00 53.72 0.00 0.00 0.00 0.00
07.12.00 RELLENO SANITARIO 0.00 - 13,999.93 0.00 0.00 0.00 1,999.99 2,659.99
07.12.01 RELLENO SANITARIO MES 7.00 1,999.99 13,999.93 0.00 1.00 1,999.99 1.33 2,659.99
07.13.00 MONITOREO AMBIENTAL 0.00 - 2,100.00 0.00 0.00 0.00 300.00 399.00
07.13.01 MONITOREO AMBIENTAL MES 7.00 300.00 2,100.00 0.00 1.00 300.00 1.33 399.00
VAL N 06 - DIC. 06 VAL N 07 - ENE. 07 VAL N 08 - FEB. 07 VAL N 09 - MAR. 07 VAL N 10 - ABR. 07
ITEM DESCRIPCION UND METRADO P.U. PARCIAL
METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL
01.00.00 OBRAS PRELIMINARES 838,750.57 96,336.36 7,095.30 6,131.43 62,471.04 36,492.24
01.01.00 MOVILIZACION Y DESMOVILIZACION GLB 1.00 629,609.98 629,609.98 0.134402 84,620.65 0.00 0.00456 2,870.33 0.09096 57,269.32 0.04199 26,438.99
01.02.00 TRAZO Y REPLANTEO GLB 1.00 116,960.28 116,960.28 0.00 0.00 0.00 0.00 0.00
01.03.00 MANTENIMIENTO DE TRANSITO GLB 1.00 92,471.57 92,180.31 0.12670 11,715.71 0.07673 7,095.30 0.03527 3,261.10 0.05625 5,201.72 0.10872 10,053.25
02.00.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00
02.01.01 CORTE EN MATERIAL SUELTO M3 0.00 3.84 0.00 0.00 0.00 0.00 0.00 0.00
02.01.02 CORTE EN ROCA FIJA M3 0.00 21.27 0.00 0.00 0.00 0.00 0.00 0.00
02.01.03 CORTE EN ROCA SUELTA M3 0.00 13.60 0.00 0.00 0.00 0.00 0.00 0.00
02.02.00 RELLENO CON MATERIAL PROPIO M3 0.00 9.76 0.00 0.00 0.00 0.00 0.00 0.00
02.03.00 PERFILADO Y COMPACTACION EN ZONA DE CORTE M2 0.00 1.57 0.00 0.00 0.00 0.00 0.00 0.00
03.00.00 PAVIMENTOS 0.00 0.00 0.00 0.00 0.00 0.00
03.01.00 SUB BASE GRANULAR M3 0.00 24.62 0.00 0.00 0.00 0.00 0.00 0.00
03.02.00 BASE GRANULAR M3 0.00 39.33 0.00 0.00 0.00 0.00 0.00 0.00
03.03.00 IMPRIMACION BITUMINOSA M3 0.00 1.54 0.00 0.00 0.00 0.00 0.00 0.00
03.04.00 CARPETA ASFALTICA EN CALIENTE M3 0.00 138.33 0.00 0.00 0.00 0.00 0.00 0.00
03.05.00 GEOMALLA ESTRUCTURAL PROVISION Y COLOCACION M2 0.00 7.65 0.00 0.00 0.00 0.00 0.00 0.00
03.06.00 CEMENTO ASFALTICO GLN 0.00 6.06 0.00 0.00 0.00 0.00 0.00 0.00
03.07.00 ASFALTO LIQUIDO GLN 0.00 6.14 0.00 0.00 0.00 0.00 0.00 0.00
03.08.00 FILLER KG 0.00 0.54 0.00 0.00 0.00 0.00 0.00 0.00
03.09.00 ADITIVO MEJORADOR DE ADHERENCIA KG 0.00 11.95 0.00 0.00 0.00 0.00 0.00 0.00
04.00.00 OBRAS DE ARTE Y DRENAJE 3,107,444.05 724,462.17 531,910.88 196,150.80 183,570.19 587,652.62
04.01.00 LIMPIEZA DE CAUCES ENCAUZAMIENTO M3 112.50 6.17 694.13 112.50 694.13 0.00 0.00 0.00 0.00
04.02.00 DEMOLICION DE ESTRUCTURAS M3 770.00 73.34 56,471.84 116.97 8,578.58 0.00 537.13 39,393.11 0.00 98.30 7,209.32
04.03.00 EXCAVACION PARA ESTRUCTURAS M3 7,596.31 29.87 226,901.78 1,782.03 53,229.24 1,887.69 56,385.30 1,823.72 54,474.52 0.00 0.00
04.04.00 ALIVIADERO EN ALCANTARILLAS M2 1,368.35 63.50 86,890.23 0.00 0.00 0.00 0.00 0.00
04.05.00 RELLENO DE ESTRUCTURAS M3 2,360.30 32.49 76,686.15 767.78 24,945.17 463.18 15,048.72 0.00 508.10 16,508.17 0.00
04.06.00 ENCOFRADO Y DESENCOFRADO M2 2,240.08 32.09 71,884.17 1,438.28 46,154.41 0.00 0.00 1.00 32.09 22.44 720.10
04.07.00 ACERO DE REFUERZO KG 0.00 3.97 0.00 0.00 0.00 0.00 0.00 0.00
04.08.00 CONCRETO CICLOPEO f'c= 140 Kg/cm2 M3 0.00 204.59 0.00 0.00 0.00 0.00 0.00 0.00
04.09.00 CONCRETO f'c= 175 Kg/cm2 M3 549.36 262.70 144,316.87 294.49 77,362.52 0.00 59.61 15,659.55 32.04 8,416.91 0.00
04.10.00 CONCRETO f'c= 210 Kg/cm2 M3 0.00 291.86 0.00 0.00 0.00 0.00 0.00 0.00
04.11.00 ALCANTARILLA TMC f 36" E=1.5 mm M 644.40 420.48 270,957.31 159.29 66,978.26 177.10 74,467.01 5.25 2,207.52 0.00 0.00
04.12.00 ALCANTARILLA TMC f 48" E=1.5 mm M 13.01 582.11 7,573.25 0.00 0.00 1.62 943.02 0.00 0.00
04.13.00 ALCANTARILLA TMC f 60" E=1.5 mm M 76.44 824.51 63,025.54 76.44 63,025.54 0.00 0.00 0.00 0.00
04.16.00 CUNETAS TRIANGULARES REVESTIDAS M 6,749.16 87.34 589,471.63 0.00 0.00 0.00 0.00 2,912.00 254,334.08
04.17.00 CUNETAS RECTANGULARES REVESTIDAS M 0.00 144.69 0.00 0.00 0.00 0.00 0.00 0.00
04.18.00 CANAL PROVISIONAL DURANTE LA CONSTRUCCION M 220.00 10.31 2,268.20 0.00 0.00 0.00 0.00 0.00
04.19.00 GAVION TIPO CAJA M3 10,656.95 141.72 1,510,302.95 2,706.00 383,494.32 2,723.75 386,009.85 589.00 83,473.08 1,119.20 158,613.02 2,296.00 325,389.12
05.00.00 TRANSPORTES 0.00 0.00 0.00 0.00 0.00 0.00
05.01.00 TRANSPORTE ELIMINACION DE MATERIAL EXCEDENTE DE CO M3KM 0.00 2.50 0.00 0.00 0.00 0.00 0.00 0.00
05.02.00 TRANSPORTE ELIMINACION DE MATERIAL EXCEDENTE DE CO M3KM 0.00 1.05 0.00 0.00 0.00 0.00 0.00 0.00
05.03.00 TRANSPORTE DE MATERIALES GRANULARES PARA D<=1.00 M3KM 0.00 3.49 0.00 0.00 0.00 0.00 0.00 0.00
05.04.00 TRANSPORTE DE MATERIALES GRANULARES PARA D>1.00 M3KM 0.00 1.16 0.00 0.00 0.00 0.00 0.00 0.00
05.05.00 TRANSPORTE DE MEZCLA ASFALTICA PARA D<=1.00 KM M3KM 0.00 4.78 0.00 0.00 0.00 0.00 0.00 0.00
05.06.00 TRANSPORTE DE MEZCLA ASFALTICA PARA D>1.00 KM M3KM 0.00 1.46 0.00 0.00 0.00 0.00 0.00 0.00
06.00.00 SEALIZACION 142,686.01 0.00 0.00 0.00 0.00 0.00
06.01.00 DEMARCACION EN EL PAVIMENTO M2 5,521.85 8.66 47,819.22 0.00 0.00 0.00 0.00 0.00
06.02.00 SEALES REGLAMENTARIAS UND 2.00 408.00 816.00 0.00 0.00 0.00 0.00 0.00
06.03.00 SEALES PREVENTIVAS (0.75 m x 0.75 m) UND 105.00 300.55 31,557.75 0.00 0.00 0.00 0.00 0.00
06.04.00 SEAL INFORMATIVO M2 1.60 379.62 607.39 0.00 0.00 0.00 0.00 0.00
06.05.00 TUBO D=3" SEALES INFORMATIVAS M2 11.60 81.34 943.54 0.00 0.00 0.00 0.00 0.00
06.06.00 CIMENTACION SEALES INFORMATIVAS M3 2.52 440.59 1,110.29 0.00 0.00 0.00 0.00 0.00
06.07.00 GUARDAVIAS (Incluye Terminal) M 200.00 146.00 29,200.00 0.00 0.00 0.00 0.00
06.08.00 TACHAS REFLECTIVAS BIDIRECCIONALES UND 3,012.00 9.71 29,246.52 0.00 0.00 0.00 0.00
06.09.00 POSTES KILOMETRICOS UND 14.00 98.95 1,385.30 0.00 0.00 0.00 0.00
Objeto: "Rehabilitacion y Mejoramiento de la Carretera Tacna Tarata Candarave Umalso"
Tramo: Km 57+000 - Km 72+000
VAL N 06 - DIC. 06 VAL N 07 - ENE. 07 VAL N 08 - FEB. 07 VAL N 09 - MAR. 07 VAL N 10 - ABR. 07
ITEM DESCRIPCION UND METRADO P.U. PARCIAL
METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL
07.00.00 MEDIO AMBIENTE 165,161.21 2,690.99 2,690.99 2,690.99 51,819.81 0.00
07.01.00 CAMPAMENTO 0.00 2,027.40 0.00 0.00 0.00 0.00 0.00
07.01.01 DEMOLICION DE PISOS DE CONCRETO M2 300.00 4.16 1,248.00 0.00 0.00 0.00 0.00 0.00
07.01.02 ELIMINACION DE DESMONTE M3 60.00 9.54 572.40 0.00 0.00 0.00 0.00 0.00
07.01.03 ESCARIFICADO DE SUELO COMPACTO M2 300.00 0.69 207.00 0.00 0.00 0.00 0.00 0.00
07.02.00 PATIO DE MAQUINAS 0.00 - 22,100.42 0.00 0.00 0.00 0.00 0.00
07.02.01 IMPERMEABILIZACION DE PISOS CANALETAS DE CONDUCC M2 180.00 41.72 7,509.60 0.00 0.00
07.02.02 PLANTA DE TRATAMIENTO DE AGUAS UND 1.00 11,826.54 11,826.54 0.00 0.00
07.02.03 TANQUE / TRANSICION UND 1.00 1,372.26 1,372.26 0.00 0.00
07.02.04 ELIMINACION DE DESMONTE EST 1.00 190.70 190.70 0.00 0.00
07.02.05 DEMOLICION DE PISOS DE CONCRETO M2 180.00 4.16 748.80 0.00 0.00
07.02.06 ELIMINACION DE DESMONTE M3 36.00 9.12 328.32 0.00 0.00
07.02.07 ESCARIFICADO DE SUELO COMPACTO M2 180.00 0.69 124.20 0.00 0.00
07.03.00 CANTERA DE LECHO DE RIO 0.00 - 54,076.66 0.00 0.00 0.00 1,445.68 0.00
07.03.01 DELIMITACION DE AREA EN CAMPO KM 2.00 1,138.33 2,276.66 0.00 1.27 1,445.68
07.03.02 RECUPERACION MORFOLOGICA M2 70,000.00 0.74 51,800.00 0.00 0.00
07.04.00 PLANTA DE ASFALTO 0.00 - 55,480.45 0.00 0.00 0.00 47,706.14 0.00
07.04.01 EXCAVACION Y ACOPIO DE TIERRA VEGETAL M3 400.00 3.27 1,308.00 0.00 460.96 1,507.34
07.04.02 IMPERMEABILIZACION DE PISOS CANALETAS DE CONDUCC M2 750.00 44.00 33,000.00 0.00 750.00 33,000.00
07.04.03 PLANTA DE TRATAMIENTO DE AGUAS UND 1.00 11,826.54 11,826.54 0.00 1.00 11,826.54
07.04.04 TANQUE / TRANSICION UND 1.00 1,372.26 1,372.26 0.00 1.00 1,372.26
07.04.05 DEMOLICION DE PISOS DE CONCRETO M2 750.00 3.96 2,970.00 0.00 0.00
07.04.06 ELIMINACION DE DESMONTE M3 130.00 9.12 1,185.60 0.00 0.00
07.04.07 DEMOLICION DE ESTRUCTURAS DE CONCRETO M3 30.00 91.29 2,738.70 0.00 0.00
07.04.08 ELIMINACION DE RESIDUOS, LUBRICANTES, COMBUSTIBLES EST 1.00 199.60 199.60 0.00 0.00
07.04.09 ESCARIFICADO DE SUELO COMPACTADO M2 1,275.00 0.69 879.75 0.00 0.00
07.04.10 REVEGETACION M2 0.00 11.51 0.00 0.00 0.00
07.05.00 POLVORIN 0.00 - 144.30 0.00 0.00 0.00 0.00 0.00
07.05.01 EXCAVACION Y ACOPIO DE TIERRA VEGETAL M3 30.00 3.43 102.90 0.00 0.00
07.05.02 ESCARIFICADO DE SUELO COMPACTADO M2 60.00 0.69 41.40 0.00 0.00
07.05.03 REVEGETACION M2 0.00 11.51 0.00 0.00 0.00
07.06.00 BOTADEROS 0.00 - 4,830.59 0.00 0.00 0.00 0.00 0.00
07.06.01 DELIMITACION DE AREA EN CAMPO KM 2.52 1,138.33 2,868.59 0.00 0.00 0.00
07.06.02 EXCAVACION Y ACOPIO DE TIERRA VEGETAL M3 600.00 3.27 1,962.00 0.00 0.00 0.00
07.06.03 CONFORMACION DE BOTADEROS / COMPACTACION M3 0.00 1.50 0.00 0.00 0.00
07.06.04 RECUPERACION MORFOLOGICA M2 0.00 0.74 0.00 0.00 0.00 0.00
07.06.05 REVEGETACION M2 0.00 7.50 0.00 0.00 0.00 0.00
07.07.00 SEALES AMBIENTALES 0.00 - 10,401.46 0.00 0.00 0.00 0.00 0.00
07.07.01 SEALES PROVISIONALES UND 15.00 436.58 6,548.70 0.00 0.00
07.07.02 SEALES DEFINITIVAS UND 4.00 963.19 3,852.76 0.00 0.00
07.11.00 CANALES DE IRRIGACION 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00
07.11.01 TRAZO Y REPLANTEO KM 0.00 676.18 0.00 0.00 0.00 0.00
07.11.02 PERFILADO Y OMPACTACION DE BERMA M2 0.00 2.63 0.00 0.00 0.00 0.00
07.11.03 CANAL DE CONCRETO 0.40 x 0.40 M 0.00 53.72 0.00 0.00 0.00 0.00
07.12.00 RELLENO SANITARIO 0.00 - 13,999.93 2,339.99 2,339.99 2,339.99 2,319.99 0.00
07.12.01 RELLENO SANITARIO MES 7.00 1,999.99 13,999.93 1.17 2,339.99 1.17 2,339.99 1.17 2,339.99 1.16 2,319.99 0.00
07.13.00 MONITOREO AMBIENTAL 0.00 - 2,100.00 351.00 351.00 351.00 348.00 0.00
07.13.01 MONITOREO AMBIENTAL MES 7.00 300.00 2,100.00 1.17 351.00 1.17 351.00 1.17 351.00 1.16 348.00 0.00
FORMULA POLINOMICA
K = 0.127 MOr/MOo + 0.245 IGr/IGo + 0.170 DCr/DCo + 0.206 PCr/PCo + 0.252 MMr/Mmo PRECIOS A : Noviembre 2005
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.127 100.00% 347.47 0.127 361.10 0.132 361.10 0.132 361.10 0.132 361.10 0.132 361.10 0.132
IG 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.245 100.00% 307.90 0.245 313.39 0.249 312.85 0.249 313.29 0.249 313.38 0.249 313.51 0.249
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.127 100.00% 347.47 0.127 361.10 0.132 361.10 0.132 361.29 0.132 361.29 0.132 361.29 0.132
IG 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.245 100.00% 307.90 0.245 312.63 0.249 312.71 0.249 312.74 0.249 313.55 0.249 314.64 0.250
FORMULA POLINOMICA
K = 0.127 MOr/MOo + 0.245 IGr/IGo + 0.170 DCr/DCo + 0.206 PCr/PCo + 0.252 MMr/Mmo PRECIOS A : Noviembre 2005
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.127 100.00% 347.47 0.127 361.29 0.132 361.47 0.132 361.47 0.132 374.22 0.137 374.22 0.137
IG 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.245 100.00% 307.90 0.245 315.20 0.251 316.75 0.252 318.24 0.253 319.76 0.254 320.19 0.255
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.127 100.00% 347.47 0.127 374.22 0.137 374.22 0.137
IG 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.245 100.00% 307.90 0.245 322.15 0.256 323.17 0.257
01 Jul-06 103,745.30 103,745.30 48,157.81 48,157.81 1.008 829.96 829.96 385.26 385.26
02 Aug-06 288,033.56 391,778.86 147,589.78 195,747.59 1.014 4,032.47 4,862.43 2,066.26 2,451.52
03 Sep-06 679,964.47 1,071,743.33 343,645.35 539,392.94 1.013 8,839.54 13,701.97 4,467.39 6,918.91
04 Oct-06 837,096.12 1,908,839.45 49,479.64 588,872.58 1.011 9,208.06 22,910.03 544.28 7,463.18
05 Nov-06 901,301.33 2,810,140.78 457,476.42 1,046,349.00 1.006 5,407.81 28,317.84 2,744.86 10,208.04
06 Dec-06 878,404.47 3,688,545.25 1,218,569.23 2,264,918.23 1.003 2,635.21 30,953.05 3,655.71 13,863.75
07 Jan-07 435,810.06 4,124,355.31 801,583.37 3,066,501.60 1.002 871.62 31,824.67 1,603.17 15,466.92
08 Feb-07 251,612.94 4,375,968.25 303,311.76 3,369,813.36 1.003 754.84 32,579.51 909.94 16,376.85
09 Mar-07 247,508.90 4,623,477.15 440,763.71 3,810,577.07 1.002 495.02 33,074.53 881.53 17,258.38
10 Apr-07 204,862.76 4,828,339.91 923,586.39 4,734,163.46 1.008 1,638.90 34,713.43 7,388.69 24,647.07
11 May-07 522,636.12 5,350,976.03 202,011.93 4,936,175.38 1.014 7,316.91 42,030.33 2,828.17 27,475.24
12 Jun-07 167,745.81 5,518,721.84 661,160.32 5,597,335.70 1.025 4,193.65 46,223.98 16,529.01 44,004.25
13 Jul-07 0.00 5,518,721.84 700,749.24 6,298,084.93 1.041 0.00 46,223.98 28,730.72 72,734.97
14 Aug-07 572,679.47 6,091,401.31 0.00 6,298,084.93 1.040 23,035.11 69,259.09 0.00 72,734.97
15 Sep-07 203,571.91 6,294,973.21 0.00 6,298,084.93 1.030 6,102.94 75,362.03 0.00 72,734.97
CUADRO DE RESUMEN
DONDE ; D: Deduccion del reajuste generado por el adelanto de materiales ( sin IGV ).
Ci : Coeficiente de incidencia del material que se dio el adelanto.
V: Monto del componente en S/. de la valorizacion mensual.
Imr : Indice de precios del material a la fecha del reajuste.
Ima : Indice de precio del material a la fecha efectiva del adelanto.
Imo : Indice de precio del material a la fecha del presupuesto base (Noviembre-2005)
VALORIZACION ADELANTO MONTO COEFICIENTE % MAX. ADEL. MES MONTO ADELANTO SALDO DEL
VALORIZADO INCIDENCIA PARTIC. POR DE Imr Ima Imo MAXIMO ADELANTO POR DEDUCCION
N MES FECHA MONTO
V UTILIZAR REAJUSTE UTILIZABLE UTILIZADO UTILIZAR
3 Sep-06 30-Sep-06 1,548,005.66 343,645.35 0.206 67.476% 47,766.90 Oct-06 693.42 708.65 698.72 1,526,314.14 47,766.90 1,478,547.24 -1,041.18
4 Oct-06 49,479.64 0.206 67.476% 6,877.70 Nov-06 688.12 708.65 698.72 1,478,547.24 6,877.70 1,471,669.54 -202.08
5 Nov-06 457,476.42 0.206 67.476% 63,589.48 Dec-06 678.85 708.65 698.72 1,471,669.54 63,589.48 1,408,080.06 -2,712.05
6 Dec-06 1,218,569.23 0.206 67.476% 169,381.81 Jan-07 670.24 708.65 698.72 1,408,080.06 169,381.81 1,238,698.25 -9,311.25
7 Jan-07 801,583.37 0.206 67.476% 111,420.54 Feb-07 655.67 708.65 698.72 1,238,698.25 111,420.54 1,127,277.71 -8,448.39
8 Feb-07 303,311.76 0.206 67.476% 42,160.50 Mar-07 655.01 708.65 698.72 1,127,277.71 42,160.50 1,085,117.21 -3,236.62
9 Mar-07 440,763.71 0.206 67.476% 61,266.40 Apr-07 655.01 708.65 698.72 1,085,117.21 61,266.40 1,023,850.81 -4,703.36
10 Apr-07 923,586.39 0.206 67.476% 128,379.02 May-07 682.16 708.65 698.72 1,023,850.81 128,379.02 895,471.79 -4,867.13
11 May-07 202,011.93 0.206 67.476% 28,079.77 Jun-07 704.02 708.65 698.72 895,471.79 28,079.77 867,392.02 -186.07
12 Jun-07 661,160.32 0.206 67.476% 91,901.65 Jul-07 704.02 708.65 698.72 867,392.02 91,901.65 775,490.37 -608.98
13 Jul-07 700,749.24 0.206 67.476% 97,404.54 Aug-07 704.02 708.65 698.72 775,490.37 97,404.54 678,085.83 -645.44
704.02 708.65 698.72 678,085.83 678,085.83 0.00 -4,493.27
TOTAL -40,455.82
3 Sep-06 30-Sep-06 31,630.01 343,645.35 0.170 35.294% 20,618.65 Oct-06 373.77 369.20 365.50 31,313.02 20,618.65 10,694.37 257.80
4 Oct-06 49,479.64 0.170 35.294% 2,968.77 Nov-06 373.77 369.20 365.50 10,694.37 2,968.77 7,725.60 37.12
5 Nov-06 457,476.42 0.170 35.294% 27,448.49 Dec-06 373.77 369.20 365.50 7,725.60 7,725.60 0.00 96.60
6 Dec-06 1,218,569.23 0.170 35.294% 73,113.91 Jan-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
7 Jan-07 801,583.37 0.170 35.294% 48,094.84 Feb-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
8 Feb-07 303,311.76 0.170 35.294% 18,198.64 Mar-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
9 Mar-07 440,763.71 0.170 35.294% 26,445.73 Apr-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
10 Apr-07 923,586.39 0.170 35.294% 55,415.00 May-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
11 May-07 202,011.93 0.170 35.294% 12,120.68 Jun-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
12 Jun-07 661,160.32 0.170 35.294% 39,669.49 Jul-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
13 Jul-07 700,749.24 0.170 35.294% 42,044.81 Aug-07 373.77 369.20 365.50 0.00 0.00 0.00 0.00
373.77 369.20 365.50 0.00 0.00 0.00 0.00
TOTAL 391.52
3 Sep-06 30-Sep-06 376,991.60 343,645.35 0.170 31.765% 18,557.02 Oct-06 345.86 346.39 353.06 384,250.86 18,557.02 365,693.84 -27.86
4 Oct-06 49,479.64 0.170 31.765% 2,671.93 Nov-06 345.06 346.39 353.06 365,693.84 2,671.93 363,021.91 -10.07
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
DONDE ; D: Deduccion del reajuste generado por el adelanto de materiales ( sin IGV ).
Ci : Coeficiente de incidencia del material que se dio el adelanto.
V: Monto del componente en S/. de la valorizacion mensual.
Imr : Indice de precios del material a la fecha del reajuste.
Ima : Indice de precio del material a la fecha efectiva del adelanto.
Imo : Indice de precio del material a la fecha del presupuesto base (Noviembre-2005)
VALORIZACION ADELANTO MONTO COEFICIENTE % MAX. ADEL. MES MONTO ADELANTO SALDO DEL
VALORIZADO INCIDENCIA PARTIC. POR DE Imr Ima Imo MAXIMO ADELANTO POR DEDUCCION
N MES FECHA MONTO
V UTILIZAR REAJUSTE UTILIZABLE UTILIZADO UTILIZAR
5 Nov-06 457,476.42 0.170 31.765% 24,703.96 Dec-06 344.15 346.39 353.06 363,021.91 24,703.96 338,317.95 -156.74
6 Dec-06 1,218,569.23 0.170 31.765% 65,803.35 Jan-07 343.45 346.39 353.06 338,317.95 65,803.35 272,514.60 -547.96
7 Jan-07 801,583.37 0.170 31.765% 43,285.90 Feb-07 343.37 346.39 353.06 272,514.60 43,285.90 229,228.70 -370.26
8 Feb-07 303,311.76 0.170 31.765% 16,378.99 Mar-07 343.07 346.39 353.06 229,228.70 16,378.99 212,849.71 -154.02
9 Mar-07 440,763.71 0.170 31.765% 23,801.46 Apr-07 342.70 346.39 353.06 212,849.71 23,801.46 189,048.25 -248.76
10 Apr-07 923,586.39 0.170 31.765% 49,874.13 May-07 342.11 346.39 353.06 189,048.25 49,874.13 139,174.12 -604.60
11 May-07 202,011.93 0.170 31.765% 10,908.74 Jun-07 342.26 346.39 353.06 139,174.12 10,908.74 128,265.38 -127.61
12 Jun-07 661,160.32 0.170 31.765% 35,702.99 Jul-07 365.47 346.39 353.06 128,265.38 35,702.99 92,562.39 1,929.45
13 Jul-07 700,749.24 0.170 31.765% 37,840.81 Aug-07 365.35 346.39 353.06 92,562.39 37,840.81 54,721.58 2,032.12
365.35 346.39 353.06 54,721.58 54,721.58 0.00 2,938.65
TOTAL 4,652.34
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
DONDE ; D: Deduccion del reajuste generado por el adelanto de materiales ( sin IGV ).
Ci : Coeficiente de incidencia del material que se dio el adelanto.
V: Monto del componente en S/. de la valorizacion mensual.
Imr : Indice de precios del material a la fecha del reajuste.
Ima : Indice de precio del material a la fecha efectiva del adelanto.
Imo : Indice de precio del material a la fecha del presupuesto base (Noviembre-2005)
VALORIZACION ADELANTO MONTO COEFICIENTE % MAX. ADEL. MES MONTO ADELANTO SALDO DEL
VALORIZADO INCIDENCIA PARTIC. POR DE Imr Ima Imo MAXIMO ADELANTO POR DEDUCCION
N MES FECHA MONTO
V UTILIZAR REAJUSTE UTILIZABLE UTILIZADO UTILIZAR
3 Sep-06 30-Sep-06 675,853.43 343,645.35 0.170 32.941% 19,244.04 Oct-06 207.93 208.57 205.25 665,095.25 19,244.04 645,851.21 -60.01
4 Oct-06 49,479.64 0.170 32.941% 2,770.84 Nov-06 206.96 208.57 205.25 645,851.21 2,770.84 643,080.37 -21.73
5 Nov-06 457,476.42 0.170 32.941% 25,618.54 Dec-06 205.87 208.57 205.25 643,080.37 25,618.54 617,461.83 -337.00
6 Dec-06 1,218,569.23 0.170 32.941% 68,239.51 Jan-07 225.97 208.57 205.25 617,461.83 68,239.51 549,222.32 5,784.98
7 Jan-07 801,583.37 0.170 32.941% 44,888.43 Feb-07 225.83 208.57 205.25 549,222.32 44,888.43 504,333.89 3,774.78
8 Feb-07 303,311.76 0.170 32.941% 16,985.37 Mar-07 225.48 208.57 205.25 504,333.89 16,985.37 487,348.52 1,399.38
9 Mar-07 440,763.71 0.170 32.941% 24,682.64 Apr-07 224.98 208.57 205.25 487,348.52 24,682.64 462,665.88 1,973.41
10 Apr-07 923,586.39 0.170 32.941% 51,720.56 May-07 224.20 208.57 205.25 462,665.88 51,720.56 410,945.32 3,938.57
11 May-07 202,011.93 0.170 32.941% 11,312.61 Jun-07 224.42 208.57 205.25 410,945.32 11,312.61 399,632.71 873.59
12 Jun-07 661,160.32 0.170 32.941% 37,024.78 Jul-07 224.18 208.57 205.25 399,632.71 37,024.78 362,607.93 2,815.87
13 Jul-07 700,749.24 0.170 32.941% 39,241.75 Aug-07 223.57 208.57 205.25 362,607.93 39,241.75 323,366.18 2,867.85
223.57 208.57 205.25 323,366.18 323,366.18 0.00 23,632.12
TOTAL 46,641.81
2,632,480.70
TOTAL 11,229.85
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
DONDE ; D: Deduccion del reajuste generado por el adelanto de materiales ( sin IGV ).
Ci : Coeficiente de incidencia del material que se dio el adelanto.
V: Monto del componente en S/. de la valorizacion mensual.
Imr : Indice de precios del material a la fecha del reajuste.
Ima : Indice de precio del material a la fecha efectiva del adelanto.
Imo : Indice de precio del material a la fecha del presupuesto base (Noviembre-2005)
VALORIZACION ADELANTO MONTO COEFICIENTE % MAX. ADEL. MES MONTO ADELANTO SALDO DEL
VALORIZADO INCIDENCIA PARTIC. POR DE Imr Ima Imo MAXIMO ADELANTO POR DEDUCCION
N MES FECHA MONTO
V UTILIZAR REAJUSTE UTILIZABLE UTILIZADO UTILIZAR
10 Apr-07 19-Apr-07 590,000.00 923,586.39 0.170 35.294% 55,415.00 May-07 373.77 373.77 365.50 576,945.72 55,415.00 521,530.72 0.00
11 May-07 202,011.93 0.170 35.294% 12,120.68 Jun-07 373.77 373.77 365.50 521,530.72 12,120.68 509,410.04 0.00
12 Jun-07 661,160.32 0.170 35.294% 39,669.49 Jul-07 373.77 373.77 365.50 509,410.04 39,669.49 469,740.55 0.00
13 Jul-07 700,749.24 0.170 35.294% 42,044.81 Aug-07 373.77 373.77 365.50 469,740.55 42,044.81 427,695.74 0.00
TOTAL 0.00
10 Apr-07 19-Apr-07 1,200,000.00 923,586.39 0.206 32.524% 61,879.77 May-07 1147.10 1147.10 1147.10 1,200,000.00 61,879.77 1,138,120.23 0.00
11 May-07 202,011.93 0.206 32.524% 13,534.69 Jun-07 1157.74 1147.10 1147.10 1,138,120.23 13,534.69 1,124,585.54 125.54
12 Jun-07 661,160.32 0.206 32.524% 44,297.37 Jul-07 1223.71 1147.10 1147.10 1,124,585.54 44,297.37 1,080,288.17 2,958.44
13 Jul-07 700,749.24 0.206 32.524% 46,949.81 Aug-07 1347.15 1147.10 1147.10 1,080,288.17 46,949.81 1,033,338.36 8,187.87
1347.15 1147.10 1147.10 1,033,338.36 1,033,338.36 0.00 180,210.39
TOTAL 191,482.24
11 May-07 28-May-07 840,336.13 0.00 0.206 67.476% 0.00 Jun-07 704.02 682.16 698.72 860,735.99 0.00 860,735.99 0.00
12 Jun-07 0.00 0.206 67.476% 0.00 Jul-07 704.02 682.16 698.72 860,735.99 0.00 860,735.99 0.00
13 Jul-07 0.00 0.206 67.476% 0.00 Aug-07 704.02 682.16 698.72 860,735.99 0.00 860,735.99 0.00
704.02 682.16 698.72 860,735.99 860,735.99 0.00 26,928.80
TOTAL 26,928.80
2,630,336.13
TOTAL 218,411.04
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
DONDE ; D: Deduccion del reajuste generado por el adelanto de materiales ( sin IGV ).
Ci : Coeficiente de incidencia del material que se dio el adelanto.
V: Monto del componente en S/. de la valorizacion mensual.
Imr : Indice de precios del material a la fecha del reajuste.
Ima : Indice de precio del material a la fecha efectiva del adelanto.
Imo : Indice de precio del material a la fecha del presupuesto base (Noviembre-2005)
VALORIZACION ADELANTO MONTO COEFICIENTE % MAX. ADEL. MES MONTO ADELANTO SALDO DEL
VALORIZADO INCIDENCIA PARTIC. POR DE Imr Ima Imo MAXIMO ADELANTO POR DEDUCCION
N MES FECHA MONTO
V UTILIZAR REAJUSTE UTILIZABLE UTILIZADO UTILIZAR
4 Oct-06 20-Oct-06 87,731.03 49,479.64 0.170 32.941% 2,770.84 Nov-06 206.96 207.93 205.25 86,600.27 2,770.84 83,829.43 -13.09
5 Nov-06 457,476.42 0.170 32.941% 25,618.54 Dec-06 205.87 207.93 205.25 83,829.43 25,618.54 58,210.89 -257.12
6 Dec-06 1,218,569.23 0.170 32.941% 68,239.51 Jan-07 225.97 207.93 205.25 58,210.89 58,210.89 0.00 5,116.32
7 Jan-07 801,583.37 0.170 32.941% 44,888.43 Feb-07 225.83 207.93 205.25 0.00 0.00 0.00 0.00
8 Feb-07 303,311.76 0.170 32.941% 16,985.37 Mar-07 225.48 207.93 205.25 0.00 0.00 0.00 0.00
9 Mar-07 440,763.71 0.170 32.941% 24,682.64 Apr-07 224.98 207.93 205.25 0.00 0.00 0.00 0.00
10 Apr-07 923,586.39 0.170 32.941% 51,720.56 May-07 224.20 207.93 205.25 0.00 0.00 0.00 0.00
11 May-07 202,011.93 0.170 32.941% 11,312.61 Jun-07 224.42 207.93 205.25 0.00 0.00 0.00 0.00
12 Jun-07 661,160.32 0.170 32.941% 37,024.78 Jul-07 224.18 207.93 205.25 0.00 0.00 0.00 0.00
13 Jul-07 700,749.24 0.170 32.941% 39,241.75 Aug-07 223.57 207.93 205.25 0.00 0.00 0.00 0.00
TOTAL 4,846.11
4 Oct-06 20-Oct-06 41,176.80 49,479.64 0.170 32.941% 2,770.84 Nov-06 441.51 443.56 410.29 38,088.26 2,770.84 35,317.42 -13.84
5 Nov-06 457,476.42 0.170 32.941% 25,618.54 Dec-06 421.28 443.56 410.29 35,317.42 25,618.54 9,698.88 -1,391.16
6 Dec-06 1,218,569.23 0.170 32.941% 68,239.51 Jan-07 418.66 443.56 410.29 9,698.88 9,698.88 0.00 -588.61
7 Jan-07 801,583.37 0.170 32.941% 44,888.43 Feb-07 418.40 443.56 410.29 0.00 0.00 0.00 0.00
8 Feb-07 303,311.76 0.170 32.941% 16,985.37 Mar-07 417.74 443.56 410.29 0.00 0.00 0.00 0.00
9 Mar-07 440,763.71 0.170 32.941% 24,682.64 Apr-07 416.82 443.56 410.29 0.00 0.00 0.00 0.00
10 Apr-07 923,586.39 0.170 32.941% 51,720.56 May-07 415.38 443.56 410.29 0.00 0.00 0.00 0.00
11 May-07 202,011.93 0.170 32.941% 11,312.61 Jun-07 413.46 443.56 410.29 0.00 0.00 0.00 0.00
12 Jun-07 661,160.32 0.170 32.941% 37,024.78 Jul-07 418.88 443.56 410.29 0.00 0.00 0.00 0.00
13 Jul-07 700,749.24 0.170 32.941% 39,241.75 Aug-07 459.58 443.56 410.29 0.00 0.00 0.00 0.00
TOTAL -1,993.61
10 Apr-07 24-Apr-07 28,588.46 923,586.39 0.170 32.941% 51,720.56 May-07 342.11 342.70 353.06 29,452.70 29,452.70 0.00 -49.22
11 May-07 202,011.93 0.170 32.941% 11,312.61 Jun-07 342.26 342.70 353.06 0.00 0.00 0.00 0.00
12 Jun-07 661,160.32 0.170 32.941% 37,024.78 Jul-07 365.47 342.70 353.06 0.00 0.00 0.00 0.00
13 Jul-07 700,749.24 0.170 32.941% 39,241.75 Aug-07 365.35 342.70 353.06 0.00 0.00 0.00 0.00
TOTAL -49.22
157,496.29
TOTAL 2,803.28
Objeto: "Rehabilitacion y Mejoramiento de la Carretera Tacna Tarata Candarave Umalso"
Tramo: Km 57+000 - Km 72+000
P R E S U P U E S T O A D I C I O N A L No 01
VALO R I ZAC I O N E S R E CALC U LADAS
PRESUPUESTO ADICIONAL No 01
FORMULA POLINOMICA
K = 0.264 Pr/Po + 0.265 GGUr/GGUo + 0.100 MOr/MOo + 0.338 ENr/ENo + 0.033 EIr/Eio
PRECIOS A : Noviembre 2005
Nov-05 Mar-07 Apr-07 May-07
SIMBOLO IU CONCEPTO COEF. INCIDENCIA
Indice Incidencia Indice Incidencia Indice Incidencia Indice Incidencia
P 53 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.264 100.00% 698.72 0.264 655.01 0.247 655.01 0.247 682.16 0.258
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.265 100.00% 307.90 0.265 314.64 0.271 315.20 0.271 316.75 0.273
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.100 100.00% 347.47 0.100 361.29 0.104 361.29 0.104 361.47 0.104
EN 48 MAQUINARIA Y EQUIPO NACIONAL 0.338 100.00% 321.32 0.338 333.15 0.350 329.25 0.346 331.36 0.349
EI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.033 100.00% 274.40 0.033 267.22 0.032 264.34 0.032 264.05 0.032
PRESUPUESTO ADICIONAL No 01
Calculo del Reajuste de las Valorizaciones
01 Feb-07 153,066.31 153,066.31 561,281.02 561,281.02 1.004 612.27 612.27 2,245.12 2,245.12
02 Mar-07 655,998.51 809,064.82 335,250.26 896,531.28 1.000 0.00 612.27 0.00 2,245.12
03 Apr-07 87,466.46 896,531.28 0.00 896,531.28 1.016 1,399.46 2,011.73 0.00 2,245.12
P R E S U P U E S T O A D I C I O N A L No 02
VALO R I ZAC I O N E S R E CALC U LADAS
PRESUPUESTO ADICIONAL No 02
FORMULA POLINOMICA
K = 0.230 Pr/Po + 0.270 GGUr/GGUo + 0.110 MOr/MOo + 0.150 ENr/ENo + 0.240 EIr/Eio PRECIOS A : Noviembre 2005
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.270 100.00% 307.90 0.270 313.55 0.275 314.64
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.110 100.00% 347.47 0.110 361.29 0.114 361.29
EN 48 MAQUINARIA Y EQUIPO NACIONAL 0.150 100.00% 321.32 0.150 331.63 0.155 333.15
EI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.240 100.00% 274.40 0.240 267.22 0.234 267.22
L COEFICIENTE K DE REAJUSTE
Noviembre 2005
Mar-07
Incidencia
0.216
0.276
0.114
0.156
0.234
0.996
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
PRESUPUESTO ADICIONAL No 02
Calculo del Reajuste de las Valorizaciones
01 Feb-07 39,250.83 39,250.83 39,250.83 39,250.83 0.996 (157.00) (157.00) (157.00) (157.00)
P R E S U P U E S T O A D I C I O N A L No 03
VALO R I ZAC I O N E S R E CALC U LADAS
PRESUPUESTO ADICIONAL No 03
FORMULA POLINOMICA
K = 0.255 Pr/Po + 0.265 GGUr/GGUo + 0.114 MOr/MOo + 0.089 ENr/ENo + 0.277 EIr/Eio
PRECIOS A : Noviembre 2005
Nov-05 Jan-07 Mar-07 Apr-07
SIMBOLO IU CONCEPTO COEF. INCIDENCIA
Indice Incidencia Indice Incidencia Indice Incidencia Indice Incidencia
P 53 PETROLEO DIESEL 0.255 100.00% 698.72 0.255 670.24 0.245 655.01 0.239 655.01 0.239
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.265 100.00% 307.90 0.265 312.74 0.269 314.64 0.271 315.20 0.271
MO 47 MANO DE OBRA INC. LEYES SOCIALES 0.114 100.00% 347.47 0.114 361.29 0.119 361.29 0.119 361.29 0.119
EN 48 MAQUINARIA Y EQUIPO NACIONAL 0.089 100.00% 321.32 0.089 329.90 0.091 333.15 0.092 329.25 0.091
EI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.277 100.00% 274.40 0.277 266.55 0.269 267.22 0.270 264.34 0.267
PRESUPUESTO ADICIONAL No 03
Calculo del Reajuste de las Valorizaciones
01 Feb-07 333,094.78 333,094.78 1,345,168.57 1,345,168.57 0.991 -2,997.85 -2,997.85 -12,106.52 -12,106.52
02 Mar-07 1,014,427.94 1,347,522.72 1,345,168.57 0.987 -13,187.56 -16,185.41 0.00 -12,106.52
P R E S U P U E S T O A D I C I O N A L No 04
VALO R I ZAC I O N E S R E CALC U LADAS
VAL N 01 - FEB.2007 VAL N 02 - MAR.2007 VAL N 03 - ABR.2007 VAL N 04 - MAY.2007 VAL N 05 - JUN.2007
ITEM DESCRIPCION UND METRADO P.U. TOTAL
METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO TOTAL METRADO
P R E S U P U E S T O A D I C I O N A L No 04
VALO R I ZAC I O N E S R E CALC U LADAS
VAL N 05 - JUN.2007
ITEM DESCRIPCION UND METRADO P.U. TOTAL
TOTAL
P R E S U P U E S T O A D I C I O N A L No 04
VALO R I ZAC I O N E S R E CALC U LADAS
PRESUPUESTO ADICIONAL No 04
FORMULA POLINOMICA
K = 0.059 Cr/Co + 0.239 Pr/Po + 0.037 Dr/Do + 0.276 GGUr/GGUo + 0.113 MOr/MOo + 0.071 ENr/ENo + 0.205 EIr/EIo PRECIOS A : Noviembre 2005
C 21 CEMENTO PORTLAND 0.059 100.00% 365.50 0.059 368.11 0.059 369.20 0.060 373.77 0.060 373.77 0.060
D 30 DLAR 0.037 100.00% 391.90 0.037 383.52 0.036 385.82 0.036 382.75 0.036 378.91 0.036
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.276 100.00% 307.90 0.276 313.29 0.281 313.38 0.281 313.51 0.281 312.63 0.280
MO 47 MANO DE OBRA 0.113 100.00% 347.47 0.113 361.10 0.117 361.10 0.117 361.10 0.117 361.10 0.117
EN 48 MAQUINARIA Y EQUIPO NACIONAL 0.071 100.00% 321.32 0.071 327.22 0.072 328.79 0.073 328.24 0.073 332.13 0.073
EI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.205 100.00% 274.40 0.205 267.94 0.200 269.44 0.201 270.31 0.202 268.63 0.201
C 21 CEMENTO PORTLAND 0.059 100.00% 365.50 0.059 373.77 0.060 373.77 0.060 373.77 0.060 373.77 0.060
D 30 DLAR 0.037 100.00% 391.90 0.037 376.35 0.036 375.38 0.035 376.30 0.036 377.71 0.036
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.276 100.00% 307.90 0.276 312.71 0.280 312.74 0.280 313.55 0.281 314.64 0.282
MO 47 MANO DE OBRA 0.113 100.00% 347.47 0.113 361.10 0.117 361.29 0.117 361.29 0.117 361.29 0.117
EN 48 MAQUINARIA Y EQUIPO NACIONAL 0.071 100.00% 321.32 0.071 330.71 0.073 329.90 0.073 331.63 0.073 333.15 0.074
EI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.205 100.00% 274.40 0.205 267.42 0.200 266.55 0.199 267.22 0.200 267.22 0.200
PRESUPUESTO ADICIONAL No 04
FORMULA POLINOMICA
K = 0.059 Cr/Co + 0.239 Pr/Po + 0.037 Dr/Do + 0.276 GGUr/GGUo + 0.113 MOr/MOo + 0.071 ENr/ENo + 0.205 EIr/EIo PRECIOS A : Noviembre 2005
C 21 CEMENTO PORTLAND 0.059 100.00% 365.50 0.059 373.77 0.060 373.77 0.060 373.77 0.060 373.77 0.060
D 30 DLAR 0.037 100.00% 391.90 0.037 380.31 0.036 381.47 0.036 384.16 0.036 383.68 0.036
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.276 100.00% 307.90 0.276 315.20 0.283 316.75 0.284 318.24 0.285 319.76 0.287
MO 47 MANO DE OBRA 0.113 100.00% 347.47 0.113 361.29 0.117 361.47 0.118 361.47 0.118 374.22 0.122
EN 48 MAQUINARIA Y EQUIPO NACIONAL 0.071 100.00% 321.32 0.071 329.25 0.073 331.36 0.073 331.63 0.073 332.23 0.073
EI 49 MAQUINARIA Y EQUIPO IMPORTADO 0.205 100.00% 274.40 0.205 264.34 0.197 264.05 0.197 263.88 0.197 263.67 0.197
Nov-05 Aug-07
SIMBOLO IU CONCEPTO COEF. INCIDENCIA
Indice Incidencia Indice Incidencia
0.239 0.258
P 53 PETROLEO DIESEL 0.239 67.800% 698.72 473.732 704.02 477.326
20 ASFALTO SOLIDO 27.600% 1147.10 316.600 1347.15 371.813
13 ASFALTO LIQUIDO 4.600% 1091.37 50.203 1228.45 56.509
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.276 100.00% 307.90 0.276 320.19 0.287
PRESUPUESTO ADICIONAL No 04
Calculo del Reajuste de las Valorizaciones
01 Feb-07 1,113,670.37 1,113,670.37 15,005,385.30 15,005,385.30 1.000 0.00 0.00 0.00 0.00
02 Mar-07 5,872,019.47 6,985,689.84 862,072.75 15,867,458.05 0.997 -17,616.06 -17,616.06 -2,586.22 -2,586.22
03 Apr-07 6,629,463.67 13,615,153.51 755,692.75 16,623,150.80 1.004 26,517.85 8,901.79 3,022.77 436.55
04 May-07 6,592,201.68 20,207,355.19 914,072.03 17,537,222.83 1.010 65,922.02 74,823.81 9,140.72 9,577.27
05 Jun-07 20,207,355.19 1,225,829.34 18,763,052.17 1.022 0.00 74,823.81 26,968.25 36,545.52
06 Jul-07 20,207,355.19 1,492,088.25 20,255,140.42 1.033 0.00 74,823.81 49,238.91 85,784.43
P R E S U P U E S T O A D I C I O N A L No 05
VALO R I ZAC I O N E S R E CALC U LADAS
61.65%
88.77%
93.38%
49.24%
92.75%
88.88%
75.95%
96.73%
97.51%
100.00%
100.00%
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
PRESUPUESTO ADICIONAL No 05
FORMULA POLINOMICA
K = 0.177 CPr/CPo + 0.080 Pr/Po + 0.035 PVCr/PVCo + 0.265 GGUr/GGUo + 0.290 MOr/MOo + 0.153 EQr/EQo
PRECIOS A : Noviembre 2005
Nov-05 May-07 Jun-07 Jul-07 Aug-07
SIMBOLO IU CONCEPTO COEF. INCIDENCIA
Indice Incidencia Indice Incidencia Indice Incidencia Indice Incidencia Indice Incidencia
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.265 100.00% 307.90 0.265 316.75 0.273 318.24 0.274 319.76 0.275 320.19 0.276
MO 47 MANO DE OBRA (INC. LEYES SOCIALES) 0.290 100.00% 347.47 0.290 361.47 0.302 361.47 0.302 374.22 0.312 374.22 0.312
PRESUPUESTO ADICIONAL No 05
Calculo del Reajuste de las Valorizaciones
01 May-07 94,817.20 94,817.20 707,428.68 707,428.68 1.028 2,654.88 2,654.88 19,808.00 19,808.00
02 Jun-07 711,129.07 805,946.27 275,402.76 982,831.44 1.040 28,445.16 31,100.04 11,016.11 30,824.11
03 Jul-07 284,451.61 1,090,397.88 99,418.07 1,082,249.51 1.041 11,662.52 42,762.56 4,076.14 34,900.25
P R E S U P U E S T O A D I C I O N A L No 06
VALO R I ZAC I O N E S R E CALC U LADAS
PRESUPUESTO ADICIONAL No 06
FORMULA POLINOMICA
GGU 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.178 100.00% 307.90 0.178 316.75 0.183 320.19 0.185
PRESUPUESTO ADICIONAL No 06
Calculo del Reajuste de las Valorizaciones
02 Jul-07 122,784.52 122,784.52 122,790.12 122,790.12 1.147 18,049.32 18,049.32 18,050.15 18,050.15
R = i x V x Vc
Io
CONTRATO ORIGINAL
VAL. No. MES/AO i V Vc Io R
TOTAL 1,565.34
TOTAL 154.81
TOTAL 7.46
TOTAL 264.80
TOTAL 4,279.32
TOTAL 657.70
R = i x F x Vc
Io
CONTRATO ORIGINAL
VAL. No. MES/AO i F Vc Io R
TOTAL 2,139.59
TOTAL 223.11
TOTAL 10.31
TOTAL 366.30
TOTAL 5,690.53
TOTAL 787.87
R = i x F x Vc
Io
Io = Indice de mano de obra correspondiente al mes del Presupuesto Base
Vc = Valorizacin contractual
ENTIDAD : GOBIERNO REGIONAL DE TACNA
PROYECTO DE INFRAESTRUCTURA DE TRANSPORTE REGIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA: TACNA - TARATA - CANDARAVE - UMALSO
CONTRATISTA : CONSORCIO VIAL TARATA
SUPERVISIN : CONSORCIO UMALSO
VALORIZACION No. 01
GASTOS GENERALES - AMPLIACION DE PLAZO No. 02
(RESOLUCION GERENCIAL GENERAL REGIONAL No. 220 - 2007 - GGR/G.R. TACNA, DEL 26.03.2007)
(RESOLUCION No. 39, LIMA 18.05.2009) - LAUDO ARBITRAL