ROCK SLOPE
MANAGEMENT AT
SOSSEGO MINE
Guilherme de Rezende Tammerick Vale
Pete Stacey SMGL
William Crosby MREL Group
Carajs Mining
District
PA-150
46
Pojuca
Gameleira Serra
Liberdade 55 Pelada
Breves
PA-275
Aguas
Claras
1 SOSSEGO MINE
MASTER PLAN
North Oxide Ore
Waste Dump Stock Pile Sossego Pit
Sequeirinho Pit
Primary
SW Crusher Sossego
Waste Dump Waste Dump
Explosives
Factory
Taillings Dam
SE
Waste Dump
Plant
2 SOSSEGO MINE
OPEN PITS
Sequerinho Sossego
85% 15%
3 SOSSEGO MINE
SOSSEGO MINE GEOLOGICAL MAP
4 SOSSEGO MINE
SEQUEIRINHO PIT STRUCTURAL MODEL
granite
granite
shear zone
fault
faults related to shear zone
foliation
ore
5 SOSSEGO MINE
SEQUEIRINHO PIT STRUCTURAL MODEL
S56E/55SW
JOINTS T
N40E/55SE
N60E/55SE
SHEAR ZONE P
MAIN SHEAR ZONE
6 SOSSEGO MINE
SEQUEIRINHO PIT HYDROGEOLOGICAL
ASPECTS
9.291.200
9.288.600
9.290.400
9.290.000
9.290.800
9.289.000
9.290.200
9.289.800
9.288.800
9.291.000
9.289.200
9.290.600
9.289.600
9.289.400
300,00
IV
V ? N.A.
200,00 IV ? ? ? ?
? ? N.A.
N.A.
?
? V
I-II ? ? ? ?
I-II
LEGENDA
100,00 CURSOS D'GUA INTERMITENTE
CURSOS D'GUA PERENE
NASCENTE
BARRAGEM
LAGO OU LAGOA
000,00 N 9 291 500
ALAGADO
CONE DE REBAIXAMENTO
603840
604000
603520
603680
100,00
603360
603160
N 9 291 000
200,00
CAVA PROJETADA 12/13
N 9 290 500
300,00
Nascente Sequeirinho
05/09/99 N 9 290 000
400,00
603680
CAVA SEQUEIRINHO
604000
603840
603160
603520
603360
E 603 000
200
E 604 500
300 m
E 604 000
0
E 603 000
E 603 500
100
LEGENDA:
N 9 289 500
PERFIL DO CONE DE REBAIXAMENTO
SEO DA CAVA
7 SOSSEGO MINE
SEQUEIRINHO PIT HYDROGEOLOGICAL
ASPECTS
8 SOSSEGO MINE
SEQUEIRINHO PIT GEOMECHANICAL MODEL
ROCKMASS ROCKMASS
CLASS V CLASS IV
DETAIL
ROCKMASS
DY
CLASS I-II
BO
RE
O DESIGNED OPEN
PIT
9 SOSSEGO MINE
SEQUEIRINHO PIT GEOMECHANICAL MODEL
N S
ground surface
open pit
waste
rock
waste
ore rock
new mining phases
ore
10 SOSSEGO MINE
SLOPE DESIGN PARAMETERS
11 SOSSEGO MINE
SEQUEIRINHO PIT
Talude Seguro
Talude Instvel
Cava de Sequeirinho - Talude Globais
Cava de Sequeirinho - Inter-rampa
1000
950
900
850 Bingh am Canyon
800
750
700
Chuquicamata-West Sector
Ch uquicama ta-East Sector
650
Altura do Talude (m)
Cua jone
T oquepala
GRAN ITO Sequeirinho
600
MVAZ C Sequeirinho BIX F oliao Sequeirinho
550
500 Escondida
Stability line
Lutton / H oek & Bray
450 E-1
Proje to BVP1
SE-1 N -2
400
Valley Pit
Island C opper SW
350 Lornex Pit
SW-1 Brenda Mine-NW
N-1 GR AN ITO Sequeirinho
300 Afton Mine-N W
MVAZC Seq ueirinho BI X Folia o Sequeirinho
250 S-1 Zone 1 (sector V)
Tripp/Veteran Pit
200 W-1 Brend a Mine-SW
NW-1 Kimbley Pit
Z one 2 (sector V)
150 Afton M ine-SW
0 10 20 30 40 50 60 70 80 90
ngulo do Talude
No te : Adap te d from Hoek at al., 2000.
12 SOSSEGO MINE
DATA:
SEQUEIRINHO PIT NORTH WALL FOLIATION
90 45
65
13 SOSSEGO MINE
STABILITY REVIEW
SEQUEIRINHO PIT SOUTH WALL
14 SOSSEGO MINE
STABILITY REVIEW
SOSSEGO PIT - GENERAL
18 SOSSEGO MINE
OPERATIONAL ISSUES
Common to both pits
joint surface
Alternative methods
Failed material
Overspill control
Remedial measures
Surface water control
around crests
19 SOSSEGO MINE
WALL CONTROL BLASTING
20 SOSSEGO MINE
PROBLEM INVESTIGATION TRIM BLASTS
21 SOSSEGO MINE
MREL INVESTIGATIONS OF BLASTING
PROBLEMS
Numerous misfires in production and pre-shear holes
Inaccuracy of mine GPS, particularly near walls
Poor positioning of pre-shear rows
Inaccurate hole depths
Overbreak of bench toes
Large diameter holes for pre-split (9in or 12in)
Vertical holes
Pre-shear holes often fired with trim blasts (post-split)
Delay accuracy
Testing showed 30m/s delay had range of
1m/s to 150m/s
22 SOSSEGO MINE
OPERATIONAL ISSUES CONTROLLED
BLASTING
Vale-MREL joint project has resolved many of blast mechanics issues
Alternative controlled blast designs also developed
Pre-shear first
23 SOSSEGO MINE
TITON INCLINED PRE-SHEAR
24 SOSSEGO MINE
TITON INCLINED PRE-SHEAR
Avaliao do Talude
1
0,9
0,8
Fator de Projeto
0,7
0,6
0,5
0,4
0,3
0,2
0,1
0
0 0,1 0,2 0,3 0,4 0,5 0,6 0,7 0,8 0,9 1
Fator Geotcnico
25 SOSSEGO MINE
OPERATIONAL ISSUES FACE SCALING
The adoption of a scaling system for the slopes combined
with improved controlled blasting aimed at reducing
rockfall hazards to enable double benching.
Two main methods:
Scaling with equipment (from bench)
Chaining (from crest)
26 SOSSEGO MINE
SEQUEIRINHO PIT
OVERSPILL ISSUES
MINA DO SOSSEGO
1) CAPACETE COM JUGULAR 9290000.00 Y
602750.00 X
603000.00 X
603250.00 X
603500.00 X
603750.00 X
604000.00 X
604250.00 X
3) ABAFADOR TIPO CONCHA
4) CULOS DE PROTEO Atualizado:01/09/06
5) LUVAS (VAQUETA, RASPA E PVC)
6) MSCARA SEMI-FACIAL (SEM/COM MANUTENO)
7) UNIFORME
142 PESSOAS
ELABORAO DATA: 27/ 08/ 2006
28 SOSSEGO MINE
CONCLUSIONS
Rocks in both pits strong to very strong, but with fault
zones, which are steep
Feasibility level slope designs were modified on the basis
of initial excavation experience
Slope designs remain relatively steep, except where clear
structural control
Bench-scale wedge failures, but no major stability issues
to date
Major issue is blasting, which has prevented the
achievement of the double bench designs (rockfall
hazards)
Review of blasting indicated major issues, particularly
related to product quality and hole layout accuracy
Currently reviewing impact of improved blasting practices
and products
29 SOSSEGO MINE