Increase system
High availability through redundant, geographical distributed systems availability
Object oriented concept saves cost in engineering- and
Save engineering
implementation process time
Flexible customization of client relevant requirements
Openness to adapt to country specific requirements and
Easy integration of
possibility to integrate various different sub-systems 3rd party products
System 1
2x2 Redundancy Extension of the redundancy concept through a second Hot Standby System
Benefits:
When the Master Control System is out of order, the
geographical distributed Disaster Recovery Center takes the
operating of the system and the operation of each workstation
is connected to the Disaster Recovery Center
Continuous operation and operating of the system
Reduced down time during takeover
Minimized data loss during takeover
Functions:
Master Control Center and Disaster Recovery Center must be connected via a
highly available and secured leased line
Manual or automatic takeover of all control operations,
when the Master Control Center is totally turned out
Redundant data management in a geographically distributed Disaster Recovery Center
Backward synchronization of values from SSS (Slave) to PSS (Master)
Extended switch-over mode - setting driver connections to active / inactive
Drivers run always on both system, only the specific driver
connections are set to active or inactive
Storing information of the active connections
System 3 System 2
Two or more autonomous WinCC OA systems are connected via network (LAN)
Each system can have its own connections the process (PLC, DDC, field bus,...)
All process data are mapped to local data points only (own system)
Each system is capable of displaying / processing data from other systems
No replication of data points (tags)!
Direct access to online values, states, alarms or history ("distributed database")
Event driven communication
System 1
Operator 1 Operator 2 UI ........... User Interface Manager
CTRL
DB
EV DIST D
DB
D
Use WinCC OA / PLC Generate own PLC library Create own WinCC OA library
library 1a
1a 1b
1b
22 generate PLC data type generate data point types
Library
S7 library (simple/advanced)
realize PLC code generate configuration
WinCC OA library (master)
(simple/advanced)
one time effort generate graphic symbols
PLC application
engineering
generate PLC instances 33
(data modules),
application
configuration of instances
(unit, description, alarms etc)
55
generate WinCC OA data points WinCC OA data points
Benefits:
Reduced interfaces due to the use of just one single
user interface although divers systems
Enlargement of existing WinCC OA applications with
digital video components
Reduction for training cost, maintenance and cost of operation
Live stream
Benefits:
Enhanced overview due to zoom in and out
Popup of information according to user requirements based
on the zoom factor
More value through combination of regional information to
plant status signals
Enhanced user guidance (quick and definite navigation to breakdown)
Efficient project planning due to dynamic maps instead of static single image
Functions:
Visualization of WinCC OA objects (symbol, text, color
change or process value) in different map layers
User-defined quantity of map layers
Automatic zoom to upcoming alarms and warnings
Manual zoom (+, - and zoom into detail)
Easy navigation to any user interface, alarm and event screen
Direct link to alarms and consequently integrated in the
SCADA project
Data and maps are available at many different vendors (e.g.: ESRI -
Environmental Systems Research Institute)
Requirements:
Central digital management for large gas field
Extreme short project duration
RDB Manager with the first Oracle 10g RAC database cluster (Real time
and balance data!) in SCADA system
Solution:
Hot-Standby Redundancy in central room
Auto Cool-Standby mode between central server and 5 distributed gas stations
WinCC OA Web Server and Clients
Connectivity via WinCC OA S7 (SIMATIC S7-400H PLC) & Modbus TCP driver
(Motorola RTU CPU 3600 Series)
Benefits:
Fulfill digital gas-field concept in China market
Realize the central and high efficiency management
Siemens AG 2012. All Rights Reserved.
As reference for futures setup and extend of whole southwest gas-field block Industry Sector
Natural Gas West-East Pipeline in China
Segment: Gas transport networks Natural Gas Pipeline transporting gas
from western gas fields to high
End user: Petro China (China) industrialized zones in the eastern
part of China.
System integrator: Cegelec Biggest pipeline project at that
SCADA ViewStar ICS is an OEM product based on WinCC OA time. Construction costs: about
$15 $18 US Billion
Realization date: 2006 Length: 4.400 km
Requirements:
Reliable SCADA system for distributed systems
Redundancy
OS SUN Solaris
RDB Oracle development
Solution:
Main & Emergency Control Center
WinCC OA installed in 39 geographically distributed station control systems
Benefits:
The functionalities of ViewStar ICS are ideal for gas transport networks,
especially Hot-Standby Redundancy and Distributed Systems
Requirements:
One standard for controller and visualization
The standard for the next 15 years (upward compatible, fully supported)
Interfacing with several different PLCs
Solution:
Up to 1.000 distributed servers & stations via network
User Responsibility Management
Centralized parameter-synchronization (panels, scripts)
Bulk Import function for automatic import of application data from the controller
Benefits:
Access to any site from any location within the Gasunie network with the same look-and-feel
Reduced engineering time, errors, testing time and cost of training operators through to
standardization
Reduced bandwidth thanks to On demand communication with OPC DA
Siemens AG 2012. All Rights Reserved.
Industry Sector
Loading- and Tankfarm Systems
Segment: Tankfarmmanagement Diamond Key International is a leader in providing
products and services to the petrochemical
Customer: Diamond Key International (Australia) industry related to the storage, transfer and
distribution of bulk liquid and gas products. Their
Bayview is a product of DKI based on WinCC OA products range from specialized technical
components to metering and control systems to
full facility automation systems.
Requirements:
Customizable SCADA system
Open to various hardware components
Solution:
Customized for the requirements of tankfarm and loading solutions
DKI Terminal Automation Solutions based on WinCC OA
Special functionalities, like: tanks-, valves-, pumps monitoring and control, loading gantry
monitoring, external fire system status, external multi-product pipeline interface
Benefits:
BayView provides an enhanced ability to monitor loading operations in real-time with full visual
representation keeping informed of loading activities
Ideally suited for modernization projects that require the user to integrate numerous hardware
varieties
Requirements:
Changeover to the new system within a few hours the
switchover to continuous running
Solution:
Windows XP-based Client/Server System
Two redundant servers in Hot-Standby mode
Hierarchically structured and priority-controlled fault messaging system
Benefits:
Intuitive and ergonomic user guiding with high performance levels
Easy to use, safe and simple
Clear menus and rapid picture change make operation easier
Requirements:
Integration of the new natural gas storage (in Haidach) into the
existing process management system (in Puchkirchen)
One common visualization interface, incl. authority function across the systems
Archiving with RDB (Oracle)
Solution:
Distributed (around 150 km) and redundant system
Spontaneous communication (TSPP)
Shared authority between the two natural gas storage
Interfaces to registration and accounting system (ERP Level III)
Benefits:
High level of performance and easy parameterization in face of a distributed and redundant system
Smooth plant operation thanks to the easy operation and maintenance
Siemens AG 2012. All Rights Reserved.
Industry Sector
Accounting Tankfarm Organization System
Segment: Refinery production management & optimization Founded in 1956, OMV AG is Austrias
largest listed industrial company and
End user: OMV AG (Austria) leading energy group in the European
growth belt. OMV is active in 13 Central
Sub contractor: Albrecht Consulting GmbH European countries as well as in
Realization date: 2004 Turkey in its Refining and Marketing
business segment, and in 17 countries
on four continents in Exploration and
Production.
Requirements:
Replacement of the existing tankfarm automation system
Open SCADA system
Potential for future enhancements
Efficient and low-cost maintenance
Solution:
Planning of production and product flow
Order administration
Quality control and reporting
Benefits:
The SCADA system manages product flows and quality from
crude oil pipelines to lorries which distribute refined products among the petrol stations
All-in-one software solution with future oriented concept
Comprehensive implementation competence
Siemens AG 2012. All Rights Reserved.
Industry Sector
Thank you for your attention!
Marktstrasse 3
A-7000 Eisenstadt
E-Mail: info@etm.at