Anda di halaman 1dari 4

CAISSON Version 14.

40 10:53:36 AM Thursday, June 22, 2017


National Contracting Co. Ltd.
******************************************************************************************
********
*
*
* CAISSON - Pier Foundations Analysis and Design - Copyright Power Line Systems, Inc.
1993-2016 *
*
*
******************************************************************************************
********

Project Title: OETC-114 400kV OHTL Sohar SFZ to SIS GS


Project Notes: Monopole Foundation -MAMP

Calculation Method: Conservative 4CD

******* I N P U T D A T A

Pier Properties

Diameter Distance Concrete Steel


of Top of Pier Strength Yield
above Ground Strength
(m) (m) (MPa) (MPa)
------------------------------------------------
1.20 1.00 35.00 460.00

Soil Properties

Layer Type Thickness Depth at Top Density CU KP PHI


of Layer
(m) (m) (N/m^3) (Pa) (deg)
----------------------------------------------------------------------------------------
1 Clay 1.50 0.00 2100.0
2 Sand 0.50 1.50 2200.0 37.010 71.33
3 Sand 2.00 2.00 2300.0 37.990 71.57
4 Sand 8.00 4.00 2300.0 37.990 71.57

Design (Factored) Loads at Top of Pier

Moment Axial Shear Additional Safety


Load Load Factor Against
Soil Failure
(kN-m) (kN) (kN)
-----------------------------------------------
1530.0 132.4 36.71 1.99

******* R E S U L T S

National Contracting Co. Ltd. Page 1/4


Calculated Pier Properties

Length Weight Pressure Pressure Total


Due To Due To End-Bearing
Axial Load Weight Pressure
(m) (kN) (Pa) (Pa) (Pa)
---------------------------------------------------------------
6.382 170.065 117040.8 150370.4 267411.1

Ultimate Resisting Forces Along Pier

Type Distance of Top of Layer Thickness Density CU KP


Force Arm
to Top of Pier
(m) (m) (N/m^3) (Pa)
(kN) (m)
------------------------------------------------------------------------------------------
---------
Clay 1.00 1.50 2100.0
0.00 1.75
Sand 2.50 0.50 2200.0 37.010
246.49 2.76
Sand 3.00 2.00 2300.0 37.990
1791.61 4.12
Sand 5.00 0.00 2300.0 37.990
3.72 5.00
Sand 5.00 1.38 2300.0 37.990 -
1968.73 5.73

Shear and Moments Along Pier

Distance below Shear Moment

National Contracting Co. Ltd. Page 2/4


Shear Moment
Top of Pier (with Safety Factor) (with Safety Factor) (without Safety
Factor) (without Safety Factor)
(m) (kN) (kN-m)
(kN) (kN-m)
------------------------------------------------------------------------------------------
------------------------------
0.00 73.1 3199.7
36.8 1609.5
0.64 73.1 3246.3
36.8 1633.0
1.28 73.1 3293.0
36.8 1656.4
1.91 73.1 3339.6
36.8 1679.9
2.55 50.6 3385.7
25.4 1703.1
3.19 -290.0 3316.4 -
145.9 1668.2
3.83 -763.3 2987.1 -
384.0 1502.6
4.47 -1364.7 2314.9 -
686.5 1164.4
5.11 -1843.3 1230.8 -
927.2 619.1
5.74 -985.7 321.3 -
495.8 161.6
6.38 0.0 -0.0
0.0 -0.0

Reinforcement and Capacity

Total Reinforcement Usable Usable


Reinforcement Area Axial Moment
Percent Capacity Capacity
(mm^2) (kN) (kN-m)
------------------------------------------------------
0.80 9047.81 132.4 1737.8

Canadian Standard Metric Re-Bars (Select one of the following)

Quantity Name Area Diameter Spacing


(cm^2) (mm) (cm)
-------------------------------------------------
91 #10 1.0 11.3 3.27
46 #15 2.0 16.0 6.46
31 #20 3.0 19.5 9.59
19 #25 5.0 25.2 15.64
13 #30 7.0 29.9 22.86
10 #35 10.0 35.7 29.72
7 #45 15.0 43.7 42.46

UNESCO Metric Re-Bars (Select one of the following)

Quantity Name Area Diameter Spacing


(cm^2) (mm) (cm)
-------------------------------------------------
46 #16 2.01 16.0 6.46
29 #20 3.14 20.0 10.25
24 #22 3.80 22.0 12.38
19 #25 4.91 25.0 15.64
15 #28 6.16 28.0 19.81

National Contracting Co. Ltd. Page 3/4


13 #30 7.07 30.0 22.86
12 #32 8.04 32.0 24.77
8 #40 12.56 40.0 37.15
5 #50 19.63 50.0 59.44

National Contracting Co. Ltd. Page 4/4