MANO DE OBRA
Remuneracin bsica al 31.05.08
OP = 36.59 OF = 32.56 PE = 29.13
Bonificacin Movilidad
6 pasajes/da Lima S/. 1.20 -> 6 x 1.2 = S/. 7.20
Ciudad S/. 0.50 -> 6 x 0.5 = S/. 3.00
(*)Referencia