INPUT (MASUKAN) DATA ANALISA

PEMBANGUNAN JALAN, JEMBATAN DAN BANGUNAN PELENGKAP LAINNYA

KOLOM UNTUK DIISI


DISIAPKAN OLEH :

TGL. / BULAN / TAHUN :

PROPINSI : PAPUA
KODE : ( 82 )

KABUPATEN : KOTA JAYAPURA


KODE : JAYAPURA

INSTANSI :
: JAYAPURA

LOKASI PROYEK : KOTA JAYAPURA - TA. 2008

NAMA PROYEK : PEMBANGUNAN JALAN, JEMBATAN DAN BANGUNAN PELENGKAP LAINNYA


:

PERHITUNGAN ALAT
NILAI KURS HARGA PER DOLAR SAMA DENGAN NILAI (PADA SAAT DIHITUNG) RP. 9,500.00

FAKTOR ANGKUTAN UNTUK LOKASI KOTA JAYAPURA 1.10

PERINCIAN NILAI HARGA SEWA ALAT & HARGA BAHAN YAITU :


NILAI TERSEBUT YAITU : NILAI SEBELUM PAJAK DAN PROFIT (REAL COST) = 1.00 (100 %)

DITAMBAH PROFIT DLL = 0.10 (10 %)

NILAI SETELAH PROFIT = 1.10 (110 %)

DITAMBAH PAJAK PENAMBAHAN NILAI (PPn 10 %) = 0.00 (110 x 0 %)

TOTAL NILAI SEWA ALAT PER JAM DAN BAHAN YAITU = 1.10 (110 %)

KETERANGAN :

# JARAK PROYEK KE LOKASI MATERIAL RATA-RATA DIASUMSIKAN = 10 S/D 50 KM

# HARGA STANDARD PELUMAS DI JAYAPURA = Rp. 20,000.00 (M. 145)

# HARGA STANDARD SOLAR DI JAYAPURA = Rp. 10,000.00 (M. 143)

# HARGA STANDARD BENSIN DI JAYAPURA = Rp. 8,500.00 (M. 144)

# HARGA MATERIAL TIMBUNAN-ROYALTY / KERIKIL GALIAN ROYALTY 100,000.00 (MR. 011)

# HARGA MATERIAL TIMBUNAN-ROYALTY / SIRTU SUNGAI ROYALTY 100,000.00 (MR. 012)

HARGA DIBAWAH INI HANYA UNTUK CHEK DATA SEBAGAI DASAR PERHITUNGAN

PERHITUNGAN HARGA PELUMAS DI SITE /LOKASI = Rp. #VALUE! ( M.185 )

PERHITUNGAN HARGA SOLAR DI SITE /LOKASI = Rp. #VALUE! ( M.183 )

PERHITUNGAN HARGA BENSIN DI SITE /LOKASI = Rp. #VALUE! ( M.184 )

PERHITUNGAN UPAH PEKERJA / BURUH TAK TERAMPIL PER HARI = Rp. 55,000.00 ( L.101 )

PERHITUNGAN UPAH PEKERJA / BURUH TAK TERAMPIL PER JAM = Rp. 7,857.14 ( L.101 )

PERHITUNGAN BIAYA DUMP TRUK PERJAM (SEBELUM PAJAK & PROFIT) = Rp. #VALUE! ( E. 211 )

PERHITUNGAN BIAYA WHEEL LOADER PERJAM (SEBELUM PAJAK & PROFIT) = Rp. #VALUE! ( E. 052 )
REVISI 8 FEB 2005 200.00

REVISI 8 FEB 2005 650.00


DAFTAR TENAGA KERJA DAN BAHAN-BAHAN -PERALATAN
PEKERJAAN : PEMELIHARAAN PERIODIK JALAN KOYA KOSO
LOKASI : KOYA KOSO

NO. URAIAN SATUAN KODE HARGA (Rp.)

TENAGA KERJA
1, MANDOR / KELOMPOK PEKERJA OH. L.061 #VALUE!
2, OPERATOR - Trampil OH. L.081 #VALUE!
3, PEMBANTU OPERATOR OH. L.083 #VALUE!
4, SOPIR -Trampil OH. L.091 #VALUE!
5, PEMBANTU SOPIR OH. L.099 #VALUE!
6, PEKERJA - Kasar OH. L.101 #VALUE!
7, PEKERJA - Trampil OH. L.106 #VALUE!

BAHAN / MATERIAL
1, Batu quarry/Batu besar (ukuran crusher) M3 M.010 #VALUE!
2, Kerikil Sirtu M3 M.011 #VALUE!
3, Kerikil sungai (tidak disaring) M3 M.012 #VALUE!
4, Batu kali (besar) M3 M.013 #VALUE!
5, Batu Split 5 - 7 cm M3 M.022 #VALUE!
6, Batu Split 3 - 5 cm M3 M.023 #VALUE!
7, Batu Split 2 - 3 cm M3 M.024 #VALUE!
8, Batu Split 1 - 2 cm M3 M.025 #VALUE!
9, Bahan timbunan/pengikat pilihan M3 M.040 #VALUE!
10, Agregat halus/pasir bersih (pasir beton) M3 M.041 #VALUE!
11, Kerikil berpasiran alami/Sirtu Gunung M3 M.042 #VALUE!
12, Urugan pilihan M3 M.050 #VALUE!
13, Bitumen (ASPHALT) Kg M.061 #VALUE!
14, Kerosine Liter M.065 #VALUE!
15, Kayu Bakar M3 M.070 #VALUE!
16, Pasir Hol/filler/abu batu M3 M.081 #VALUE!
17, Alat bantu / alat-alat kerja (3 set) @ Set M.170 150,000.00
18, Acuan dari kayu M3 M.180 #VALUE!
19 Solar Liter M.183 #VALUE!
20 Premium/bensin Liter M.184 #VALUE!
21 Minyak pelumas/oli Liter M.185 #VALUE!

PERALATAN
1, Buldozer Jam E.001 #VALUE!
2, Buldozer Jam E.003 #VALUE!
3, Motor grader Jam E.010 #VALUE!
4, Exavator Hidrolik 1.0 m3 Jam E.020 #VALUE!
5, Stone Crusher/Scr 30 ton/h Jam E.031 #VALUE!
6, Stone Crusher/Scr 20 ton/h Jam E.032 #VALUE!
7, Stone Crusher/Scr 10 ton/h Jam E.033 #VALUE!
8, Loader tracked Jam E.051 #VALUE!
9, Loader wheeled Jam E.052 #VALUE!
10, Tractor wheeled Jam E.053 #VALUE!
11, Three Wheel Roller 6-8 ton Jam E.080 #VALUE!
12, Tandem Roller 6-12 ton Jam E.081 #VALUE!
13, Vibrator Roller self p. 6-7 ton Jam E.082 #VALUE!
14, Asphalt sprayer 4000l Jam E.152 #VALUE!
15, Asphalt sprayer 1000l Jam E.153 #VALUE!
16, Asphalt sprayer towed 400 l Jam E.154 #VALUE!
17, Fuel tank truck Jam E.172 #VALUE!
18, Water tank truck Jam E.182 #VALUE!
19, Low loader + tractor Jam E.192 #VALUE!
20, Dump Truck 3,5 ton Jam E.211 268,125.33
21, Dump Truck 5 ton Jam E.212 357,572.00
22, Dump Truck 8 ton Jam E.213 456,500.05
23, Flat bed truck 3,5 ton Jam E.221 #VALUE!

Jayapura 7 April 2008


PT. JAYAKSI

JOHNY GUNAWAN
Direktur
DAFTAR HARGA SATUAN ANALISA "K"
(Untuk Perhitungan Rencana Anggaran Biaya)
PEMBANGUNAN JALAN, JEMBATAN DAN BANGUNAN PELENGKAP LAINNYA
KOTA JAYAPURA - TA. 2008
NO. URAIAN PEKERJAAN KODE HARGA SATUAN SATUAN
ANALISA Rp. ANALISA

1 PENGADAAN KERIKIL GALIAN (TIDAK DISARING) - DGN ALAT K.010 #VALUE! M3


2 PENGADAAN KERIKIL GALIAN (TIDAK DISARING) - DGN BURUH K.011 #VALUE! M3
3 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) - DGN ALAT K.012 #VALUE! M3
4 PENGADAAN KERIKIL SUNGAI (TIDAK DISARING) - DGN BURUH K.013 #VALUE! M3
5 PENGADAAN KERIKIL GALIAN TERSARING - DGN ALAT K.014 #VALUE! M3
6 PENGADAAN KERIKIL SUNGAI TERSARING - DGN ALAT K.016 #VALUE! M3
7 PRODUKSI BATU PECAH TERSARING (BATU SUNGAI) - DGN ALAT K.017 #VALUE! M3
8 PRODUKSI BATU PECAH TERSARING (BATU QUARY) - DGN ALAT K.018 #VALUE! M3
9 PRODUKSI DAN SUPLAI LATASIR - DGN ALAT K.020 #VALUE! TON
10 PRODUKSI DAN SUPLAI LATASIR - DGN BURUH K.020 M #VALUE! TON
11 PRODUKSI DAN SUPLAI LABUTAG - DGN BURUH K.023 #VALUE! TON
12 PRODUKSI DAN SUPLAI LASTON ATAS - DGN ALAT K.026 #VALUE! TON
13 PRODUKSI DAN SUPLAI LATASTON - DGN ALAT K.035 #VALUE! TON
14 MEMBUAT PARIT - DGN ALAT K.111 #VALUE! M3
15 MEMBUAT PASANGAN BATU PADA PARIT - DGN BURUH K.112 #VALUE! M'
16 PAS. BATU PD PARIT DGN PNTP PLAT BERTULANG - DGN BURUH K.113 #VALUE! M1
17 MEMBUAT SALURAN MELINTANG PD BAHU JALAN - DGN BURUH K.114 #VALUE! M3
18 PEMB. PIPA BETON BERTULANG DIA 60 CM x 1 M - DGN BURUH K.115 #VALUE! M'
19 PEMB. PIPA BETON BERTULANG DIA 80 CM x 1 M - DGN BURUH K.116 #VALUE! M'
20 PEMB. PIPA BETON BERTULANG DIA 100 CM x 1 M - DGN BURUH K.117 #VALUE! M'
21 PAS. PIPA BETON TDK. BERTULANG DIA 60 CM x 1 M - DGN BURUH K.121 #VALUE! M'
22 PAS. PIPA BETON BERTULANG DIA 60 CM x 1 M - DGN BURUH K.122 #VALUE! M'
23 PAS. PIPA BETON TDK. BERTULANG DIA 80 CM x 1 M - DGN BURUH K.123 #VALUE! M'
24 PAS. PIPA BETON BERTULANG DIA 80 CM x 1 M - DGN BURUH K.124 #VALUE! M'
25 PAS. PIPA BETON TDK. BERTULANG DIA 100 CM x 1 M - DGN BURUH K.125 #VALUE! M'
26 PAS. PIPA BETON BERTULANG DIA 100 CM x 1 M - DGN BURUH K.126 #VALUE! M'
27 PENGUPASAN & PEMBERSIHAN SEMAK PD DAMIJA - DGN BURUH K.210 #VALUE! ARE
28 PENGUPASAN & PEMBERSIHAN SEMAK PD DAMIJA - DGN ALAT K.211 #VALUE! ARE
29 PENGURUGAN TANAH - DGN BURUH K.220 #VALUE! M3
30 PENGURUGAN TANAH - DGN ALAT K.221 #VALUE! M3
31 GALIAN TANAH UNTUK KONSTRUKSI - DGN BURUH K.224 #VALUE! M3
32 PENIMBUNAN DAN PEMADATAN (UTK. JEMBATAN & GORONG2) DGN K.225 #VALUE! M3
33 PENIMBUNAN BADAN JALAN - DGN ALAT K.311 #VALUE! M3
34 GALIAN TANAH DAN PEMBUANGAN - DGN BURUH K.320 #VALUE! M3
35 GALIAN TANAH DAN PEMBUANGAN - DGN ALAT K.321 #VALUE! M3
36 PENYIAPAN TANAH DASAR - DGN ALAT K.342 #VALUE! ARE
37 PEMBENTUKAN BAHU JALAN KERAS - DGN BURUH K.410 #VALUE! M3
38 PEMBENTUKAN BAHU JALAN KERAS - DGN ALAT K.411 #VALUE! M3
39 MEMOTONG BAHU JALAN TINGGI - DGN BURUH K.420 #VALUE! M3
40 MEMOTONG BAHU JALAN TINGGI - DGN ALAT K.421 #VALUE! M3
41 PEMBERSIHAN SEMAK DLL PD BAHU JALAN - BURUH K.422 #VALUE! ARE
42 PEMBERSIHAN PARIT - DGN BURUH K.424 #VALUE! M'
43 LAPIS PONDASI BAWAH (LPB) KLAS A - DGN ALAT K.510 #VALUE! M3
44 LAPIS PONDASI BAWAH (LPB) KLAS A - DGN BURUH K.511 #VALUE! M3
45 LAPIS PONDASI BAWAH (LPB) KLAS B - DGN ALAT K.512 #VALUE! M3
46 LAPIS PONDASI BAWAH (LPB) KLAS B - DGN BURUH K.513 #VALUE! M3
47 LAPIS PONDASI BAWAH (LPB) KLAS C - DGN ALAT K.514 #VALUE! M3
48 LAPIS PONDASI BAWAH (LPB) KLAS C - DGN BURUH K.515 #VALUE! M3
49 LAPIS PONDASI BAWAH (LPB) KLAS C - DGN ALAT K.517 #VALUE! M3
50 LAPIS PONDASI ATAS (LPA) KLAS A - DGN ALAT K.520 #VALUE! M3
51 LAPIS PONDASI ATAS (LPA) KLAS A - DGN BURUH K.521 #VALUE! M3
52 LAPIS PONDASI ATAS (LPA) KLAS B - DGN ALAT K.522 #VALUE! M3
53 LAPIS PONDASI ATAS (LPA) KLAS B - DGN BURUH K.523 #VALUE! M3
54 PENGHAMPARAN LAPIS PONDASI ATAS ASPAL BETON - DGN ALAT (A.T. K.528 #VALUE! M3
55 LAPEN/PONDASI ATAS MACADAM 7 CM - DGN BURUH K.530 #VALUE! M3
56 PENYIAPAN JAPAT 100 MM - DGN BURUH K.610 #VALUE! M2
57 PENYIAPAN JAPAT 100 MM - DGN ALAT K.611 #VALUE! M2
58 LABURAN ASPAL PASIR (BURAS) - DGN ALAT K.612 #VALUE! M2
59 PEMBTKAN & PENGKERIKILAN ULANG JAPAT 4 CM -DGN ALAT K.613 #VALUE! M2
60 LAPIS PENETRASI (LAPEN) MACADAM 5 CM - DGN BURUH K.618 #VALUE! M2
61 PENGHAMPARAN LATASIR 2 CM - DGN ALAT K.621 #VALUE! M2
62 PENGHAMPARAN LATASIR 2 CM - DGN ALAT K.621 M #VALUE! M2
63 PENGHAMPARAN LASBUTAG 2 CM - DGN BURUH K.631 #VALUE! M2
64 PENGHAMPARAN LASTASTON 3 CM - DGN ALAT (H.R.S) K.636 #VALUE! M2
65 PENGHAMPARAN LATASIR 2 CM - DGN BURUH (Dgn. Minyak Bakar) K.638 #VALUE! M2
66 PENGHAMPARAN LATASIR 2 CM - DGN BURUH (dgn. Kayu Bakar) K.638 M #VALUE! M2
67 KONSTRUKSI PASANGAN BATU - DGN BURUH K.705 #VALUE! M3

Suplement

PENYIAPAN TANAH DASAR (DENGAN BURUH) K.341 #VALUE! M2


PENGUPASAN DAN PERATAAN BADAN JALAN (ASPAL) K.342. M #VALUE! M2

1 GALIAN TANAH UNTUK KONSTRUKSI - DGN BURUH s.d. kedalaman 1 M K.224 M1 #VALUE! M3
2 GALIAN TANAH UNTUK KONSTRUKSI - DGN BURUH s.d. kedalaman 2 M K.224 M2 #VALUE! M3
DAFTAR HARGA SATUAN ANALISA "K" LANJUTAN
(Untuk Perhitungan Rencana Anggaran Biaya)
PEMBANGUNAN JALAN, JEMBATAN DAN BANGUNAN PELENGKAP LAINNYA
KOTA JAYAPURA - TA. 2008
NO. URAIAN PEKERJAAN KODE HARGA SATUAN SATUAN
ANALISA Rp. ANALISA

68 ACUAN UNTUK BETON STRUKTUR - DGN BURUH K.710 #VALUE! M2


69 MEMOTONG, MEMBENGKOK & PAS.TUL. BESI BETON - DGN BRH K.715 #VALUE! KG
70 BETON NON STRUKTUR/RABAT KLAS Bo K.719 #VALUE! M3
71 BETON MASSA KLAS K125 (MESIN MOLLEN 125 LITER) K.720 #VALUE! M3
72 BETON STRUKTUR KLAS K175 (MESIN MOLLEN 125 LITER) K.721 #VALUE! M3
73 BETON STRUKTUR KLAS K225 (MESIN MOLLLEN 125 LITER) K.722 #VALUE! M3
74 BETON MASSA KLAS K125 (MESIN MOLLEN 250 LITER) K.723 #VALUE! M3
75 BETON STRUKTUR KLAS K175 (MESIN MOLLEN 250 LITER) K.724 #VALUE! M3
76 BETON STRUKTUR KLAS K225 (MESIN MOLLLEN 250 LITER) K.725 #VALUE! M3
77 BETON STRUKTUR KLAS K175 (MESIN MOLLEN 500 LITER) K.727 #VALUE! M3
78 BETON STRUKTUR KLAS K225 (MESIN MOLLLEN 500 LITER) K.728 #VALUE! M3
79 BETON STRUKTUR KLAS K275 (MESIN MOLLLEN 500 LITER) K.729 #VALUE! M3
80 BETON STRUKTUR KLAS K350 (MESIN MOLLLEN 500 LITER) K.730 #VALUE! M3
81 BIAYA PEMEL. RUTIN TAHUNAN JL. KERIKIL KLAS 1 - BURUH K.801 #VALUE! KM
82 BIAYA PEMEL. RUTIN TAHUNAN JL. KERIKIL KLAS 2 - BURUH K.802 #VALUE! KM
83 BIAYA PEMEL. RUTIN TAHUNAN JL. ASPAL KLAS 1 - BURUH K.803 #VALUE! KM
84 BIAYA PEMEL. RUTIN TAHUNAN JL. ASPAL KLAS 2 - BURUH K.804 #VALUE! KM
85 BIAYA PEMEL. RUTIN TAHUNAN JL. ASPAL KLAS 3 - BURUH K.805 #VALUE! KM
86 BIAYA PEMEL. RUTIN TAHUNAN JL. ASPAL KLAS 4 - BURUH K.806 #VALUE! KM
87 BRONJONG PENAHAN TANAH - DENGAN BURUH K.815 #VALUE! M3
88 PEMBENTUKAN DAN PERATAAN BAHU JALAN - DGN ALAT K.855 #VALUE! KM
89 PERATAAN KEMBALI JALAN KERIKIL - DGN ALAT K.860 #VALUE! KM
90 PERBAIKAN LUBANG JALAN KERIKIL - DGN BURUH K.865 #VALUE! M2
91 PERBAIKAN LEGOKAN JALAN KERIKIL - DGN BURUH K.870 #VALUE! M2
92 PENGHAMPARAN ULANG JL. KERIKIL PADAT 5 CM - DGN BURUH K.875 #VALUE! M2
93 PENGHAMPARAN ULANG JL. KERIKIL PADAT 5 CM - DGN ALAT K.877 #VALUE! M2
94 PERBAIKAN LUBANG JALAN ASPAL - DGN BURUH K.880 #VALUE! M2
95 PERBAIKAN LEGOKAN JALAN ASPAL - DGN BURUH K.885 #VALUE! M2

HARGA BETON
MUTU BETON K.175
NO (cor beton massa) ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 BETON STRUKTUR K. 175 K. 721 1 x #VALUE! #VALUE! M3
HARGA BETON MASSA PER M3 #VALUE! M3
PPN 10 % #VALUE!
TOTAL HARGA BETON MASA/M3 #VALUE! M3
NO MUTU BETON K.225 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN
(cor beton massa)
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 BETON STRUKTUR K. 225 K. 722 1 x #VALUE! #VALUE! M3
HARGA BETON MASSA PER M3 #VALUE! M3
PPN 10 % #VALUE!
TOTAL HARGA BETON MASA/M3 #VALUE! M3
NO MUTU BETON K.175 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN
MUTU BAJA U.24
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 PEK. PEMBESIAN K. 715 110 x #VALUE! #VALUE! Kg
3 BETON STRUKTUR K. 175 K. 721 1 x #VALUE! #VALUE! M3
HARGA BETON BERTULANG PER M3 #VALUE! M3
PPN 10 % #VALUE!
TOTAL HARGA BETON BERTULANG/M3 #VALUE! M3
NO MUTU BETON K.225 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN
MUTU BAJA U.24
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 PEK. PEMBESIAN K. 715 200 x #VALUE! #VALUE! Kg
3 BETON STRUKTUR K. 225 K. 722 1 x #VALUE! #VALUE! M3
HARGA BETON BERTULANG PER M3 #VALUE! M3

NO MUTU BETON K.175 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN


MUTU BAJA U.24
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 PEK. PEMBESIAN K. 715 110 x #VALUE! #VALUE! Kg
3 BETON STRUKTUR K. 175 K. 724 1 x #VALUE! #VALUE! M3
HARGA BETON BERTULANG PER M3 #VALUE! M3

NO MUTU BETON K.225 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN


MUTU BAJA U.24
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 PEK. PEMBESIAN K. 715 200 x #VALUE! #VALUE! Kg
3 BETON STRUKTUR K. 225 K. 725 1 x #VALUE! #VALUE! M3
HARGA BETON BERTULANG PER M3 #VALUE! M3

NO MUTU BETON K.175 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN


MUTU BAJA U.24
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 PEK. PEMBESIAN K. 715 110 x #VALUE! #VALUE! Kg
3 BETON STRUKTUR K. 175 K. 727 1 x #VALUE! #VALUE! M3
HARGA BETON BERTULANG PER M3 #VALUE! M3

NO MUTU BETON K.225 ANALISA VOLUME HARSAT JUMLAH HARGA SATUAN


MUTU BAJA U.24
1 ACUAN (Bekisting) K. 710 5 x #VALUE! #VALUE! M2
2 PEK. PEMBESIAN K. 715 200 x #VALUE! #VALUE! Kg
3 BETON STRUKTUR K. 225 K. 728 1 x #VALUE! #VALUE! M3
HARGA BETON BERTULANG PER M3 #VALUE! M3
DAFTAR PERHITUNGAN UPAH BURUH DAN PERHITUNGAN PENGADAAN BAHAN/MATERIAL
KOTA JAYAPURA - TA. 2008
N KODE HARGA DI HARGA JARAK TEMPUH KAPASITAS KECEPATAN WAKTU BIAYA WAKTU WAKTU HARGA JUMLAH WAKTU MUAT WAKTU JML. WAKTU JML. BIAYA PROSEN - NILAI PROFIT TOT BIAYA PPN TOT BIAYA
O ~ LOKASI ATAU PER JAM DARI LOKASI ANGKUT RATA-RATA TEMPUH LOADER/ MUAT BONGKAR TENAGA TENAGA DENGAN BONGKAR TEMPUH + BONGKAR TASE PE (10 %) SETELAH + (10 %) SMP LOKASI
M NAMA URAIAN MA DI QUARY TRUK ANGKUT S/D LOKASI TRUK TRUK TRUK PP. DOZER DENGAN DGN KEEP KERJA KERJA TENAGA DGN TENAGA BONGKAR MUAT NYU PROFIT PROYEK
O TE RY (Rp./LT) MATERIAL PROYEK (DLM. LT) PER LOADER PER MANUSIA MANUSIA MUAT (Rp./LT) PENYU - SUTAN (Rp./LT) (Rp./LT) (Rp./LT) (Rp./LT)
R RI (Rp./KG) (DLM. M3) (Rp./KG) SUTAN (Rp./LT) (Rp./M3) (Rp./M3) (Rp./M3) (Rp./M3)
AL (Rp./M3) ( Rp.) ( KM ) (DLM. KG) KM/JAM (JAM) (Rp./JAM) (JAM) ( JAM ) ( JAM ) ORANG ( JAM ) ( JAM ) ( JAM ) (Rp./M3) (%) (Rp./KG) (Rp./KG) (Rp./KG) (Rp./KG) (Rp./KG)
((15+16)x13x14
1 2 3 4 HARGA 6 7 8 (2 x 6)/8 HARGA 11 12 HARGA 14 15 16 9+11+12+15+16 + 19 (19/4)x100 (4+18+20)x10% (4+18+20)+21 21 x 10 % 22 + 23
E.211 E.052 L.101/5 (9+12)x5+10x11))/7

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

TENAGA KERJA / UPAH


1. MANDOR / KELOMPOK PEKERJA L.061 85,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
2. MEKANIK - Trampil L.071 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
3. MEKANIK - Semi Trampil L.072 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
4. KEPALA TUKANG L.073 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
5. TUKANG L.079 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
6. OPERATOR - Trampil L.081 100,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
7. OPERATOR - Semi Trampil L.082 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
8. PEMBANTU OPERATOR L.083 75,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
9. SOPIR -Trampil L.091 85,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
10. SOPIR -Pribadi L.092 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
11. PEMBANTU SOPIR L.099 75,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
12. PEKERJA - Kasar L.101 55,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
13. PEKERJA - Semi Trampil L.103 0.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!
14. PEKERJA - Trampil L.106 65,000.00 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE!

BAHAN / MATERIAL
1. BATU GUNUNG ATAU QUARY M.010 100,000.00 #VALUE! 25.00 2.50 40.00 1.25 - - 0.10 7,857.14 4 0.50 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2. KERIKIL SIRTU MR.011 125,000.00 #VALUE! 25.00 2.50 40.00 1.25 - - 0.10 7,857.14 4 0.40 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3. KERIKIL SUNGAI (TDK DISARING) M.012 100,000.00 #VALUE! 25.00 2.50 40.00 1.25 - - 0.10 7,857.14 4 0.30 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4. BATU KALI M.013 100,000.00 #VALUE! 25.00 2.50 40.00 1.25 - - 0.10 7,857.14 4 0.40 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5. BATU KALI (KECIL DISARING) M.014 - - - - - - - - - - - - - - - - - -
6. BATU PECAH 10 - 15 CM M.020 - - - - - - - - - - - - - - - - - -
7. BATU PECAH 7 - 10 CM M.021 - - - - - - -
8. BATU PECAH 5 - 7 CM M.022 250,000.00 #VALUE! 25.00 2.50 40.00 1.25 #VALUE! 0.08 0.07 - - - - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9. BATU PECAH 3 - 5 CM M.023 400,000.00 #VALUE! 25.00 2.50 40.00 1.25 #VALUE! 0.08 0.07 - - - - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10. BATU PECAH 2 - 3 CM M.024 425,000.00 #VALUE! 25.00 2.50 40.00 1.25 #VALUE! 0.08 0.07 - - - - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11. BATU PECAH 1 - 2 CM M.025 450,000.00 #VALUE! 25.00 2.50 40.00 1.25 #VALUE! 0.08 0.07 - - - - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
12. BATU PECAH 0,5 - 1 CM M.026 - - - - - - - - - - - - - - - - - -
13. GORONG - 2 BETON DIA. 60 CM M.030 0.00 #VALUE! 15.00 3.50 40.00 0.75 - - - 7,857.14 4 0.50 0.50 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
14. GORONG - 2 BETON DIA. 80 CM M.033 0.00 #VALUE! 15.00 3.50 40.00 0.75 - - - 7,857.14 6 0.50 0.50 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
15. GORONG - 2 BETON DIA. 100 CM M.035 0.00 #VALUE! 15.00 3.50 40.00 0.75 - - - 7,857.14 6 0.50 0.50 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
16. BAHAN TIMBUNAN/PENGIKAT PILIHAN M.040 0.00 #VALUE! 10.00 2.50 40.00 0.50 - - 0.07 7,857.14 4 0.50 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
17. PASIR AYAK UNTUK BETON M.041 125,000.00 #VALUE! 25.00 2.50 40.00 1.25 - - 0.07 7,857.14 4 0.50 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
18. KERIKIL BERPASIRAN ALAMI/SIRTU Gu M.042 100,000.00 #VALUE! 16.00 2.50 40.00 0.80 - - 0.07 7,857.14 4 0.50 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
19. URUGAN PILIHAN / KARANG GUNUNG M.050 100,000.00 #VALUE! 10.00 2.50 40.00 0.50 - - 0.10 7,857.14 4 0.15 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
20. ASPAL BITUMEN M.061 8,700.00 #VALUE! 12.00 3,500.00 40.00 0.60 - - - 7,857.14 4 1.14 0.57 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
21. ASPAL BUTON M.062 - - - - - - - - - - - - - - - - - -
22. MINYAK FLUX ( UNTUK EMULSI ) M.063 0.00 #VALUE! 28.00 3,500.00 40.00 1.40 - - - 7,857.14 4 0.36 0.36 #VALUE! #VALUE! 0.50 0.00 #VALUE! #VALUE! #VALUE! #VALUE!
23. MINYAK TANAH M.065 8,710.00 #VALUE! 28.00 3,500.00 40.00 1.40 - - - 7,857.14 4 0.40 0.40 #VALUE! #VALUE! 0.50 43.55 #VALUE! #VALUE! #VALUE! #VALUE!
24. KAYU BAKAR M.070 850,000.00 #VALUE! 5.00 3.50 40.00 0.25 - - - 7,857.14 4 0.50 0.25 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
25. SEMEN PORTLAND (PC)/ZAK M.080 0.00 #VALUE! 12.00 87.50 40.00 0.60 - - - 7,857.14 4 0.60 0.60 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
26. PASIR HOL / FILLER/ABU BATU M.081 0.00 #VALUE! 25.00 2.50 40.00 1.25 - - 0.13 7,857.14 4 0.37 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
27. BATU KAPUR M.082 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
28. CAT JEMBATAN M.090 0.00 #VALUE! 12.00 - 10.00 - - - - 7,857.14 1 - - - - - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
29. BAJA TERALIS M.161 - - - - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
30. KAWAT BRONJONG M.162 0.00 #VALUE! 12.00 3,500.00 35.00 0.69 - - - 7,857.14 4 4.50 1.00 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
31. BAUT BAJA M.163 0.00 #VALUE! - - - - - - - - - - - - - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
32. BESI GALVANIS M.164 0.00 #VALUE! 12.00 139.33 35.00 0.69 - - - 7,857.14 4 0.75 1.00 #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
33. BAJA KONSTRUKSI M.165 0.00 #VALUE! 12.00 3,500.00 35.00 0.69 - - 0.20 7,857.14 4 2.00 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
34. PAKU JEMBATAN M.166 0.00 #VALUE! - - - - - - - 7,857.14 - - - - - - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
35. BAJA TULANGAN/BESI BETON M.167 0.00 #VALUE! 12.00 3,500.00 35.00 0.69 - - 0.20 7,857.14 4 2.00 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
36. ALAT 2 BANTU M.170 150,000.00 - - - - - - - - - - - - - - - - - - - 150,000.00
37. KAYU UNTUK PERANCAH M.180 0.00 #VALUE! 12.00 4.00 40.00 0.60 - - 0.25 7,857.14 4 0.50 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
38. KAYU UTK KONS. JEMBATAN M.181 0.00 #VALUE! 12.00 4.00 40.00 0.60 - - 0.25 7,857.14 4 0.50 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
39. MINYAK DIESEL / SOLAR M.183 10,000.00 #VALUE! 12.00 3,000.00 30.00 0.80 - - - 7,857.14 2 0.60 0.40 #VALUE! #VALUE! 0.25 25.00 #VALUE! #VALUE! #VALUE! #VALUE!
40. BENSIN PREMIUM M.184 8,500.00 #VALUE! 12.00 3,000.00 30.00 0.80 - - - 7,857.14 2 0.60 0.50 #VALUE! #VALUE! 0.50 42.50 #VALUE! #VALUE! #VALUE! #VALUE!
41. MINYAK PELUMAS M.185 20,000.00 #VALUE! 12.00 3,000.00 30.00 0.80 - - - 7,857.14 2 0.75 0.50 #VALUE! #VALUE! 0.15 30.00 #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE!
Aspal (Pelabuhan) per Drum Rp. 1,197,000.00 7,980.00 BESI GALVANIS 25.12
besi beton dia. 12 mm Rp. 7,352.581 3 INCH

#REF! 1.25

1,466.40

HITUNGAN UPAH BURUH DAN PERHITUNGAN PENGADAAN BAHAN/MATERIAL


N KODE HARGA DI HARGA JARAK TEMPUH KAPASITAS KECEPATAN WAKTU BIAYA WAKTU WAKTU HARGA JUMLAH WAKTU MUAT WAKTU JML. WAKTU JML. BIAYA PROSEN - NILAI PROFIT TOT BIAYA PPN TOT BIAYA
O ~ LOKASI ATAU PER JAM DARI LOKASI ANGKUT TRUK RATA-RATA TEMPUH LOADER/ MUAT BONGKAR TENAGA TENAGA DENGAN BONGKAR TEMPUH + BONGKAR TASE PE 0.00 SETELAH + 0.00 SMP LOKASI
M NAMA URAIAN MA DI QUARY TRUK ANGKUT S/D LOKASI (DLM. LT) TRUK TRUK PP. DOZER DENGAN DGN KEEP KERJA KERJA TENAGA DGN TENAGA BONGKAR MUAT NYU PROFIT PROYEK
O TE RY (Rp./LT) MATERIAL PROYEK (DLM. M3) PER LOADER PER MANUSIA MANUSIA MUAT (Rp./LT) PENYU - SUTAN (Rp./LT) (Rp./LT) (Rp./LT) (Rp./LT)
R RI (Rp./KG) ~CRANE (DLM. KG) (Rp./KG) SUTAN (Rp./LT) (Rp./M3) (Rp./M3) (Rp./M3) (Rp./M3)
AL (Rp./M') ( Rp.) ( KM ) (DLM. TON) KM/JAM (JAM) (Rp./JAM) (JAM) ( JAM ) ( JAM ) ORANG ( JAM ) ( JAM ) ( JAM ) (Rp./M3) (%) (Rp./KG) (Rp./KG) (Rp./KG) (Rp./KG) (Rp./KG)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
19. URUGAN PILIHAN M.050 15,000.00 #VALUE! 1.00 2.60 40.00 0.05 - - 0.10 7,857.14 4 0.15 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
43. PIPA BETON DIA. 40 CM / TIANG PANC M. 250,000.00 456,500.05 5.00 8.00 20.00 0.50 - - 0.50 7,857.14 8 1.00 - #VALUE! #VALUE! - #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
44. KAWAT LAS M. 20,000.00 - - - - - - - - - - - - - - - - - - - #VALUE!

10,600.00
62,857.12

60,571.44
75,428.56

61,714.32
61,714.32

50,285.68

42,285.68

#VALUE! 40.00
#VALUE! 40.00
#VALUE! 40.00
#VALUE! 40.00
-
-
(1,047,500.00) 40.00
#VALUE! 40.00
#VALUE! 40.00
#VALUE! 40.00
#VALUE! 40.00
357,500.00 -
375,000.00 40.00
412,500.00 35.00
321,750.00 40.00
337,500.00 40.00
#VALUE! 35.00
-
#VALUE! - 5,333.33
#VALUE! 40.00
40.00
40.00
40.00
40.00
REVISI 3 FEB 2003 - 44,000.00
20.00
20.00
20.00
10.00
40.00
-
10.00
10.00
-
10.00
10.00
30.00
20.00
30.00
-
10.00
10.00
-
30.00
30.00
-
30.00
-
10.00
10.00
10.00

10.00
10.00
20.00
DAFTAR PERHITUNGAN ANALISA BIAYA PERALATAN
HARGA HARGA ALAT UMUR UMUR JUMLAH FAK BIAYA PEMILIKAN BIAYA OPERASI JUMLAH JUMLAH HARGA
KODE ALAT TH. BERJALAN KERJA KERJA JAM TOR SOLAR MAINTNC BIAYA SBL. PROFIT BIAYA PPN SEWA
NO. NAMA PERALATAN HP ALAT TAHUN '91 HARGA ALAT ALAT PER - DEPRESIASI ASURANSI BIAYA MINYAK BENSIN PELUMAS & SPARE BIAYA PROFIT DLL SEBELUM 10 % ALAT
10^3 10^3 (THN) (JAM) TAHUN CRF PEMILIKAN DIESEL PART DLL PPN NIHIL PER JAM
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
HARGA (KURS DOLAR)x TABEL 0,158x 0,158x 0,006x (14) ATAU
(1) (2) (3) (4) THN. 91/92 (5)/Rp. 2000 x (7) (8) (8)/(7) 12,5% 0,9x(6)x(10)/(9) 0,033x(6)/(9) (11)+(12) (3)xM.183 (3)xM.184 (3)xM.185 0,6x(11) (15)+(16) (13)+(18) (19)x10 % (19)+(20) (21)x10 % (21)+(22)
1.10 +(17)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

1. Buldozer 110 E.001 225,533.00 1,178,409.93 10.00 9,600.00 960.00 0.18062 199,541.63 40,507.84 240,049.47 #VALUE! 0.00 #VALUE! 119,724.98 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2. Buldozer 65 E.003 120,698.00 630,647.05 8.00 9,600.00 1,200.00 0.20483 96,881.58 17,342.79 114,224.37 #VALUE! 0.00 #VALUE! 58,128.95 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3. Motor grader 100 E.010 166,782.00 871,435.95 9.00 9,300.00 1,033.33 0.19126 145,164.92 27,829.73 172,994.65 #VALUE! 0.00 #VALUE! 87,098.95 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4. Excavator Hidrolik 1.0 m3 90 E.020 219,450.00 1,146,626.25 9.00 10,080.00 1,120.00 0.19126 176,226.22 33,784.52 210,010.74 #VALUE! 0.00 #VALUE! 105,735.73 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Mini Excavator Hidrolik 1.0 m3 47.6 E.021 105,000.00 548,625.00 3.00 3,990.00 1,330.00 0.41993 155,899.01 13,612.50 169,511.51 #VALUE! 0.00 #VALUE! 93,539.41 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5. Stone Crusher/Scr 30 ton/h 185 E.031 306,446.00 1,601,180.35 12.00 12,000.00 1,000.00 0.16519 238,049.08 52,838.95 290,888.04 #VALUE! 0.00 #VALUE! 142,829.45 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6. Stone Crusher/Scr 20 ton/h 95 E.032 236,555.00 1,235,999.88 12.00 15,000.00 1,250.00 0.16519 147,005.87 32,630.40 179,636.27 #VALUE! 0.00 #VALUE! 88,203.52 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
7. Stone Crusher/Scr 10 ton/h 15 E.033 129,030.00 674,181.75 12.00 12,000.00 1,000.00 0.16519 100,231.27 22,248.00 122,479.27 #VALUE! 0.00 #VALUE! 60,138.76 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8. Butas Crusher 15 E.039 25,000.00 130,625.00 8.00 12,000.00 1,500.00 0.20483 16,053.55 2,873.75 18,927.30 #VALUE! 0.00 #VALUE! 9,632.13 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9. Screening plant 80 E.040 107,525.00 561,818.13 8.00 12,000.00 1,500.00 0.20483 69,046.32 12,360.00 81,406.32 #VALUE! 0.00 #VALUE! 41,427.79 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10. Loader tracked 135 E.051 160,423.00 838,210.18 8.00 11,100.00 1,387.50 0.20483 111,366.87 19,935.81 131,302.68 #VALUE! 0.00 #VALUE! 66,820.12 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11. Loader wheeled 115 E.052 158,698.00 829,197.05 11.00 11,600.00 1,054.55 0.17211 121,798.25 25,948.15 147,746.40 #VALUE! 0.00 #VALUE! 73,078.95 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
12. Tractor wheeled 60 E.053 42,937.00 224,345.83 10.00 15,000.00 1,500.00 0.18062 24,312.81 4,935.61 29,248.41 #VALUE! 0.00 #VALUE! 14,587.68 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
13. Three Wheel Roller 6-8 ton 37 E.080 100,000.00 522,500.00 7.00 6,860.00 980.00 0.22260 106,813.93 17,594.39 124,408.32 #VALUE! 0.00 #VALUE! 64,088.36 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
14. Tandem Roller 6-12 ton 95 E.081 240,000.00 1,254,000.00 7.00 7,840.00 1,120.00 0.22260 224,309.25 36,948.21 261,257.46 #VALUE! 0.00 #VALUE! 134,585.55 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
15. Vibrator Roller self p. 6-7 ton 51 E.082 107,892.00 563,735.70 7.00 7,350.00 1,050.00 0.22260 107,560.77 17,717.41 125,278.18 #VALUE! 0.00 #VALUE! 64,536.46 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
16. Roller Towed Vibro 2-3 ton 6 E.083 53,946.00 281,867.85 8.00 12,000.00 1,500.00 0.20483 34,641.00 6,201.09 40,842.09 #VALUE! 0.00 #VALUE! 20,784.60 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
17. Pneumatic Tire Roller 8-15 ton 95 E.084 215,259.00 1,124,728.28 10.00 9,000.00 900.00 0.18062 203,148.42 41,240.04 244,388.46 #VALUE! 0.00 #VALUE! 121,889.05 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
18. Vibrator roller ped. 1 ton 12 E.087 22,503.00 117,578.18 6.00 7,200.00 1,200.00 0.24668 21,753.14 3,233.40 24,986.54 #VALUE! 0.00 #VALUE! 13,051.88 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
19. Vibro plate tamper 4 E.088 3,517.00 18,376.33 6.00 4,500.00 750.00 0.24668 5,439.69 808.56 6,248.24 0.00 #VALUE! #VALUE! 3,263.81 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
20. Concrete vibrator 4 E.089 2,195.00 11,468.88 10.00 2,000.00 200.00 0.18062 9,321.79 1,892.36 11,214.15 0.00 #VALUE! #VALUE! 5,593.07 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
21. Stab/pulver mixer attachmant E.100 9,000.00 47,025.00 5.00 3,000.00 600.00 0.28085 19,810.46 2,586.38 22,396.83 #VALUE! 0.00 #VALUE! 11,886.27 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
22. Chip spreader 3 ton 8 E.130 8,587.00 44,867.08 6.00 3,600.00 600.00 0.24668 16,601.72 2,467.69 19,069.40 #VALUE! 0.00 #VALUE! 9,961.03 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
23. Asphalt sprayer 4000l 68 E.152 120,363.00 628,896.68 11.00 9,000.00 818.18 0.17211 119,063.35 25,365.50 144,428.85 #VALUE! 0.00 #VALUE! 71,438.01 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
24. Asphalt sprayer 1000l 25 E.153 44,887.00 234,534.58 11.00 9,000.00 818.18 0.17211 44,402.32 9,459.56 53,861.88 #VALUE! 0.00 #VALUE! 26,641.39 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
25. Asphalt sprayer towed 400 l 5 E.154 10,305.00 53,843.63 11.00 4,500.00 409.09 0.17211 20,387.46 4,343.39 24,730.84 0.00 #VALUE! #VALUE! 12,232.47 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
26. Asphalt mixing plant 30 ton/h 200 E.155 547,708.00 2,861,774.30 11.00 4,300.00 390.91 0.17211 1,133,987.38 241,586.99 1,375,574.38 #VALUE! 0.00 #VALUE! 680,392.43 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
27. Asphalt mixing plant 10 ton/h 75 E.156 284,808.00 1,488,121.80 10.00 4,000.00 400.00 0.20483 685,826.97 122,770.05 808,597.02 #VALUE! 0.00 #VALUE! 411,496.18 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
28. Asphalt finisher 1,82 m 30 E.157 219,450.00 1,146,626.25 10.00 11,500.00 1,150.00 0.20483 183,806.18 32,903.19 216,709.37 #VALUE! 0.00 #VALUE! 110,283.71 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
29. Fuel tank truck 115 E.172 31,000.00 161,975.00 10.00 5,600.00 560.00 0.18062 47,018.45 9,544.96 56,563.41 #VALUE! 0.00 #VALUE! 28,211.07 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
30. Water tank truck 115 E.182 75,000.00 391,875.00 7.00 8,000.00 1,142.86 0.22260 68,694.71 11,315.39 80,010.10 #VALUE! 0.00 #VALUE! 41,216.82 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
31. Trailer towed 1 ton 18 E.191 7,506.00 39,218.85 12.00 9,000.00 750.00 0.16519 7,774.27 1,725.63 9,499.90 #VALUE! 0.00 #VALUE! 4,664.56 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
32. Low loader + tractor 175 E.192 108,822.00 568,594.95 10.00 7,500.00 750.00 0.18062 123,239.54 25,018.18 148,257.72 #VALUE! 0.00 #VALUE! 73,943.73 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
33. Dump Truck 3,5 ton 115 E.211 38,000.00 198,550.00 5.00 9,000.00 1,800.00 0.28085 27,881.38 3,640.08 31,521.47 181,700.00 0.00 13,800.00 16,728.83 212,228.83 243,750.30 24,375.03 268,125.33 0.00 268,125.33
34. Dump Truck 5 ton 145 E.212 55,000.00 287,375.00 5.00 8,000.00 1,600.00 0.28085 45,398.96 5,927.11 51,326.07 229,100.00 0.00 17,400.00 27,239.38 273,739.38 325,065.45 32,506.55 357,572.00 0.00 357,572.00
35. Dump Truck 8 ton 177 E.213 75,000.00 391,875.00 6.00 8,000.00 1,333.33 0.24668 65,250.71 9,698.91 74,949.62 279,660.00 0.00 21,240.00 39,150.43 340,050.43 415,000.05 41,500.00 456,500.05 0.00 456,500.05
36. Flat bed truck 3,5 ton 100 E.221 39,000.00 203,775.00 5.00 9,000.00 1,800.00 0.28085 28,615.10 3,735.88 32,350.98 158,000.00 0.00 #VALUE! 17,169.06 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
37. Pickup truck 61 E.222 38,157.00 199,370.33 11.00 9,000.00 818.18 0.17211 37,744.99 8,041.27 45,786.26 #VALUE! 0.00 #VALUE! 22,646.99 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
38. Jeep 4 wheel drive 61 E.223 38,333.00 200,289.93 11.00 9,000.00 818.18 0.17211 37,919.09 8,078.36 45,997.45 0.00 86,589.50 #VALUE! 22,751.45 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
39. Flat bed truck 5 ton 145 E.224 50,000.00 261,250.00 10.00 7,800.00 780.00 0.18062 54,446.51 11,052.88 65,499.39 #VALUE! 0.00 #VALUE! 32,667.91 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
40. Flat bed truck with crane 148 E.225 69,774.00 364,569.15 10.00 9,000.00 900.00 0.18062 65,848.48 13,367.54 79,216.02 #VALUE! 0.00 #VALUE! 39,509.09 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
41. Motor cycle 125 cc 14 E.226 2,398.00 12,529.55 12.00 6,000.00 500.00 0.16519 3,725.56 826.95 4,552.51 0.00 #VALUE! #VALUE! 2,235.34 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
42. Mobile workshop 5 ton 145 E.231 108,822.00 568,594.95 8.00 9,600.00 1,200.00 0.20483 87,348.98 15,636.36 102,985.34 #VALUE! 0.00 #VALUE! 52,409.39 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
43. Lube truck 5 ton 145 E.232 56,691.00 296,210.48 8.00 9,600.00 1,200.00 0.20483 45,504.59 8,145.79 53,650.38 #VALUE! 0.00 #VALUE! 27,302.76 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
44. Concrete mixer 0,125 m3 6 E.251 2,796.00 14,609.10 10.00 6,000.00 600.00 0.18062 3,958.04 803.50 4,761.54 0.00 #VALUE! #VALUE! 2,374.83 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
45. Concrete mixer 0,25 m3 10 E.252 12,903.00 67,418.18 10.00 7,500.00 750.00 0.18062 14,612.48 2,966.40 17,578.88 #VALUE! 0.00 #VALUE! 8,767.49 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
46. Concrete mixer 0,5 m3 20 E.253 25,806.00 134,836.35 10.00 7,500.00 750.00 0.18062 29,224.97 5,932.80 35,157.77 #VALUE! 0.00 #VALUE! 17,534.98 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
47. Rock breaker Excavator 90 E.281 219,400.00 1,146,365.00 11.00 7,500.00 681.82 0.17211 260,437.16 55,484.07 315,921.23 #VALUE! 0.00 #VALUE! 156,262.30 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
48. Air compressor 210 m3/h 35 E.301 21,908.00 114,469.30 10.00 6,000.00 600.00 0.18062 31,013.17 6,295.81 37,308.98 #VALUE! 0.00 #VALUE! 18,607.90 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
49. Generator 3-5 kVA 10 E.311 3,884.00 20,293.90 8.00 4,800.00 600.00 0.20483 6,235.20 1,116.16 7,351.36 #VALUE! 0.00 #VALUE! 3,741.12 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
50. Generator las 10 E.311.a 3,884.00 20,293.90 12.00 4,800.00 400.00 0.16519 7,542.79 1,674.25 9,217.03 #VALUE! 0.00 #VALUE! 4,525.67 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
51. Water Pump (5cm) 30 m3/hr 8 E.341 1,720.00 8,987.00 4.00 3,000.00 750.00 0.33271 3,588.08 395.43 3,983.51 0.00 #VALUE! #VALUE! 2,152.85 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
52. Water Pump (10cm) 40 m3/hr 10 E.342 2,151.00 11,238.98 4.00 3,000.00 750.00 0.33271 4,487.18 494.51 4,981.70 0.00 #VALUE! #VALUE! 2,692.31 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
53. Jack hammer equipment etc 10 E.351 2,633.00 13,757.43 9.00 3,750.00 416.67 0.19126 5,683.49 1,089.59 6,773.08 0.00 #VALUE! #VALUE! 3,410.09 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
54. Tractor equipment etc 20 E.401 21,835.00 114,087.88 5.00 3,000.00 600.00 0.28085 48,062.37 6,274.83 54,337.20 #VALUE! 0.00 #VALUE! 28,837.42 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
55. Diesel hammer / Pile driver 120 E.402 385,000.00 2,011,625.00 6.00 10,800.00 1,800.00 0.24668 248,113.83 36,879.79 284,993.62 #VALUE! 0.00 #VALUE! 148,868.30 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
56. Crane, 10 - 15 ton 100 E.403 275,000.00 1,436,875.00 12.00 10,800.00 900.00 0.16519 237,357.38 52,685.42 290,042.80 #VALUE! 0.00 #VALUE! 142,414.43 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
MADYA Konsultan
ANALISA HARGA SATUAN KODE
JAYAPURA PENGADAAN KERIKIL GALIAN (TDK DISARING) K.010
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 . Buldozer menggusur lapis penutup dan me- 1. Menggunakan alat berat 360 m3/hari
nyiapkan kerikil galian untuk wheel loader. 2. Kapasitas wheel loader 60 m3/jam
2. Wheel Loader memuati dump truk 3. Wheel Loader memuati 18 truk/jam (6 jam kerja/hari)
3. Dumptruk mengangkut kerikil galian ke lo - 4. 50 cm lapisan penutup dibuang untuk mendapatkan kerikil galian
kasi pekerjaan atau penimbunan. 5. Jumlah lapis penutup 1 m3 per 8 m3 kerikil galian
4. Buldozer menghampar lapis penutup dan 6. Sumber material tersedia bebas /dengan ganti rugi royalti yang berlaku
menyiapkan area untuk tanam ulang 7. Pengadaan /penimbunan material 1 trip/jam/truk, 10 km dari Sumber
8. Volume yang diukur berdasarkan 5ton lepas /truk (Bj=1,6)
9. Umur alat bantu rata-rata 1 bulan /orang /set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #VALUE! #VALUE!
E Supir terampil 18 1.00 L.091 18 #VALUE! #VALUE!
R Pembantu supir 18 1.00 L.099 18 #VALUE! #VALUE!
J Buruh tak terlatih 8.00 1.00 L.101 8.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Material timbunan-Royalty M3 MR.011 360.00 100,000.00 36,000,000.0


A Alat bantu (set @ 3 alat) set M.170 0.32 150,000.00 48,000.0
T
E
R
I
A
L

MATERIAL 36,048,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 2.00 1.00 E.001 12.00 #VALUE! #VALUE!


E Wheel Loader 1.00 1.00 E.052 6.00 #VALUE! #VALUE!
R Dump truk 18.00 1.00 E.212 108.00 357,572.00 38,617,775.6
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 360.0 SATUAN : M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
JAYAPURA PENGADAAN KERIKIL GALIAN (TDK DISARING) K.011
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Membuang lapisan penutup dengan tenaga 1 Menggunakan tenaga manusia (60 m3/hari) dalam dua kelompok
manusia. 2 50 cm lapisan penutup dibuang untuk mendapatkan kerikil
2 Menggali kerikil galian dan memuat ke truk 3 Jumlah lapis penutup 1 m3 per 8 m3 kerikil galian
dengan tenaga manusia. 4 Sumber material tersedia bebas/dengan ganti rugi yang berlaku terhadap pemilik
3 Truk mengangkut kerikil kelokasi pekerjaan material
penimbunan 5 Waktu muat 12 min/10 orang/truk; waktu bongkar 5 min/5 orang/truk
4 Membongkar muatan truk dengan tenaga 6 Jarak angkut 10 Km, 72 menit/trip, 5 trip/hari/truk
manusia. 7 Volume yang diukur berdasarkan 3,5 ton lepas/truk (BJ=1,6)
8 Umur alat bantu rata - rata 1 bulan/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Supir terampil 5.00 1.00 L.091 5.00 #VALUE! #VALUE!
K Pembantu supir 5.00 1.00 L.099 5.00 #VALUE! #VALUE!
E Buruh tak terampil 68.00 1.00 L.101 68.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil-Royalty M3 MR.011 60.00 100,000.00 6,000,000.00


A Alat bantu (set @ 3 alat) set M.170 2.72 150,000.00 408,000.00
T
E
R
I
A
L

MATERIAL 6,408,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk bak terbuka 5.00 1.00 E.221 30.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN : M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
JAYAPURA PENGADAAN KERIKIL SUNGAI (TDK DISARING) / KARANG K.012
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Buldozer membuat timbunan kerikil di tepi - 1 Menggunakan alat berat (360 m3/hari)
sungai 2 Kapasitas wheel loader 60 m3/jam
2 Wheel loader memuati dumptruk dari tim - 3 Wheel Loader memuati 18 truk/jam (6 jam kerja/hari)
bunan. 4 Material diambil dari tempat penimbunan dengan ganti rugi yang berlaku
3 Dumptruk mengangkut kerikil sungai tidak 5 Pengadaan /penimbunan material 1 trip/jam/truk, 10 Km dari Waena
disaring ke lokasi pekerjaan/penimbunan. 6 Volume yang diukur berdasarkan 5 ton lepas/truk (BJ= 1,6)
7 Umur alat bantu rata - rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #VALUE! #VALUE!
E Supir terampil 18.00 1.00 L.091 18.00 #VALUE! #VALUE!
R Pembantu supir 18.00 1.00 L.099 18.00 #VALUE! #VALUE!
J Buruh tak terlatih 8.00 1.00 L.101 8.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Material timbunan-Royalty M3 MR.012 360.00 100,000.00 36,000,000.0


A Alat bantu (set @ 3 alat) set M.170 0.32 150,000.00 48,000.0
T
E
R
I
A
L

MATERIAL 36,048,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 2.00 1 E.001 9.0 #VALUE! #VALUE!


E Wheel Loader 1.00 1 E.052 6.0 #VALUE! #VALUE!
R Dump truk 18 1 E.212 108.0 357,572.00 38,617,775.61
A
L
A
T
A
N

PERLATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 360.0 SATUAN : M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
JAYAPURA PENGADAAN KERIKIL SUNGAI (TDK DISARING) K.013
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Menggali kerikil sungai dan memuat ke truk 1 Menggunakan tenaga manusia (60 m3/hari) dalam dua kelompok
dengan tenaga manusia disungai. 2 Sumber material tersedia bebas/dengan ganti rugi royalti yang berlaku
2 Truk mengangkut kerikil sungai kelokasi - 3 Muatan 5 truk perjam (3 m3/orang/hari)
pekerjaan / penimbunan. 4 Waktu muat 12 menit/ 10 orang/truk ; waktu bongkar 5 menit /5 orang/truk
3 Membongkar muatan truk dengan tenaga 5 Dua tim @ 5 orang membongkar truk
manusia 6 Jarak angkut 10 Km, 72 menit per trip, 5 trip/hari/truk
7 Volume yang diukur berdasarkan 3,5 ton lepas/truk (BJ=1,6)
8 Umur alat bantu rata - rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Supir terampil 5 1 L.091 5.00 #VALUE! #VALUE!
K Pembantu supir 5 1 L.099 5.00 #VALUE! #VALUE!
E Buruh tak terampil 60.00 1.00 L.101 60.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Sirtu sungai - Royalty m3 MR.042 60.00 100,000.00 6,000,000.00


A Alat bantu (set @ 3 alat) set M.170 2.40 150,000.00 360,000.00
T
E
R
I
A
L

MATERIAL 6,360,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk Bak Terbuka 5 1 E.221 30.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN : M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
JAYAPURA PENGADAAN KERIKIL GALIAN TERSARING K.014
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Buldoser menggusur lapis penutup dan 1 Menggunakan alat berat (60 m3/hari) dengan 6 jam kerja/hari
menimbun stok untuk loader. 2 50 cm lapisan penutup dibuang untuk mendapatkan kerikil
2 Dumptruk memuat dan mengangkut kerikil 3 Jumlah lapis penutup 1 m3 per 8m3 kerikil galian
galian ketempat saringan 4 Material diambil dari tempat penimbunan dengan ganti rugi yang berlaku
3 Kerikil disaring sesuai ukuran 5 Kapasitas penyaringan 20 ton/jam, dengan surplus 25 %
4 Loader memuati dumptruk 6 Pengadaan/penimbunan material 1 trip/jam/truk, 10 km dari sumber
5 Dumptruk mengangkut kerikil galian yang 7 Tiga truk, mengangkut kelokasi dan satu truk mensuplai tempat saringan
disaring ke lokasi pekerjaan/penimbunan 8 Volume yang diukur berdasarkan 5 ton lepas/truk (BJ=1,6)
9 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #VALUE! #VALUE!
E Supir terampil 4 1 L.091 4 #VALUE! #VALUE!
R Pembantu supir 4 1 L.099 4 #VALUE! #VALUE!
J Buruh tak terlatih 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
A Buruh terampil 2.00 1.00 L.106 2.00 #VALUE! #VALUE!

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil galian - Royalty m3 MR.011 80.00 100,000.00 8,000,000.00


A Alat bantu (set @ 3 alat) set M.170 0.20 150,000.00 30,000.00
T
E
R
I
A
L

MATERIAL 8,030,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Bulldozer 1.00 1 E.001 3.0 #VALUE! #VALUE!


E Mesin penyaring 1.00 1 E.040 6.0 #VALUE! #VALUE!
R Wheel loader 1.00 1 E.052 5.0 #VALUE! #VALUE!
A Dump truk 4 1 E.212 24.0 357,572.00 8,581,727.91
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN : M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PEGADAAN KERIKIL SUNGAI TERSARING K.016
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Buldozer menimbun stok di sungai untuk loade 1 Menggunakan alat berat (60 m3/hari)
2 Dumptruk memuat dan mengangkut kerikil 2 Loader memuati bergantian diantara truk pengangkut dan truk pengisi tempat
sungai ketempat saringan saringan
3 Kerikil disaring sesuai ukuran 3 Material diambil dari tempat penimbunan dengan ganti rugi yang berlaku
4 Loader memuati dump truk 4 Volume yang diukur berdasarkan 5 ton lepas /truk (BJ=1,6)
5 Dump truk mengangkut kerikil sungai yang 5 Suplai ke lokasi jarak 10 km dari sumber; 1 trip/jam/truk (dengan 3 truk)
disaring ke lokasi pekerjaan/penimbunan 6 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
7 Kapasitas saringan rata-rata 20 ton/jam, dengan ditambah bagian halus 20 %
dengan dibuang ovesize 25 %

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Operator semi terampil 1.00 1.00 L.082 1.00 #VALUE! #VALUE!
E Supir terampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R Buruh tak terlatih 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
J Buruh semi terampil 4.00 1.00 L.103 4.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
T O TAL HAR GA B IAYA SUB TOTAL
MAT E R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai - Royalty m3 MR.012 67.50 100,000.00 6,750,000.00


A Ganti rugi Kerikil sungai - Royalty m3 MR.042 12.50 100,000.00 1,250,000.00
T Alat bantu (set @ 3 alat) set M.170 0.20 100,000.00 20,000.00
E
R
I
A
L

MATERIAL 8,020,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 1.00 1.00 E.001 3.00 #VALUE! #VALUE!


E Mesin penyaring 1.00 1.00 E.040 3.00 #VALUE! #VALUE!
R Wheel Loader 1.00 1.00 E.052 5.00 #VALUE! #VALUE!
A Dump truk 4.00 1.00 E.212 24.00 357,572.00 8,581,727.91
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN : M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PRODUKSI BATU PECAH TERSARING K.017
MEMPERGUNAKAN BATU SUNGAI (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Buldozer membuat timbunan di sungai untuk 1 Menggunakan alat berat (60 m3/hari), material diolah tiga kali
loader 2 Batu diambil dari sungai & diangkut kesaringan pertama (30 t/j)
2 Loader memuat ke dump truk yang 3 Ex saringan1:oversize 25 %(7,5t/j) kepemecah1 & 75 %(22,5t/j) ke saringan2
membongkar ke saringan 1 4 Ex saringan2:7,5t/j kepemecah1 7,5t/j kepemecah2 & 7,5t/j terbuang
3 Batu oversize ke pemecah 1 5 Ex saringan1:7,5t/j kepemecah2 & 7,5t/j untuk dikirim
4 Hasil pecahan batu dicampur ulang dengan 6 Ex saringan2:15t/j untuk dikirim
hasil saringan untuk pemecah 2 7 Volume yang diukur berdasarkan 5 ton lepas /truk (BJ=1,6)
5 Dump truk angkut batu pecah tersaring 8 Jarak kirim dari sumber bahan kelokasi pekerjaan 10 km, 1 trip/jam/truk

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Operator semi terampil 2.00 1.00 L.082 2.00 #VALUE! #VALUE!
E Supir terampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R Buruh tak terampil 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
J Buruh semi terampil 4.00 1.00 L.103 4.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai - Royalti M3 MR.012 80.00 100,000.00 8,000,000.00


A Alat bantu (set @ 3 alat) set M.170 0.20 150,000.00 30,000.00
T
E
R
I
A
L

MATERIAL 8,030,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 1.00 1.00 E.001 6.00 #VALUE! #VALUE!


E Pemecah batu 1.00 1.00 E.031 6.00 #VALUE! #VALUE!
R Wheel Loader 1.00 1.00 E.052 6.00 #VALUE! #VALUE!
A Dump truk 4.00 1.00 E.212 24.00 357,572.00 8,581,727.91
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
JAYAPURA PRODUKSI BATU PECAH TERSARING K.018
MEMPERGUNAKAN BATU QUARY (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material ditimbun pada jarak maks. 10 km 1 Menggunakan alat berat (60 m3/hari), bahan diolah tiga kali
dari lokasi 2 Batu diambil dari quarry & diangkut kesaringan pertama (25t/j)
2 Loader memuat ke dumptruk yang membong 3 Ex saringan1:2t/j) kepemecah1,21t/j kesaringan 2 & 2t/j terbuang
kar kesaringan1 4 Ex saringan2:19,2t/j kepemecah1 & 1,8t/j kepemecah2
3 Batu oversize kepemecah 1 5 Ex saringan1:12,2t/j kepemecah2, 7,2t/j utk dikirim & 1,8t/j terbuang
4 Hasil pecahan batu dicampur ulang dengan 6 Ex saringan2:14t/j untuk dikirim
hasil saringan untuk pemecah 2 7 Volume yang diukur berdasarkan 5 ton lepas /truk (BJ=1,55)
5 Dumptruk angkut batu pecah tersaring 8 Jarak kirim dari sumber bahan ke lokasi pekerjaan 10 km, 1 trip/jam/truk
9 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 4.00 1.00 L.081 4.00 #VALUE! #VALUE!
K
E Supir terampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R
J Buruh tak terampil 5.00 1.00 L.101 5.00 #VALUE! #VALUE!
A Buruh terampil 4.00 1.00 L.106 4.00 0 0

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Batu quarry - Royalti m3 MR.010 70.00 100,000.00 7,000,000.00


A Alat bantu (set @ 3 alat) set M.170 0.20 150,000.00 30,000.00
T
E
R
I
A
L

MATERIAL 7,030,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 1.00 1.00 E.001 6.00 #VALUE! #VALUE!


E Pemecah batu 1.00 1.00 E.031 4.00 #VALUE! #VALUE!
R Wheel Loader 1.00 1.00 E.052 6.00 #VALUE! #VALUE!
A Dump truk 4.00 1.00 E.212 24.00 357,572.0 8,581,727.9
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

SATUAN = 60.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
JAYAPURA LAPIS TIPIS ASPAL PASIR (LATASIR) K.020
PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Semua material dikirim pemasok 1 LATASIR dibuat di AMP produksi 100 ton/hari
2 Loader menjaga tetap penuh 2 Aspal dipanaskan lebih dahulu agar sudah siap saat dimulai
3 Produksi AMP 100 ton /hari 3 Biaya produksi termasuk pengangkutan s/d 10 km dari AMP
4 Dumptruk dimuati dan ditutup terpal untuk 4 Produksi dimuat ke dalam dump truk 5 ton dan dikirim ke tempat pekerjaan
mempertahankan suhu 5 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
5 Dump truk membongkar langsung ke dalam 6 Spek.B.M.No. 12/PT/B/1983 dan revisi Spesifikasi Umum Maret 1989-Buku3
mesin penghampar aspal

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K
E Supir terampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R
J Buruh tak terlatih 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
A Buruh terlatih 5.00 1.00 L.106 5.00 0 0

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 45.00 #VALUE! #VALUE!


A Aspal kg M.061 9,000.00 #VALUE! #VALUE!
T Semen 40 kg M.080 98.00 #VALUE! #VALUE!
E Kapur/Pasir Hol/filler m3 M.081 6.00 #VALUE! #VALUE!
R Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
I Batu sungai pecah tersaring m3 K.017 1.50 #VALUE! #VALUE!
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 1.00 1.00 E.052 5.00 #VALUE! #VALUE!


E Mesin penyampur aspal 1.00 1.00 E.155 5.00 #VALUE! #VALUE!
R Dump truk 5 ton/120 HP 4.00 1.00 E.212 24.00 357,572.00 8,581,727.91
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 100.0 SATUAN = tonne HARGA SATUAN Rp. #VALUE! per tonne
ANALISA HARGA SATUAN KODE
LAPIS TIPIS ASPAL PASIR (LATASIR) K.020.M
PRODUKSI DAN SUPLAI (MENGGUNAKAN TENAGA BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Semua material dikirim pemasok 1 Latasir dibuat secara manual
2 Produksi Latasir dilaksanakan secara manual 2 Aspal dipanaskan lebih dahulu agar sudah siap saat dimulai
3 Dumptruk dimuati dan ditutup terpal untuk 3 Biaya produksi termasuk pengangkutan s/d 10 km dari tempat pembuatan
mempertahankan suhu 4 Produksi dimuat ke dalam dump truk 5 ton dan dikirim ke tempat pekerjaan
4 Dumptruk membongkar langsung kedalam 5 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
mesin penghampar aspal 6 Spek.B.M.No. 12/PT/B/1983 dan revisi Spesifikasi Umum Maret 1989-Buku3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 3.00 1.00 L.061 3.00 #VALUE! #VALUE!


E Supir terampil 6.00 1.00 L.091 6.00 #VALUE! #VALUE!
K Buruh tak terlatih 75.00 1.00 L.101 75.00 #VALUE! #VALUE!
E Buruh semi terlatih 6.00 1.00 L.103 6.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 45.00 #VALUE! #VALUE!


A Aspal kg M.061 9,000.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 15.00 150,000.00 2,250,000.00
E Kayu bakar m3 M.070 60.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Dump truk 5 ton/120 HP 4.00 1.00 E.212 24.00 357,572.00 8,581,727.91


E
R
A
T
A
N

PERALATAN 8,581,727.91
TOTAL (Rp.) #VALUE!

VOLUME = 100.0 SATUAN = Tonne HARGA SATUAN Rp. #VALUE! per tonne
ANALISA HARGA SATUAN KODE
LAPIS TIPIS ASBUTON DAN AGREGAT HALUS (LASBUTAG) K.023
PRODUKSI DAN SUPLAI (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Semua material dikirim pemasok 1 Menggunakan tenaga manusia 30ton/harihari
2 Pengaduk diisi asbuton tersaring + minyak 2 Kapasitas mixer 6 ton/jam bekerja 5 jam / hari
flux secara manual 3 Pengisian ke bin agar tetap penuh dengan sekop tangan
3 Timbunan produksi ditutup terpal agar tetap - 4 Asbuton tidak baik (kadar air dll) dan terbuang 12,5 %
kering sampai dipakai 5 Material tersaring dicampur dgn minyak flux/aspal/bunker dipengaduk
4 Dumptruk didisi secara manual dan me - (0,4m3/campuran) selama 6 menit (campuran/jam)
ngangkut kelokasi pekerjaan 6 hasil campuran disimpan tertutup terpal selama 3 s/d 5 hari
5 Muatan dibongkar secara manual 7 Truk pengangkut s/d 10km dari depot dan dibongkar secara manual
8 Spec. B.M.No.15/PT/1989 dan revisi Spesifikasi umum Maret 1989 buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 0 0
E Supir terampil 2.00 1.00 L.091 2.00 #VALUE! #VALUE!
R Pembantu supir 2.00 1.00 L.099 2.00 0 0
J Buruh tak terlatih 25.00 1.00 L.101 25.00 #VALUE! #VALUE!
A Buruh terlatih 2.00 1.00 L.106 2.00 0 0

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 2.00 #VALUE! #VALUE!


A Aspal kg M.061 460.00 #VALUE! #VALUE!
T Asbuton tonne M.062 12.00 0.00 0.00
E Minyak flux lt M.063 630.00 #VALUE! #VALUE!
R Minyak bakar lt M.065 210.00 #VALUE! #VALUE!
I Kapur/Pasir hol/filler m3 M.081 0.33 #VALUE! #VALUE!
A Alat bantu (set @ 3 alat) set M.170 1.00 150,000.00 150,000.00
L Batu sungai pecah tersaring m3 K.017 9.00 #VALUE! #VALUE!

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk bak terbuka 2 1 E.221 10.0 #VALUE! #VALUE!


E Pengaduk beton 1.00 1 E.253 5.0 #VALUE! #VALUE!
R
A
L
T
A
N

PERALATAN #VALUE!
TOTAL (Rp) #VALUE!

VOLUME = 30.0 SATUAN = tonne HARGA SATUAN Rp. #VALUE! per tonne
ANALISA HARGA SATUAN KODE
ASPAL BETON UNTUK LAPIS PONDASI ATAS (LASTON ATAS) K.026
PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Semua material dikirim pemasok 1 ATB dibuat di AMP produksi 100ton/harihari
2 Loader menjaga bin tetap penuh 2 Agregat pecah tersaring disuplai termurah
3 Produksi AMP 100ton/hari 3 Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai
4 Dumptruk dimuati dan ditutup terpal untuk 4 Produksi dimuat kedalam dumptruk 5ton dan kirim kepenghampar aspal
mempertahankan suhu 5 Biaya produksi termasuk pengangkutan sejauh 30 km dari AMP
5 Dumptruk mengangkut & membongkar lang - 6 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
sung kedalam mesin penghampar aspal 7 Spec. B.M.No.03/PT/1983 dan revisi Spesifikasi umum Maret 1989 buku 3

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Mekanik terampil 1.00 1.00 L.071 1.00 #VALUE! #VALUE!
K Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
E Operator semi terampil 3.00 1.00 L.082 3.00 #VALUE! #VALUE!
R Supir terampil 7.00 1.00 L.091 7.00 #VALUE! #VALUE!
J Buruh tak terlatih 7.00 1.00 L. 101 7.00 #VALUE! #VALUE!
A Buruh semi terlatih 7.00 1.00 L.103 7.00 #VALUE! #VALUE!

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 25.00 #VALUE! #VALUE!


A Aspal kg M.061 5,900.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 0.20 150,000.00 30,000.00
E Batu sungai pecah tersaring m3 K.017 47.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 115 HP 2.00 1.00 E.052 10.00 #VALUE! #VALUE!


E Mesin pencampur aspal 30 t/j 1.00 1.00 E.155 5.00 #VALUE! #VALUE!
R Dump truk 5 ton/120 HP 7.00 1.00 E.212 42.00 357,572.00 15,018,023.85
A Bulldozer 110 HP 1.00 1.00 E.001 4.00 #VALUE! #VALUE!
L Pemecah batu 200 HP 1.00 1.00 E.031 4.00 #VALUE! #VALUE!
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 100.0 SATUAN = tonne HARGA SATUAN Rp. #VALUE! per tonne
ANALISA HARGA SATUAN KODE
LAPIS TIPIS ASPAL BETON (LATASTON) K.035
PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Semua material dikirim pemasok 1 HRS dibuat di AMP produksi 100ton/harihari
2 Loader menjaga bin tetap penuh 2 Agregat pecah tersaring disuplai termurah
3 Produksi AMP 100ton/hari 3 Aspal dipanaskan lebih dahulu agar aspal sudah siap saat dimulai
4 Dumptruk dimuati dan ditutup terpal untuk 4 Produksi dimuat kedalam dumptruk 5ton dan kirim kepenghampar aspal
mempertahankan suhu 5 Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP
5 Dumptruk membongkar langsung kedalam 6 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
mesin penghampar aspal 7 Spec. B.M.No.12/PT/1983 (label 3.3) dan revisi Spesifikasi umum Maret 1989 - Buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #VALUE! #VALUE!
E Supir terampil 4 1 L.091 4 #VALUE! #VALUE!
R Pembantu supir 4 1 L.099 4 0 0
J Buruh tak terlatih 6.00 1.00 L.101 6.00 #VALUE! #VALUE!
A Buruh terlatih 3.00 1.00 L.106 3.00 #VALUE! #VALUE!

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 31.00 #VALUE! #VALUE!


A Aspal kg M.061 7,300.00 #VALUE! #VALUE!
T Semen 40kg M.080 90.00 150,000.00 13,500,000.00
E Kapur/pasir hol/filler m3 M.081 1.00 #VALUE! #VALUE!
R Alat bantu (set @ 3 alat) set M.170 0.24 0.00 0.00
I Batu sungai pecah tersaring m3 K.017 22.50 #VALUE! #VALUE!
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 115 HP 1.00 1.00 E.052 5.00 #VALUE! #VALUE!


E Mesin penyampur aspal 30 t/jam 1.00 1.00 E.155 5.00 #VALUE! #VALUE!
R Dump truk 5 ton/145 HP 4.00 1.00 E.212 24.00 357,572.00 8,581,727.91
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 100.0 SATUAN = Tonne HARGA SATUAN Rp. #VALUE! per tonne
ANALISA HARGA SATUAN KODE
ASPAL BETON (LASTON) K.040
PRODUKSI DAN SUPLAI (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Semua material dikirim pemasok 1 Memakai alat berat (100 ton/hari)
2 Loader menjaga bin tetap penuh 2 Agregat pecah tersaring disuplai termurah
3 Produksi AMP 20 ton/jam (5 jam per hari) 3 AMP didirikan di dekat penimbunan material
4 Dump truk dimuati dan ditutup terpal untuk 4 Aspal dipanaskan lebih dulu agar aspal sudah siap saat dimulai
mempertahankan suhu 5 Produksi dimuat ke dalam dump truk 5 ton dan kirim ke penghampar aspal
5 Dump truk membongkar langsung ke dalam 6 Biaya produksi termasuk pengangkutan sejauh 10 km dari AMP
mesin penghampar aspal 7 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
8 Spec. B.M.No.13/PT/1983 (Mic v) dan revisi Spesifikasi Umum Maret 1989 - Buku 3

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 0 0
E Supir terampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R Pembantu supir 4.00 1.00 L.099 4.00 0 0
J Buruh tak terampil 6.00 1.00 L.101 6.00 #VALUE! #VALUE!
A Buruh terampil 3.00 1.00 L.106 3.00 #VALUE! #VALUE!

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 27.00 #VALUE! #VALUE!


A Aspal kg M.061 7,000.00 #VALUE! #VALUE!
T Semen 40 kg M.080 100.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
R Batu sungai pecah tersaring m3 K.017 27.50 #VALUE! #VALUE!
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 115 HP 1.00 1.00 E.052 5.00 #VALUE! #VALUE!


E Mesin penyampur aspal 30 t/jam 1.00 1.00 E.155 5.00 #VALUE! #VALUE!
R Dump truk 5 ton/145 HP 4.00 1.00 E.212 24.00 357,572.00 8,581,727.91
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 100.0 SATUAN = Tonne HARGA SATUAN Rp. #VALUE! per tonne
###
ANALISA HARGA SATUAN KODE
MEMBUAT PARIT K.111
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit dengan grader 1 Menggunakan peralatan berat (500m/hari)
### Membuang sisa galian menggunakan - 2 Volume galian parit 0,8m3/m
dumptruk 3 Digali dengan grader
4 1/3 disebar pada bahu jalan/badan jalan
5 2/3 dibuang sejauh 1 km
6 3 rit pp/jam/truk
7 Pembuatan parit per hari 500m

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2.00 1.00 L.083 2.00 #VALUE! #VALUE!
E Supir terampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R Pembantu supir 4.00 1.00 L.099 4.00 #VALUE! #VALUE!
J Buruh tak terampil 16.00 1.00 L.101 16.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 0.64 150,000.00 96,000.00


A
T
E
R
I
A
L

MATERIAL 96,000.00
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1.00 1 E.010 6.0 #VALUE! #VALUE!


E Wheel Loader 1.00 1.00 E.052 6.0 #VALUE! #VALUE!
R Dump truk 4.00 1.00 E.212 24.0 357,572.00 8,581,727.91
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 400.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
MEMBUAT PASANGAN BATU PADA PARIT K.112
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Galian tambahan (0,4 m3/m) 1 Parit yang ada vol 0,54 m3/meter
2 Buat dasar pasangan batu 2 Ukuran parit bagian dalam : tebal rata-rata dinding = 20 cm; tebal dasar = 25 cm; lebar -
3 Buat dinding pasangan batu pada parit ber - dasar = 0,5 m; lebar atas = 0,9 m; kedalaman = 0,6 m
berbatasan dengan jalan untuk mendukung 3 50 % sisa galian dibuang dengan truk bak terbuka, sejauh 1 km
perkerasan jalan dimana perlu. 4 50 % sisa galian dibuang di sekitar lokasi
4 Urug kembali dan buang sisa galian. 5 Bahan-bahan dikirim ke tempat pekerjaan oleh pemasok
6 Hasil produksi 60 m/hari

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Sopir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
K Pembantu sopir 1.00 1.00 L.099 1.00 #VALUE! #VALUE!
E Buruh tak terampil 36.00 1.00 L.101 36.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 1.44 150,000.00 216,000.00


A Konstruksi pasangan batu m3 K.705 30.00 #VALUE! #VALUE!
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk bak terbuka 1.00 1 E.221 6.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = M' HARGA SATUAN Rp. #VALUE! per m'
ANALISA HARGA SATUAN KODE
MEMBUAT PASANGAN BATU PADA PARIT DENGAN K.113
PENUTUP PLAT BETON BERTULANG (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Galian tambahan (0,4 m3/m) 1 Parit yang ada vol 0,54 m3/meter
2 Buat dasar pasangan batu 2 Ukuran parit bagian dalam : tebal rata-rata dinding = 20 cm; tebal dasar = 25 cm; lebar -
3 Buat dinding pasangan batu pada parit ber- dasar = 0,5 m; lebar atas = 0,9 m; kedalaman = 0,6 m
batasan dengan jalan untuk mendukung - 3 Item material termasuk perlengkapan buruh, tukang, penggetar beton dll
perkerasan jalan dimana perlu. 4 Pelat penutup tebal 15 cm, pembesian 3 %
4 Cor pelat penutup 5 50 % sisa galian dibuang dengan truk bak terbuka, sejauh 1 km
5 Letakkan pelat penutup, timbun kembali dan 6 50 % sisa galian dibuang disekitar lokasi
buang sisa galian 7 Bahan-bahan dikirim ke tempat perkejaan oleh pemasok
8 Hasil produksi 20 m/hari

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Sopir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
K Pembantu sopir 1.00 1.00 L.099 1.00 #VALUE! #VALUE!
E Buruh tak terampil 12.00 1.00 L.101 12.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 0.48 150,000.00 72,000.00


A Pembesian kg K.715 300.00 #VALUE! #VALUE!
T Bekesting m2 K.710 17.00 #VALUE! #VALUE!
E Konstruksi pasangan batu m3 K.705 11.00 #VALUE! #VALUE!
R Beton struktur klas K.225 (125l) m3 K.722 4.00 #VALUE! #VALUE!
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk bak terbuka 1.00 1.00 E.221 6.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 20.0 SATUAN = M HARGA SATUAN Rp. #VALUE! per m1


ANALISA HARGA SATUAN KODE
MEMBUAT SALURAN MELINTANG PADA BAHU JALAN K.114
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Penimbunan agregat 1 Menggunakan tenaga manusia 40 m3/hari
### Gali saluran melintang pada bahu jalan dan 2 Penggalian terdalam 30 cm dibawah permukaan
buang kelebihan galian 3 Lapis saringan 10 cm dan lapis urug kembali 29 cm
### Pasang dan letakkan agregat saringan 4 Hasil daya kerja rata-rata 1,5 m3/orang-hari
### Urug kembali dalam lapis @ 10 cm dan pa- 5 Agregat gradasi baik dikirim ketempat pekerjaan oleh pemasok
datkan. 6 50 % sisa galian dibuang dengan truk bak terbuka, sejauh 1 km
7 50 % sisa galian dibuang disekitar lokasi/setempat (disekitar pekerjaan)
8 Koefisien pemadatan = 1,2
9 Sesuai gambar D 1,2

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
K Pembantu supir 1.00 1.00 L.099 1.00 #VALUE! #VALUE!
E Buruh tak terampil 72.00 1.00 L.101 72.00 #VALUE! #VALUE!
R Buruh terampil 4.00 1.00 L.106 4.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 0.64 150,000.00 96,000.00


A Batu sungai pecah tersaring m3 K.017 48.00 #VALUE! #VALUE!
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Tamper 4.00 1 E.088 12.0 #VALUE! #VALUE!


E Truk bak terbuka 1.00 1.00 E.221 6.0 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 40.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PEMBUATAN PIPA BETON BERTULANG K.115
DIA. 600 mm x 1,0 m (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Acuan dibersihkan & dilapisi oli. 1 Beton K225 diaduk dilokasi pekerjaan (54adukan /hari @ 144liter/adukan)
### Jaringan tulangan beton dibuat . 2 Dicor kira-kira 6,0m3/hari (terbuang 3 %)
### Acuan dirakit melingkari jaringan tulangan - 3 Diameter dalam pipa 60cm, luar 73cm, tebal 6,5cm, panjang 1,0 m
beton 4 Tulangan berlapis satu: 8,175kg/m pipa,50kg/orang-hari(terbuang 9 %)
### Adukan beton dicor kedalam acuan dan di- 5 Buka dan bersihkan acuan 11m/kelompok/hari; 4kelompok buruh @ 2orang
getar sampai padat. 6 Berat pipa jadi yang masing-masing kira-kira 350kg
### Membuka acuan setelah beton cukup kuat. 7 Umur acuan dari baja : 3tahun atau 900 pemakaian @ 165kg/acuan
### Pipa dipindahkan dengan Loader. 8 Sesuai Peraturan Beton Betulang Indonesia (PBI 1971 N.I. 2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Buruh tak terampil 8.00 1.00 L.101 8.00 #VALUE! #VALUE!
E Buruh terampil 8.00 1.00 L.106 8.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Baja konstruksi/profil kg M.165 8.07 #VALUE! #VALUE!


A Tulangan besi beton kg M.167 400.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 0.32 150,000.00 48,000.00
E Beton struktur klas K225 (125l) m3 K.722 6.17 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 1.00 1 E.052 5.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 44.0 SATUAN = M' HARGA SATUAN Rp. #VALUE! per m'
ANALISA HARGA SATUAN KODE
PEMBUATAN PIPA BETON BERTULANG K.116
DIA. 800 mm x 1,0 m (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Acuan dibersihkan & dilapisi oli 1 Beton K225 diaduk dilokasi pekerjaan (54adukan /hari @ 144liter/adukan)
### Jaringan tulangan beton dibuat 2 Dicor kira-kira 6,0m3/hari (terbuang 3 %)
### Acuan dirakit melingkari jaringan tulangan - 3 Diameter dalam pipa 80cm, luar 95cm, tebal 7,5cm, panjang 1,0 m
beton 4 Tulangan berlapis satu: 11,8kg/m pipa,47,5kg/orang-hari(terbuang 10 %)
### Adukan beton dicor kedalam acuan dan di- 5 Buka dan bersihkan acuan 7,25m/kelompok/hari; 5kelompok buruh @ 3orang
digetar sampai padat 6 Berat pipa jadi yang masing-masing kira-kira 520kg
### Membuka acuan setelah beton cukup kuat 7 Umur acuan dari baja : 3tahun atau 900 pemakaian @ 215kg/acuan
### Pipa dipindahkan dengan Loader 8 Sesuai Peraturan Beton Betulang Indonesia (PBI 1971 N.I. 2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Buruh tak terampil 15.00 1.00 L.101 15.00 #VALUE! #VALUE!
E Buruh terampil 8.00 1.00 L.106 8.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Baja konstruksi/profil kg M.165 6.93 #VALUE! #VALUE!


A Tulangan besi beton kg M.167 380.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 0.60 150,000.00 90,000.00
E Beton struktur klas K225 (125) l m3 K.722 6.17 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 1.00 1 E.052 5.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 29.0 SATUAN = M HARGA SATUAN Rp. #VALUE! per m'


ANALISA HARGA SATUAN KODE
PEMBUATAN PIPA BETON BERTULANG K.117
DIA. 1000 mm x 1,0 m (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Acuan dibersihkan & dilapisi oli 1 Beton K225 diaduk dilokasi pekerjaan (54adukan /hari @ 144liter/adukan)
### Jaringan tulangan beton dibuat 2 Dicor kira-kira 6,0m3/hari (terbuang 3 %)
### Acuan dirakit melingkari jaringan tulangan - 3 Diameter dalam pipa 100cm, luar 117cm, tebal 8,5cm, panjang 1,0 m
beton 4 Tulangan berlapis dua: 31,6kg/m pipa,50kg/orang-hari(terbuang 10 %)
### Adukan beton dicor kedalam acuan dan di- 5 Buka dan bersihkan acuan 5m/kelompok/hari; 4kelompok buruh @ 3orang
getar sampai padat 6 Berat pipa jadi yang masing-masing kira-kira 750kg
### Membuka acuan setelah beton cukup kuat 7 Umur acuan dari baja : 3tahun atau 900 pemakaian @ 320kg/acuan
### Pipa dipindahkan dengan Loader 8 Sesuai Peraturan Beton Betulang Indonesia (PBI 1971 N.I. 2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Buruh tak terampil 16.00 1.00 L.101 16.00 #VALUE! #VALUE!
R Buruh terampil 14.00 1.00 L.106 14.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Baja konstruksi/profil kg M.165 7.11 #VALUE! #VALUE!


A Tulangan besi beton kg M.167 700.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 0.64 150,000.00 96,000.00
E Beton struktur klas K225 (125) l m3 K.722 6.17 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Wheel Loader 1.00 1 E.052 5.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 20.0 SATUAN = M' HARGA SATUAN Rp. #VALUE! per m'
ANALISA HARGA SATUAN KODE
PASANG PIPA BETON PRACETAK TIDAK BERTULANG DIA. 600 mm K.121
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 1,0m dengan dalam 1,0 m - 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
dibawah elevasi subgrade 2 Pipa beton pracetak tidak bertulang 8m dipasang dalam 4 hari
### Suplai pipa kelokasi pekerjaan 3 Beton K.125 digunakan untuk alas dan selubung pipa gorong-2
### Letakkan pipa pada alas parit 4 Material diangkut kelokasi pekerjaan oleh pemasok
### Urug kembali dan padatkan sekeliling pipa 5 Tidak termasuk penggalian dan pemadatan ulang perkerasan yang ada
sampai elevasi subgrade
### Jika ada penambahan/penggantian pipa -
gorong-gorong diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 4.00 L.061 4.00 #VALUE! #VALUE!


E Buruh tak terampil 7.00 4.00 L.101 28.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Beton massa Klas K.125 (125l) m3 K.720 4.50 #VALUE! #VALUE!


A Pipa beton bertulang DIA. 600 mm m' M.031 8.00 #VALUE! #VALUE!
T Alat bantu (set @ alat) set M.170 1.12 150,000.00 168,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN 0.00
TOTAL (Rp.) #VALUE!

VOLUME = 8.0 SATUAN = M' HARGA SATUAN #VALUE! per m'


ANALISA HARGA SATUAN KODE
PASANG PIPA BETON PRACETAK BERTULANG DIA. 600 mm K.122
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 1,0m dengan dalam 1,0 m di- 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
bawah elevasi subgrade. 2 Pipa beton pracetak bertulang 8m dipasang dalam 4 hari
### Suplai pipa kelokasi pekerjaan 3 Material pilihan digunakan untuk alas dan mengurug pipa gorong-2 sampai dibawah -
### Letakkan pipa pada alas parit pekerjaan
### Urug kembali dan padatkan sekeliling pipa 4 Material diangkut kelokasi pekerjaan oleh pemasok
sampai elevasi subgrade. 5 Tidak termasuk penggalian dan pemadatan ulang perkerasan yang ada
### Jika ada penambahan/penggantian pipa -
gorong-gorong diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 4.00 L.061 4.00 #VALUE! #VALUE!


E Buruh tak terampil 7.00 4.00 L.101 28.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K.012 8.00 #VALUE! #VALUE!


A Pipa beton bertulang DIA. 600 mm m' K.115 8.00 #VALUE! #VALUE!
T Alat bantu (set @ alat) set M.170 1.12 150,000.00 168,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Tamper 1.00 2 E.088 10 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 8.0 SATUAN = M' HARGA SATUAN #VALUE! per m'


ANALISA HARGA SATUAN KODE
PASANG PIPA BETON PRACETAK TIDAK BERTULANG DIA. 800 mm K.123
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 1,3m dengan dalam 1,3 m di - 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
bawah elevasi subgrade 2 Pipa beton pracetak tidak bertulang 9m dipasang dalam 4 hari
### Suplai pipa kelokasi pekerjaan 3 Beton K.125 digunakan untuk alas dan selubung pipa gorong-2
### Letakkan pipa pada alas parit 4 Material diangkut kelokasi pekerjaan oleh pemasok
### Urug kembali dan padatkan sekeliling pipa 5 Tidak termasuk penggalian dan pemadatan ulang perkerasan yang ada
sampai elevasi subgrade
### Jika ada penambahan/penggantian pipa -
gorong-gorong diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 4.00 L.061 4.00 #VALUE! #VALUE!


E Buruh tak terampil 8.00 4.00 L.101 32.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Beton massa Klas K.125 (125l) m3 K.720 8.20 #VALUE! #VALUE!


A Pipa beton bertulang DIA. 800 mm m' M.033 9.00 #VALUE! #VALUE!
T Alat bantu (set @ alat) set M.170 1.28 150,000.00 192,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN 0.00
TOTAL (Rp.) #VALUE!

VOLUME = 9.0 SATUAN = M' HARGA SATUAN #VALUE! per m'


ANALISA HARGA SATUAN KODE
PASANG PIPA BETON PRACETAK BERTULANG DIA. 800 mm K.124
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 1,3m dengan dalam 1,3 m di- 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
bawah elevasi subgrade 2 Pipa beton pracetak bertulang 9m dipasang 4 hari
### Suplai pipa kelokasi pekerjaan 3 Material pilihan digunakan untuk mengurug pipa gorong-gorong sampai dibawah -
### Letakkan pipa pada alat parit perkerasan
### Urug kembali dan padatkan sekeliling pipa 4 Pipa ditaruh diatas alas dari beton K125 tebal 10cm
sampai elevasi subgrade. 5 Material diangkut kelokasi pekerjaan oleh pemasok
### Jika ada penambahan/penggantian pipa 6 Tidak termasuk penggalian dan pemadatan ulang perkerasan yang ada
gorong-gorong diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 4.00 L.061 4.00 #VALUE! #VALUE!


E Buruh tak terampil 4.00 4.00 L.101 16.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K.012 12.50 #VALUE! #VALUE!


A Beton massa klas K125 (125l) m3 K.720 1.50 #VALUE! #VALUE!
T Pipa beton bertulang DIA. 800 mm m K.116 9.00 #VALUE! #VALUE!
E Alat bantu (set @ alat) set M.170 0.25 150,000.00 37,500.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Tamper 1.00 2 E.088 5.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 9.0 SATUAN = M' HARGA SATUAN Rp. #VALUE! per m'
ANALISA HARGA SATUAN KODE
PASANG PIPA BETON PRACETAK TIDAK BERTULANG DIA. 1000 mm K.125
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 1,5m dengan dalam 1,5 m di 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
bawah elevasi subgrade. 2 Pipa beton pracetak tidak bertulang 10m dipasang dalam 5 hari
### Suplai pipa kelokasi pekerjaan 3 Beton K.125 digunakan untuk alas dan selubung pipa gorong-2
### Letakkan pipa pada alas parit 4 Material diangkut kelokasi pekerjaan oleh pemasok
### Urug kembali dan padatkan sekeliling pipa 5 Tidak termasuk penggalian dan pemadatan ulang perkerasan yang ada
sampai elevasi subgrade
### Jika ada penambahan/penggantian pipa
gorong-gorong diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 5.00 L.061 5.00 #VALUE! #VALUE!


E Buruh tak terampil 10.00 5.00 L.101 50.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Beton massa Klas K.125 (125l) m3 K.720 11.20 #VALUE! #VALUE!


A Pipa beton bertulang DIA. 1000 mm m' M.035 10.00 #VALUE! #VALUE!
T Alat bantu (set @ alat) set M.170 2.00 150,000.00 300,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN 0.00
TOTAL (Rp.) #VALUE!

VOLUME = 10.0 SATUAN = M' HARGA SATUAN #VALUE! per m'


ANALISA HARGA SATUAN KODE
PASANG PIPA BETON PRACETAK BERTULANG DIA. 1000 mm K.126
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 1,5m dengan dalam 1,5 m di 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
bawah elevasi subgrade 2 Pipa beton pracetak bertulang 10 m dipasang 5 hari
### Suplai pipa kelokasi pekerjaan 3 Material pilihan digunakan untuk mengurug pipa gorong-gorong sampai dibawah -
### Letakkan pipa pada alat parit perkerasan
### Urug kembali dan padatkan sekeliling pipa 4 Pipa ditaruh diatas alas dari beton K125 tebal 10cm
sampai elevasi subgrade. 5 Material diangkut kelokasi pekerjaan oleh pemasok .
### Jika ada penambahan/penggantian pipa 6 Tidak termasuk penggalian dan pemadatan ulang perkerasan yang ada.
gorong-gorong diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 5.00 L.061 5.00 #VALUE! #VALUE!


E Buruh tak terampil 10.00 5.00 L.101 50.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K.012 16.00 #VALUE! #VALUE!


A Beton massa klas K125 (125l) m3 K.720 1.50 #VALUE! #VALUE!
T Pipa beton bertulang DIA. 1000 mm m' K.117 10.00 #VALUE! #VALUE!
E Alat bantu (set @ alat) set M.170 0.50 150,000.00 75,000.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Tamper 1.00 3 E.088 15.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 10.0 SATUAN = M' HARGA SATUAN Rp. #VALUE! per m'
ANALISA HARGA SATUAN KODE
0.00 PASANG PIPA BETON PRACETAK TIDAK BERTULANG U. 400 mm K.
TANPA DINDING KEPALA (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Gali parit lebar 0,5m dengan dalam 0,3 m di- 1 Menggunakan tenaga manusia (tidak termasuk dinding kepala)
bawah elevasi bahu jalan 2 Pipa beton pracetak tidak bertulang 8m dipasang dalam 2 hari
### Suplai pipa kelokasi pekerjaan 3 Beton K.125 digunakan untuk alas dan selubung sambungan pipa U
### Letakkan pipa pada alas galian 4 Material diangkut kelokasi pekerjaan oleh pemasok
### Urug kembali dan padatkan sekeliling pipa 5 Tidak termasuk penggalian dan perkerasan yang ada
sampai elevasi bahu jalan
### Jika ada penambahan/penggantian pipa U
saluran diperlukan pekerjaan ekstra.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 2.00 L.061 2.00 #VALUE! #VALUE!


E Buruh tak terampil 3.00 2.00 L.101 6.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Beton massa Klas K.125 (125l) m3 K.720 0.60 #VALUE! #VALUE!


A Pipa beton tdk bertulang U. 40 cm m' M. 8.00 #REF! #REF!
T Alat bantu (set @ alat) set M.170 0.50 150,000.00 75,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN 0.00
TOTAL (Rp.) #VALUE!

VOLUME = 8.0 SATUAN = M' HARGA SATUAN #VALUE! per m'


cm; tebal dasar = 25 cm; lebar -

#VALUE!
cm; tebal dasar = 25 cm; lebar -
Modif
ANALISA HARGA SATUAN KODE
PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA K.210
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Mengupas dan membuang semak dengan 1 Menggunakan tenaga manusia (1200 m2/hari)
tenaga manusia pada DAMIJA (Daerah 2 Tidak ada pohon besar pada DAMIJA (hanya semak)
Milik Jalan) 3 DAMIJA 12 m
2 Lebar pengupasan & pembersihan = 4 Pembersihan DAMIJA 100 m per hari
DAMIJA minus lebar badan jln. 5 Bakar sampah di lokasi pekerjaan
6 Hasil kerja 25 m2/orang-hari
7 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Buruh tak terampil 36.00 1.00 L.101 36.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 1.50 150,000.00 225,000.00


A
T
E
R
I
A
L

MATERIAL 225,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) #VALUE!

VOLUME = 12.0 SATUAN = Are HARGA SATUAN #VALUE! per are


#VALUE! per m2
ANALISA HARGA SATUAN KODE
PENGUPASAN DAN PEMBERSIHAN SEMAK PADA DAMIJA K.211
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Buldozer mengupas dan membuang 1 Menggunakan alat berat (2400m2/hari)
semak pada DAMIJA 2 Tidak ada pohon besar pada DAMIJA (hanya semak)
### Lebar pengupasan dan pembersihan 3 DAMIJA 12 m
= DAMIJA minus lebar badan jalan. 4 Pembersihan DAMIJA 200 m per hari

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Buruh tak terampil 2.00 1.00 L.101 2.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.08 150,000.00 12,000.00


A
T
E
R
I
A
L

MATERIAL 12,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 1.00 1 E.001 5.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 24.0 SATUAN = Are HARGA SATUAN #VALUE! per are


#VALUE! per m2
ANALISA HARGA SATUAN KODE
PENGURUGAN TANAH K.220
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Penggalian & pemuatan ke truk dengan 1 Menggunakan tenaga manusia (60 m3/hari)
tenaga manusia. 2 Dipakai material dari penggalian di jalan / lokasi lain yang diijinkan
2 Pengiriman ke lokasi pekerjaan dengan truk. 3 Jarak angkut pp < 4 km (1 trip/jam/truk)
3 Membongkar & mertakan dengan tenaga manusia 4 Lima truk dimuati per jam ( 3 m3/orang/hari)
4 Meratakan & memadatkan lapis demi lapis, 5 Waktu muat 12 menit/10 orang/truk; waktu bongkar 5 menit/5 orang/truk
tebal tiap lapis 10 cm. 6 Pemadatan menggunakan mesin gilas tandem
7 Kapasitas pemadatan 60 m3 per hari
8 Tidak termasuk penyiapan tanah dasar jalan
9 Umur alat bantu rata-rata 1 bvlan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Supir terampil 6.00 1.00 L.091 6.00 #VALUE! #VALUE!
R Pembantu supir 6.00 1.00 L.099 6.00 #VALUE! #VALUE!
J Buruh tak terampil 60.00 1.00 L.101 60.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 2.40 150,000.00 360,000.00


A
T
E
R
I
A
L

MATERIAL 360,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas tandem 6 - 10 ton 1.00 1.00 E.081 5.00 #VALUE! #VALUE!
E Truk tangki air 115 1.00 1.00 E.182 5.00 #VALUE! #VALUE!
R Truk bak terbuka 3.5 ton/115 HP 5.00 1.00 E.221 30.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = m3 HARGA SATUAN #VALUE! per m3


ANALISA HARGA SATUAN KODE
PENGURUGAN TANAH K.221
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Penggalian dengan Buldozer 1 Menggunakan alat berat (120 m3/hari)
2 Pemuatan ke dump truk dengan Loader 2 Dipakai material dari penggalian di jalan / lokasi lain yang diijinkan
3 Pengangkutan dengan dump truk. 3 Jarak angkut pp < 4 km (2 rit pp/jam/truk)
4 Meratakan dengan Motor Grader 4 Pemadatan menggunakan mesin gilas bergetar
5 Meratakan & memadatkan lapis demi lapis, 5 Kapasitas pemadatan 120 m3 per hari
tebal tiap lapis 15 cm. 6 Tidak termasuk penyiapan tanah dasar jalan

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 4.00 1.00 L.081 4.00 #VALUE! #VALUE!
K Pembantu operator 4.00 1.00 L.083 4.00 #VALUE! #VALUE!
E Supir terampil 6.00 1.00 L.091 6.00 #VALUE! #VALUE!
R Pembantu supir 6.00 1.00 L.099 6.00 #VALUE! #VALUE!
J Buruh tak terampil 10.00 1.00 L.101 10.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.40 150,000.00 60,000.00


A
T
E
R
I
A
L

MATERIAL 60,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Bulldozer 11 1.00 1.00 E.001 5.00 #VALUE! #VALUE!


E Motor Grader 100 H 1.00 1.00 E.010 5.00 #VALUE! #VALUE!
R Wheel Loader 115 1.00 1.00 E.052 5.00 #VALUE! #VALUE!
A Mesin gilas bergetar 6 - 7 ton 1.00 1.00 E.082 5.00 #VALUE! #VALUE!
L Truk tangki air 115 1.00 1.00 E.182 5.00 #VALUE! #VALUE!
A Truk bak terbuka 5 ton/145 HP 5.00 1.00 E.212 25.00 357,572.00 8,939,299.91
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 120.0 SATUAN = m3 HARGA SATUAN #VALUE! per m3


ANALISA HARGA SATUAN KODE
GALIAN TANAH UNTUK KONSTRUKSI K.224
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali dengan tenaga manuasia 1 Menggunakan tenaga manusia ( 40 m3/hari)
2. Membuang tanah galian sejauh 30 m dari 2 Kapasitas kerja per orang 1.3 m3/hari)
lubang galian 3 Kedalaman rata-rata galian s/d 3 m
4 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)
P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!
E Buruh tak terampil 30.00 1.00 L.101 30.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 1.20 150,000.00 180,000.00


A
T
E
R
I
A
L

MATERIAL 180,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) #VALUE!

VOLUME = 40.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PENIMBUNAN DAN PEMADATAN K.225
(UNTUK JEMBATAN DAN GORONG-GORONG) DGN BURUH
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Membersihkan struktur dari bahan-bahan 1 Bahan urugan dikirim ke lokasi pekerjaan oleh pemasok
organik 2 Digunakan kerikil galian/sungai tidak disaring yang termurah
2. Buruh mengurug bagian belakang struktur 3 Urugan dipadatkan berlapis tebal 10 cm
3 Memadatkan dengan Tamper dan mesin
gilas bergetar.

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Buruh tak terampil 10.00 1.00 L.101 10.00 #VALUE! #VALUE!
K Buruh terampil 3.00 1.00 L.106 3.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak tersaring m3 K.013 20.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.40 150,000.00 60,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas bergetar 1 ton 1.00 1.00 E.087 5.00 #VALUE! #VALUE!
E Tamper 2.00 1.00 E.088 10.00 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 15.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PENIMBUNAN BADAN JALAN (URPIL) K.311
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material dihampar maksimum tebal setiap 1 Menggunakan alat berat (120m3/hari)
lapis 20 cm. 2 Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan sejauh 10 km
2 Setiap lapis dipadatkan minimum 4 kali oleh pemasok (Material yang dapat direkomendasikan : Karang Gunung/Sirtu gunung)
lintasan dengan mesin gilas Vibrator Roller 3 Harga material timbunan tergantung harga di lokasi pekerjaan

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
E Buruh tak terampil 10.00 1.00 L.101 10.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Timbunan pilihan m3 M.050 160.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 1.00 150,000.00 150,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor Grader 125HP 1.00 1.00 E.010 5.00 #VALUE! #VALUE!


E Vibro Roller 1.00 1.00 E.082 5.00 #VALUE! #VALUE!
R Truk tangki air 115 HP 1.00 1.00 E.182 4.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 120.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 PENIMBUNAN BADAN JALAN (URPIL) K.311M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material dihampar maksimum tebal setiap 1 Menggunakan alat berat (120m3/hari)
lapis 20 cm. 2 Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan sejauh 10 km
2 Setiap lapis dipadatkan minimum 4 kali oleh pemasok (Material yang dapat direkomendasikan : /Sirtu gunung)
lintasan dengan mesin gilas Vibrator Roller 3 Harga material timbunan tergantung harga di lokasi pekerjaan

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2.00 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1.00 0 0
J Buruh tak terampil 4 1 L.101 4.00 0 0
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Timbunan pilihan m3 M.050 144.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 1.00 150,000.00 150,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor Grader 125HP 1 1 E.010 5.0 #VALUE! #VALUE!


E Vibro Roller 1 1 E.082 5.0 #VALUE! #VALUE!
R Truk tangki air 115 HP 1 1 E.182 5.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 120.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
GALIAN TANAH DAN PEMBUANGAN K.320
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali dengan tenaga manusia 1 Menggunakan tenaga manusia (32m3/hari)
2 Permukaan tanah dibentuk dan diratakan 2 20 % dibuang di lokasi tanpa diangkut dengan truk
dengan tenaga manusia. 3 80 % dibuang dan diangkut dengan truk
3 Dimuat ke truk dengan tenaga manusia 4 Jarak 1 rit pp < 2 km
4 Membuang tanah menggunakan truk 5 1,6 rit pp/jam/truk
3,5 ton 6 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Supir terampil 2.00 1.00 L.091 2.00 #VALUE! #VALUE!
K Pembantu supir 2.00 1.00 L.099 2.00 0 0
E Buruh tak terampil 34.00 1.00 L.101 34.00 0 0
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 1.50 150,000.00 225,000.00


A
T
E
R
I
A
L

MATERIAL 225,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk bak terbuka 3,5ton / 115 HP 2.00 1.00 E.221 10.00 #VALUE! #VALUE!
E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 32.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
GALIAN TANAH DAN PEMBUANGAN K.321
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali dengan buldozer 1 Menggunakan alat berat (200m3/hari)
2 Permukaan tanah dibentuk dan diratakan 2 20 % dibuang dilokasi tanpa diangkut dengan truk
dengan grader. 3 80 % dibuang dan diangkut dengan truk
3. Dimuat ke truk dengan loader 4 Jarak 1 rit pp < 2 Km
4. Membuang tanah menggunakan dump truk. 5 2,5 rit pp/jam/truk

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Supir terampil 2.00 1.00 L.091 2.00 #VALUE! #VALUE!
R Pembantu Supir 2.00 1.00 L.099 2.00 0 0
J Buruh tak terampil 5.00 1.00 L.101 5.00 0 0
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.24 150,000.00 36,000.00


A
T
E
R
I
A
L

MATERIAL 36,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

R Whell Loader 80 hp 1.00 1.00 E.052 5.0 #VALUE! #VALUE!


A Dump truk 5 ton 4.00 1.00 E.212 20.0 357,572.00 7,151,439.93
L Buldozer 110 hp 1.00 1.00 E. 001 5.00 #VALUE! #VALUE!
A Grader 110 hp 1.00 1.00 E.010 5.00 #VALUE! #VALUE!
T
A
N

ALAT #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 200.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PENYIAPAN TANAH DASAR K.341
(MENGGUNAKANBURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pembentukan tanah dasar dengan tenaga 1 Menggunakan tenaga orang (8m x 400m/hari)
manusia 2 DAMIJA dibersihkan dari semak dll
2 Dipadatkan dengan mesin gilas roda baja 3 Lebar dasar jalan 8 m
sampai 100 % MDD (AASHTO T99) 4 Hasil kerja menyiapkan dasar jalan 400m/hari
5 Kapasitas kerja 32 m2/orang-hari
6 Umur alat bantu rata-rata 1 bulan /orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Buruh tak terampil 80.00 1.00 L.101 80.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 3.20 150,000.00 480,000.00


A
T
E
R
I
A
L

MATERIAL 480,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E Mesin gilas 3 roda 1.00 1.00 E.080 5.00 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 32.0 SATUAN = Are HARGA SATUAN Rp. #VALUE! per are
#VALUE! per m2
ANALISA HARGA SATUAN KODE
PENYIAPAN TANAH DASAR K.342
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pembentukan tanah dasar dengan grader 1 Menggunakan alat berat (8m x 500m/hari)
grader 2 DAMIJA dibersihkan dari semak dll
2 Dipadatkan dengan mesin gilas roda baja 3 Lebar dasar jalan 8 m
sampai 100 % MDD (AASHTO T99) 4 Hasil kerja menyiapkan dasar jalan 500m/hari

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Buruh tak terampil 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.16 150,000.00 24,000


A
T
E
R
I
A
L

MATERIAL 24,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1.00 1.00 E.010 6.00 #VALUE! #VALUE!


E Mesin gilas 3 roda 1.00 1.00 E.080 6.00 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 40.0 SATUAN = Are HARGA SATUAN Rp. #VALUE! per are
#VALUE! per m2
ANALISA HARGA SATUAN KODE
PEMBENTUKAN BAHU JALAN KERAS K.410
(MENGGUNAKAN BURUH) 0.00
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material LPB yang baik dan sesuai ditim - 1. Menggunakan tenaga orang (96m3/hari, pemadatan 960m bahu jalan/hari)
bun sepanjang bahu jalan oleh pemasok 2. 10 cm timbunan padat dibutuhkan untuk 1m lebar bahu jalan
2 Tenaga terampil mengatur penimbunan. 3. Material LPB yang termurah dikirim ke lokasi pekerjaan oleh pemasok
3 Material disebar dengan tenaga manusia. 4. Pemasok menimbun material LPB sepanjang bahu jalan
4 Pemadatan dengan mesin gilas bergetar - 5. Material disebar dengan tenaga manusia
yang kecil 6. 96 m3 dihampar dan dipadatkan per hari
7. Koefisien pemadatan = 1,2
8. Umur alat bantu rata-rata i bulan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 3 1 L.061 3.00 #VALUE! #VALUE!


E Buruh tak terampil 96 1 L.101 96.00 #VALUE! #VALUE!
K Buruh terampil 1 1 L.106 1.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K.013 116.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 3.84 150,000.00 576,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas bergetar 1 ton 1 1 E.087 5.0 #VALUE! #VALUE!


E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 96.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PEMBENTUKAN BAHU JALAN KERAS K.411
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material LPB yang baik dan sesuai ditim - 1 Menggunakan alat berat (200m3/hari, pemadatan 2000 m bahu jalan/hari)
bun sepanjang bahu jalan oleh pemasok. 2 10 cm timbunan padat dibutuhkan untuk 1m lebar bahu jalan
2 Tenaga terampil mengatur penimbunan 3 Material LPB yang termurah dikirim ke lokasi pekerjaan oleh pemasok
3 Material disebar dengan grader 4 Pemasok menimbun material LPB disepanjang bahu jalan
4 Pemadatan dengan mesin gilas bergetar 5 Material disebar dengan grader
yang kecil 6 200 m3 dihampar dan dipadatkan perhari
7 Koefisien pemadatan = 1,2

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #REF! #REF!
E Buruh tak terampil 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
R Buruh terampil 2.00 1.00 L.106 2.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K.012 240.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.16 150,000.00 24,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1.00 1.00 E.010 5.00 #VALUE! #VALUE!


E Mesin gilas bergetar 1ton 2.00 1.00 E.087 10.00 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 200.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


#VALUE! per m2
ANALISA HARGA SATUAN KODE
MEMOTONG BAHU JALAN TINGGI K.420
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Perbaiki bahu jalan yang tingginya melebihi 1 Menggunakan tenaga manusia ( 48 m3/hari)
permukaan jalan antara parit & perkerasan jalan 2 Rata-rata bahu jalan yang tingginya 10 cm dari permukaan jalan
2. Muat & bongkar ke/dari truck dgn tenaga manusia dipotong dengan tenaga manusia.
3. Buang semua sisa galian 3 Semua sisa galian di buang sejauh 1 km, kapasitas 1,6 rit / jam / truck.
4 Memuat dan membuang ke / dari truck dengan tenaga manusia
5 Hasil kerja rata-rata 1,2 m2/Orang-Hari
6 Umur alat bantu rata-rata 1 bulan / Orang / Set @ 3 Alat.

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Supir Trampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
K Pembantu Supir 4.00 1.00 L.099 4.00 #VALUE! #VALUE!
E Buruh tak terampil 40.00 1.00 L.101 40.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M
A Alat bantu (set @ 3 alat) set M.170 1.60 150,000.00 240,000.00
T
E
R
I
A
L

MATERIAL 240,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truck bak terbuka 3,5 ton/115 HP 4.00 1.00 E.221 20.00 #VALUE! #VALUE!
E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 48.00 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
MEMOTONG BAHU JALAN TINGGI K.421
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Perbaiki bahu jalan yang tingginya melebihi 1 Menggunakan alat berat ( 150 m3/hari)
permukaan jalan antara parit & perkerasan jalan 2 Greder memotong bahu jalan yang tingginya 10 cm, selebar 1,5 m,
2. Gunakan loader untuk memuat sisa galian ke truc sepanjang 1 km pada satu sisi jalan.
3. Buang semua sisa galian 3 Jarak membuang 1 ret pp < 2 km.
4 Kapasitas 2,5 ret pp / jam / truck.

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Pembantu Operator 2.00 1.00 L.083 2.00 #VALUE! #VALUE!
E Supir Trampil 4.00 1.00 L.091 4.00 #VALUE! #VALUE!
R Pembantu Supir 4.00 1.00 L.099 4.00 #VALUE! #VALUE!
J Buruh tak terampil 6.00 1.00 L.101 6.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M
A Alat bantu (set @ 3 alat) set M.170 1.60 150,000.00 240,000.00
T
E
R
I
A
L

MATERIAL 240,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 100 HP 1.00 1.00 E.010 5.00 #VALUE! #VALUE!


E Wheel loader 115 HP 1.00 1.00 E.052 5.00 #VALUE! #VALUE!
R Truck bak terbuka 5 ton/145 HP 4.00 1.00 E.212 20.00 357,572.00 7,151,439.93
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 150.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PEMBERSIHAN SEMAK PADA LOKASI K.422
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Potong semak belukar yang tumbuh pada 1 Menggunakan tenaga manusia (2 x 1,5m x 500m/hari)
bahu jalan 2 Dengan lebar 1,5m dari tepi jalan, rata-rata luas yang dibersihkan 1500 m2/km satu
2. Bersihkan rumput/semak dari bahu jalan sisi
dan aspalan 3 Hasil kerja : 60m2/orang/hari
4 Sampah/reruntuhan dibuang sejauh 1km
5 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Buruh tak terampil 25.00 1.00 L.101 25.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 2.00 150,000.00 300,000.00


A
T
E
R
I
A
L

MATERIAL 300,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) #VALUE!

VOLUME = 15.0 SATUAN = Are HARGA SATUAN Rp. #VALUE! per are
#VALUE! per m2
ANALISA HARGA SATUAN KODE
PEMBERSIHAN PARIT K.424
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Membersihkan dan membentuk ulang 1 Menggunakan tenaga manusia (500 m/hari)
parit type V dan menimbun tumpukan puing 2 Membersihkan sampah, kotoran yang menyumbat, tumbuh-tumbuhan dari parit dan
sepanjang jalan dengan tenaga orang gorong-gorong.
2. Membuang puing dengan truk bak terbuka 3 Pembuangan puing sejauh 1 km (10m3/100m)
dimuat/dibongkar dgn tenaga orang 4 Umur alat bantu 1 bulan/orang/set @ 3 alat
5 Kapasitas 1,6 rit pp/jam/truk

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Supir terampil 2.00 1.00 L.091 2.00 #VALUE! #VALUE!
K Pembantu supir 2.00 1.00 L.099 2.00 0 0
E Buruh tak terampil 36.00 1.00 L.101 36.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 1.44 150,000.00 216,000.00


A
T
E
R
I
A
L

MATERIAL 216,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Truk bak terbuka 3,5 ton/115 HP 2.00 1.00 E.221 10.00 #VALUE! #VALUE!
E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 500.0 SATUAN = M' HARGA SATUAN Rp. #VALUE! per m'
ANALISA HARGA SATUAN KODE
GALIAN TANAH KERAS DAN PEMBUANGAN K.321.M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali dengan Braker Excavator 1 Menggunakan alat berat (55m3/hari)
2 Permukaan tanah dibentuk dan diratakan 2 20 % dibuang dilokasi tanpa diangkut dengan truk
dengan Buldozer 3 80 % dibuang dan diangkut dengan truk
3 Dimuat ke truk dengan loader/Exavator 4 Jarak 1 rit pp < 2 Km
4 Membuang tanah menggunakan dump truk. 5 2,5 rit pp/jam/truk

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #REF! #REF!
E Supir terampil 2.00 1.00 L.091 2.00 #VALUE! #VALUE!
R Pembantu Supir 2.00 1.00 L.099 2.00 0 0
J Buruh tak terampil 2.00 1.00 L.101 2.00 0 0
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.24 150,000.00 36,000.00


A
T
E
R
I
A
L

MATERIAL 36,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Buldozer 1.00 1.00 E.001 3.00 #VALUE! #VALUE!


E Exavator Hidrolik 1.00 1.00 E.020 3.00 #VALUE! #VALUE!
R Wheel loader 1.00 1.00 E.052 5.00 #VALUE! #VALUE!
A Dump truk 2.00 1.00 E.212 5.00 357,572.00 1,787,859.98
L Rock Braker Exavator 1.00 1.00 E.281 3.00 #VALUE! #VALUE!
A
T
A
N

MATERIAL #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 55.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


PPN 10 % #VALUE!
Total Harga Satuan Rp. #VALUE!
175.00
#VALUE!
ANALISA HARGA SATUAN KODE
GALIAN TANAH UNTUK KONSTRUKSI K.224. M
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali dengan tenaga manuasia 1 Menggunakan tenaga manusia ( 40 m3/hari)
Membuang tanah galian sejauh 30 m dari 2 Kapasitas kerja per orang 0.64 m3/hari)
2 Lubang galian 3 Kedalaman rata-rata galian s/d 1 m
4 Umur alat bantu rata-rata 1 bvlan/orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)
P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!
E Buruh tak terampil 14.00 1.00 L.101 14.00 #VALUE! #VALUE!
K
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) set M.170 1.20 150,000.00 180,000.00


A
T
E
R
I
A
L

MATERIAL 180,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) #VALUE!

VOLUME = 40.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 PENIMBUNAN BADAN JALAN (TANAH URUG) K.311M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material dihampar maksimum tebal setiap 1 Menggunakan alat berat (120m3/hari)
lapis 20 cm. 2 Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan sejauh 10 km
2 Setiap lapis dipadatkan minimum 4 kali oleh pemasok (Material yang dapat direkomendasikan : Tanah Urug
lintasan dengan mesin gilas Vibrator Roller 3 Harga material timbunan tergantung harga di lokasi pekerjaan

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2.00 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1.00 0 0
J Buruh tak terampil 4 1 L.101 4.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Timbunan Tanah m3 M.040 144.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 1.00 150,000.00 150,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor Grader 125HP 1 1 E.010 5.0 #VALUE! #VALUE!


E Vibro Roller 1 1 E.082 5.0 #VALUE! #VALUE!
R Truk tangki air 115 HP 1 1 E.182 5.0 0.00 0.00
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 120.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


#VALUE!
#VALUE!
0
0

225,000.00

#VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
ANALISA HARGA SATUAN KODE
GALIAN TANAH DAN PEMBUANGAN K.321 M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali dengan Mini Excavator 1 Menggunakan alat berat (65m3/hari)
2 Dimuat ke dump truk dengan Mini Excavator 2 Dibuang di lokasi tanpa diangkut dengan truk
3 Membuang tanah menggunakan Dump Truk 3 Jarak 1 rit pp < 5 Km
4 Dimuat ke dump truk dengan Mini Excavator

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Supir terampil 2.00 1.00 L.091 2.00 #VALUE! #VALUE!
R Pembantu Supir 2.00 1.00 L.099 2.00 #VALUE! #VALUE!
J Buruh tak terampil 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.44 150,000.00 66,000.00


A
T
E
R
I
A
L

MATERIAL 66,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

R Mini Excavator 1.00 1.00 E.021 7.00 #VALUE! #VALUE!


A Truk bak terbuka 3,5ton/115 HP 2.00 1.00 E.221 12.00 #VALUE! #VALUE!
L
A
T
A
N

ALAT #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 65.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
PENYIAPAN TANAH DASAR K.341 M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pembentukan tanah dasar dengan tenaga 1 Menggunakan tenaga orang (5m x 400m/hari)
manusia 2 DAMIJA dibersihkan dari semak dll
2 Dipadatkan dengan mesin gilas roda baja 3 Lebar dasar jalan 5 m
sampai 100 % MDD (AASHTO T99) 4 Hasil kerja menyiapkan dasar jalan 400m/hari
5 Kapasitas kerja 20 m2/orang-hari
6 Umur alat bantu rata-rata 1 bulan /orang/set @ 3 alat

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Buruh tak terampil 50.00 1.00 L.101 50.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 2.00 150,000.00 300,000.00


A
T
E
R
I
A
L

MATERIAL 300,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E Mesin gilas 3 roda 1.00 1.00 E.080 5.00 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 20.0 SATUAN = Are HARGA SATUAN Rp. #VALUE! per are
#VALUE! per m2
ANALISA HARGA SATUAN KODE
0.00 PENGUPASAN DAN PERATAAN BADAN JALAN (ASPAL) K.342.M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemgupasan badan jalan/lapis permukaan 1 Menggunakan alat berat
Aspal dengan Motor Grader 2 Lapis Permukaan badan jalan yang dianggap rusak di kupas
2 Dipadatkan dengan mesin gilas roda baja 3 Lebar dasar jalan 3 - 8 m
sampai 100 % MDD (AASHTO T99) 4 permukaan badan jalan di ratakan dan dibentuk

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2.00 #REF! #REF!
E Buruh tak terampil 4 1 L.101 4.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Alat bantu (set @ 3 alat) Set M.170 0.16 150,000.00 24,000


A
T
E
R
I
A
L

MATERIAL 24,000.00
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1 1 E.010 6.0 #VALUE! #VALUE!


E Mesin gilas 3 roda 1 1 E.080 6.0 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1.5 SATUAN = Are HARGA SATUAN Rp. #VALUE! per are
#VALUE! per m2
ANALISA HARGA SATUAN KODE
LAPIS PONDASI BAWAH KLAS A AGREGAT PECAH TERSARING K.510
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat pecah tersaring /bergradasi ditim- 1 Menggunakan alat berat (150m3/hari)
bun disepanjang jalan oleh oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Grader membentuk ulang permukaan lama 3 Dikirim batu quary/kerikil sungai pecah tersaring yang termurah
jalan 4 Dihampar dan dipadatkan sampai tebal padat 15 cm
### Grader menghampar agregat 5 Dihampar dan dipadatkan 1000m2/hari
### Jalan disiram air dengan truk air 6 Koefisien kompaksi /pemadatan = 1,2
### Pemadatan dengan mesin gilas 6-8 ton sam- 7 Gradasi bahan lapis pondasi bawah klas A semua harus melalui saringan 75 mm se -
pai 100% MDD suai rev. Umum B.M. Maret 1989 - Buku -3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2.00 1.00 L.083 2.00 #VALUE! #VALUE!
E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 4.00 1.00 L.101 4.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Batu quary pecah tersaring m3 K.018 129.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
T Pasir Urug m3 M.040 51.00 #VALUE! #VALUE!
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1.00 1 E.010 5.0 #VALUE! #VALUE!


E Mesin gilas 3 roda 6-8ton 1.00 1 E.080 5.0 #VALUE! #VALUE!
R Truk tangki air 115HP 1.00 1 E.182 5.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 150.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI BAWAH KLAS A AGREGAT PECAH TERSARING K.511
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat pecah tersaring /bergradasi ditim - 1 Menggunakan tenaga manusia (16m3/hari)
bun disepanjang jalan oleh oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Membetuk ulang permukaan lama jalan & 3 Dikirim batu quary/kerikil sungai pecah tersaring yang termurah
menghampar agregat dengan tenaga ma - 4 Dihampar dengan tenaga manusia dalam dua lapis dan dipadatkan sampai tebal -
nusia padat 10 cm
### Jalan disiram air dengan truk air 5 Dihampar dan dipadatkan 600m2/hari
### Pemadatan dengan mesin gilas 6-8 ton sam- 6 Koefisien kompaksi /pemadatan = 1,2
pai 100% MDD 7 Umur alat bantu rata-rata 1 bulan/orang /set @ 3 alat
### Perpihan dengan tenaga manusia 8 Gradasi bahan lapis pondasi bawah klas A semua harus melalui saringan 75 mm se -
suai rev. Umum B.M. Maret 1989 - Buku -3
PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 60.00 1.00 L.101 60.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Batu quary pecah tersaring m3 K.018 51.50 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
T Pasir Urug m3 M.040 20.50 #VALUE! #VALUE!
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 6-8ton 1.00 1 E.080 5.0 #VALUE! #VALUE!


E Truk tangki air 115HP 1.00 1 E.182 5.0 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI BAWAH KLAS B KERIKIL TERSARING K.512
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat tersaring /bergradasi ditimbun di - 1 Menggunakan alat berat (150m3/hari)
sepanjang jalan oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Grader membentuk ulang permukaan jalan 3 Dikirim kerikil galian/sungai tersaring /bergradasi yang termurah
lama. 4 Dihamparkan dan dipadatkan sampai tebal padat 15 cm
### Grader menghampar agregat. 5 Koefisian pemadatan = 1,2
### Jalan disiram air dengan truk air 6 Gradasi bahan lapis pondasi bawah klas B semua harus melalui saringan
### Pemadatan dengan mesin gilas 6-8 ton sam 62,5mm sesuai rev.Spek.Umum B.M Maret 1989-Buku 3
pai 100% MDD

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2.00 1.00 L.083 2.00 #VALUE! #VALUE!
E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 4.00 1.00 L.101 4.00 0 0
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tersaring m3 K.016 125.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.20 150,000.00 30,000.00
T Pasir Urug / Bahan Pengikat m3 M.040 65.00 #VALUE! #VALUE!
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1.00 1.00 E.010 5.00 #VALUE! #VALUE!


E Mesin gilas 3 roda 6-8ton 1.00 1.00 E.080 5.00 #VALUE! #VALUE!
R Truk tangki air 115HP 1.00 1.00 E.182 5.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 150.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI BAWAH KLAS B KERIKIL TERSARING K.513
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat tersaring /bergradasi ditimbun di- 1 Menggunakan tenaga manusia (60m3/hari)
sepanjang jalan oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Bentuk ulang permukaan lama jalan dan 3 Dikirim kerikil galian/sungai tersaring /bergradasi yang termurah
hampar agar dgn tenaga manusia. 4 Dihamparkan dengan tenaga manusia dalam dua lapis dan dipadatkan sampai tebal
### Jalan disiram air dengan truk air. padat 10 cm
### Pemadatan dengan mesin gilas 6-8 ton 5 Dihamparkan dan dipadatkan 600m2/hari;koefisian pemadatan = 1,2
sampai 100% MDD. 6 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
### Perapihan jalan dengan tenaga manusia. 7 Gradasi bahan lapis pondasi bawah klas B semua harus melalui saringan
62,5mm sesuai rev.Spek.Umum B.M Maret 1989-Buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 60.00 1.00 L.101 60.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tersaring m3 K.016 72.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 6-8ton 1.00 1 E.080 5.00 #VALUE! #VALUE!


E Truk tangki air 115HP 1.00 1 E.182 5.00 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI BAWAH KLAS C SIRTU/KARANG K.514
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Sirtu/karang ditimbun disepanjang jalan o - 1 Menggunakan alat berat (150m3/hari)
leh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Grader membentuk ulang permukaan lama 3 Dikirim kerikil galian/sungai tidak disaring yang termurah
jalan 4 6% sirtu dengan ukuran lebih dipisah pada saat penghamparan dengan grader
### Grader menghampar sirtu/karang dan uku - 5 Lapis pondasi bawah dipadatkan sampai tebal padat 15 cm
ran yang lebih dipisah. 6 Dihampar dan dipadatkan 1000m2/hari
### Jalan disiram air dengan truk air 7 Koefisien kompaksi = 1,2
### Pemadatan dengan mesin gilas 6-8 ton -
sampai 100% MDD

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2.00 1.00 L.083 2.00 #VALUE! #VALUE!
E Sopir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu sopir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 6.00 1.00 L.101 6.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring atau m3 K.012 191.00 #VALUE! #VALUE!


A karang
T Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 125HP 1.00 1 E.010 5.0 #VALUE! #VALUE!


E Mesin gilas 3 roda 1.00 1 E.080 5.0 #VALUE! #VALUE!
R Truk tangki air 115HP 1.00 1 E.182 5.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 150.0 SATUAN = m3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI BAWAH KLAS C SIRTU/KARANG K.515
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Sirtu/karang ditimbun disepanjang jalan o - 1 Menggunakan tenaga manusia (60m3/hari)
leh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Membentuk permukaan lama 3 Dikirim kerikil galian/sungai tidak disaring atau karang yang termurah
& menghampar sirtu dgn tenaga manusia 4 Dihamparkan dgn tenaga manusia dalam 2 lapis dan dipadatkan sampai tebal padat
### Jalan disiram air dengan truk air. 10 cm
### Dipadatkan dalam 2 lapis dengan mesin gi- 5 Dihampar dan dipadatkan 600m2/hari
las roda baja sampai 100% MDD 6 Koefisien kompaksi = 1,2
### Perapihan dengan tenaga manusia. 7 Umur alat bantu rata-rata 1 bulan/orang /set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Operator terampil 1.00 1.00 L.081 1.00 #VALUE! #VALUE!
K Pembantu operator 1.00 1.00 L.083 1.00 #VALUE! #VALUE!
E Sopir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu sopir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 60.00 1.00 L.101 60.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring atau m3 K.013 72.00 #VALUE! #VALUE!


A karang
T Alat bantu (set @ 3 alat) set M.170 2.40 150,000.00 360,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1.00 1 E.080 5.0 #VALUE! #VALUE!


E Truk tangki air 115HP 1.00 1 E.182 5.0 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = m3 HARGA SATUAN Rp. #VALUE! per m3

#VALUE!

ANALISA HARGA SATUAN KODE


LAPIS PONDASI BAWAH KLAS B AGREGAT PECAH TERSARING K.517
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat pecah tersaring ditimbun disepan - 1 Menggunakan alat berat (150m3/hari)
jang jalan oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
### Grader membentuk ulang permukaan jalan 3 Dikirim kerikil galian/kerikil sungai pecah terrsaring yang termurah
lama. 4 Dihamparkan dan dipadatkan sampai tebal padat 15 cm
### Grader menghampar agregat. 5 Dihamparkan dan dipadatkan 1000 m2/hari
### Jalan disiram air dengan truk air 6 Koefisian pemadatan = 1,2
### Pemadatan dengan mesin gilas 6-8 ton sam 7 Gradasi bahan lapis pondasi bawah klas B semua harus melalui saringan
pai 100% MDD 62,5mm sesuai rev.Spek.Umum B.M Maret 1989-Buku 3
PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #VALUE! #VALUE!
E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 10.00 1.00 L.101 10.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Batu sungai pecah tersaring m3 K.017 122.50 #VALUE! #VALUE!


A Pasir urug / bahan pengikat m3 M.040 50.50 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 0.50 150,000.00 75,000.00
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 1.00 1 E.010 5.0 #VALUE! #VALUE!


E Mesin gilas 3 roda 6-8ton 1.00 1 E.080 5.0 #VALUE! #VALUE!
R Truk tangki air 115HP 1.00 1 E.182 5.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 150.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING K.520
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat pecah tersaring ditimbun disepan- 1 Menggunakan alat berat (150m3/hari)
jang jalan oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
2 Grader menghampar agregat . 3 Dikirim batu quarry/kerikil sungai pecah tersaring yang termurah.
3 Jalan disiram air dgn truk air 4 Dihampar dan dipadatkan sampai tebal padat 10cm
4 Dipadatkan dengan mesin gilas roda baja 5 Dihampar dan dipadatkan 1000m2/hari; koefisien pemadatan = 1,25
6 - 8 ton 6 Gradasi agraegat Lapis Pondasi atas klas A, semua harus melalui saringan 37,5mm
sesuai rev spek.Umum B.M Maret'89-Buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Pembantu operator 2.00 1.00 L.083 2.00 #VALUE! #VALUE!
E Sopir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
R Pembantu supir 1.00 1.00 L.099 1.00 0 0
J Buruh tak terampil 4.00 1.00 L.101 4.00 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai pecah tersaring m3 K.017 177.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 100 HP 1.00 1.00 E.010 5.00 #VALUE! #VALUE!


E Mesin gilas 3 roda 6 - 8 ton 1.00 1.00 E.080 5.00 #VALUE! #VALUE!
R Truk tangki air 115 HP 1.00 1.00 E.182 5.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL Rp. #VALUE!

VOLUME = 150.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI ATAS KLAS A AGREGAT PECAH TERSARING K.521
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Agregat pecah tersaring ditimbun disepan- 1 Menggunakan tenaga manusia (60m3/hari)
jang jalan oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
2 Agregat dihampar dengan tenaga manusia 3 Dikirim kerikil galian/sungai tersaring yang termurah
3 Jalan disiram air dgn truk air 4 Dihampar dan dipadatkan sampai tebal padat 10cm
4 Dipadatkan dengan mesin gilas roda baja 5 Dihampar dan dipadatkan 600m2/hari; koefisien pemadatan = 1,25
6 Gradasi agraegat Lapis Pondasi atas klas A, semua harus melalui
saringan 75mm dan agregat halus semua harus melalui saringan 9,5 mm sesuai rev.
Spek.Umum B.M Maret'89-Buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 1 1 L.081 1 #VALUE! #VALUE!
K Pembantu operator 1 1 L.083 1 #VALUE! #VALUE!
E Sopir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 0 0
J Buruh tak terampil 60 1 L.101 60 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai pecah tersaring m3 K.017 60.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 2.20 150,000.00 330,000.00
T Pasir Urug m3 M.040 15.00 #VALUE! #VALUE!
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1 1 E.080 5.0 #VALUE! #VALUE!


E Truk tangki air 1 1 E.182 5.0 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL Rp. #VALUE!

VOLUME = 60.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI ATAS KLAS B KERIKIL TERSARING K.522
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Kerikil tersaring ditimbun disepanjang jalan 1 Menggunakan alat berat (150m3/hari)
oleh pemasok 2 Material ditimbun di sepanjang jalan oleh pemasok
2 Grader menghampar agregat. 3 Dikirim kerikil galian/sungai tersaring yang termurah
3 Jalan disiram air dgn truk air. 4 Dihampar dan dipadatkan sampai tebal padat 10 cm
4 Pemadatan dengan mesin gilas 6-8 ton. 5 Dihampar dan dipadatkan 1000 m2/hari; koefisien pemadatan = 1,25
6 Gradasi Macadam ikat air klas B, agregat kasar semua harus melalui saringan 75 mm
dan agregat halus semua harus melalui saringan 9,5mm sesuai rev.Spek.Umum B.M.
1989 Buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 2.00 1.00 L.081 2.00 #VALUE! #VALUE!
K Sopir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
E Buruh tak terampil 4.00 1.00 L.101 4.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tersaring m3 K.016 200.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.20 150,000.00 30,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 125HP 1.00 1.00 E.010 5.00 #VALUE! #VALUE!


E Mesin gilas 3 roda 1.00 1.00 E.080 5.00 #VALUE! #VALUE!
R Truk tangki air 115HP 1.00 1.00 E.182 5.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 150.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
LAPIS PONDASI ATAS KLAS B KERIKIL TERSARING K.523
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Kerikil tersaring ditimbun disepanjang jalan 1 Menggunakan tenaga manusia (60m3/hari)
oleh pemasok. 2 Material ditimbun disepanjang jalan oleh pemasok
2 Agregat dihampar dengan tenaga manusia 3 Dikirim kerikil galian/sungai tersaring yang termurah
3 Jalan disiram air dgn truk air 4 Dihampar dan dipadatkan sampai tebal padat 10cm
4 Dipadatkan dengan mesin gilas roda baja 5 Dihampar dan dipadatkan 600m2/hari; koefisien pemadatan = 1,25
6 Gradasi Macadam ikat air klas B, agregat kasar semua harus melalui saringan 75 mm
dan agregat halus semua harus melalui saringan 9,5 mm sesuai rev.Spek. Umum B.M.
Maret'89 Buku 3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2 1 L.061 2 #VALUE! #VALUE!


E Operator terampil 1 1 L.081 1 #VALUE! #VALUE!
K Pembantu operator 1 1 L.083 1 #VALUE! #VALUE!
E Sopir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 0 0
J Buruh tak terampil 60 1 L.101 60 0 0
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tersaring m3 K.016 75.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 2.40 150,000.00 360,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1 1 E.080 5.0 #VALUE! #VALUE!


E Truk tangki air 115HP 1 1 E.182 5.0 #VALUE! #VALUE!
R
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 60.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


#VALUE!
ANALISA HARGA SATUAN KODE
PENGHAMPARAN LAPIS PONDASI ATAS ASPAL BETON K.528
LASTON ATAS (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Permukaan jalan dibersihkan dan kering 1 Menggunakan alat berat (45m3/hari)
2 Lapis Tack/pengikat aspal cutback di hampar 2 Dikirim ATB ke lokasi pekerjaan oleh pemasok dari AMP
0,5 l/m2 3 ATB dihampar dan dipadatkan sampai tebal padat 4 cm
3 ATB dihampar dengan aspal finisher. 4 BJ ATB padat = 2,25 ton/m3
4 Temperatur ATB 120 C dan tidak kurang 5 Sesuai Spec B.M./ No. 03/PT/B/1983 dan rev Spesivikasi Umum Maret'89 - Buku 3
dari 100 C~

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 5.00 1.00 L.081 5.00 #VALUE! #VALUE!
K
E Buruh tak terampil 12.00 1.00 L.101 12.00 #VALUE! #VALUE!
R Buruh terampil 8.00 1.00 L.106 8.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M A.T.B. (Laston Atas) tonne K.026 100.00 #VALUE! #VALUE!


A Pasir ayak untuk beton m3 M.041 0.60 #VALUE! #VALUE!
T Aspal kg M.061 180.00 #VALUE! #VALUE!
E Minyak Bakar lt M.065 45.00 #VALUE! #VALUE!
R Alat Bantu (set @ 3 alat) Set M.170 6.00 150,000.00 900,000.00
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin Gilas Tandem 6-8 ton 1.00 1.00 E.081 5.00 #VALUE! #VALUE!
E Mesin gilas roda karet 1.00 1.00 E.084 5.00 #VALUE! #VALUE!
R Mesin penyemprot aspal 1.00 1.00 E.153 3.00 #VALUE! #VALUE!
A Mesin Penghampar Aspal 1.00 1.00 E.157 5.00 #VALUE! #VALUE!
L Compressor 1.00 1.00 E.301 4.00 #VALUE! #VALUE!
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 45.0 SATUAN = m3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 LAPISAN PENETRASI/PERMUKAAN MACADAM 70mm K.530
LAPEN (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
### Hampar batu pecah 3-5 cm, 16m2/m3 1 Menggunakan tenaga buruh
### Hampar batu pecah 2-3 cm, 60 m2/m3 2 Material dikirim kelokasi pekerjaan oleh pemasok
3 Setiap lapis batu dipadatkan 3 Tebal total padat perkerasan 7cm
4 Semprotkan aspal, 3,71/m2 4 Kapasitas penghamparan 2000m2/minggu
### Hampar batu pecah 1-2 cm, 70 m2/m3
### Semprotkan aspal 1,5L/m2
### Hamparkan pasir (binder), 90 m2/m3

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2 3 L.061 6 #VALUE! #VALUE!


E Operator terampil 2 3 L.081 6 #VALUE! #VALUE!
K Pembantu operator 2 3 L.083 6 #VALUE! #VALUE!
E Supir terampil 1 3 L.091 3 #VALUE! #VALUE!
R Pembantu supir 1 3 L.099 3 #VALUE! #VALUE!
J Buruh tak terampil 66 3 L.101 198 #VALUE! #VALUE!
A Buruh terampil 2 3 L.106 6 #VALUE! #VALUE!

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Batu pecah 3-5cm m3 M.023 62.50 #VALUE! #VALUE!


A Batu pecah 2-3cm m3 M.024 16.67 #VALUE! #VALUE!
T Batu pecah 1-2cm m3 M.025 14.29 #VALUE! #VALUE!
E Pasir ayak untuk beton m3 M.041 11.11 #VALUE! #VALUE!
R Aspal kg M.061 5,500.00 #VALUE! #VALUE!
I Alat bantu (set @ 3 alat) set M.170 7.92 150,000.00 1,188,000.00
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1 3 E.080 15.0 #VALUE! #VALUE!


E Mesin penyemprot aspal 1 3 E.154 15.0 #VALUE! #VALUE!
R Truk bak terbuka 1 3 E.221 15.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 70.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 PENYIAPAN JAPAT 100 MM K.610
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pengadaan agregat tidak disaring disepan- 1 Menggunakan tenaga manusia (4 x 225m per hari)
jang jalan dengan truk oleh pemasok. 2 Tanah dasar jalan selebar 8 m sudah disiapkan
2 Agregat dihampar dengan tenaga manusia 3 Agregat tdak disaring yang termurah dikirim oleh pemasok
dan batu yang melebihi ukuran diambil dipe- 4 20 % agregat yang melebihi ukuran diambil & dipecah dengan manusia dilokasi pe-
cahkan dan dihampar ulang kerjaan.
### Truk air & mesin gilas digunakan untuk me - 5 Agregat dihampar dgn tenaga manusia , dipadatkan dengan mesin gilas roda besi
madatkan agregat kedalam tanah dasar ja- dan disiram dengan truk air, sampai tebal padat 10 cm
lan. 6 Menghampar dan mencampur 1,2 m3/orang - hari ; koefisien pemadatan =1,2
7 JAPAT untuk memperkuat tanah dasar jalan sesuai Spesifikasi B.M.No.07/PT/B/1983

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 3 1 L.061 3 #VALUE! #VALUE!


E Operator terampil 1 1 L.081 1 #VALUE! #VALUE!
K Pembantu operator 1 1 L.083 1 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 #VALUE! #VALUE!
J Buruh tak terampil 90 1 L.101 90 #VALUE! #VALUE!
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil sungai tidak disaring m3 K.013 108.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 3.60 150,000.00 540,000
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1 1 E.080 5.0 #VALUE! #VALUE!


E Truk tangki air 1 1 E.182 5.0 #VALUE! #VALUE!
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 900.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
0.00 PENYIAPAN JAPAT 100 MM K.611
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pengadaan agregat tidak disaring disepan- 1 Menggunakan alat berat (4m x 375 km/hari)
jang jalan dengan truk oleh pemasok. 2 Tanah dasar jalan selebar 8 m sudah disiapkan
2 Grader menghampar agregat. 3 Agregat tdak disaring yang termurah dikirim oleh pemasok
### Truk air & mesin gilas digunakan untuk me- 4 Grader menghampar agregat
madatkan agregat kedalam tanah dasar - 5 Agregat dipadatkan dengan mesin gilas roda besi & disiram dgn truk air, sampai -
jalan. tebal padat 10 cm
6 JAPAT untuk memperkuat tanah dasar jalan sesuai Spesifikasi B.M.No.07/PT/B/1983

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 #VALUE! #VALUE!
J Buruh tak terampil 6 1 L.101 6 #VALUE! #VALUE!
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil galian tersaring m3 K.014 180.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 125HP 1 1 E.010 5.0 #VALUE! #VALUE!


E Mesin gilas 3 roda 1 1 E.080 5.0 #VALUE! #VALUE!
R Truk tangki air 115 HP 1 1 E.182 5.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,500.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA LABURAN ASPAL PASIR K.612
BURAS (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Permukaan yang lama dibersihkan dengan 1 Kapasitas kerja (4 x 600)m2 atau 2400m2 per hari
compressor 2 Pasir dikirim kelokasi pekerjaan oleh pemasok
2 Panaskan dan semprot aspal dengan me - 3 Cutback aspal disemprot 1L/m2 (aspal residu 0,961/m2)
sin penyemprot aspal. 4 Pasir disebarkan rata-rata 200m2/m3 (8kg/m2)
3 Tutup aspal cutback dgn pasir dan digilas 5 Penggunaan mesin penyemprot aspal dibatasi sampai 3 kali pengisian.
dengan mesin gilas pneumatic roda karet 6 Pasir dimuat ulang kedalam truk dengan tenaga manusia dan dihampar dengan mesin
4 Cutback aspal dgn kerosine 5% (25~-30~ C). penghampar
7 Sesuai Spesifikasi B.M.No.05/PT/B/1983

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 #VALUE! #VALUE!
J Buruh tak terampil 12 1 L.101 12 #VALUE! #VALUE!
A Buruh terampil 2 1 L.106 2 #VALUE! #VALUE!

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 12.00 #VALUE! #VALUE!


A Aspal kg M.061 2,280.00 #VALUE! #VALUE!
T Minyak bakar lt M.065 120.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 0.40 150,000.00 60,000
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas roda karet 8-15 ton 1 1 E.084 5.0 #VALUE! #VALUE!
E Mesin penyemprot aspal 1000 ltr 1 1 E.153 5.0 #VALUE! #VALUE!
R Dump truk 3,5ton/115HP 1 1 E.211 5.0 268,125.33 1,340,626.64
A Compressor 210m3/jam 1 1 E.301 4.0 #VALUE! #VALUE!
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 2,400.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PEMBENTUKAN DAN PENGKERIKILAN ULANG JAPAT 40mm K.613
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Grader membentuk kembali perkerasan - 1 Menggunakan alat berat (3m x 1,25km/hari)
pekerasan. 2 Dimulai dgn pekerjaan perbaikan yang ambles/menutup lubang pd muka jalan
2 Pengadaan agregat tersaring disepanjang 3 Grader melakukan 2 lintasan memotong dan 3 lintasan menghampar,
jalan dengan truk oleh pemasok. diselesaikan 3m x 1,25km/hari.
3 Grader menghampar agregat 4 Digunakan agregat tersaring yang termurah.
4 Permukaan disiram dgn truk air . 5 Agregat dikirim kelokasi pekerjaan oleh pemasok.
5 Mesin gilas memadatkan material lepas. 6 Tebal pemadatan agregat tersaring rata-rata 40mm.
7 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 #VALUE! #VALUE!
J Buruh tak terampil 6 1 L.101 6 #VALUE! #VALUE!
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Kerikil galian tersaring m3 K.014 180.00 #VALUE! #VALUE!


A Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Motor grader 125HP 1 1 E.010 5.0 #VALUE! #VALUE!


E Mesin gilas roda karet 8-15 ton 1 1 E.084 5.0 #VALUE! #VALUE!
R Truk tangki air 115 HP 1 1 E.182 5.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 3,750.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


PPN 10 % #VALUE!
Total Harga Satuan Rp. #VALUE!
ANALISA HARGA SATUAN KODE
JAYAPURA LAPISAN PENETRASI/PERMUKAAN MACADAM 50 mm K.618
LAPEN (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Siram aspal tack coat 0,5 l/m2 1 Menggunakan tenaga buruh.
2 Hamparkan agregat kasar 20 m2/m3 2 Agregat pecah tersaring dikirim ke lokasi pekerjaan oleh pemasok.
3 Digilas & dipadatkan dgn mesin gilas roda 3 Digunakan agregat pecah tersaring yang termurah (agregat kasar < 50 mm,
baja 6-8 ton agregat pengunci < 25 mm, agregat penutup < 12,5 mm).
4 Siram aspal binder 4,8 l/m2 4 Agregat dimuat ulang ke truk dengan tenaga manusia dan dihampar dengan
5 Hamparkan agr pengunci 64 m2/m3 tenaga manusia.
6 Hamparkan lapisan seal dgn 12,5 mm, 5 Tebal padat perkerasan 5 cm
chip 80 m2/m3 & cutback 1,25 l/m2 6 Pen Mac sesuai rev.Spek.Umum B.M. Maret '89-Buku 3

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 3.00 L.061 6.00 #VALUE! #VALUE!


E Operator terampil 1.00 3.00 L.081 3.00 #VALUE! #VALUE!
K Supir terampil 1.00 3.00 L.091 3.00 #VALUE! #VALUE!
E Buruh tak terampil 66.00 3.00 L.101 198.00 #VALUE! #VALUE!
R Buruh terampil 2.00 3.00 L.106 6.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Batu pecah 3-5 cm m3 M.023 56.00 #VALUE! #VALUE!


A Batu pecah 2-3 cm m3 M.024 31.10 #VALUE! #VALUE!
T Batu pecah 1-2 cm m3 M.025 15.50 #VALUE! #VALUE!
E Pasir ayak untuk beton m3 M.041 3.50 #VALUE! #VALUE!
R Aspal kg M.061 6,270.00 #VALUE! #VALUE!
I Minyak bakar Lt M.065 350.00 #VALUE! #VALUE!
A Kayu Bakar m3 M.070 12.00 #VALUE! #VALUE!
L Alat bantu (set @ 3 alat) set M.170 12.15 150,000.00 1,822,500.00

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1.00 3.00 E.080 15.00 #VALUE! #VALUE!


E Mesin penyemprot aspal 1.00 0.00 E.153 0.00 #VALUE! #VALUE!
R Truk bak terbuka 1.00 3.00 E.221 15.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,400.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA LAPISAN PENETRASI/PERMUKAAN MACADAM 50 mm K.618 M
LAPEN (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Siram aspal tack coat 0,5 l/m2 1 Menggunakan tenaga buruh.
2 Hamparkan agregat 12,5 mm, 80 m2/m3 2 Agregat pecah tersaring dikirim ke lokasi pekerjaan oleh pemasok.
3 Digilas & dipadatkan dgn mesin gilas roda 3 Digunakan agregat pecah tersaring yang termurah (agregat penutup < 12,5 mm
baja 6-8 ton 4 Agregat dimuat ulang ke truk dengan tenaga manusia dan dihampar dengan
4 Siram aspal binder 1,25 l/m2 tenaga manusia.
5 Tebal padat perkerasan 2 cm
6 Pen Mac sesuai rev.Spek.Umum B.M. Maret '89-Buku 3

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 2.00 L.061 4.00 #VALUE! #VALUE!


E Operator terampil 2.00 2.00 L.081 4.00 #VALUE! #VALUE!
K
E Supir terampil 1.00 2.00 L.091 2.00 #VALUE! #VALUE!
R
J Buruh tak terampil 66.00 2.00 L.101 132.00 0 0
A Buruh terampil 2.00 2.00 L.106 4.00 0 0

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Batu pecah 3-5 cm m3 M.023 0.00 #VALUE! #VALUE!


A Batu pecah 2-3 cm m3 M.024 0.00 #VALUE! #VALUE!
T Batu pecah 1-2 cm m3 M.025 15.50 #VALUE! #VALUE!
E Pasir ayak untuk beton m3 M.041 0.00 #VALUE! #VALUE!
R Aspal kg M.061 3,762.00 #VALUE! #VALUE!
I Minyak bakar Lt M.065 210.00 #VALUE! #VALUE!
A Kayu Bakar m3 M.070 7.17 #VALUE! #VALUE!
L Alat bantu (set @ 3 alat) set M.170 5.10 150,000.00 765,000.00

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 1.00 2.00 E.080 10.00 #VALUE! #VALUE!


E Mesin penyemprot aspal 1.00 0.00 E.153 0.00 #VALUE! #VALUE!
R Truk bak terbuka 1.00 2.00 E.221 10.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,400.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2

Aspal per m2 = 2.69 kg/m2

Agr Kasar 3/5 = #DIV/0! m2/m3


Agr Kasar 2/3 = #DIV/0! m2/m3
Agr Kasar 1/2 = 90.32 m2/m3
###
ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20mm K.621
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Sebelum di lapis tack/pengikat permukaan 1 Menggunakan alat berat 1750m2/hari
aspal lama dibersihkan lebih dahulu dengan 2 Pasir aspal dikirim kelokasi pekerjaan oleh pemasok dari AMP
compressor. 3 BJ padat 1,9ton/m3
2 Pengisian material sampai bin dari spreader 4 Tebal padat rata-rata 2cm
oleh pemasok. 5 Lapis tack/pengikat aspal cutback dihampar @ 0.5L/m2
3 Material dihampar dengan spreader dan di - 6 Sesuai spesifikasi B.M.No.02/PT/B/1983
padatkan dengan mesin gilas roda baja dan
mesin gilas pneumatic roda karet.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 4 1 L.081 4 #VALUE! #VALUE!
K Pembantu operator 4 1 L.083 4 #VALUE! #VALUE!
E Buruh tak terampil 6 1 L.101 6 0 0
R Buruh terampil 2 1 L.106 2 0 0
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Campuran panas LATASIR tonne K.020 66.00 #VALUE! #VALUE!


A Aspal kg M.061 700.00 #VALUE! #VALUE!
T Minyak bakar lt M.065 175.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 6-10 ton 1 1 E.081 5.0 #VALUE! #VALUE!


E Mesin gilas roda karet 8-15 ton 1 1 E.084 5.0 #VALUE! #VALUE!
R Mesin penyemprot aspal 1000 ltr 1 1 E.153 5.0 #VALUE! #VALUE!
A Mesin penghampar 1820 mm/30 1 1 E.157 5.0 #VALUE! #VALUE!
L Compressor 210m3/jam 1 1 E.301 4.0 #VALUE! #VALUE!
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,750.0 SATUAN = M2 HARGA SATUAN #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20mm K.621.M
(MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Sebelum di lapis tack/pengikat permukaan 1 Menggunakan alat berat 1750m2/hari
aspal lama dibersihkan lebih dahulu dengan 2 Pasir aspal dikirim kelokasi pekerjaan oleh pemasok dari AMP
compressor 3 BJ padat 1,9ton/m3
2 Pengisian material sampai bin dari spreader 4 Tebal padat rata-rata 2cm
oleh pemasok 5 Lapis tack/pengikat aspal cutback dihampar @ 0.5L/m2
3 Material dihampar dengan spreader dan di - 6 Sesuai spesifikasi B.M.No.02/PT/B/1983
padatkan dengan mesin gilas roda baja -
dan mesin gilas pneumatic roda karet.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 4 1 L.081 4 #VALUE! #VALUE!
K Pembantu operator 4 1 L.083 4 #VALUE! #VALUE!
E Buruh tak terampil 6 1 L.101 6 0 0
R Buruh terampil 2 1 L.106 2 0 0
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Campuran panas LATASIR tonne K.020 M 66.00 #VALUE! #VALUE!


A Aspal kg M.061 700.00 #VALUE! #VALUE!
T Minyak bakar lt M.065 175.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 0.24 150,000.00 36,000.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 6-10 ton 1 1 E.081 5.0 #VALUE! #VALUE!


E Mesin gilas roda karet 8-15 ton 1 1 E.084 5.0 #VALUE! #VALUE!
R Mesin penyemprot aspal 1000 ltr 1 1 E.153 5.0 #VALUE! #VALUE!
A Mesin penghampar 1820 mm/30 1 1 E.157 5.0 #VALUE! #VALUE!
L Compressor 210m3/jam 1 1 E.301 4.0 #VALUE! #VALUE!
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,750.0 SATUAN = M2 HARGA SATUAN #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS TIPIS ASBUTON DAN AGREGAT HALUS 30 mm K.631
LASBUTAG (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Mandor menempatkan papan tebal 2,5 cm 1 Menggunakan tenaga manusia (150m2/hari)
sepanjang as & pinggir jalan 2 Lasbutag dikirim kelokasi pekerjaan oleh pemasok
### Panaskan dan semprotkan aspal lapis tack/ 3 Lasbutag dihampar @ 16,7 m2/ton dengan tebal padat 3 cm
pengikat dihampar dipermukaan yang su - 4 Tebal padat rata-rata 3 cm
dah bersih permukaan yang sudah bersih. 5 Lapis tackpengikat aspal cutback dihampar @ 0,5 l/m2
### Lasbutag dihampar langsung dari truk de - 5 Sesuai Spek.B.M.No.15/PT/B/1989 dan rev.Spek.umum B.M. Maret'89 buku 3
ngan tenaga manusia.
### Pemadatan dengan mesin gilas.

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 2 1 L.081 2 #VALUE! #VALUE!
K Pembantu operator 2 1 L.083 2 #VALUE! #VALUE!
E Supir terampil 1 1 L.091 1 #VALUE! #VALUE!
R Pembantu supir 1 1 L.099 1 #VALUE! #VALUE!
J Buruh tak terampil 17 1 L.101 17 #VALUE! #VALUE!
A Buruh terampil 2 1 L.106 2 #VALUE! #VALUE!

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Campuran dingin LASBUTAG tonne K.023 45.00 #VALUE! #VALUE!


A Aspal kg M.061 300.00 #VALUE! #VALUE!
T Minyak bakar Lt M.065 75.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 0.64 150,000.00 96,000.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas tandem 3 roda 1 1 E.080 5.0 #VALUE! #VALUE!


E Mesin gilas roda karet 1 1 E.084 5.0 #VALUE! #VALUE!
R Mesin penyemprot aspal 400 ltr 1 1 E.154 5.0 #VALUE! #VALUE!
A Truk bak terbuka 1 1 E.221 5.0 #VALUE! #VALUE!
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 750.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS TIPIS ASPAL BETON K.636
LATASTON (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pengisian material sampai ke bin spreader 1 Menggunakan alat berat 1500m2/hari
oleh pemasok 2 Hot Rolled sheet (LATASTON) dikirim kelokasi pekerjaan oleh pemasok dari AMP
### Material dihampar dengan mesin spreader, 3 Tebal padat rata-rata 3 cm
dipadatkan dengan mesin gilas roda baja 4 BJ LATASTON padat 2,2ton/m3
dan mesin gilas pneumatic roda karet. 5 Sesiuai Spek.B.M.No.12/PT/B/1983 (tabel 3,3) dan rev.Spek.umum B.M. Maret 89 - Buku 3
3 Hamparkan lapis tack/pengikat aspal cut -
back @ 0,5l/m2

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 5 1 L.081 5 #VALUE! #VALUE!
K Pembantu operator 5 1 L.083 5 #VALUE! #VALUE!
E Buruh tak terampil 12 1 L.101 12 0.0 0.0
R Buruh terampil 12 1 L.106 12 0.0 0.0
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M H.R.S. (LATASTON) tonne K.035 110.00 #VALUE! #VALUE!


A Aspal kg M.061 600.00 #VALUE! #VALUE!
T Minyak bakar Lt M.065 150.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 1.70 150,000.00 255,000.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas tandem 6-10 ton 1 1 E.081 5.0 #VALUE! #VALUE!


E Mesin gilas roda karet 8-15 ton 1 1 E.084 5.0 #VALUE! #VALUE!
R Mesin penyemprot aspal 1000 ltr 1 1 E.153 5.0 #VALUE! #VALUE!
A Mesin penghampar 1820mm/30 1 1 E.157 5.0 #VALUE! #VALUE!
L Campressor 210m3/jam 1 1 E.301 5.0 #VALUE! #VALUE!
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,500.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20mm K.638
LATASIR (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Membersihkan permukaan aspal lama de - 1 Menggunakan tenaga manusia (1600m2/hari)
ngan tenaga manusia. 2 Pasir aspal dikirim kelokasi pekerjaan oleh pemasok dari AMP
2 Dilapis dengan lapis tack/pengikat 3 BJ padat 1,9t/m3
3 Hamparkan pasir aspal dengan tenaga ma- 4 Tebal padat rata-rata 2cm
nusia. 5 Lapis tack/pengikat aspal cutback dihampar @ 0,5l/m2
4 Digilas sampai padat. 6 Sesuai Spesifikasi B.M.No.02/PT/B/1083

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1 1 L.061 1 #VALUE! #VALUE!


E Operator terampil 3 1 L.081 3 #VALUE! #VALUE!
K Pembantu operator 3 1 L.083 3 #VALUE! #VALUE!
E Buruh tak terampil 10 1 L.101 10 0 0
R Buruh terampil 8 1 L.106 8 0 0
J Supir terampil 1 1 L.091 1 #VALUE! #VALUE!
A Pembantu supir 1 1 L.099 1 #VALUE! #VALUE!

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Campuran panas LATASIR tonne K.020 60.00 #VALUE! #VALUE!


A Aspal kg M.061 480.00 #VALUE! #VALUE!
T Minyak bakar M3 M.065 480.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 4.00 150,000.00 600,000.00
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas tandem 6-10 ton 1 1 E.081 5.0 #VALUE! #VALUE!


E Mesin gilas roda karet 8-15 ton 1 1 E.084 5.0 #VALUE! #VALUE!
R Mesin penyemprot aspal 400 ltr 1 1 E.154 5.0 #VALUE! #VALUE!
A Truk bak terbuka 3,5ton/115 HP 1 1 E.221 5.0 #VALUE! #VALUE!
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,600.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS TIPIS ASPAL PASIR 20mm K.638.M
LATASIR (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Membersihkan permukaan aspal lama de - 1 Menggunakan tenaga manusia (1600m2/hari)
ngan tenaga manusia. 2 Pasir aspal dikirim kelokasi pekerjaan oleh pemasok dari AMP
2 Dilapis dengan lapis tack/pengikat 3 BJ padat 1,9t/m3
3 Hamparkan pasir aspal dengan tenaga 4 Tebal padat rata-rata 2cm
manusia 5 Lapis tack/pengikat aspal cutback dihampar @ 0,5l/m2
4 Digilas sampai padat. 6 Sesuai Spesifikasi B.M.No.02/PT/B/1083

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 3.00 1.00 L.081 3.00 #VALUE! #VALUE!
K Pembantu operator 3.00 1.00 L.083 3.00 #VALUE! #VALUE!
E Buruh tak terampil 8.00 1.00 L.101 8.00 #VALUE! #VALUE!
R Buruh terampil 8.00 1.00 L.106 8.00 #VALUE! #VALUE!
J Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
A Pembantu supir 1.00 1.00 L.099 1.00 #VALUE! #VALUE!

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Campuran panas LATASIR tonne K.020 M 60.00 #VALUE! #VALUE!


A Aspal kg M.061 480.00 #VALUE! #VALUE!
T Kayu bakar M3 M.070 7.50 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 6.00 150,000.00 900,000.00
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas tandem 6-10 ton 1.00 1.00 E.081 5.00 #VALUE! #VALUE!
E Mesin gilas roda karet 8-15 ton 1.00 0.00 E.084 0.00 #VALUE! #VALUE!
R Mesin penyemprot aspal 400 ltr 1.00 1.00 E.154 0.00 #VALUE! #VALUE!
A Truk bak terbuka 3,5ton/115 HP 1.00 1.00 E.221 5.00 #VALUE! #VALUE!
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 1,600.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


ANALISA HARGA SATUAN KODE
JAYAPURA PENGHAMPARAN LAPIS PERMUKAAN ASPAL BETON K.641
LASTON (MENGGUNAKAN ALAT)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pengisian material sampai bin dari spreader 1 Menggunakan alat berat
oleh pemasok. 2 Hotmix aspal beton dikirim sampai ke spreader oleh pemasok dari AMP
2 Material dihamparkan dengan spreader dan 3 Berat jenis padat 2.25 t/m3, tebal padat 5 cm
dipadatkan dengan mesin gilas oda baja dan 4 Dihampar & dipadatkan 900 m2/hari
mesin gilas pneumatik roda karet. 5 Lapis tack/pengikat aspal cutback dihampar @ 0,5l/m2
6 Sesuai Spesifikasi B.M.No.13/PT/B/1983 (Mix v) & rev. Spek. Umum Maret '89 - Buku 3

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Operator terampil 5.00 1.00 L.081 5.00 #VALUE! #VALUE!
K Pembantu operator 5.00 1.00 L.083 5.00 #VALUE! #VALUE!
E Buruh tak terampil 15.00 1.00 L.101 15.00 #VALUE! #VALUE!
R Buruh terampil 10.00 1.00 L.106 10.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Aspal beton (Laston) tonne K.040 100.00 #VALUE! #VALUE!


A Pasir ayak untuk beton M3 M.041 0.90 #VALUE! #VALUE!
T Aspal Kg M.061 360.00 #VALUE! #VALUE!
E Minyak bakar Ltr M.065 90.00 #VALUE! #VALUE!
R Alat bantu (set @ 3 alat) set M.170 0.48 150,000.00 72,000.00
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas 3 roda 6-8 to 1.00 1.00 E.080 5.00 #VALUE! #VALUE!
E Mesin gilas tandem 6-10 t 1.00 1.00 E.081 5.00 #VALUE! #VALUE!
R Mesin gilas roda karet 8-15 to 1.00 1.00 E.084 5.00 #VALUE! #VALUE!
A Mesin penyemprot aspal 1000 ltr 1.00 1.00 E.153 3.00 #VALUE! #VALUE!
L Mesin penghampar 1820 mm/30 1.00 1.00 E.157 5.00 #VALUE! #VALUE!
A Air Compressor 210 m3/jam 1.00 1.00 E.301 4.00 #VALUE! #VALUE!
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 900.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


2,000.00
mum B.M. Maret 89 - Buku 3
#VALUE!
ANALISA HARGA SATUAN KODE
KONSTRUKSI PASANGAN BATU K.705
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Material ditimbun di lokasi pekerjaan oleh - 1 Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan struk-
pemasok tur lainnya yang menggunakan konstruksi pasangan batu
2 Pekerja membawa batu pecah ke tempat 2 Material-material dikirim ke tempat pekerjaan oleh pemasok
tukang batu bekerja 3 Tidak termasuk galian/timbunan
3 Tukang batu memasang batu pecah dengan 4 Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu untuk
adukan pasir semen lubang drainase

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Kepala tukang 1.00 1.00 L.073 1.00 #VALUE! #VALUE!


E Tukang 4.00 1.00 L.079 4.00 #VALUE! #VALUE!
K Buruh tak terampil 12.00 1.00 L.101 12.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Batu quarry m3 M.010 5.00 #VALUE! #VALUE!


A Pasir ayak untuk beton m3 M.041 1.25 #VALUE! #VALUE!
T Semen Zak M.080 19.00 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 1.00 150,000.00 150,000.00
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Pompa air (DIA. 50) 1.00 1.00 E.341 2.000 #VALUE! #VALUE!
E
R
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 5.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
ACUAN UNTUK BETON STRUKTUR K.710
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pengadaan bahan oleh pemasok 1 Kelompok tukang kayu memasang 20m2 dalam 1 hari kerja
2 Kelompok tukang kayu memotong dan mem 2 1/3 material dapat dipakai kembali
buat acuan. 3 Pengadaan bahan oleh pemasok
3 Kelompok tukang kayu membongkar acuan 4 Untuk 1m3 beton dipakai 20 lbr plywood (120cm x 240cm x 1.75cm)
setelah beton cukup kuat. 5 Kelompok tukang kayu membongkar acuan.
4 Kelompok tukang kayu membersihkan acu -
an untuk dipakai kembali

KODE TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Kepala tukang 1.00 1.00 L.073 1.00 #VALUE! #VALUE!


E Tukang 4.00 1.00 L.079 4.00 #VALUE! #VALUE!
K Buruh tak terampil 7.00 1.00 L.101 7.00 #VALUE! #VALUE!
E Buruh terampil 3.00 1.00 L.106 3.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Paku jembatan kg M.166 4.00 #VALUE! #VALUE!


A Kayu acuan m3 M.180 0.60 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 0.56 150,000.00 84,000.00
E
R
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN 0.00
TOTAL (Rp.) #VALUE!

VOLUME = 20.0 SATUAN = M2 HARGA SATUAN #VALUE! per m2


ANALISA HARGA SATUAN KODE
MELURUSKAN, MEMBENGKOK & MEMASANG TULANGAN BESI BETON K.715
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Batang besi beton dipotong sesuai ukuran 1 200 kg tulangan jadi disiapkan dalam 1 hari
panjang yang diperlukan. 2 Besi tulangan dikirim ke tempat pekerjaan oleh pemasok
2 Batang dan beugel besi beton dibengkok- 3 Penyusutan akibat pemotongan 10% dan pakai kawat baja dll dianggap 1%
kan sesuai yang diperlukan. 4 Panjang dan diameter besi tulangan yang biasa dipakai gorong-gorong dll
3 Perakitan tulangan besi beton dan diikat - 5 Membengkok dan memasang batang besi beton dilaksanakan dengan tangan
dengan kawat baja. 6 0,8 orang-hari memotong 200kg batang besi beton
7 1,0 orang-hari membengkok 200 kg batang besi beton
8 1,2 orang-hari memasang dan mengikat 200 kg tulangan besi beton
9 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Kepala Tukang 1.00 1.00 L.073 1.00 #VALUE! #VALUE!
K Buruh tak terampil 3.00 1.00 L.101 3.00 #VALUE! #VALUE!
E Buruh terampil 1.00 1.00 L.106 1.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Tulangan besi beton kg M.167 225.00 #VALUE! #VALUE!


A Alat bantu (set @3 alat) set M.170 0.12 150,000.00 18,000.00
T
E
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.) #VALUE!

VOLUME = 200.0 SATUAN = Kg HARGA SATUAN Rp. #VALUE! per kg


ANALISA HARGA SATUAN KODE
BETON NON STRUKTUR/RABAT KLAS Bo K.719
(MENGGUNAKAN ALAT PENGADUK BETON 125 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pemasok
2 Beton diaduk di lokasi pekerjaan 2 Dipakai agregat pecah dan tersaring yang termurah
3 Beton dicor dan digetar sampai padat 3 Dicor 6,5m3/hari dengan 54 adukan /6 jam /hari
4 Adukan 1Pc:3Ps:5Kr(yaitu 1:8);semen:220kg/m3;air:120kg/m3;2326kg/m3
5 Anggap tiap adukan membutuhkan : 2/3 zak (18,5liter lepas)semen
portland; 55,6liter pasir;92,6liter kerikil dan 14,5 liter air
6 Beton kurus dipakai utk dasar dan lantai kerja pondasi,dll
7 Untuk dasar/lantai kerja beton, diijinkan memakai acuan seperlunya
8 Sesuai Peraturan Beton Bertulang Indonesia (PBI 1971 N.I. 2)

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 2.00 L.061 2.00 #VALUE! #VALUE!


E Kepala Tukang 1.00 2.00 L.073 2.00 #VALUE! #VALUE!
K Buruh tak terampil 12.00 2.00 L.101 24.00 #VALUE! #VALUE!
E Buruh terampil 2.00 2.00 L.106 4.00 #VALUE! #VALUE!
R
J
A

PEKERJA #VALUE!
TOTAL HAR GA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 6.00 #VALUE! #VALUE!


A Semen Zak M.080 72.00 #VALUE! #VALUE!
T Kayu acuan m3 M.180 0.19 #VALUE! #VALUE!
E Alat bantu (set @ 3 alat) set M.170 0.96 150,000.00 144,000.00
R Batu sungai pecah tersa ring m3 K.017 10.00 #VALUE! #VALUE!
I
A
L

MATERIAL #VALUE!
HARI JAM HAR GA B IAYA SUB TOTAL
P E RALATAN JUMLAH KODE
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 1.00 2.00 E.089 12.00 #VALUE! #VALUE!


E Pengaduk beton 1.00 2.00 E.251 12.00 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 1.00 2.00 E.341 4.00 #VALUE! #VALUE!
A
L 20.77
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 13.0 SATUAN = M3 HARGA SATUAN #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON MASSA KLAS K125 K.720
(MENGGUNAKAN ALAT PENGADUK BETON 125 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton di aduk di lokasi pekerjaan 3 Dicor 5,75m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 1Pc:3Ps:4Kr (yaitu 1:7);semen:250kg /m3;air:130kg/m3;2359kg/m
5 Anggap tiap adukan membutuhkan: 3/4 zak (20,8 liter lepas)semen
portland; 62,5 liter pasir ; 83,3 liter kerikil dan 15,6 liter air
6 Tidak termasuk acungan dan tulangan besi beton yang sudah dipasang
7 Beton massa dipakai utk kepala jembatan/struktur beton tdk bertulang
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 4.00 L.061 4.00 #VALUE! #VALUE!


E Buruh tak terampil 12.00 4.00 L.101 48.00 #VALUE! #VALUE!
K Buruh terampil 2.00 4.00 L.106 8.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 12.00 #VALUE! #VALUE!


A Semen Zak M.080 144.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 1.92 150,000.00 288,000.00
E Batu sungai pecah tersa - m3 K.017 16.00 #VALUE! #VALUE!
R ring
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 1.00 4.00 E,089 24.0 #VALUE! #VALUE!


E Pengaduk beton 1.00 4.00 E,251 24.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 1.00 4.00 E,341 8.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 23.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
BETON STRUKTUR KLAS K175 K.721
(MENGGUNAKAN ALAT PENGADUK BETON 125 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
2 Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
3 Beton diaduk dilokasi pekerjaan 3 Dicor 6,0m3/hari dengan 50adukan /6jam/hari
4 Beton dicor dan digetar sampai padat 4 Adukan 2Pc:5Ps:7Kr(yaitu:6);semen:300kg/m3;air:150kg/m3;2485kg/m3
portland; 62,5 liter pasir; 87,5 liter kerikil dan 18,0 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton dengan tulangan ringan dipakai utk pondasi plat, dinding dll
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 4.00 L. 061 4.00 #VALUE! #VALUE!


E Buruh tak terampil 12.00 4.00 L. 101 48.00 #VALUE! #VALUE!
K Buruh tarampil 2.00 4.00 L. 106 8.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 12.50 #VALUE! #VALUE!


A Semen Zak M.080 180.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 1.92 150,000.00 288,000.00
E Batu sungai pecah tersa - m3 K.017 17.50 #VALUE! #VALUE!
R ring
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 1.00 4.00 E.089 24.0 #VALUE! #VALUE!


E Pengaduk beton 1.00 4.00 E.251 24.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 1.00 4.00 E.341 8.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 24.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
BETON STRUKTUR KLAS K225 K.722
(MENGGUNAKAN ALAT PENGADUK BETON 125 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim ke lokasi pekerjaan oleh pemasok
2 Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
3 Beton diaduk dilokasi pekerjaan 3 Dicor 6,17m3/hari dengan 54 adukan/6jam/hari
4 Beton dicor dan digetar sampai padat 4 Adukan 1Pc:2Ps:3Kr (yaitu 1:5);semen:350kg/m3;air:160kg/m3;2487kg/m3
5 Anggap tiap adukan membutuhkan: 1 zak (27,8 liter lepas) semen
portland; 55,6 liter pasir; 83,3 liter kerikil dan 18,3 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton bertulang dipakai utk pilar,gorong-gorong,dinding penahan dll
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 6.00 L.061 6.00 #VALUE! #VALUE!


E Buruh tak terampil 12.00 6.00 L.101 72.00 #VALUE! #VALUE!
K Buruh terampil 2.00 6.00 L.106 12.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 18.00 #VALUE! #VALUE!


A Semen Zak M.080 324.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 2.88 150,000.00 432,000.00
E Batu sungai pecah tersaring m3 K.017 27.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 1.00 6.00 E. 089 36.0 #VALUE! #VALUE!


E Pengaduk beton 1.00 6.00 E. 251 36.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 1.00 6.00 E. 341 12.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 37.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


###
ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K125 K.723
(MENGGUNAKAN ALAT PENGADUK BETON 250 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 11,5m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 1Pc:2Ps:4Kr(yaitu 1:7);semen:250kg/m3;air:130kg/m3;2359kg/m3
5 Anggap tiap adukan membutuhkan: 1,5 zak (21,7 liter lepas) semen
portland; 125 liter pasir; 166,7 liter kerikil dan 31,2 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton massa dipakai utk kepala jembatan/struktur beton tdk bertulang
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 6.00 L.061 6.00 #VALUE! #VALUE!


E Buruh tak terampil 25.00 6.00 L.101 150.00 #VALUE! #VALUE!
K Buruh terampil 3.00 6.00 L.106 18.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 36.00 #VALUE! #VALUE!


A Semen Zak M.080 432.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 6.00 150,000.00 900,000.00
E Batu sungai pecah tersaring m3 K.017 48.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 2.00 6.00 E. 089 72.0 #VALUE! #VALUE!


E Pengaduk beton 250 ltr/10HP 1.00 6.00 E. 252 36.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 6.00 E. 341 12.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 69.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K175 K.724
(MENGGUNAKAN ALAT PENGADUK BETON 250 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 6,0m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 2Pc:5Ps:7Kr(yaitu 1:6);semen:300kg/m3;air:150kg/m3;2485kg/m3
5 Anggap tiap adukan membutuhkan: 1,5 zak (41,7 liter lepas) semen
portland; 104,2 liter pasir; 145,8 liter kerikil dan 30 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton dengan tulangan ringan dipakai utk pondasi plat, dinding dll.
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 5.00 L.061 5.00 #VALUE! #VALUE!


E Buruh tak terampil 25.00 5.00 L.101 125.00 #VALUE! #VALUE!
K Buruh terampil 3.00 5.00 L.106 15.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 25.00 #VALUE! #VALUE!


A Semen Zak M.080 360.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 5.00 150,000.00 750,000.00
E Batu sungai pecah tersaring m3 K.017 35.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 2.00 5.00 E. 089 60.0 #VALUE! #VALUE!


E Pengaduk beton 250 ltr/10HP 1.00 5.00 E. 252 30.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 5.00 E. 341 10.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 48.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K225 K.725
(MENGGUNAKAN ALAT PENGADUK BETON 250 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 11,0m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 1Pc:2Ps:3Kr(yaitu 1:5);semen:350kg/m3;air:160kg/m3;2487kg/m3
5 Anggap tiap adukan membutuhkan: 2,0 zak (55,6 liter lepas) semen
portland; 111,1 liter pasir; 166,7 liter kerikil dan 36,6 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton bertulang ringan dipakai utk pilar, gorong-gorong, dinding penahan dll.
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 3.00 L.061 3.00 #VALUE! #VALUE!


E Buruh tak terampil 25.00 3.00 L.101 75.00 #VALUE! #VALUE!
K Buruh terampil 3.00 3.00 L.106 9.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 16.00 #VALUE! #VALUE!


A Semen Zak M.080 288.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 3.00 150,000.00 450,000.00
E Batu sungai pecah tersaring m3 K.017 24.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 2.00 3.00 E. 089 36.0 #VALUE! #VALUE!


E Pengaduk beton 250 ltr/10HP 1.00 3.00 E. 252 18.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 3.00 E. 341 6.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 33.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K175 K.727
(MENGGUNAKAN ALAT PENGADUK BETON 500 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 19,0m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 2Pc:5Ps:7Kr(yaitu 1:6);semen:300kg/m3;air:150kg/m3;2485kg/m3
5 Anggap tiap adukan membutuhkan: 3,0 zak (83,3 liter lepas) semen
portland; 208,3 liter pasir; 291,7 liter kerikil dan 60 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton dengan tulangan ringan dipakai utk pondasi plat, dinding dll.
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 5.00 L.061 5.00 #VALUE! #VALUE!


E Buruh tak terampil 50.00 5.00 L.101 250.00 #VALUE! #VALUE!
K Buruh terampil 5.00 5.00 L.106 25.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 50.00 #VALUE! #VALUE!


A Semen Zak M.080 720.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 10.00 150,000.00 1,500,000.00
E Batu sungai pecah tersaring m3 K.017 70.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 4.00 5.00 E. 089 120.0 #VALUE! #VALUE!


E Pengaduk beton 500 ltr/20HP 1.00 5.00 E. 253 30.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 5.00 E. 341 10.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 96.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K225 K.728
(MENGGUNAKAN ALAT PENGADUK BETON 500 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 22,0m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 1Pc:2Ps:3Kr(yaitu 1:5);semen:350kg/m3;air:160kg/m3;2487kg/m3
5 Anggap tiap adukan membutuhkan: 4,0 zak (111,1 liter lepas) semen
portland; 222,2 liter pasir; 333,3 liter kerikil dan 73,1 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton bertulang ringan dipakai utk pilar, gorong-gorong, dinding penahan dll.
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 3.00 L.061 6.00 #VALUE! #VALUE!


E Buruh tak terampil 50.00 3.00 L.101 150.00 #VALUE! #VALUE!
K Buruh terampil 5.00 3.00 L.106 15.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 32.00 #VALUE! #VALUE!


A Semen Zak M.080 576.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 6.00 150,000.00 900,000.00
E Batu sungai pecah tersaring m3 K.017 48.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 4.00 3.00 E. 089 72.0 #VALUE! #VALUE!


E Pengaduk beton 500 ltr/20HP 1.00 3.00 E. 253 18.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 3.00 E. 341 6.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 66.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K275 K.729
(MENGGUNAKAN ALAT PENGADUK BETON 500 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 24,0m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 2Pc:3Ps:6Kr(yaitu 2:9);semen:400kg/m3;air:170kg/m3;2598kg/m3
5 Anggap tiap adukan membutuhkan: 5,0 zak (138,9 liter lepas) semen
portland; 208,3 liter pasir;416,7 liter kerikil dan 85,0 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton bertulang dipakai utk bagian - bagian struktur utama
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 1.00 L.061 2.00 #VALUE! #VALUE!


E Buruh tak terampil 50.00 1.00 L.101 50.00 #VALUE! #VALUE!
K Buruh terampil 5.00 1.00 L.106 5.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 10.00 #VALUE! #VALUE!


A Semen Zak M.080 240.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 2.00 150,000.00 300,000.00
E Batu sungai pecah tersaring m3 K.017 20.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 4.00 1.00 E. 089 24.0 #VALUE! #VALUE!


E Pengaduk beton 500 ltr/20HP 1.00 1.00 E. 253 6.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 1.00 E. 341 2.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 24.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN KODE
0.00 BETON STRUKTUR KLAS K350 K.730
(MENGGUNAKAN ALAT PENGADUK BETON 500 LITER)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pemasok mengirim material 1 Bahan-bahan dasar dikirim kelokasi pekerjaan oleh pemasok
### Acuan dan tulangan besi beton dipasang 2 Dipakai agregat pecah dan tersaring yang termurah
### Beton diaduk dilokasi pekerjaan 3 Dicor 22,6m3/hari dengan 48 adukan/6jam/hari
### Beton dicor dan digetar sampai padat 4 Adukan 4Pc:6Ps:11Kr(yaitu 4:17);semen:425kg/m3;air:180kg/m3;2642kg/m3
5 Anggap tiap adukan membutuhkan: 5,0 zak (138,9 liter lepas) semen
portland; 208,3 liter pasir;381,9 liter kerikil dan 84,7 liter air
6 Tidak termasuk acuan dan tulangan besi beton yang sudah dipasang
7 Beton dipakai utk bagian - bagian struktur pratekan, lantai jembatan dll.
8 Sesuai Peraturan Beton bertulang Indonesia (PBI 1971 N.1.2)

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA SUB TOTAL
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 2.00 6.00 L.061 12.00 #VALUE! #VALUE!


E Buruh tak terampil 50.00 6.00 L.101 300.00 #VALUE! #VALUE!
K Buruh terampil 5.00 6.00 L.106 30.00 #VALUE! #VALUE!
E
R
J
A

PEKERJA #VALUE!
MATE R IAL SATUAN KODE TOTAL HAR GA B IAYA SUB TOTAL
VOL (Rp./unit) (Rp.) (Rp.)

M Pasir ayak untuk beton m3 M.041 60.00 #VALUE! #VALUE!


A Semen Zak M.080 1,440.00 #VALUE! #VALUE!
T Alat bantu (set @ 3 alat) set M.170 12.00 150,000.00 1,800,000.00
E Batu sungai pecah tersaring m3 K.017 110.00 #VALUE! #VALUE!
R
I
A
L

MATERIAL #VALUE!
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA SUB TOTAL
KERJA KERJA (Rp./unit) (Rp.) (Rp.)

P Alat penggetar beton 4 HP 4.00 6.00 E. 089 144.0 #VALUE! #VALUE!


E Pengaduk beton 500 ltr/20HP 1.00 6.00 E. 253 36.0 #VALUE! #VALUE!
R Pompa air (DIA.50mm) 30 m3/ja 1.00 6.00 E. 341 12.0 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 135.0 SATUAN = M3 HARGA SATUAN Rp. #VALUE! per m3


ANALISA HARGA SATUAN
JAYAPURA BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN KERIKIL
KRLL KLAS 1 ( < 50 LHR ) (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pekerja jalan memelihara jalan setiap ha - 1 Dua orang bersama - sama memelihara jalan sepanjang 8km per tahun
rinya 2 Hari kerja dialokasikan sebagai berikut :
2 Kelompok pekerja jalan melakukan tugas - - Pembersihan gorong - gorong 10 orang - hari/km/tahun
lain seurutan prioritas sepanjang tahun - Pembersihan parit 20 orang - hari/km/tahun
- Pemotongan rumput 30 orang - hari/km/tahun
- Pemeliharaan alur sungai dibawah jembatan 9 orang - hari/km/tahun
- Pemeliharaan lantai jembatan 6 orang - hari/km/tahun

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA


(org.hari) (Rp./org/hari) (Rp.)

P Buruh tak terampil 2 300 L.101 600 #VALUE! #VALUE!


E
K
E
R
J
A

PEKERJA
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA
VOL (Rp./unit) (Rp.)

M Pengkerikilan ulang KEPATUP m2 K.877 800.00 #VALUE! #VALUE!


A Perbaikan lubang jl. kerikil m2 K.865 400.00 #VALUE! #VALUE!
T Perbaikan ambles jl. kerikil m2 K.870 80.00 #VALUE! #VALUE!
E Perataan kembali jl. kerikil km K.860 32.00 #VALUE! #VALUE!
R Pembersihan parit m K.424 1,600.00 #VALUE! #VALUE!
I Pembersihan semak pd bahu Jl. are K.422 80.00 #VALUE! #VALUE!
A Pembentukan bahu jalan keras m3 K.411 24.00 #VALUE! #VALUE!
L Alat bantu (set @ 3 alat) set M.170 30.40 150,000.00 4,560,000.00

MATERIAL
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA
KERJA KERJA (Rp./unit) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.)

VOLUME = 8.0 SATUAN = Km HARGA SATUAN Rp. #VALUE!


ANALISA HARGA SATUAN
JAYAPURA BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN KERIKIL
KRLL KLAS 2 (50-200 LHR) (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pekerja jalan memelihara jalan setiap ha - 1 Dua orang bersama - sama memelihara jalan sepanjang 7km per tahun
rinya. 2 Hari kerja dialokasikan sebagai berikut :
2 Kelompok pekerja jalan melakukan tugas - - Pembersihan gorong - gorong 10 orang - hari/km/tahun
lain seurutan prioritas sepanjang tahun - Pembersihan parit 25 orang - hari/km/tahun
- Pemotongan rumput 35 orang - hari/km/tahun
- Pemeliharaan alur sungai dibawah jembatan 9 orang - hari/km/tahun
- Pemeliharaan lantai jembatan 7 orang - hari/km/tahun

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA


(org.hari) (Rp./org/hari) (Rp.)

P Buruh tak terampil 2 300 L.101 600 #VALUE! #VALUE!


E
K
E
R
J
A

PEKERJA
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA
VOL (Rp./unit) (Rp.)

M Pengkerikilan ulang KEPATUP m2 K.877 1,400.00 #VALUE! #VALUE!


A Perbaikan lubang jl. kerikil m2 K.865 420.00 #VALUE! #VALUE!
T Perbaikan ambles jl. kerikil m2 K.870 84.00 #VALUE! #VALUE!
E Perataan kembali jl. kerikil km K.860 42.00 #VALUE! #VALUE!
R Pembersihan parit m K.424 1,400.00 #VALUE! #VALUE!
I Pembersihan semak pd bahu Jl. are K.422 105.00 #VALUE! #VALUE!
A Pembentukan bahu jalan keras m3 K.411 42.00 #VALUE! #VALUE!
L Alat bantu (set @ 3 alat) set K.170 30.10 150,000.00 4,515,000.00

MATERIAL
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA
KERJA KERJA (Rp./unit) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.)

VOLUME = 7.0 SATUAN = Km HARGA SATUAN Rp. #VALUE!

ANALISA HARGA SATUAN


JAYAPURA BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL
KRLL KLAS 1 ( < 50 LHR ) (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pekerja jalan memelihara jalan setiap ha - 1 Dua orang bersama - sama memelihara jalan sepanjang 8km per tahun
rinya 2 Hari kerja dialokasikan sebagai berikut :
2 Kelompok pekerja jalan melakukan tugas - - Pembersihan gorong - gorong 10 orang - hari/km/tahun
lain seurutan prioritas sepanjang tahun - Pembersihan parit 20 orang - hari/km/tahun
- Pemotongan rumput 30 orang - hari/km/tahun
- Pemeliharaan alur sungai dibawah jembatan 9 orang - hari/km/tahun
- Pemeliharaan lantai jembatan 6 orang - hari/km/tahun

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA


(org.hari) (Rp./org/hari) (Rp.)

P Buruh tak terampil 2 300 L.101 600 #VALUE! #VALUE!


E
K
E
R
J
A

PEKERJA
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA
VOL (Rp./unit) (Rp.)

M Laburan BURAS m2 K.612 400.00 #VALUE! #VALUE!


A LAPEN/PERMUKAAN MACADAM 50mm m2 K.618 160.00 #VALUE! #VALUE!
T Perbaikan lubang jalan aspal m2 K.880 320.00 #VALUE! #VALUE!
E Perbaikan ambles jalan aspal m2 K.885 80.00 #VALUE! #VALUE!
R Pembersihan parit m K.424 1,600.00 #VALUE! #VALUE!
I Pembersihan semak pd bahu Jl. are K.422 80.00 #VALUE! #VALUE!
A Pembentukan & perataan bahu Jl. km K.855 16.00 #VALUE! #VALUE!
L Pembentukan bahu jalan keras m3 K.411 8.00 #VALUE! #VALUE!
Alat bantu (set @ 3 alat) set M.170 30.40 150,000.00 4,560,000.00
MATERIAL
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA
KERJA KERJA (Rp./unit) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.)

VOLUME = 8.0 SATUAN = Km HARGA SATUAN Rp. #VALUE!

ANALISA HARGA SATUAN


JAYAPURA BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL
KRLL KLAS 2 (50-200 LHR) (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pekerja jalan memelihara jalan setiap ha - 1 Dua orang bersama - sama memelihara jalan sepanjang 7km per tahun
rinya 2 Hari kerja dialokasikan sebagai berikut :
2 Kelompok pekerja jalan melakukan tugas - - Pembersihan gorong - gorong 10 orang - hari/km/tahun
lain seurutan prioritas sepanjang tahun - Pembersihan parit 25 orang - hari/km/tahun
- Pemotongan rumput 35 orang - hari/km/tahun
- Pemeliharaan alur sungai dibawah jembatan 9 orang - hari/km/tahun
- Pemeliharaan lantai jembatan 7 orang - hari/km/tahun

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA


(org.hari) (Rp./org/hari) (Rp.)

P Buruh tak terampil 2 300 L.101 600 #VALUE! #VALUE!


E
K
E
R
J
A

PEKERJA
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA
VOL (Rp./unit) (Rp.)

M Laburan BURAS m2 K.612 350.00 #VALUE! #VALUE!


A LAPEN/PERMUKAAN MACADAM 50mm m2 K.618 210.00 #VALUE! #VALUE!
T Perbaikan lubang jalan aspal m2 K.880 420.00 #VALUE! #VALUE!
E Perbaikan ambles jalan aspal m2 K.885 105.00 #VALUE! #VALUE!
R Pembersihan parit m K.424 1,400.00 #VALUE! #VALUE!
I Pembersihan semak pd bahu Jl. are K.422 105.00 #VALUE! #VALUE!
A Pembentukan & perataan bahu Jl. km K.855 21.00 #VALUE! #VALUE!
L Pembentukan bahu jalan keras m3 K.411 14.00 #VALUE! #VALUE!
Alat bantu (set @ 3 alat) set M.170 30.10 150,000.00 4,515,000.00
MATERIAL
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA
KERJA KERJA (Rp./unit) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.)

VOLUME = 7.0 SATUAN = Km HARGA SATUAN Rp. #VALUE!

ANALISA HARGA SATUAN


JAYAPURA BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL
KRLL KLAS 3 (200-500 LHR ) (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pekerja jalan memelihara jalan setiap ha - 1 Dua orang bersama - sama memelihara jalan sepanjang 6km per tahun
rinya 2 Hari kerja dialokasikan sebagai berikut :
2 Kelompok pekerja jalan melakukan tugas - - Pembersihan gorong - gorong 10 orang - hari/km/tahun
lain seurutan prioritas sepanjang tahun - Pembersihan parit 32 orang - hari/km/tahun
- Pemotongan rumput 42 orang - hari/km/tahun
- Pemeliharaan alur sungai dibawah jembatan 9 orang - hari/km/tahun
- Pemeliharaan lantai jembatan 7 orang - hari/km/tahun

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA


(org.hari) (Rp./org/hari) (Rp.)

P Buruh tak terampil 2 300 L.101 600 #VALUE! #VALUE!


E
K
E
R
J
A

PEKERJA
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA
VOL (Rp./unit) (Rp.)

M Laburan BURAS m2 K.612 300.00 #VALUE! #VALUE!


A LAPEN/PERMUKAAN MACADAM 50mm m2 K.618 240.00 #VALUE! #VALUE!
T Perbaikan lubang jalan aspal m2 K.880 480.00 #VALUE! #VALUE!
E Perbaikan ambles jalan aspal m2 K.885 120.00 #VALUE! #VALUE!
R Pembersihan parit m K.424 1,200.00 #VALUE! #VALUE!
I Pembersihan semak pd bahu Jl. are K.422 90.00 #VALUE! #VALUE!
A Pembentukan & perataan bahu Jl. km K.855 18.00 #VALUE! #VALUE!
L Pembentukan bahu jalan keras m3 K.411 24.00 #VALUE! #VALUE!
Alat bantu (set @ 3 alat) set M.170 30.40 150,000.00 4,560,000.00
MATERIAL
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA
KERJA KERJA (Rp./unit) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.)

VOLUME = 6.0 SATUAN = km HARGA SATUAN Rp. #VALUE!

ANALISA HARGA SATUAN


JAYAPURA BIAYA PEMELIHARAAN RUTIN TAHUNAN JALAN ASPAL
KRLL KLAS 4 (500-1600 LHR) (MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Pekerja jalan memelihara jalan setiap ha - 1 Dua orang bersama - sama memelihara jalan sepanjang 5km per tahun
rinya 2 Hari kerja dialokasikan sebagai berikut :
2 Kelompok pekerja jalan melakukan tugas - - Pembersihan gorong - gorong 10 orang - hari/km/tahun
lain seurutan prioritas sepanjang tahun - Pembersihan parit 40 orang - hari/km/tahun
- Pemotongan rumput 52 orang - hari/km/tahun
- Pemeliharaan alur sungai dibawah jembatan 9 orang - hari/km/tahun
- Pemeliharaan lantai jembatan 9 orang - hari/km/tahun

PEKERJA VOL HARI KODE TOTAL VOL UPAH B IAYA


(org.hari) (Rp./org/hari) (Rp.)

P Buruh tak terampil 2 300 L.101 600 #VALUE! #VALUE!


E
K
E
R
J
A

PEKERJA
MAT E R IAL SATUAN KODE T O TAL HAR GA B IAYA
VOL (Rp./unit) (Rp.)

M Laburan BURAS m2 K.612 250.00 #VALUE! #VALUE!


A LAPEN/PERMUKAAN MACADAM 50mm m2 K.618 250.00 #VALUE! #VALUE!
T Perbaikan lubang jalan aspal m2 K.880 500.00 #VALUE! #VALUE!
E Perbaikan ambles jalan aspal m2 K.885 125.00 #VALUE! #VALUE!
R Pembersihan parit m K.424 1,000.00 #VALUE! #VALUE!
I Pembersihan semak pd bahu Jl. are K.422 75.00 #VALUE! #VALUE!
A Pembentukan & perataan bahu Jl. km K.855 20.00 #VALUE! #VALUE!
L Pembentukan bahu jalan keras m3 K.411 40.00 #VALUE! #VALUE!
Alat bantu (set @ 3 alat) set M.170 30.00 150,000.00 4,500,000.00
MATERIAL
P E RALATAN JUMLAH HARI KODE JAM HAR GA B IAYA
KERJA KERJA (Rp./unit) (Rp.)

P
E
R
A
L
A
T
A
N

PERALATAN
TOTAL (Rp.)

VOLUME = 5.0 SATUAN = km HARGA SATUAN Rp. #VALUE!


KODE
K.801

an sepanjang 8km per tahun

SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

0.00
#VALUE!

per km
KODE
K.802

an sepanjang 7km per tahun

SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

0.00
#VALUE!

per km

KODE
K.803

an sepanjang 8km per tahun

SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

0.00
#VALUE!

per km

KODE
K.804
an sepanjang 7km per tahun

SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

0.00
#VALUE!

per km

KODE
K.805
an sepanjang 6km per tahun

SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

0.00
#VALUE!

per km

KODE
K.806
an sepanjang 5km per tahun

SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

#VALUE!
SUB TOTAL
(Rp.)

0.00
#VALUE!

per km
ANALISA HARGA SATUAN KODE
PERBAIKAN LUBANG JALAN ASPAL K.880
(MENGGUNAKAN BURUH)
PROPINSI : PAPUA KOTA : KOTA JAYAPURA DISIAPKAN OLEH :
KODE : ( 82 ) KODE : JAYAPURA TGL. /BULAN/TAHUN :
PROSES: ANGGAPAN :
1 Digali persegi sampai dasar yang mantap 1 Kedalaman rata-rata 10 cm
2 Mengganti bahan LPA & padatkan 2 Termasuk pengadaan material
3 Sapu bersih permukaan 3 Rata-rata hasil kerja kelompok 35 m2/hari
4 Dilapis prime/resap dan ditutup lapis 4 Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat
permukaan baru

TOTAL VOL UPAH B IAYA SUB TOTAL


PEKERJA VOL HARI KODE
(org.hari) (Rp./org/hari) (Rp.) (Rp.)

P Mandor 1.00 1.00 L.061 1.00 #VALUE! #VALUE!


E Supir terampil 1.00 1.00 L.091 1.00 #VALUE! #VALUE!
K Pembantu supir 1.00 1.00 L.099 1.00 #VALUE! #VALUE!
E Buruh tak terampil 8.00 1.00 L.101 8.00 #VALUE! #VALUE!
R Buruh terampil 4.00 1.00 L.106 4.00 #VALUE! #VALUE!
J
A

PEKERJA #VALUE!
TOTAL HARGA B IAYA SUB TOTAL
MATE R IAL SATUAN KODE
VOL (Rp./unit) (Rp.) (Rp.)

M Batu sungai pecah tersaring m3 K.017 4.00 #VALUE! #VALUE!


A Pasir ayak untuk beton m3 M.041 0.50 #VALUE! #VALUE!
T Aspal kg M.061 17.50 #VALUE! #VALUE!
E Minyak bakar lt M.065 17.50 #VALUE! #VALUE!
R Alat bantu (set @ 3 alat) set M.170 1.78 150,000.00 267,263.63
I
A
L

MATERIAL #VALUE!
JAM HARGA B IAYA SUB TOTAL
P E RALATAN JUMLAH HARI KODE
KERJA (Rp./unit) (Rp.) (Rp.)

P Mesin gilas bergetar 1 ton 1.00 1.00 E.087 5.00 #VALUE! #VALUE!
E Mesin penyemprot aspal 400 ltr 1.00 1.00 E.154 0.00 #VALUE! #VALUE!
R Truk bak terbuka 3,5 ton/115 HP 1.00 1.00 E.221 5.00 #VALUE! #VALUE!
A
L
A
T
A
N

PERALATAN #VALUE!
TOTAL (Rp.) #VALUE!

VOLUME = 35.0 SATUAN = M2 HARGA SATUAN Rp. #VALUE! per m2


HARGA SATUAN PEKERJAAN DENGAN ANALISA BOW
PEMBANGUNAN JALAN, JEMBATAN DAN BANGUNAN PELENGKAP LAINNYA

Hrg. Sat. (Rp.) Jumlah Harga (Rp.)


No. Uraian Pekerjaan Jumlah (Rp.)
Upah/Bahan
Upah Bahan
1 2 3 4 5 6
I. GALIAN TANAH
I.1 1 M3 Galian Tanah Biasa sedalam 1 meter
0.400 HO Pekerja #VALUE! #VALUE!
0.040 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.2 1 M3 Galian Tanah Biasa sedalam 2 meter
0.526 HO Pekerja #VALUE! #VALUE!
0.053 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.3 1 M3 Galian Tanah Biasa sedalam 3 meter
0.735 HO Pekerja #VALUE! #VALUE!
0.074 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.4 1 M3 Galian Tanah Keras sedalam 1 meter
0.625 HO Pekerja #VALUE! #VALUE!
0.063 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.5 1 M3 Galian Tanah Cadas sedalam 1 meter
1.250 HO Pekerja #VALUE! #VALUE!
0.125 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.6 1 M3 Galian Tanah Lumpur sedalam 1 meter
0.823 HO Pekerja #VALUE! #VALUE!
0.083 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.7 1 M3 Galian Tanah Cadas
2.000 HO Pekerja #VALUE! #VALUE!
0.066 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
I.8 1 M3 Urugan Tanah Kembali
Dihitung 1/2 harga analisa yg sesuai dengan analisa di atas

II. PENGANGKUTAN TANAH


II.1 1 M3 ANGKUTAN S/D 30 M
0.330 HO Pekerja #VALUE! #VALUE!
0.010 HO M a n d o r #VALUE! #VALUE!
#VALUE! #VALUE!
II.2 1 M3 ANGKUTAN TANAH > 30 M
K = 9/275 (L + 75 )
K = Biaya yang dicari
a = Upah Pekerja
L = Jarak angkutan

III. PENGURUGAN
III.1 1 M3 Urugan Pasir/Tanah
1.200 M3 Pasir urug #VALUE! #VALUE!
0.300 HO Pekerja #VALUE! #VALUE!
0.010 HO Mandor #VALUE! #VALUE!
` #VALUE! #VALUE! #VALUE!
III.2 1 M3 Batu Karang/Ditimbris
1.200 M3 Batu karang #VALUE! #VALUE!
0.300 HO Pekerja #VALUE! #VALUE!
0.250 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
Note :
Utk permukaan tanah yg perlu lapisan karang atau batu
belah dpt dihitung per m2 setelah volume 1 m2 dihitung

III.3 1 M3 Urugan Karang yang Dipadatkan


1.200 M3 Karang #VALUE! #VALUE!
0.300 HO Pekerja #VALUE! #VALUE!
0.010 HO Mandor #VALUE! #VALUE!
Pemadatan (1/7500 x biaya menggilas) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6

IV. PASANGAN BATU KOSONG


IV.1 1 M3 PASANGAN BATU KOSONG
1.100 M3 Batu kali #VALUE! #VALUE!
1.500 HO Pekerja #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
IV.2 3 M3 BRONJONG BATU KALI UNTUK KAWAT 3 MM
25.000 KG Kawat galvano 3 mm #VALUE! #VALUE!
2.000 HO Penganyam #VALUE! #VALUE!
1.600 HO Pekerja menganyam #VALUE! #VALUE!
0.080 HO Mandor #VALUE! #VALUE!
3.000 M3 Batu Kali #VALUE! #VALUE!
4.500 HO Pekerja Mengisi #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M3 BRONJONG BATU KALI #VALUE!

IV.3 3 M3 BRONJONG BATU KALI UNTUK KAWAT 4 MM


45.000 KG Kg. Kawat galvano 4 mm #VALUE! #VALUE!
2.200 HO Penganyam #VALUE! #VALUE!
1.800 HO Pekerja menganyam #VALUE! #VALUE!
0.080 HO Mandor #VALUE! #VALUE!
3.000 M3 Batu Kali #VALUE! #VALUE!
4.500 HO Pekerja Mengisi #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M3 BRONJONG BATU KALI #VALUE!

IV.4 3 M3 BRONJONG BATU KALI UNTUK KAWAT 5 MM


70.000 KG Kawat galvano 5 mm #VALUE! #VALUE!
2.500 HO Penganyam #VALUE! #VALUE!
2.000 HO Pekerja menganyam #VALUE! #VALUE!
0.080 HO Mandor #VALUE! #VALUE!
3.000 M3 Batu Kali #VALUE! #VALUE!
4.500 HO Pekerja Mengisi #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M3 BRONJONG BATU KALI #VALUE!

V. PASANGAN BATU KALI


V.1 1 M3 UPAH PASANG TINGGI 6 M'
1.200 HO Tukang Batu #VALUE! #VALUE!
0.120 HO Kepala Tukang #VALUE! #VALUE!
3.600 HO Pekerja #VALUE! #VALUE!
0.180 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE!
V.2 1 M3 UPAH PASANGAN TINGGI 6 M'
1.500 HO Tukang Batu #VALUE! #VALUE!
0.150 HO Kepala Tukang #VALUE! #VALUE!
4.500 HO Pekerja #VALUE! #VALUE!
0.225 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE!
V.3 1 M3 PAS. BATU KALI ADUKAN 1:1
1.200 M3 Batu Kali #VALUE! #VALUE!
9.844 ZAK = 393,74 Kg Pc. #VALUE! #VALUE!
0.315 M3 Pasir #VALUE! #VALUE!
Upah Pilih diatas #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6

V.4 1 M3 PAS. BATU KALI ADUKAN 1:2


1.200 M3 Batu Kali #VALUE! #VALUE!
6.610 ZAK = 264,384 Kg Pc. #VALUE! #VALUE!
0.428 M3 Pasir #VALUE! #VALUE!
Upah Pilih diatas #VALUE!
#VALUE! #VALUE! #VALUE!
V.5 1 M3 PAS. BATU KALI ADUKAN 1:3
1.200 M3 Batu Kali #VALUE! #VALUE!
5.062 ZAK = 202,496 Kg Pc. #VALUE! #VALUE!
0.475 M3 Pasir #VALUE! #VALUE!
Upah Pilih diatas #VALUE!
#VALUE! #VALUE! #VALUE!
V.6 1 M3 PAS. BATU KALI ADUKAN 1:4
1.200 M3 Batu Kali #VALUE! #VALUE!
4.077 ZAK = 163,098 Kg Pc. #VALUE! #VALUE!
0.522 M3 Pasir #VALUE! #VALUE!
Upah Pilih diatas #VALUE!
#VALUE! #VALUE! #VALUE!
VI. PENGHAMPAR ATAS JALAN TEBAL 15 CM
TIAP 1 M2
0.200 M3 Batu Kali #VALUE! #VALUE!
0.05 M3 Pasir Urug #VALUE! #VALUE!
0.120 HO Tukang #VALUE! #VALUE!
0.120 HO Kepala Tukang #VALUE! #VALUE!
0.063 HO Pekerja #VALUE! #VALUE!
0.018 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
VI.1 BIAYA MENGGILAS 1 BULAN
26.000 HO Masinis #VALUE! #VALUE!
JAM Sewa mesin Gilas untuk 1 bulan #VALUE!
LT Bahan Bakar #VALUE!
#VALUE! #VALUE! #VALUE!
VI.2 100 M2 SLIJTLAAG TEBAL 6 CM
9.000 M3 Batu Pecah 5-7 cm #VALUE! #VALUE!
7.500 HO Pekerja #VALUE! #VALUE! #VALUE!
0.38 HO Mandor #VALUE! #VALUE!
2/75 Biaya menggilas #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M2 SLIJTLAAG 6 CM #VALUE!

VI.3 100 M2 SLIJTLAAG TEBAL 9 CM


Upah 9/6 x (Upah pekerja & Mandor) #VALUE!
Bahan 9/6 x (Harga batu pecah) #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M2 SLIJTLAAG 9 CM #VALUE!

VI.4 100 M2 SLIJTLAAG TEBAL 12 CM


Upah 12/6 x (Upah pekerja & Mandor) #VALUE!
Bahan 12/6 x ( Harga batu pecah) #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M2 SLIJTLAAG 12 CM #VALUE!

VI.5 100 M2 PENGASPALAN MUKA JALAN DGN ASPAL


PANAS 5 KG/1M2
500.000 KG Aspal panas #VALUE! #VALUE!
2.400 M3 Ciping/Split #VALUE! #VALUE!
1.000 HO Tukang masak aspal #VALUE! #VALUE!
20.000 HO Pekerja #VALUE! #VALUE!
1.000 HO Mandor #VALUE! #VALUE!
1/750 Biaya menggilas #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M2 PENGASPALAN MUKA JALAN #VALUE!
1 2 3 4 5 6

VI.7 100 M2 DENGAN ASPAL 2,5 KG/M2


Upah 2,5 /5 x (Upah analisa VI.5) #VALUE! #VALUE!
Bahan 2,5 /5 x (Bahan analisa VI.5) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M2 PENGASPALAN MUKA JALAN #VALUE!

VI.8 1 M2 ASPAL GORENG 4 CM


0.440 HO Pekerja #VALUE! #VALUE!
0.025 JAM Biaya menggilas #VALUE! #VALUE!
0.035 M3 Pasir kasar #VALUE! #VALUE!
0.030 M3 Ciping / Split #VALUE! #VALUE!
0.030 M3 Kayu bakar #VALUE! #VALUE!
6.000 KG Aspal #VALUE! #VALUE!
Peralatan 5% upah + bahan #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M2 ASPAL GORENG 2 CM #VALUE!

VII. PLESTERAN ADUKAN PAS. BATU KALI


TEBAL 15 MM
VII.1 1 M2 UPAH PLESTERAN TEBAL 15 MM
0.200 HO Tukang batu #VALUE! #VALUE!
0.020 HO Kepala tukang #VALUE! #VALUE!
0.400 HO Pekerja #VALUE! #VALUE!
0.020 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE!
VII.2 1 M2 PLESTERAN ADUKAN 1:1
0.315 ZAK = 15,75 Kg. Pc #VALUE! #VALUE!
0.0126 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
VII.3 1 M2 PLESTERAN ADUKAN 1:2
0.216 ZAK = 10,575 Kg. PC #VALUE! #VALUE!
0.0171 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
VII.4 1 M2 PLESTERAN ADUKAN 1:3
0.162 ZAK = 10,575 Kg. PC #VALUE! #VALUE!
0.0194 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
VII.5 1 M2 PLESTERAN ADUKAN 1:4
0.130 ZAK = 615,24 Kg. PC #VALUE! #VALUE!
0.0209 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6
VIII. PLESTERAN PERMUKAAN PAS. BATU
TEBAL 10 MM
0.150 HO Tukang Batu #VALUE! #VALUE!
0.02 HO Kepala Tukang #VALUE! #VALUE!
0.400 HO Pekerja #VALUE! #VALUE!
0.020 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE!
VIII.1 1 M2 PLESTERAN ADUKAN 1:1
0.210 ZAK = 10,450 Kg. PC #VALUE! #VALUE!
0.0084 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
VIII.2 1 M2 PLESTERAN ADUKAN 1:2
0.141 ZAK Zak 7,050 Kg. PC #VALUE! #VALUE!
0.0119 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
VIII.3 1 M2 PLESTERAN ADUKAN 1:3
0.108 ZAK = 5,400 Kg. PC #VALUE! #VALUE!
0.0134 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
VIII.4 1 M2 PLESTERAN ADUKAN 1:4
0.087 ZAK Zak 4,349 Kg. PC #VALUE! #VALUE!
0.0134 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
IX. SIAR (BERAMPING) 1M2 UPAH SIAR
0.120 HO Tukang Batu #VALUE! #VALUE!
0.01 HO Kepala Tukang #VALUE! #VALUE!
0.360 HO Pekerja #VALUE! #VALUE!
0.018 HO Mandor #VALUE! #VALUE!
#VALUE! 0.00 #VALUE!
IX.1 1 M2 SIAR ADUKAN 1:1
0.1575 ZAK Zak 7,875 Kg. PC #VALUE! #VALUE!
0.0063 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
IX.2 1 M2 SIAR ADUKAN 1:2
0.1575 ZAK Zak 5,875 Kg. PC #VALUE! #VALUE!
0.0086 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
IX.3 1 M2 SIAR ADUKAN 1:3
0.0810 ZAK Zak 10,4500 Kg. PC #VALUE! #VALUE!
0.0097 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
IX.4 1 M2 SIAR ADUKAN 1:4
0.0562 ZAK Zak 3,262 Kg. PC #VALUE! #VALUE!
0.0110 M3 M3 Pasir #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
X. TIANG PANCANG KAYU
X.1 1 BUAH KAYU BULAT/DOLKEN DILANCIPKAN DIA. 15
CM PANJANG 3 M'
0.053 M3 Volume 1 tiang pancang #VALUE! #VALUE!
0.250 HO Tukang Kayu #VALUE! #VALUE!
0.03 HO Kepala Tukang #VALUE! #VALUE!
0.100 HO Pekerja #VALUE! #VALUE!
0.025 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
X.2 1 BUAH KAYU BULAT/DOLKEN DILANCIPKAN DIA. 15
CM PANJANG 6 M'
0.106 M3 Volume 1 tiang Pancang #VALUE! #VALUE!
0.03 HO Kepala Tukang #VALUE! #VALUE!
0.100 HO Pekerja #VALUE! #VALUE!
0.025 HO Mandor #VALUE! #VALUE!
0.250 HO Tukang Kayu #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
Kolom. 7 > HARGA SATUAN = Harga Satuan Riil + PPN 10 %
1 2 3 4 5 6
X.3 1 BUAH KAYU 30 X 30 CM2 DILANCIPKAN DAN DICIN -
CIN PANJANG 5 M'
0.45 M3 Volume 1 tiang Pancang #VALUE! #VALUE!
1.000 BH Sepatu besi 10,000.00 10,000.00
0.080 HO Kepala Tukang #VALUE! #VALUE!
0.200 HO Pekerja #VALUE! #VALUE!
0.010 HO Mandor #VALUE! #VALUE!
0.800 HO Tukang Kayu #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
X.4 1 BUAH KAYU BULAT/DOLKEN DIA. 30 CM DILANCIP -
KAN DAN DICINCIN PANJANG 6 M'
0.424 M3 Volume 1 tiang Pancang #VALUE! #VALUE!
1.000 BH Buah sepatu besi 10,000.00 10,000.00
0.080 HO Kepala Tukang #VALUE! #VALUE!
0.200 HO Pekerja #VALUE! #VALUE!
0.010 HO Mandor #VALUE! #VALUE!
0.800 HO Tukang Kayu #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
X.5 1 BUAH KAYU BULAT/DOLKEN DILANCIPKAN DIA. 20
CM PANJANG 5 M'
0.157 M3 Volume 1 tiang pancang #VALUE! #VALUE!
0.250 BH Tukang Kayu #VALUE! #VALUE!
0.03 HO Kepala Tukang #VALUE! #VALUE!
0.100 HO Pekerja #VALUE! #VALUE!
0.025 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XI. PEMANCANGAN TIANG PANCANG KAYU
/CERUCUK
XI.1 1 M' TIANG PANCANG YG MASUK TANAH LUNAK
0.040 HO Tukang kayu #VALUE! #VALUE!
0.040 HO Kepala tukang #VALUE! #VALUE!
1.800 HO Pekerja #VALUE! #VALUE!
0.045 HO Mandor #VALUE! #VALUE!
#VALUE! 0.00 #VALUE!
XI.2 1 M' TIANG PANCANG YANG MASUK TANAH BIASA
1 1.250 Harga Analisa XI.1 #VALUE! #VALUE!
#VALUE! #VALUE!
XI.3 1 M' TIANG PANCANG YANG MASUK PASIR
1 2.000 Harga Analisa XI.1 #VALUE! #VALUE!
#VALUE! #VALUE!
XI.4 1 M' TIANG PANCANG YANG MASUK TANAH DGN
ALAT PERANCAH DIATAS RAKIT
0.060 HO Tukang kayu #VALUE! #VALUE!
0.006 HO Kepala tukang #VALUE! #VALUE!
3.000 HO Pekerja #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE!
XI.5 1 M' TIANG PANCANG UNTUK DERMAGA DIHI-
TUNG SELURUH PANJANG TIANG PANCANG
0.006 HO Kepala tukang #VALUE! #VALUE!
3.000 HO Pekerja #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
0.060 HO Tukang kayu #VALUE! #VALUE!
#VALUE! 0.00 #VALUE!
#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!
7.00

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!

#VALUE!
1 2 3 4 5 6
XII. BETON TANPA TULANGAN

XII.1 1 M3 BETON COR 1:1,5:2,5

10.450 ZAK = 522,5 Kg. PC #VALUE! #VALUE!


0.628 M3 Pasir #VALUE! #VALUE!
1.846 M3 Kerikil #VALUE! #VALUE!
1.000 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.100 HO Kepala Tukang #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.2 1 M3 BETON COR 1:2:3
6.800 ZAK =340 Kg. PC #VALUE! #VALUE!
0.540 M3 Pasir #VALUE! #VALUE!
0.820 M3 Kerikil #VALUE! #VALUE!
1.000 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.100 HO Kepala Tukang #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.3 1 M3 BETON COR 1:2:4
5.970 ZAK = 298,52 Kg. PC #VALUE! #VALUE!
0.480 M3 Pasir #VALUE! #VALUE!
0.960 M3 Kerikil #VALUE! #VALUE!
0.500 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.050 HO Kepala Tukang #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.4 1 M3 BETON COR 1:2,5:5
5.000 ZAK = 250 Kg. PC #VALUE! #VALUE!
0.050 M3 Pasir #VALUE! #VALUE!
1.000 M3 Kerikil #VALUE! #VALUE!
0.500 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.050 HO Kepala Tukang #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.5 1 M3 BETON COR CAMP. 1:3:6
2.240 ZAK = 11,82 Kg. PC #VALUE! #VALUE!
0.500 M3 Pasir #VALUE! #VALUE!
1.000 M3 Kerikil #VALUE! #VALUE!
0.500 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.050 HO Kepala Tukang #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.6 1 M3 COR BTN KARANG CAMP. PC:PS:KR : 1:2:4
2.828 ZAK = 141,39 Kg. PC #VALUE! #VALUE!
0.292 M3 Pasir #VALUE! #VALUE!
0.342 M3 Karang #VALUE! #VALUE!
1.000 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.100 HO Kepala Tukang #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.7 1 M3 COR BETON KARANG 1:2:6(PC:PS:KR)
2.268 ZAK = 118,38 Kg. PC #VALUE! #VALUE!
0.234 M3 Pasir #VALUE! #VALUE!
0.411 M3 Karang #VALUE! #VALUE!
0.500 HO Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.050 HO Kepala Tukang #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XII.8 1 M3 COR BETON KARANG 1:2:7(PC:PS:KR)
0.065 ZAK = 103,25 Kg. PC #VALUE! #VALUE!
0.213 M3 Pasir #VALUE! #VALUE!
0.437 M3 Karang #VALUE! #VALUE!
Upah Sda. #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6

XIII. BETON BERTULANG


XIII.1 1 M3 BETON BERTULANG 1:1,5:2,5 TANPA BEKES -
TING UTK LANDASAN MESIN, LANTAI KERJA
(ABUDMENT DLL.)
6.800 ZAK = 340 Kg. PC #VALUE! #VALUE!
0.540 M3 Pasir #VALUE! #VALUE!
0.820 M3 Kerikil #VALUE! #VALUE!
0.100 HO Kepala Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
1.000 HO Tukang #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XIII.2 100 KG PEKERJAAN BESI BETON
100.000 KG Besi Beton #VALUE! #VALUE!
2.000 KG Kawat Ikat #VALUE! #VALUE!
9.000 HO Tukang Besi #VALUE! #VALUE!
5.000 HO Pekerja #VALUE! #VALUE!
3.000 HO Kepala Tukang #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
HARGA 1 KG PEKERJAAN BESI BETON #VALUE!

XIII.3 10 M2 BEKESTING KAYU


0.430 M3 Kayu #VALUE! #VALUE!
4.000 KG Paku #VALUE! #VALUE!
5.000 HO Tukang #VALUE! #VALUE!
0.500 HO Kepala Tukang #VALUE! #VALUE!
2.000 HO Pekerja #VALUE! #VALUE!
0.100 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1 M2 BEKESTING KAYU #VALUE!

XIII.4 1 M3 BETON BERTULANG 1:1,5:2,5


10.450 ZAK = 522,50 Kg. PC #VALUE! #VALUE!
0.628 M3 Pasir #VALUE! #VALUE!
1.846 M3 Kerikil #VALUE! #VALUE!
1.000 HO Tukang #VALUE! #VALUE!
0.100 HO Kepala Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
0.430 M3 Kayu Bekesting #VALUE! #VALUE!
4.000 KG Paku #VALUE! #VALUE!
5.000 HO Tukang #VALUE! #VALUE!
0.500 HO Kepala Tukang #VALUE! #VALUE!
2.000 HO Pekerja #VALUE! #VALUE!
0.100 HO Mandor #VALUE! #VALUE!
Upah bahan pekerjaan besi beton per (100 kg) #VALUE!
#VALUE! #VALUE! #VALUE!

XIII.5 1 M3 BETON KARANG 1:2:8


1.895 ZAK = 94,75 Kg. PC #VALUE! #VALUE!
0.195 M3 Pasir #VALUE! #VALUE!
0.458 M3 Karang #VALUE! #VALUE!
U p a h Sda #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6

XIII.6 1 M3 BETON BERTULANG 1:2:3


6.800 ZAK Zak/ 340 Kg. PC #VALUE! #VALUE!
0.540 M3 M3 Pasir #VALUE! #VALUE!
0.820 M3 M3 Kerikil #VALUE! #VALUE!
1.000 HO Tukang #VALUE! #VALUE!
0.100 HO Kepala Tukang #VALUE! #VALUE!
6.000 HO Pekerja #VALUE! #VALUE!
0.300 HO Mandor #VALUE! #VALUE!
0.430 M3 Kayu Bekesting #VALUE! #VALUE!
4.000 KG Paku #VALUE! #VALUE!
5.000 HO Tukang #VALUE! #VALUE!
0.500 HO Kepala Tukang #VALUE! #VALUE!
2.000 HO Pekerja #VALUE! #VALUE!
0.100 HO Mandor #VALUE! #VALUE!
Upah bahan pekerjaan besi beton per (100 kg) #VALUE!
#VALUE! #VALUE! #VALUE!
XIII.7 10 M' TIANG PANCANG BETON 30/30 CM2 1:1,5:2,5
9.000 ZAK PC #VALUE! #VALUE!
0.582 M3 Pasir #VALUE! #VALUE!
0.970 M3 Kerikil #VALUE! #VALUE!
0.093 HO Kepala Tukang #VALUE! #VALUE!
5.562 HO Pekerja #VALUE! #VALUE!
0.278 HO Mandor #VALUE! #VALUE!
0.927 HO Tukang #VALUE! #VALUE!
0.399 M3 Kayu Bekesting #VALUE! #VALUE!
31.710 KG Paku #VALUE! #VALUE!
4.635 HO Tukang #VALUE! #VALUE!
1.854 HO Pekerja #VALUE! #VALUE!
0.464 HO Kepala Tukang #VALUE! #VALUE!
0.093 HO Mandor #VALUE! #VALUE!
203.940 KG Besi Beton #VALUE! #VALUE!
3.708 KG Kawat ikat #VALUE! #VALUE!
16.686 HO Tukang besi #VALUE! #VALUE!
5.562 HO Kepala Tukang #VALUE! #VALUE!
9.270 HO Pekerja #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M'TIANG PANCANG BETON 30/30 CM2 #VALUE!

XIII.8 10 M' TIANG PANCANG BETON 40/40 CM2 1:1,5:2,5


1.780 Analisa diatas #VALUE! #VALUE! #VALUE! #VALUE!
# HARGA 1 M'TIANG PANCANG BETON 40/40 CM2 #VALUE!

XIII.9 10 M' TIANG PANCANG BETON 30/30 CM2 1:2:3


6.800 ZAK PC #VALUE! #VALUE!
0.500 M3 Pasir #VALUE! #VALUE!
0.760 M3 Kerikil #VALUE! #VALUE!
0.927 HO Tukang #VALUE! #VALUE!
0.093 HO Kepala Tukang #VALUE! #VALUE!
5.562 HO Pekerja #VALUE! #VALUE!
0.278 HO Mandor #VALUE! #VALUE!
0.399 M3 Kayu Bekesting #VALUE! #VALUE!
3.710 KG Paku #VALUE! #VALUE!
4.635 HO Tukang #VALUE! #VALUE!
1.854 HO Pekerja #VALUE! #VALUE!
0.093 HO Mandor #VALUE! #VALUE!
203.940 KG Besi beton #VALUE! #VALUE!
3.708 KG Kawat ikat #VALUE! #VALUE!
16.686 HO Tukang besi #VALUE! #VALUE!
5.562 HO Kepala Tukang #VALUE! #VALUE!
9.270 HO Pekerja #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
# HARGA 1 M'TIANG PANCANG BETON 30/30 CM2 #VALUE!

XIII.10 10 M' TIANG PANCANG BETON 40/40 CM2 CAMP. 1:2:3


1.780 Analisa diatas #VALUE! #VALUE! #VALUE! #VALUE!
# HARGA 1 M' TIANG PANCANG BETON 40/40 CM2 #VALUE!
1 2 3 4 5 6
XIV. JEMBATAN KAYU
XIV.1 1 M3 PEK. MEMBUAT GELAGAR JEMBATAN
1.500 HO Kepala Tukang #VALUE! #VALUE!
5.000 HO Pekerja #VALUE! #VALUE!
0.250 HO Mandor #VALUE! #VALUE!
15.000 HO Tukang kayu #VALUE! #VALUE!
1.200 HO Kayu besi #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XIV.2 1 M3 PEKERJAAN MEMBUAT GELAGAR JEMBATAN
DARI KAYU YANG DIDAPAT DARI HUTAN
0.5000 Analisa diatas #VALUE! #VALUE! #VALUE! #VALUE!

XIV.3 1 M3 PEK. MEMBUAT GELAGAR JEMBATAN DARI


BATANG KELAPA
0.250 Analisa diatas #VALUE! #VALUE! #VALUE! #VALUE!

XIV.4 1 M3 PEK. PEMBUATAN KAYU PENAHAN,


SANDARAN, BALOK SANDARAN, BALOK
PENAHAN ANGIN & BALOK TERALI.
24.000 HO Tukang kayu #VALUE! #VALUE!
2.400 HO Kepala Tukang #VALUE! #VALUE!
8.000 HO Pekerja #VALUE! #VALUE!
0.400 HO Mandor #VALUE! #VALUE!
1.200 M3 Kayu besi #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XIV.5 1 M2 PEK. PENGGERGAJIAN & MEMASANG LANTAI
JEMBATAN & DIPASANG PADA JEMBATAN
0.060 M3 Kayu #VALUE! #VALUE!
0.500 HO Tukang kayu #VALUE! #VALUE!
0.050 HO Kepala Tukang #VALUE! #VALUE!
0.200 HO Pekerja #VALUE! #VALUE!
0.010 HO Mandor #VALUE! #VALUE!
2.000 M2 Upah menggergaji #VALUE! #VALUE!
0.750 KG Paku #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XIV.6 1 M2 RAIL BAND KAYU
0.750 HO Tukang kayu #VALUE! #VALUE!
0.075 HO Kepala Tukang #VALUE! #VALUE!
0.250 HO Pekerja #VALUE! #VALUE!
0.0125 HO Mandor #VALUE! #VALUE!
0.100 KG Paku #VALUE! #VALUE!
1.300 M2 Upah menggergaji #VALUE! #VALUE!
0.060 HO Kayu besi #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XIV.7 1 M2 RESIDU KAYU
` 0.350 KG Kg Residu #VALUE! #VALUE!
0.100 HO Pekerja #VALUE! #VALUE!
0.005 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
XIV.8 1 M2 PENGECATAN
0.350 KG Cat #VALUE! #VALUE!
0.100 HO Pekerja #VALUE! #VALUE!
0.005 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6

1 M' PEMANCANGAN PIPA BETON DIA. 40 CM


4.000 KG Kawat las #VALUE! #VALUE!
0.200 JAM Alat pemancang #VALUE! #VALUE!
0.150 JAM Crane #VALUE! #VALUE!
0.100 JAM Mesin las #VALUE! #VALUE!
0.200 HO Pekerja #VALUE! #VALUE!
0.100 HO Tukang #VALUE! #VALUE!
0.100 HO Mekanik #VALUE! #VALUE!
0.200 HO Operator terampil #VALUE! #VALUE!
0.200 HO Pembantu operator #VALUE! #VALUE!
0.100 HO Tukang las #VALUE! #VALUE!
0.050 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

1M2 PASANG PAVING BLOK

0.120 M3 Pasir #VALUE! #VALUE!


40.000 BH Paving Blok 2,300.0 92,000.0
0.310 HO Tukang Batu #VALUE! #VALUE!
0.031 HO Kepala Tukang #VALUE! #VALUE!
1.300 HO Pekerja #VALUE! #VALUE!
0.075 HO Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

1.000 M' Pipa beton DIA 40 cm #VALUE! #VALUE!


ANALISA TAMBAHAN (Standarisasi Harga Satuan Barang & Jasa 2006)
1 2 3 4 5 6

1.00 100 M2 STENSLAAG JALAN Tbl. 6 cm


8.0000 M3 Batu Pecah 3-5 #VALUE! #VALUE!
2.0000 M3 Pasir Urug #VALUE! #VALUE!
7.5000 H/O Pekerja #VALUE! #VALUE!
0.3750 H/O Mandor #VALUE! #VALUE!
0.3300 Hari Mesin Gilas (Walas) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
**** Untuk Harga per M2 = #VALUE!

2.00 100 M2 PEK. LAPIS PENETRASI (LAPEN) Tbl. 6 cm.


3.6000 M3 Batu Pecah 3/5 #VALUE! #VALUE!
2.4000 M3 Batu Pecah 2/3 #VALUE! #VALUE!
1.2000 M3 Batu Pecah 1/2 #VALUE! #VALUE!
2.0000 M3 Pasir Pasang #VALUE! #VALUE!
120.0000 Kg Aspal #VALUE! #VALUE!
1.0000 Ikat Kayu Bakar 50,000.00 50,000.00
7.5000 H/O Pekerja #VALUE! #VALUE!
0.3750 H/O Mandor #VALUE! #VALUE!
0.6600 Hari Mesin Gilas (Walas) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
**** Untuk Harga per M2 = #VALUE!

3.00 100 M2 PEK. LAPIS PERMUKAAN ASPAL GORENG


Tbl. 3 cm (LATASIR)
0.0000 M3 Abu Batu / Filler #VALUE! #VALUE!
0.0000 M3 Batu Pecah 2/3 #VALUE! #VALUE!
0.0000 M3 Batu Pecah 1/2 #VALUE! #VALUE!
2.0000 M3 Pasir Kasar #VALUE! #VALUE!
120.0000 Kg Aspal #VALUE! #VALUE!
1.0000 Ikat Ikat Kayu Bakar 50,000.00 50,000.00
7.5000 H/O Pekerja #VALUE! #VALUE!
0.3750 H/O Mandor #VALUE! #VALUE! #VALUE!
0.6600 Hari Mesin Gilas (Walas) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
**** Untuk Harga per M2 = #VALUE!

4.00 1 M3 PEK. LAPISAN SIRTU


1.2000 M3 Sirtu #VALUE! #VALUE!
0.3000 H/O Pekerja #VALUE! #VALUE!
0.0100 H/O Mandor #VALUE! #VALUE!
0.0045 Hari Mesin Gilas (Walas) #VALUE! #VALUE!
0.00

5.00 1 M3 PEK. LAPISAN BATU PECAH 5-7


0.0600 M3 Batu Pecah 3/5 #VALUE! #VALUE!
0.2000 H/O Pekerja #VALUE! #VALUE!
0.0190 H/O Mandor #VALUE! #VALUE!
0.0045 Hari Mesin Gilas (Walas) #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
6.00 1 Kg PEK. ASPAL PANAS
1.1000 Kg Aspal Panas #VALUE! #VALUE!
0.8000 Ikat Kayu Bakar 50,000.00 40,000.00
0.2000 H/O Pekerja #VALUE! #VALUE!
0.0050 H/O Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
1 2 3 4 5 6

7.00 1 M2 PEK. HAMPARAN ASPAL PANAS


1.1000 Kg Aspal Panas #VALUE! #VALUE!
0.2000 H/O Pekerja #VALUE! #VALUE!
0.0050 H/O Mandor #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

6.00 1 M2 LAPISAN CIPING 2/3 DENGAN


HAMPARAN ASPAL PANAS
0.0350 M3 Batu Pecah 2/3 #VALUE! #VALUE!
2.5000 Kg Aspal Panas #VALUE! #VALUE!
0.0190 H/O Pekerja #VALUE! #VALUE!
0.0038 H/O Mandor #VALUE! #VALUE!
0.0045 Hari Mesin Gilas (Walas) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!

6.00 1 M2 HAMPARAN LAPIS AUS DENGAN


ASPAL PANAS LATASIR Tbl. 1,00 cm.
0.0100 M3 Pasir Kasar #VALUE! #VALUE!
0.0100 Kg Screen 1/2 #VALUE! #VALUE!
1.5000 Kg Aspal Panas #VALUE! #VALUE!
0.0750 H/O Pekerja #VALUE! #VALUE!
0.0038 H/O Mandor #VALUE! #VALUE!
0.0045 Hari Mesin Gilas (Walas) #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
DAFTAR UPAH TENAGA KERJA DAN HARGA SATUAN MATERIAL/
PROPINSI : PAPUA LOKASI PROYEK : KOTA JAYAPURA - TA. 2008
K O D YA : KOTA JAYAPURA
UPAH
NO. TENAGA KERJA KODE TENAGA KERJA NO. TENAGA KERJA
(Rp./Hari)
1. MANDOR LAPANGAN/Kelompok Kerja L.061 #VALUE! 8. PEMBANTU OPERATOR
2. MEKANIK - Trampil L.071 #VALUE! 9. SOPIR -Trampil
3. MEKANIK - Semi Trampil L.072 #VALUE! 10. SOPIR -Pribadi
4. KEPALA TUKANG L.073 #VALUE! 11. PEMBANTU SOPIR
5. TUKANG L.079 #VALUE! 12. PEKERJA - Kasar
6. OPERATOR - Trampil L.081 #VALUE! 13. PEKERJA - Semi Trampil
7. OPERATOR - Semi Trampil L.082 #VALUE! 14. PEKERJA - Trampil

U HARGA/DISUM- JARAK ANG- ONGKOS ANGKUT


NO. MATERIAL/BAHAN N KODE BER/QUARY KUT RATA- PER UNIT (Rp.)
I (TANPA PAJAK) RATA (Km)
T (Rp.)
1. Batu quarry/Batu besar (ukuran crusher) m3 M.010 100,000.00 25.00 #VALUE!
2. Kerikil Sirtu m3 M.011 125,000.00 25.00 #VALUE!
3. Kerikil sungai (tidak disaring) m3 M.012 100,000.00 25.00 #VALUE!
4. Batu kali (besar) m3 M.013 100,000.00 25.00 #VALUE!
5. Batu kali (kecil disaring) m3 M.014 - - #VALUE!
6. Batu Split 10 -15 cm m3 M.020 - - #VALUE!
7. Batu Split 7 -10 cm m3 M.021 - 0.00 0.00
8. Batu Split 5 - 7 cm m3 M.022 250,000.00 25.00 #VALUE!
9. Batu Split 3 - 5 cm m3 M.023 400,000.00 25.00 #VALUE!
10. Batu Split 2 - 3 cm m3 M.024 425,000.00 25.00 #VALUE!
11. Batu Split 1 - 2 cm m3 M.025 450,000.00 25.00 #VALUE!
12. Batu Split 0,5 - 1 cm m3 M.026 - - #VALUE!
13. Gorong2 beton Pipa 60 cm (tnp tulangan) m' M.031 0.00 15.00 #VALUE!
14. Gorong2 beton Pipa 80 cm (tnp tulangan) m' M.033 0.00 15.00 #VALUE!
15. Gorong2 beton Pipa 100 cm (tnp tulangan) m' M.035 0.00 15.00 #VALUE!
16. Bahan timbunan/pengikat pilihan m3 M.040 0.00 10.00 #VALUE!
17. Agregat halus/pasir bersih (pasir beton) m3 M.041 125,000.00 25.00 #VALUE!
18. Kerikil berpasiran alami m3 M.042 - - #VALUE!
19. Urugan pilihan m3 M.050 100,000.00 10.00 #VALUE!
20. Bitumen (ASPHALT) kg M.061 8,700.00 12.00 #VALUE!
21. Bitumen (ASBUTON) Ton M.062 - - #VALUE!
22. Flux oil (untuk emulsi) liter M.063/64 0.00 28.00 #VALUE!
23. Kerosine liter M.065 8,710.00 28.00 #VALUE!
24. Kayu Bakar m3 M.070 850,000.00 5.00 #VALUE!
25. Portland Cement (dalam kantong/zak) 40 kg M.080 0.00 12.00 #VALUE!
26. Pasir Hol/filler m3 M.081 0.00 25.00 #VALUE!
27. Batu kapur bongkahan m3 M.082 0.00 0.00 #VALUE!
28. Cat untuk pekerjaan baja jembatan kg M.090 0.00 12.00 #VALUE!
29. Baja, gulungan ukuran ringan kg M.161 - - #VALUE!
30. Baja, anyaman bronjong kg M.162 0.00 12.00 #VALUE!
31. Baja, baut-baut btg M.163 0.00 0.00 #VALUE!
32. Baja, galvanisasi kg M.164 0.00 0.00 #VALUE!
33. Baja, struktur kg M.165 0.00 12.00 #VALUE!
34. Baja, paku-paku jembatan kg M.166 0.00 0.00 #VALUE!
35. Tulangan baja dan kawat baja kg M.167 0.00 12.00 #VALUE!
36. Alat bantu / alat-alat kerja (3 set) @ set M.170 150,000.00 0.00 #VALUE!
37. Acuan dari kayu m3 M.180 0.00 12.00 #VALUE!
38. Kayu struktural m3 M.181 0.00 12.00 #VALUE!
39. Solar liter M.183 10,000.00 12.00 #VALUE!
40. Premium/bensin liter M.184 8,500.00 12.00 #VALUE!
41. Minyak pelumas/oli liter M.185 20,000.00 12.00 #VALUE!
* = tak bertulang ** = 1 cangkul + 1 sekop + 1 Pikulan

Mengetahui,
GA SATUAN MATERIAL/BAHAN KETERANGAN MENGE
K.9 PROPINSI : PAPUA
K O D YA : KOTA JAYAPURA
UPAH LOKASI BAHAN / MATERIAL
KODE TENAGA KERJA SUMBER BAHAN JENIS
(Rp./Hari) MATERIAL
L.083 #VALUE! Harapan M.010
L.091 #VALUE! M.012
L.092 #VALUE! M.011
L.099 #VALUE! M.013
L.101 #VALUE!
L.103 #VALUE! Doyo M.041
L.106 #VALUE!

JUMLAH JUMLAH HARGA


HARGA PROFIT TERMASUK
(TANPA PAJAK) PAJAK DLL.) CEK !!!! K. 9 Keheran M.041
(Rp.) (Rp.) (Rp.)
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! Waena M.010
#VALUE! #VALUE! - 0.00 M.011
#VALUE! #VALUE! - 0.00
#VALUE! #VALUE! 0.00 ###
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! - 357,500.00
#VALUE! #VALUE! #VALUE! 375,000.00
#VALUE! #VALUE! #VALUE! 412,500.00
#VALUE! #VALUE! #VALUE! 321,750.00
#VALUE! #VALUE! #VALUE! 337,500.00
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! - 0.00
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! - 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! REVISI 3 FEB 2003
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! - 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! - 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! 150,000.00 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00
#VALUE! #VALUE! #VALUE! 0.00

Jayapura..........................
KETERANGAN MENGENAI BAHAN / MATERIAL
DIISI OLEH : K.8
KOTA JAYAPURA
BAHAN / MATERIAL JARAK ANGKUT TANGGAL
SATUAN HARGA/SAT. KERUAS JARAK PENDATAAN KETERANGAN
(Rp.) NOMOR KM TGL/BLN/THN
M3 35,000.00 -- 50.00 05 Januari 2000 Batu Gunung
M3 90,000.00 -- 50.00 05 Januari 2000 Kerikil sungai
M3 60,000.00 -- 50.00 05 Januari 2000 Kerikil Sirtu
M3 40,000.00 -- 50.00 05 Januari 2000 Batu Kali

M3 30,000.00 -- 50.00 05 Januari 2000 Pasir Beton

M3 30,000.00 -- 50.00 05 Januari 2000 Pasir Beton

M3 35,000.00 -- 30.00 05 Januari 2000 Batu Gunung


M3t 12,500.00 -- 30.00 05 Januari 2000 Sirtu Gunung
REKAPITULASI BIAYA
kegiatan
Pekerjaan
Tahun Anggaran

Kode Harga Satuan


No Uraian Pekerjaan Satuan Volume
Analisa (Rp)

Real Cost
PPN 10 %
Total
Dibulatkan

TERBILANG :
Jumlah Harga
(Rp)
BACK UP - DATA
KEGIATAN : PEMELIHARAAN PERIODIK JALAN DAN JEMBATAN
PEKERJAAN : PEMELIHARAAN PERIODIK JALAN KOYA KOSO
NOMOR KONTRAK : 146/621,1/KONT/08 Tanggal 05 Mei 2008
NILAI KONTRAK : Rp. 1,294,327,000
JANGKA WAKTU : 90 ( sembilan puluh ) hari Kalender
KONTRAKTOR : PT. JAYAKSI

KONTRAK REALISASI DILAPANGAN


HARGA SAT. JUMLAH HARGA Selisih HARGA SAT. JUMLAH HARGA
NO. URAIAN PEKERJAAN SAT. VOL. SAT. VOL.
[ RP ] [ RP ] Volume [ RP ] [ RP ]

A PEKERJAAN PENDAHULUAN
1 Mobilisasi dan Demobilisasi Ls 1.00 7,000,000.00 7,000,000.00 Ls 1.00 0.00 7,000,000.00 7,000,000.00
2 Dokumentasi Ls 1.00 750,000.00 750,000.00 Ls 1.00 0.00 750,000.00 750,000.00
3 Pengukuran Ls 1.00 765,000.00 765,000.00 Ls 1.00 0.00 765,000.00 765,000.00

B PEKERJAAN JALAN
1 Penyiapan Badan Jalan M2 6,200.00 #VALUE! #VALUE! M2 6,200.00 0.00 #VALUE! #VALUE!
2 Timbunan Bahu Jalan M3 150.00 #VALUE! #VALUE! M3 150.03 -0.03 #VALUE! #VALUE!
3 Timbunan Badan Jalan M3 523.80 #VALUE! #VALUE! M3 525.00 -1.20 #VALUE! #VALUE!
4 Lapis Pondasi Atas (LPA) Klas B M3 728.33 #VALUE! #VALUE! M3 729.30 -0.97 #VALUE! #VALUE!
5 Lapis Penetrasi Macadam (t = 5 cm) M2 4,940.50 #VALUE! #VALUE! M2 5,064.18 -123.68 #VALUE! #VALUE!

REAL COST #VALUE! #VALUE!


PPN #VALUE! #VALUE!
JUMLAH #VALUE! #VALUE!
DIBULATKAN #VALUE! #VALUE!

Mengetahui DIPERIKSA Di Buat


Pejabat Pelaksana Teknis Direksi Lapangan Konsultan Pengawas PT. JAYAKSI
Kegiatan (PPTK ) DPU Kota Jayapura CV. DUTA DWI CIPTA

YAYONG BADDU.ST RIYANTO PALANGAN.ST HERIYANSYAH.ST JOHNY GUNAWAN


Nip. 640 027 571 Nip. 640 029 942 Site Engginerr Direktur

Anda mungkin juga menyukai