Yksel Proje, founded in 1978, is in the position of the largest
engineering and consultancy firm of Turkey today.

Firm, which has completed numerous large scale projects both


inland and abroad, is providing services mainly in the fields
of feasibility, design, construction supervision and project
management under the main headings of transportation,
infrastructure and environment, buildings, geological and
geotechnical engineering.

Customer satisfaction-oriented fundamental approach underlies


the achievements of Yksel Proje. All process is organized to
meet customer expectations.

Yksel Proje places human factor at the center. It identiies the


responsibilities related with both its employees and its clients
meticulously, and acts within the framework of national and
international regulations. The Firm does not restrict its liabilities
with the employee-client axis only. Actions are taken with
social responsibility and environmental consciousness.

Yksel Proje has, which has carried out activity in 13 countries


until today, nearly 1400 employees, over 50 active construction
area and major projects at national and international arena.
According to Engineering New Record 2015 records, Yksel
Proje 209th largest design firm of the world among 225 design
firms.

3
Service Areas

Transportation Motorways and State Highways


Bridges and Viaducts
Railways
Railway Mass Transportation Systems
Marine Structures - Harbours
Airports

Infrastructure & Water Transmission Lines


Drainage and Waste Water Networks
Environment Water and Waste Water Treatment Plants
Solid Waste Storage and Incineration Plants
Natural Gas and Crude Oil Pipelines

Buildings Smart Buildings


Industrial Facilities
Mass Housing
Education, Sports and Health Facilities

Geologic & Geotechnical Soil Investigation


Geological Engineering Implementations
Engineering Geotechnical Engineering Designs
5
Services

Feasibility
Using all our experience, we evaluate econom-
ical, technical and social effects; we determine
the correct sources and take the right steps.

Design
Using the high technological opportunities, we
put into practice the designs which are practicable,
aesthetical, economic, functional, eco-friendly and
original.

Construction Supervision
We provide and conduct the services within the
specified budget correctly, timely, effectively
and in compliance with the contract conditions,
specifications, and OHS process considering en-
vironmental effects.

Project Management
We examine the project integrally, analyze all
details specifically the cost, and perform the
process management productively.
7
Osmangazi Bridge
Osmangazi Bridge under Gebze - zmit Motorway Project is the
4th largest mid - span bridge in the world.
Location : Gebze - Orhangazi - zmir
Service Period : 2013 - 2016
Client : General Directorate of Highways
Scope of Service : Consultancy and supervision services

Type : Suspension bridge


Mid - Span : 1550 m
Width : 35,93 m
Bridge towers height : 252 m
Length : 2682 m
9
3rd Bosphorus Bridge
The 3rd Bosphorus Bridge which is high technology and engineering product will be the widest with
59 meters, the longest with 1408 meters main span having rail system and the suspension bridge having
highest tower with more than 322 meters in the world.
Location : stanbul
Service Period : 2013 - Ongoing
Client : General Directorate of Highways
Scope of Service : Consultancy and supervision services

System : Hybrid (Cable-Stayed + Suspension)


Scope : Eight-lane highway and two-lane railway
Width : 59 m (The worlds widest suspension bridge)
Main Span : 1408 m (The longest suspension bridge in the world having a rail system)
Height : 322 m (The suspension bridge having the highest tower in the world)

11
Nissibi Bridge
Nissibi cable - stayed bridge is planned to be constructed on Atatrk Dam Lake which is 80th km of
Adyaman - Kahta - Siverek - Diyarbakr Highway.
In terms of technical features, Nissibi Bridge is an example project including a series of initials and
innovation for the construction industry in Turkey.
Location : Diyarbakr - Adyaman
Service Period : 2010 - 2011
Client : General Directorate of Highways
Scope of Service : Detailed design

Construction Method : Cable - Stayed, segmental


Superstructure Type : Post-tensioned box girder side spans,
Steel orthotropic main span
Total Length : 610 m
Main Span : 400 m
Bridge Width : 22.90 m
Number of Pylons : 2
Pylon Height : 96 m

13
Glburnu Bridge
In scope of the construction of Glburnu Bridge, crossing with an aesthetic bridge of the bay containing
the historical Zefre Harbor and protection of Glburnu Bay that has a natural beauty have been aimed.
Desire of large span selection is closely related to geological
and topographical features of the sea bottom.

The bedrocks are about 15 meters to 20 meters deep in


the sea. Thus, they lead to reduce the number of pier as
much as possible and place in shallower parts.

Free balanced cantilever method has been selected as


a construction method because it is not possible to base
scaffolding at offshore.

Location : Glburnu - Giresun


Service Period : 2005 - 2007
Client : Gri naat A.. - Meti naat A.. Joint Venture
Scope of Service : Detailed design

Bridge Type : Highway - Reinforced concrete


Superstructure Type : Post-tensioned cast in place box girder
Construction Method : Free balanced cantilever method
Total Length : 330 m
Main Span : 165 m
Bridge Width : 2 x 14.50 m

15
Kmrhan Bridge
Kmrhan cable - stayed bridge is planned to be constructed on Frat river which is a natural border
separating Malatya - Elaz cities and on 51th km of the existing Elaz - Malatya State Road. The bridge
will be constructed next to the existing post - tensioned bridge.

LONGITUDINAL SECTION

MALATYA

KARAKAYA BARAJ GL
KARAKAYA DAM LAKE
The single pyloned bridge which is crossing over the Keban
Dam, has a main span of 380 m and has a total length of 660 m.
Kmrhan Bridge will be linked to the new tunnel by approach
spans.

Location : Malatya - Elaz Highway


Service Period : 2010 - Design is completed, construction continues
Client : General Directorate of Highways
Scope of Service : Detailed design, construction consultancy and supervision services

Bridge Type : Highway - Cable stayed


Construction Method : Cable stayed, segmental
Superstructure Type : Post-tensioned box girder side spans, Steel orthotropic main span
Total Length : 660 m
Main Span : 380 m
Bridge Width : 23.90 m
Number of Pylons : 1
Pylon Height : 168.50 m

17
Gerze-1 Viaduct
Gerze - 1 Viaduct consists of two bridges with 865 m and 885 m. The bridge superstructure has two
different types as precast beam and composite steel beam. Precast Beam Bridge is between 1 and 13 axes of
the viaduct and consists of 12 spans. Pier height varies from 5 m to 26 m.
Steel composite continuous superstructure system is
consists of four steel I-beam and cast in place concrete
deck.

165 cm diameter steel armored bored piles have been


used to withstand landslide effects.

Project : Yakakent - Gerze Highway Project


Location : Sinop
Service Period : 2009 - 2011
Client : General Directorate of Highways
Scope of Service : Detailed Design, Survey and Design Services

Bridge Type : Highway - Steel - Concrete


Superstructe Type : Steel I-Beam + Concrete composite deck
Total Length : 865 m (A - Bridge), 885 m (B - Bridge)
The Longest Span : 70 m
Bridge Width : 2 x 14.25 m
19
Sinop demli Viaduct
demli viaducts (1, 2.1, 2.2 and 3) have required a special structure design because of landslide having
20 m depth in the bridge area. A structure design has led to large spans without block of the landslide
as much as possible.
A composite superstructure has been selected consisting
of four I-beams and cast in place deck because of ease
of construction and road profile. The superstructure
system is continuous.

165 cm diameter steel armored bored piles have been


used to withstand landslide effects.

Project : Yakakent - Gerze Highway Project


Location : Sinop
Service Period : 2009 - 2011
Client : General Directorate of Highways
Scope of Service : Detailed design, survey and design services

Bridge Type : Highway - Steel


Superstructure Type : Steel I-Beam + Concrete compasite deck
Total Length : 230m (For Idemli 2.1 Viaduct)
The Longest Span : 80 m
Bridge Width : 2 x 12.75 m
21
Algeria Oran Viaduct
Oran viaduct which is planned to be constructed in scope of the city crossing project
with 8 km in Oran - Algeria, will be 1279 m length.

Viaduct will be constructed with installation of Side spans of the viaduct are 40 m and main spans
precast segments which are manufactured in the are 70, 75 and 80 m. The bridge has a total of 17
factory and post - tensioning in place. piers and all foundations are supported by piles.

Location : Oran - Algeria


Service Period : 2015 - 2016
Client : Makyol naat A.. - ENGOA Joint Venture
Scope of Service : Detailed design

Bridge Type : Highway - Concrete precast segmental box cross-section


Construction Method : Free balanced cantilever method
Total Length : 1279 m
Main Span : 80 m
Bridge Width : 2 x 14.50 m
Akyunlu Bridge
Akynl Bridge will be constructed on Tunceli - Elaz State Highway and Uzunayr Dam Lake.
The bridge will connect Malazgirt to Tunceli province.

1 2 3 4

AKYNL

Location : Tunceli
Service Period : 2012 - 2013
Client : General Directorate of Highways
Scope Of Service : Detailed Design

Bridge Type : Highway - Reinforced concrete


Superstructure Type : Post-tensioned cast in place box girder
Construction Method : Free balanced cantilever method
Total Length : 360 m
Main Span : 180 m
Bridge Width : 18 m

23
Sakarya Bridge
Bozyk - Mekece highway connects the Mediterranean region and interior regions of Anatolia to
stanbul. Because of the accidents and the other problem owing to the heavy traffic, design of the new
highway has been planned and the construction has been started.

In scope of the project, Sakarya viaduct passes through Location : Mekece - Bilecik
Sakarya River, existing railway and highway. The bridge Service Period : 2008 - 2009
is approximately 300 meters away from the South Client : General Directorate of
(Geyne - Iznik) fault of the North Anatolian fault. The Highways
soil in the bridge region consists of sand - gravel layers Scope of Service : Detailed design
having liquefiable feature. The viaducts superstructure is
a composite superstructure consisting of steel beam and Bridge Type : Highway - Steel
reinforced concrete deck. composite system
Construction Method: Conventional
Total Length : 364 ~ 385 m
Main Span : 52 m
Bridge Width : 2 x 13.43 m
Steel - Arch High Speed Train Bridge
Arch bridge that was planned to be constructed under Kars - Idr - Aralk - Dilucu Railway Survey
Design and Engineering Services has been designed as steel structure.

Bridge span is 200 m and arch height is 45 the arch carry the composite deck with steel
meters. The distance from valley floor to bridge I-beamed. Two high - speed train lines located
deck is about 60 meters. Hanger elements on the ballast base. Steel weight is 3500 tons
and transverse beams which are connected to approximately.

Location : Kars - Idr


Service Period : 2011
Client : Ministry of Transport, Maritime Affairs and
Communication - General Directorate of Infrastructure Investment
Scope of Service : Detailed design

Bridge Type : High-Speed Train - Steel arch bridge


Superstructure Type : Steel I-beam + Concrete composite deck
Total Length : 200 m
Main Span : 200 m
Bridge Width : 13.40 m
Project Speed : 250 km/hour
Arch Height : 45 m 25
Esenler Viaduct
Esenler New Viaduct (Section 1 and 2) has been designed as a light rail transport system and construction
has been stopped after some time. Seismic retrofitting has become a necessity because of insufficient pile,
foundation and column capacities.

The construction siteis located on city center as a result


all kind of excavation, forage and jacketing in the site
may have caused traffic problems. In order to minimize
such operations in both viaducts, seismic isolators have
been used. In addition, concrete rail beam has been
used instead of ballast to reduce the weight of the bridge
superstructure.

The U section is used to increase the torsional stiffness


of the superstructure because of the horizontal curves
with small radius. Difficulty of superstructure geometry
has brought special solutions in the design.

Location : stanbul
Service Period : 2012 - 2013
Client : Glermak - Dou Partnership
Scope of Service : Investigation of existing substructures, Seismic retrofitting and
repairment projects, design of steel superstructure and steel shop
drawings

Bridge Type : Light Rail System - Steel


Superstructure Type : Steel U-Beam + Concrete composite deck
Total Length : 290 m (Section-1 bridge), 128 m (Section-2 bridge)
Bridge Width : 5.3 m
Kaya - Yerky High Speed Train Project Viaducts
The viaducts between Kaya - Yerky under Ankara - Sivas High Speed Train Railway Project has
been designed as post - tensioned cast in place box cross-section. Viaducts are constructed with
balanced cantilever system and movable scaffolding system.

Location : Kaya - Yerky


Service Period : 2012
Client : Turkish State Railways
Scope Of Service : Detailed design

Number of Total Viaduct : 22


Total Viaduct Length : 16.181 m

Bridge Type : High Speed Train - Post - tensioned cast in place box girder
Construction Method : Free balanced cantilever method,
Movable scaffolding system (MSS)
Main Span : 75 m
Max Pier Length : 87 m
Bridge Width : 13.40 m
27
zmit Pedestrian Over Bridge
3 pedestrian overpass bridges have been constructed under D-100 Highway zmit Urban Crossing Renewal
Project. The project has aimed to facilitate the crossing to seaside from the city for pedestrians and been
designed as cable - stayed.
Location : Kocaeli
Service Period : 2008 - 2009
Client : lke Yap A..
Scope of Service : Detailed design

Bridge Type : Pedestrian bridge - Cable-stayed


Construction Method : Segmental
Superstructure Type : Steel box cross-section

29
Bayrakl Suspension Overpass Bridge
The main span with 92 meters of the bridge is carried by steel arch with 12 x 75 meters special tension bars.
The steel - arch having 65 meters length has been made with inclined form. It has been connected to 4 concrete
pyramids that were built on the pile with special anchorages. Arched steel suspension bridge implementation has
been a first in Turkey.
Location : zmir
Service Period : 1998
Client : zmir Metropolitan Municipality
Scope of Service : Detailed design

Superstructure Type : Steel suspension bridge


Total Length : 126 m
Main Span : 92 m
Bridge Width : 10 m

31
Gztepe Pedestrian Overbridge
Steel bridge deck is supported by 4 galvanized special pre-stressed cables which
are 2 x 40 m and 2 x 60 m in length to a single pylon.
The pylon which is 28 m height is connected to a
concrete block on the ground by 2 pre-stressed cables
with 29 m length. The first stay cable implementation
of Turkey has been put into practice in zmir with the
bridge and it has brought a landmark to the city.

Location : zmir
Service Perod : 1997
Client : zmir Metropolitan Municipality
Scope of Service : Detailed design

Bridge Type : Pedestrian bridge Cable stayed


Construction Method : Segmental
Superstructure Type : Steel box cross-section
Total Length : 126 m
Main Span : 90
Bridge Width : 10 m
Pylon Height : 28 m
33
Birlik Mah. 450 Cad. No: 23 06610
ankaya ANKARA / TURKEY
T. +90 312 495 70 00
F. +90 312 495 70 24

yproje@yukselproje.com.tr
yukselproje.com.tr
35
yukselproje.com.tr

Anda mungkin juga menyukai