REDUCED LEVER ARM MODEL by Park and Paulay


Vertical Direction
dVf / Mf = 3.52 >1.0 -> pilecap acts as deep beam
dVf / Mf > 2.0 Mf / Vf = 125 [mm] z = 0.4(d + Mf / Vf ) for dVf / Mf >=1.0 = 150 [mm]
1.2 Mf / Vf for dVf / Mf >=2.0
As1 = Mf / ( s fy z ) = 1877 [mm2]
Asmin = 0.2% x bf x tf = 1240 [mm2]
As1 = max ( As1, Asmin ) = 1877 [mm2] As1 prov = = 3500 [mm2]
> As1 OK
[Deep Beam Model Is Applicable]
[Pilecap Reinft by Deep Beam Model Is Adequate]
COLUMN ONE WAY SHEAR
Factored single pile load Qpr = 766 [kN] bc = 330 [mm]
Pile diameter dp = 250 [mm] hc = 500 [mm]
Pile edge distance ed = 500 [mm] bf = 1000 [mm]
Pilecap effective depth d = 440 [mm] hf = 1750 [mm]
Hor Critical Shear Line
Dist from col face to pile edge dc = 250 [mm] Fraction of pile outside critical line r = 0.00
Factored shear force Vf = r x Qpr =0 [kN]
bw = bf = 1000 [mm]
When no transverse reinft. = 230 / (1000 + d) = 0.160 11.3.6.3 Eq (11-9)
V f ' = 250 [kN] 11.3.4 Eq (11-6)
c = c c bw d
> Vf OK
[Column One Way Shear Is Adequate]

Civil Bay
Anchor Bolt Design per ACI 318-11
Crane Beam Design www.civilbay.com

3-Pile Pilecap Design Example


Civil Bay
Anchor Bolt Design per ACI 318-11
Crane Beam Design www.civilbay.com
Anchor Bolt Design ACI 318-11 Crane Project : Anchor Bolt Design ACI 318-11 Crane Beam Design Eng :
Beam Design www.civilbay.com Jon No : Chk :
www.civilbay.com
Doc No : www.civilbay.com Date :

Calculation Sheet Subject : Pilecap Design Examples Rev :

Anda mungkin juga menyukai