Outotec will initiate the scheduling of planned For the second stage the mill is kept running without
maintenance inspection visits with your plants feed until most of the material and water has passed
designated contact person. All site visits will be through. The following is an example of the inspection
scheduled to the mutual convenience of both parties. checks that Outotec recommends in the second stage:
It shall be the customers responsibility to ensure that
the plant is available for the inspection visit at the nn Trunnion bearing and labyrinth sealing feed
scheduled time. and discharge end
nn Mill pinion gear
Outotecs experienced mill specialist performs the nn Mill ring gear
maintenance inspection on site. The two-day inspection nn Mill pinion bearings
is performed in two stages. During the first stage the nn Gearbox and inching drive
mill is operating in normal condition and at normal nn Motor
load. We use advanced analyzers and instruments for nn Couplings
the inspection. Graphics from these are enclosed in the nn Coupling alignment
report. The following is an example of the inspection nn Mill foundation
checks that Outotec recommends in the first stage: nn Trunnion linings
nn Discharge trommel
nn Trunnion bearings nn Feed elbow
nn Pinion bearings nn Mill linings shell, feed and discharge heads.
nn Pinion gear nn Parts supplied and required
nn Ring gear
nn Electric motor Outputs and resulting actions
nn Gearbox
nn Bearing lubrication systems The condition and required action is evaluated for every
nn Pinion ring gear grease system procedure. The findings are summarised in Outotecs
mill inspection report. Outotecs mill specialist
evaluates the maintenance status of the equipment and
gives feedback and recommendations.