o When there are local restrictions for import preventing Supply Chain from
conducting international procurement
Only one vendor/supplier can satisfy the technical requirements because of unique technical competence or expertise. (The technical requirements must be valid and verifiable.) Only one source possesses patents or exclusive rights to furnish the item or service. (For example, the product is available only from the manufacturer, software developer, etc.) An IRC donor has requested, in writing, that we use a specific source.
Procurement Process Waivers and Sole/Single Sourcing justification should be the
exception, not the rule, and should never be based on lack of advance planning.
These waiver guidelines do not apply when an emergency is delcared by IRC. In this case, refer to Section 6 and the Emergency Procurement Protocol (Appendix P45).
Note: If a Sole Source Supplier is required under a EuropeAid funded
grant then approval must be requested from EuropeAid by the country grants team prior to initiating the procurement. Proof after the fact is unacceptable.
Sole/Single Source Supplier or Procurement Process Waiver Request
Process
Supply Chain and CD or DDO Regional Supply
Program Staff Chain Director SC Lead in-country CD or DDO After review, if in discusses the situation review and sign the agreement with the with the requesting Request Form request, the RSCD program (P44) sends Request The requestor (of the Form (P44) and waiver) prepares SC Lead sends to Request Form (P44), RSCD for review, supporting including market verification, documents to survey, process confirmation, and GSCD for documentation and int'l clarification approval quotes, as needed. Send Request Form (P44) to CD OR DDO for review and intial approval
Note: Approved Procurement waivers and Sole/Single Source
requests shall be filed with the procurement transaction documents. No additional note to file is required. 25