Anda di halaman 1dari 1

REKAPITULASI MAN POWER PEKERJAAN SIPIL PER AREA PERIODE MARET 2017

MARET 2017
No Area
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 CPI
2 ESP#1 9 15 12 12 9 20 20 15 15 13 9 4 4 8 7 8 11 12 6 6 4 2
3 Lamela
4 MPH 8 27 43 42 8 50 49 52 52 54 42 8 25 61 56 46 37 30 58 42 44 9 39 32 3 43 22 27 51 45
5 Buffer pond 9 47
6 Transfer Tower 7 11 20 9 3 3 3 14 14 9 5 8 10 24 3 8 9 5 5 5 8 3 2
7 Bucket Wheel 8 4 6 3 6 3 6 3 10 2 3 15 14 3 2 15
8 Underground hopper 12 12 20 10 2 9 12 12 17 13 5 10 5 1 7 11 11 11 2 11 10 13 12 22 19 22 9
9 IDF 4 15 12 7 4 18 15 14 18 8 6 5 8 15 12 13 7 2 15 16 23 29 16 18 19 11
10 Lime stone silo 9 7 11 6 11 9 7 2 19 13 11 1
11 MMF tank
12 Conveyor 6 16 22 4 2 20 4 5 10 3 4 4 5 10 2 4 15 35 2 8 8 4
13 Chimney
14 Back Gas Support 24 16 5 11 11 13 9 15 32 5 5 16 14 6 6 17 16 10 6 10
15 Closed water tank 14 4
16 Gas Monitor
17 Boiler 12 8 22 12 18 15 15 21 8 45 14 25 12 7 18 21 14 14 13 15 8
18 Coal Run off pond 2 2 2 2 2 1 2 2 2 2
19 Mosque 6 3 5 4 3 4 4 8 8 6 6 3 3 6 3 3 4 3 2 4 1 1 1 1 1 2 2
20 Admin 8 4 4 3 4 4 4 2 6 6 7 7 7 9 8 5 3 8 5 6 2 2 4 4 4 16 7
21 Bottom Ash Silo 6
22 WTP 15 6 51 23 22 29 22 23 13 20 21 23 20 20 12 8 8 15 12
23 Electric Room 6
24 Switchyard 8 9 9 6 4
25 EDG 10 10 9 9 7 9 7 4 4 6 6 7 9
26 LV Room 4 4 4 4 4 7
27 CWP 5 5 5 5 5 5 5 5
28 Workshop 22 3
29 Garage 12
Total 98 128 134 135 41 135 132 147 161 128 173 25 158 201 122 117 168 137 70 161 157 137 201 188 142 6 139 132 120 160 128

*) Man power Berdasarkan Daily Report Kontraktor

Anda mungkin juga menyukai