Anda di halaman 1dari 58

One Corps, One Regiment, One Team

Geohazards in Transportation in the Appalachian Region

Rock Cut-Slope
Design and Construction
Auxiliary Spillway and
Relocation of SR 3051 & 302
Dewey Lake, KY
Michael Nield - Geologist
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Lake, KY

Four Main Topics of Discussion

1. Project Description
2. Site Geology
3. Rock Cut-Slope Design
4. Construction Challenges
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description

Located in Eastern Kentucky Huntington


District
Dam completed in 1949
DEWEY DAM
Rolled earth embankment
dam with a tunnel type outlet
works in the left abutment.

SR 302
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description

Hydrologic Deficiencies at Dewey Dam

Dam Safety Assurance Program identified deficiencies with the


existing spillway during predicted floods, resulting in a high
risk of dam failure with catastrophic consequences
downstream.

Correction:
Raise the Dam crest (future work)
Raise crest of Brandy Keg Dike (this contract)
Restrict flows to the Existing Spillway (this contract)
Construct 129 wide Auxiliary Spillway (this contract)
Relocate State Routes 302 and 3051 (this contract)
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description
Dam
Existing Spillway

Relocation of
Auxiliary St. Rt. 302
Spillway &
St. Rt. 3051 & 302

Brandy Keg Dike

Project Features Impacted by Hydrologic Deficiencies


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description
Existing Spillway

Existing spillway was not designed to withstand predicted flows.


Constructed horizontal restrictors, which reduced the spillway
width from 60 feet to 43 feet.
Rock excavation by mechanical (non-explosive) methods.
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description
Brandy Keg Dike

Raised Brandy Keg Dike approximately 3 feet.


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description
Relocation of State Route 302

Design
Effort

State Route 302 was relocated as a result of the construction for


the Auxiliary Spillway.
Design was performed by Fuller Mossbarger Scott & May
Engineers with close cooperation by the Kentucky Department
of Transportation and the Corps of Engineers.
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Project Description
Auxiliary Spillway
Spoil Site

Dam

Excavation for
Auxiliary Spillway

Spoil Sites

Constructed a 129-foot wide Auxiliary Spillway through bedrock.


Relocate State Route 3051 and a portion of State Route 302.
SUBJECT OF THIS PRESENTATION
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Lake, KY

Four Main Topics of Discussion

1. Project Description
2. Site Geology
3. Rock Cut-Slope Design
4. Construction Challenges
One Corps, One Regiment, One Team
Auxiliary Spillway Dewey Dam, KY
Site Geology
Existing and Field Data

Auxiliary Spillway
Coal Mine Adit

Coal Mine Adits

Original SR 3051

Geologic Quadrangle Map Joint Measurements from Outcrops


One Corps, One Regiment, One Team
Auxiliary Spillway Dewey Dam, KY
Site Geology
Exploratory Drilling
Total of 17 Borings (15 2-inch diameter borings)
2 Angled Borings to Obtain Discontinuity Orientations
2 4-inch Diameter Core Borings, Pressure Tested at Sill Location
4 Borings for Highway Relocation

Proposed Spillway
Floor & Center Line

Small Coal Mine Adits


Boring Location Plan
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
Lithology
900
WEATHERED SHALE AND CLAYSTONE:
reddish brown to dark gray, soft, clayey,
850 occasionally broken or weathered.
BREATHITT FORMATION
PENNSYLVANIAN AGE

Low percentage of core recovery (30 -90).


800 Low RQD (30 75).

750

700

Elev. 650
Geologic Column Core Sample
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
Lithology
900

850
BREATHITT FORMATION
PENNSYLVANIAN AGE

800
SHALE with interbedded siltstone: gray
to dark gray, soft to moderately hard.
750
High percentage of core recovery (90
100).
700
Medium range RQD (65 85)

Elev. 650
Geologic Column Core Sample
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
Lithology
900

850
BREATHITT FORMATION
PENNSYLVANIAN AGE

800

750 SANDSTONE: light gray, moderately


hard, fine to medium grained,
micaceous.
700
High percentage of core recovery (95
100).
Elev. 650
Good RQD (95 - 100)
Geologic Column Core Sample
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
Lithology
900

850
COAL SEAMS: black, moderately
BREATHITT FORMATION
PENNSYLVANIAN AGE

hard, slightly to severely broken.


800
0.8 to 2.7 thick.
Core loss common.
750
Poor RQD

700

Elev. 650
Geologic Column Core Sample
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology

Geologic Cross Sections

Sill Location
Station 15+33

Proposed Spillway
Floor & Center Line

Flow

Upstream of Sill
Downstream of Sill Station 13+00
Station 19+00

Geologic Cross Section Location Plan


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
South/Left
Geologic Cross Section North/Right
900 SOIL 900
SHALE & SILTSTONE
C-91-7
SANDSTONE
COAL SEAM
WEATHERED SH & CLS
C-91-9
C-91-5
800 800
C-91-8
C-91-6

700 700

3+00 2+00 1+00 CL 1+00 2+00


Station 15+33 Spillway Crest
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
South/Left
Geologic Cross Section
North/Right
900 900
SOIL
SHALE & SILTSTONE
SANDSTONE
COAL SEAM

800 800
C-91-2
C-91-4 C-91-3

700 700

2+00 1+00 CL 1+00 2+00


Station 13+00 (Upstream of Sill)
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Site Geology
South/Left
Geologic Cross Section
North/Right
900 900
SOIL
SHALE & SILTSTONE
SANDSTONE
COAL SEAM

800 800

C-91-11 C-91-10
C-91-12

700 700

2+00 1+00 CL 1+00 2+00


Geologic Section - Station 19+00 (Downstream of Sill)
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Lake, KY

Four Main Topics of Discussion

1. Project Description
2. Site Geology
3. Rock Cut-Slope Design
4. Construction Challenges
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Rock Cut Slope Design Topics

1. Bench and Slope Design


2. Wedge/Block Analysis
3. Rock Fall Analysis
4. Spillway Sill Design
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
Bench and Slope Design

Relatively flat-lying sedimentary rock, with interbedded lithologies


that have varying resistance to weathering and high angled joints.
The cut slope design needs to minimize the effects of differential
weathering to reduce wedge/block failures and rock fall hazards.
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
South/Left Bench and Slope Design North/Right
900 SOIL 900
SHALE & SILTSTONE
SANDSTONE
COAL SEAM
WEATHERED SH & CLS
3 18 Bench at Elev. 800 on Coal Seam
800 4 800
1 18 Bench on Coal Seam
2
766 763
18 Bench at Base
1
of Sandstone
4
725 722
1 SR 3051 &
700 2 Spillway Crest 700
Elev. 866

Spillway Sill Foundation Elev. 688

3+00 2+00 1+00 CL 1+00 2+00


Geologic Section - Station 15+33 Spillway Crest
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
South/Left Bench and Slope Design North/Right
900 900
SOIL
SHALE & SILTSTONE
SANDSTONE
COAL SEAM

800 800

18 Bench at Base of Sandstone


1
4
720 717
700 1 SR 302 700
2

2+00 1+00 CL 1+00 2+00


Geologic Section - Station 13+00 (Upstream of Sill)
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
South/Left Bench and Slope Design North/Right
900 900
SOIL
SHALE & SILTSTONE
SANDSTONE
COAL SEAM

800 800

18 Bench at Base of Sandstone

1
18 Bench on Coal Seam 730 4
1
2
700 701 700
1 SR 3051
2

2+00 1+00 CL 1+00 2+00


Geologic Section - Station 19+00 (Downstream of Sill)
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
Bench and Slope Design
East 2.4% Slope on Coal Seams West
Limits of Excavation
800 4V:3H 2.4% Slope at 800
2V:1H Base of Sandstone
Flow 4V:1H 3% Slope on Coal Seam
700 2V:1H 700
2V:1H
Spillway Floor Spillway Sill
12+00 14+00 16+00 18+00 20+00 22+00
Elevation View South/Left Spillway Wall
West East
800 800
2V:1H Flow
4V:1H
700 2V:1H 700
2V:1H

22+00 20+00 18+00 16+00 14+00 12+00


Elevation View North/Right Spillway Wall
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
Bench and Slope Design

Relocated
State Route
Spillway Sill 302
Relocated
State Route
3051

Limits of Excavation

Plan View
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis - Four Main Failure Modes


Circular Failure soil-like failure, unlikely
to occur at this project, will not be
discussed at this time.

Planar Failure common with joints that


are parallel to cut-slope some failures
may be blast induced

Wedge Failure could be detrimental,


large volume of rock.

Toppling Failure similar results as


planar failure, unlikely to occur at this
project, will not be discussed at this time.
From Hoek, E. and Bray, J.W. Rock Slope Engineering 1981.
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis - Four Main Failure Modes

Planar Failure common with joints that


are parallel to cut-slope some failures
may be blast induced

Wedge Failure could be detrimental,


large volume of rock.
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis Joint Analysis


Joint measurements obtained from outcrops and angled exploratory
borings.
Typical joint surface has a planar shape with smooth texture, occasionally
iron stained or slightly open.

Joint Rosette Simplified Joint Rosette


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis Joint Analysis

Stereographic Projection of Joint Measurements Pole Plot


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis Joint Analysis

Stereographic Projection of Joint Measurements Contoured Plot of Poles


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis Joint Analysis

Stereographic Projection of Joint Measurements Planes Representing Joint Sets


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis Wedge Failure Analysis

Sandstone
Phi Angle = 30

1/4:1 Slope North Wall

Wedge
Sliding Zone

Joint Intersection

Stereographic Projection of Planes used for Wedge Analysis


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge Analysis Wedge Analysis


1/2:1 Slope 1/2:1 Slope
South Wall North Wall
Shale Shale

Wedge Analysis Wedge Analysis


1/4:1 Slope 1/4:1 Slope
South Wall North Wall
Sandstone Sandstone
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Wedge/Block Analysis Planar Failure


Daylight Envelope
Planar
Sliding Zone

Sandstone
Phi Angle = 30
1/4:1 Slope North Wall

Stereographic Projection of Poles used for Planar Analysis


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Planar Analysis Planar Analysis


1/2:1 Slope 1/2:1 Slope
South Wall North Wall
Shale Shale

Planar Analysis Planar Analysis


1/4:1 Slope 1/4:1 Slope
South Wall North Wall
Sandstone Sandstone
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Rock Fall Analysis Input Parameters


Values are subjective, derived from published tables.

Computer programs included Colorado Rockfall Simulation


and RocFall.

Coefficient of
Coefficient of Friction Angle
Tangential
Normal Restitution (Phi angle)
Restitution
SURFACE AND MATERIALS
mean std. dev. mean std. dev. mean std. dev.

ALL BENCHES 0.35 0.02 0.85 0.02 25 5


SLOPES IN SANDSTONE 0.37 0.05 0.87 0.05 25 5
SLOPES IN SHALE/SILTSTONE 0.37 0.05 0.87 0.05 30 5
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Rock Fall Analysis

Boulder Origin
Boulder Origin
Slope was
Redesign

SR 3051
Boulder Boulder
Trajectory Trajectory

Boulder Origin at Bench Elev. 800 Boulder Origin at Top of Cut Slope
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Rock Fall Analysis

Boulder Origin
Boulder Origin

SR 3051

Boulder Boulder
Trajectory Trajectory
Boulder Origin at Bench Elev. 725 Boulder Origin at Bench Elev. 766
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design

Spillway Sill Design

Spillway Sill

SR 3051

Plan View
One Corps, One Regiment, One Team
Auxiliary Spillway Dewey Dam, KY
Rock Cut Slope Design
Spillway Sill Bedrock Parameters
Sliding Friction Cross Bed Anchor Allowable
Unit
LITHOLOGIC Strength Shear Strength Bond Bearing
Weight
MEMBER phi c phi c Strength Pressure
710 710
degree psi degree psi psi pcf psi
LOWER SHALE 25 0 30 10 65 160 90
700LOWER SANDSTONE 25 15 50 175 95 150 320 700

690 Concrete Spillway Sill Crest EL. 688 Flow 690

EL. 678
Lower Shale Member
680 680

EL. 676 Lower Sandstone Member


670 670
37 Long, 1 Diameter
Threadbar Anchor, 4 Diameter Hole
660 660
Tensioned to 112 kips
Cross Section Spillway Sill Normal Condition
One Corps, One Regiment, One Team
Auxiliary Spillway Dewey Dam, KY
Rock Cut Slope Design

Spillway Sill Design Headcut Erosion


710 Flood Crest EL. 708 710

700 700
Flow
Spillway Sill Crest EL. 688
690 690
EL. 686
2 Erosion of Shale U/S
10 Shale Removed EL. 678 Lower Shale Member 680
680 by Headcut Erosion
EL. 676
Lower Sandstone Member
670 670

660 Rock Anchor 660

Cross Section Spillway Sill Flood Condition


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Rock Cut Slope Design
Spillway Sill Design
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Lake, KY

Four Main Topics of Discussion

1. Project Description
2. Site Geology
3. Rock Cut-Slope Design
4. Construction Challenges
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Construction Contract
PRIME CONTRACTOR:
Tab Construction Co. of Canton, Ohio
DRILLING AND BLASTING SUBCONTRACTOR:
Hilltop Energy Inc. of Mineral City, Ohio

CONSTRUCTION DURATION:
Approximately Two Years from August 2000 to September 2002.
FINAL EXCAVATION QUANTITIES:
Rock Excavation: 677,000 cubic yards
Structural (Rock/Concrete) Excavation: 1,000 cubic yards
Common (Soil) Excavation: 306,000 cubic yards
FINAL CONSTRUCTION CONTRACT COST:
$12.8 Million Dollars
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges

Modifying Rock-Cut Slopes

Removal of Slip-Prone Soil Initial Rock Cut


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Blasting Vibration Control
Blasting Within
790 Feet of
Boulders and
Blasting for 1,000 Feet From
Auxiliary Spillway Homes
SR 3051 & 302

Perched
Restricted Peak
Boulders
Particle Velocity
to 1.5 in/sec at
200 Feet From
Homes
Blast

Location of Homes
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Blasting Vibration Control

Large Boulders Located on Ridge Line and Perched Above Homes


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Drilling And Blasting

Pre-Split Drilling
18 to 30 Center to Center Loading Production Shot
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges

Drilling And Blasting

Production Blast Production Blast


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Excavation and Spoil Sites

Rock Excavation Spoil Sites


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges

Maintaining Traffic and Utilities During Excavation

View of South/Left Spillway Wall Spillway Sill


One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Spillway Sill

Low Strength
Eliminated Upper Concrete
Rock Anchor

Recessed
Concrete

SR 3051

Over Excavation of Spillway Modifications to Correct for Future


Sidewalls Erosion of Shale
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges

Final Product

South/Left Spillway Wall North/Right Spillway Wall


as Viewed from Upstream as Viewed from Upstream
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Dam, KY


Construction Challenges
Final Product

Relocated
SR 302

Relocated
SR 3051

Upstream of Spillway Auxiliary Spillway Viewed from


Route 302 Transition Downstream
One Corps, One Regiment, One Team

Auxiliary Spillway Dewey Lake, KY

Questions & Discussion

Contact Information:
Michael Nield
Phone: (304) 529-5056
E-mail: michael.c.nield@lrh01.usace.army.mil