Anda di halaman 1dari 2

Federal Register / Vol. 67, No.

218 / Tuesday, November 12, 2002 / Notices 68593

Filing’’ link. The Commission strongly 385.2001(a)(1)(iii) and the instructions CFR 385.2001(a)(1)(iii) and the
encourages electronic filings. on the Commission’s web site under the instructions on the Commission’s Web
‘‘e-Filing’’ link. site at http://www.ferc.gov under the ‘‘e-
Magalie R. Salas,
Filing’’ link. The Commission strongly
Secretary. Magalie R. Salas,
encourages electronic filings.
[FR Doc. 02–28730 Filed 11–8–02; 8:45 am] Secretary.
BILLING CODE 6717–01–P [FR Doc. 02–28734 Filed 11–8–02; 8:45 am] Linwood A. Watson, Jr.,
BILLING CODE 6717–01–P Deputy Secretary.
[FR Doc. 02–28586 Filed 11–8–02; 8:45 am]
DEPARTMENT OF ENERGY BILLING CODE 6717–01–P
DEPARTMENT OF ENERGY
Federal Energy Regulatory
Commission Federal Energy Regulatory DEPARTMENT OF ENERGY
[Docket No. RP03–59–000]
Commission
Federal Energy Regulatory
[Project No. 11797–000]
Horizon Pipeline Company, L.L.C.; Commission
Notice of Proposed Changes in FERC Grande Pointe Power Corporation; [Project No. 1494–244]
Tariff Notice of Availability of Environmental
Assessment Notice of Application to Amend
November 5, 2002. License and Soliciting Comments,
Take notice that on November 1, November 4, 2002. Motions to Intervene, and Protests
2002, Horizon Pipeline Company, L.L.C. In accordance with the National
(Horizon) tendered for filing to become Environmental Policy Act of 1969 and November 4, 2002.
part of its FERC Gas Tariff, Original the Federal Energy Regulatory Take notice that the following
Volume No. 1, Original Sheet No. 195A, Commission (Commission or FERC) hydroelectric application has been filed
to be effective December 2, 2002. regulations contained in the Code of with the Commission and is available
Horizon states that the purpose of this Federal Regulations (CFR) (18 CFR part for public inspection:
filing is to revise the provisions of the 380 [FERC Order No. 486, 52 FR a. Application Type: Non-project use
General Terms and Conditions in its 47897]), the Office of Energy Projects of project lands and waters.
Tariff relating to capacity releases where staff (staff) reviewed the application for b. Project No.: 1494–244.
the releasing Shipper is not an original minor license for the Three c. Date Filed: September 30, 2002.
creditworthy. d. Applicant: Grand River Dam
Rivers Project, located on the St. Joseph
Horizon states that copies of the filing Authority (GRDA).
River in the city of Three Rivers, St. e. Name of Project: Pensacola Dam.
are being mailed to Horizon’s customers Joseph County, Michigan, and has f. Location: The project is located on
and interested state commissions. prepared an environmental assessment the Grand (Neosho) River in Craig,
Any person desiring to be heard or to (EA) for the project. In this EA, the staff Delaware, Mayes, and Ottawa Counties,
protest said filing should file a motion has analyzed the potential Oklahoma. The project does not occupy
to intervene or a protest with the environmental effects of the existing any Federal or tribal lands. The
Federal Energy Regulatory Commission, project and concluded that licensing the proposed non-project use would be
888 First Street, NE., Washington, DC project, with staff’s recommended located in Ketchum Cove on Grand Lake
20426, in accordance with Sections measures, would not constitute a major O’ The Cherokees in Section 2,
385.214 or 385.211 of the Commission’s federal action significantly affecting the Township 23 North, Range 21 East, in
Rules and Regulations. All such motions quality of the human environment. Mayes County.
or protests must be filed in accordance A copy of the EA is available for g. Filed Pursuant to: Federal Power
with Section 154.210 of the review at the Commission in the Public Act 16 U.S.C. 791(a)-825(r)
Commission’s Regulations. Protests will Reference Room, or it may be viewed on h. Applicant Contact: Mary Von
be considered by the Commission in the Commission’s Web site at http:// Drehle or Teresa Hicks, Grand River
determining the appropriate action to be www.ferc.gov using the ‘‘FERRIS’’ link. Dam Authority, P.O. Box 409, Vinita,
taken, but will not serve to make Enter the docket number, excluding the OK 74301. Phone: (918) 256–5545.
protestants parties to the proceedings. last three digits in the docket number i. FERC Contact: Steve Naugle,
Any person wishing to become a party field, to access the document. For steven.naugle@ferc.gov, 202–502–6061.
must file a motion to intervene. This assistance, please contact FERC Online j. Deadline for filing comments and or
filing is available for review at the Support at motions: December 6, 2002.
Commission in the Public Reference FERCOnlineSupport@ferc.gov or toll- All documents (original and eight
Room or may be viewed on the free at (866)208–3676, or for TTY, copies) should be filed with Magalie R.
Commission’s Web site at http:// contact (202)502–8659. Salas, Secretary, Federal Energy
www.ferc.gov using the ‘‘FERRIS’’ link. Any comments should be filed within Regulatory Commission, 888 First
Enter the docket number excluding the 45 days from the date of this notice and Street, NE., Washington, DC 20426.
last three digits in the docket number should be addressed to Magalie R. Salas, Comments, protests, and interventions
field to access the document. For Secretary, Federal Energy Regulatory may be filed electronically via the
Assistance, please contact FERC Online Commission, 888 First Street, NE., Internet in lieu of paper. See, 18 CFR
Support at Washington, DC 20426. Please affix 385.2001(a)(1)(iii) and the instructions
FERCOnlineSupport@ferc.gov or toll- ‘‘Three Rivers Project No. 11797-000,’’ on the Commission’s Web site under the
free at (866) 208–3676, or TTY, contact to all comments. For further ‘‘e-Filing’’ link. Please reference
(202) 502–8659. Comments, protests and information, please contact Sean ‘‘Pensacola Project, FERC Project
interventions may be filed electronically Murphy at (202) 502–6145 or at No.1494–244’’ on any comments or
via the Internet in lieu of paper. The sean.murphy@ferc.gov. motions filed.
Commission strongly encourages Comments may be filed electronically k. Description of the Application:
electronic filings. See, 18 CFR via the Internet in lieu of paper. See 18 GRDA requests Commission approval to

VerDate 0ct<31>2002 15:38 Nov 08, 2002 Jkt 200001 PO 00000 Frm 00035 Fmt 4703 Sfmt 4703 E:\FR\FM\12NON1.SGM 12NON1
68594 Federal Register / Vol. 67, No. 218 / Tuesday, November 12, 2002 / Notices

permit Terry Frost d/b/a Water Front p. Agency Comments—Federal, state, the instructions for filing comments
Development Company (WFDC) to and local agencies are invited to file described in item k below.
construct 6 docks with 67 boat slips to comments on the described application. k. Pursuant to Section 4.32(b)(7) of 18
be used by patrons of a new A copy of the application may be CFR of the Commission’s regulations, if
condominium development known as obtained by agencies directly from the any resource agency, Indian Tribe, or
Colony Cove. GRDA has waived the Applicant. If an agency does not file person believes that an additional
dock-placement provisions of Artice comments within the time specified for scientific study should be conducted in
IV(7) of the Rules and Regulations filing comments, it will be presumed to order to form an adequate factual basis
Governing the Use of Shorelands and have no comments. One copy of an for a complete analysis of the
Waters of GRDA for WFDC’s proposal. agency’s comments must also be sent to application on its merit, the resource
l. Locations of the Application: This the Applicant’s representatives. agency, Indian Tribe, or person must file
filing is available for review at the a request for a study with the
Commission in the Public Reference Linwood A. Watson, Jr., Commission not later than 60 days from
Room or may viewed on the Deputy Secretary. the date of filing of the application, and
Commission’s Web site at http:// [FR Doc. 02–28584 Filed 11–8–02; 8:45 am] serve a copy of the request on the
www.ferc.gov using the ‘‘FERRIS’’ link. BILLING CODE 6717–01–P applicant.
Enter the docket number excluding the l. Deadline for filing additional study
last three digits in the docket number requests and requests for cooperating
field to access the document. For DEPARTMENT OF ENERGY agency status: December 30, 2002.
assistance, please contact FERC Online All documents (original and eight
Support at Federal Energy Regulatory copies) should be filed with: Magalie R.
FERCOnlineSupport@ferc.gov or toll- Commission Salas, Secretary, Federal Energy
free at (866) 208–3676, or for TTY, Regulatory Commission, 888 First
Notice of Application Tendered for Street, NE., Washington, DC 20426.
contact (202) 502–8659. A copy is also
Filing With the Commission, Soliciting The Commission’s Rules of Practice
available for inspection and
Additional Study Requests, and require all intervenors filing documents
reproduction at the address in item h
above. Establishing Procedural Schedule for with the Commission to serve a copy of
m. Individuals desiring to be included Relicensing and a Deadline for that document on each person on the
on the Commission’s mailing list should Submission of Final Amendments official service list for the project.
so indicate by writing to the Secretary November 5, 2002. Further, if an intervenor files comments
of the Commission. Take notice that the following or documents with the Commission
n. Comments, Protests, or Motions to relating to the merits of an issue that
hydroelectric application has been filed
Intervene—Anyone may submit may affect the responsibilities of a
with the Commission and is available
comments, a protest, or a motion to particular resource agency, they must
for public inspection.
intervene in accordance with the also serve a copy of the document on
a. Type of Application: New Minor
requirements of Rules of Practice and that resource agency.
Procedure, 18 CFR 385.210, .211, .214. License. Additional study requests and
In determining the appropriate action to b. Project No.: 1413–032. requests for cooperating agency status
take, the Commission will consider all c. Date Filed: October 30, 2002. may be filed electronically via the
protests or other comments filed, but d. Applicant: Fall River Rural Electric Internet in lieu of paper. The
only those who file a motion to Cooperative, Inc. Commission strongly encourages
intervene in accordance with the e. Name of Project: Buffalo River electronic filings. See 18 CFR
Commission’s Rules may become a (previously Pond’s Lodge) Hydroelectric 385.2001(a)(1)(iii) and the instructions
party to the proceeding. Any comments, Project. on the Commission’s web site (http://
protests, or motions to intervene must f. Location: On the Buffalo River near www.ferc.gov) under the ‘‘e-Filing’’ link.
be received on or before the specified it’s confluence with the Henry’s Fork m. This application is not ready for
comment date for the particular River, in Fremont, Idaho. The project environmental analysis at this time.
application. occupies 9.8 acres of land within the n. The existing Buffalo River Project
o. Filing and Service of Responsive Targhee National Forest. consists of: (1) a 142-foot-long by 12-
Documents—Any filings must bear in g. Filed Pursuant to: Federal Power foot-high timber-faced rock-filled
all capital letters the title Act 16 U.S.C. 791 (a)–825(r). diversion dam; (2) a 40-foot-long by 3-
‘‘COMMENTS’’, h. Applicant Contact: Fall River Rural foot-high concrete slab spillway with
sbull I11‘‘RECOMMENDATIONS FOR Electric Cooperative, Inc., 1150 North stop logs; (3) a fish passage structure; (4)
TERMS AND CONDITIONS’’, 3400 East, Ashton, Idaho 83420, Tel. # a concrete intake structure with a 5-foot
‘‘PROTEST’’, OR ‘‘MOTION TO (208) 652–7431, and/or Brent L. Smith, steel slide gate; (5) a trash rack; (6) a 52-
INTERVENE’’, as applicable, and the President, Northwest Power Services, foot-long by 5-foot-diameter concrete
Project Number of the particular Inc, P.O. Box 535, Rigby, Idaho 83442, encased steel penstock; (7) a 34-foot-
application to which the filing refers. Tel. # (208) 745–0834. long by 22-foot-high masonry block
Any of the above-named documents i. FERC Contact: Gaylord Hoisington, powerhouse containing a 250-kilowatt
must be filed by providing the original (202) 502–8163, Bouvier Kaplan inclined shaft turbine;
and the number of copies provided by gaylord.hoisington@FERC.gov. and (8) other appurtenant facilities. The
the Commission’s regulations to: The j. Cooperating agencies: We are asking applicant estimates that the total
Secretary, Federal Energy Regulatory Federal, state, local, and tribal agencies average annual generation would be
Commission, 888 First Street NE., Mail with jurisdiction and/or special 1,679 megawatthours.
Stop PJ–12.1, Washington, DC 20426. A expertise with respect to environmental o. A copy of the application is
copy of any motion to intervene must issues to cooperate with us in the available for review at the Commission
also be served upon each representative preparation of the environmental in the Public Reference Room or may be
of the Applicant specified in the document. Agencies who would like to viewed on the Commission’s Web site at
particular application. request cooperating status should follow http://www.ferc.gov using the ‘‘FERRIS’’

VerDate 0ct<31>2002 15:38 Nov 08, 2002 Jkt 200001 PO 00000 Frm 00036 Fmt 4703 Sfmt 4703 E:\FR\FM\12NON1.SGM 12NON1

Anda mungkin juga menyukai