2014 International Symposium on Computer, Consumer and Control

Lightning Protection and Calculation Methods of


Transmission Line
Zhouxing Fu#, Lingling Huang#, Lei Sun#, Ruoya Zhang#, Nan Wang#
#
Department of Geology and Environment Engineering, Xian University of Science and Technology
Xian 710054, Shaanxi Province, China
1
elisay@sina.com
2
fuzx@xust.edu.cn


Abstract It is necessary to select appropriate methods of
calculation and lightning protection for transmission line has A. The Standard Method
characteristics such as wide distribution, long span and high According to the formula of DL/T620-1997 Over-voltage
lightning trip-out rate. This paper initially introduces and AC electrical installations and insulation coordination, the
compares several calculation methods, then analyzes principles of Standard method can calculate trip rate. This method is
some common lightning protection measures of transmission line
in detail. Large quantity fact proved that lightning protection and
incompetence on the analysis of specific problem, such as high
calculation methods have great value to guidance engineering voltage grade problems, because it is derived from operating
practice. experience on low voltage grade line.
Plain area: (1)
Keywords Lightning; Transmission line; Calculation Method; Mountain area: (2)
Lightning Protection Technology; Measures is the edge of wires for wire protection angle (); H is the
tower height (m); is line lightning rate.
I. INTRODUCTION From (1) and (2) we know, shielding failure rate of
In nature, lightning is an extremely powerful disaster which mountain area is about 3 times of plain area or equivalent eight
will bring tremendous damage to the natural resources and times of protection angle.
building facilities that human beings rely on. Therefore, the If we set n as shielding failure trip-out rate, it can be
phenomenon of lightning and lightning protection measures calculated by next formula:
has always been the focus of many researches. As we all know,  () (3)
transmission line is a important part of the power system. Among them, N is the number of lightning
When transmission line exposed to air, it is very vulnerable to strike of per 100 km circuit, annually on 40 thunderbolt days
external influence and damage and one of the most important (); is the probability that lightning current amplitude over
aspects is lightning struck. However, transmission line is more detour lightning resisting level; is rate of arc establishing
easily to suffer lightning because transmission line always rate.
located in the wilderness, hills or mountains. In view of
lightning has brought great harm to transmission line, it is B. The Monte Carlo Method
imperative to strengthen the study on transmission line and In Monte Carlo method, some statistics (such as lighting
perfect the performance of transmission line protection. The current amplitude and wave front generated by computer) can
key to ensuring power grid safe and reliable operation is to be used to simulate all kinds of random factors in the lightning.
find some effective lightning protection measures. In this This way is regarded as a considered comprehensively method.
paper, transmission line lightning protection calculation model Due to the statistical principle used in the simulating
and measure will be expounded. calculation cannot give reasonable calculating analytic
expression and computer cannot absolutely random at the
II. SEVERAL CALCULATION METHODS OF LIGHTNING LINE same time, it requires a substantial increase in calculated
Transmission line tripping caused by lightning mainly amount in order to improve the calculation precision of Monte
contains counterattack trip and shielding failure trip. An Carlo method. However, this solution is adverse to calculation
accurate calculation counterattack trip rate and shielding analysis in practice which has a large number of circuit.
failure occurred on transmission line is an important basis for When using this method, the computer will simulate the
evaluating protection performance and determining protection situation that transmission line being struck by lightning
strategies of lightning transmission line. frequently and track the lightning status. Supposing random
At present, calculation method of lightning trip rate is variables ( I, A, U, B ......) are independent of each other ,
varied, mainly includes Travelling Wave method, The EMTP using random sampling algorithm, the computer can achieve a
simulation method, Monte Carlo method, The Standard lightning current amplitude probability distribution f(i). Via
method, Electrical Geometry Model (EGM), Leader this distribution, sampling random variables I correspond a
Progression Model (LPM), etc. random number . Generally, we treat the random number as

978-1-4799-5277-9/14 $31.00 2014 IEEE 150


DOI 10.1109/IS3C.2014.50
the first lightning strike lightning current amplitude. Then Fig. 1 Transmission line lightning stroke around the EGM
distribute f(a) random sampling get a random number of
random variables A from the probability of lightning current
wave steepness, and treat it as the first head of lightning Setting the intensity of lightning current I of the lightning
current wave steepness. Lightning frequency voltage value leader position for curve CABD and segment arcs of CA and
(the first time lighting happened) can be obtained from their AD respectively, the grounding wire G and wire C-section
respective probability distributions and location that first location as the centre and the radius of the arc S, both of which
lightning occurred can be determined by taking a sample. intersect at point A. BE is parallel to the ground, KS is the
height from the ground, which is segmental arc AD intersect at
After the appropriate operation: =f
point B. Called transmission line arc AB the exposed
.From the result, it can be judged whether insulation arc ,thunderbolt located in the AB will hit the wires, in diagram
caused the first lightning flashover. When insulation caused 1,  is the exposed conductor distance. With lightning
the first lightning flashover take , or else take . current increases, exposed arc is getting smaller, when
Repeat the above steps and track the status of secondary increases to a certain degree, exposure arc AB is zero, the
lightning from the beginning. response of the lightning current is the maximum lightning
From the second track of the results ( ), current that makes the shielding failure taken place, while the
after being calculated:  =f , it can wire is completely shielded, shielding failure will not occur.
determine whether a second lightning stoke will lead to In accordance with the above concept, shielding failure rate
insulation flashover, then determine the value of . After (shielding failure rate) is:
repeating above steps N times under lightning conditions, we
SFR= ( ) (6)

can get a observations of N samples . Shielding failure flashover rate (shielding failure flashover
Using this sample, the line caused by lightning insulation rate) for:
flashover can be calculated:

SFR= ( ) (7)

(4)
Among them, is the ground lightning density
Thus it is not difficult to get further estimates of the ( ); means minimum lightning current that
lightning trip-out rate: can occur shielding (kA);  means maximum lightning
(5) current that can occur shielding (kA); is wire exposed
In that formula, C is the number of lines per 100km average distance (m); is the minimum critical current flashover of
annual suffered from lightning,  is built arc rate. insulator string (kA); P(I) is the lightning current amplitude
C. The Electrical Geometry Model probability distribution function.
Electrical Geometric Model is a geometric analysis and D. Leader Progression Model (LPM)
calculation modelwhich integrate discharge characteristics of Leader Progression Model (LPM) is based on long-gap
the lightning with contact line structure. The basic principle is: discharge observations and lightning research. It is a analytical
before the head of pilot discharge channel from the model by simulating the development of the physical
thundercloud to ground arrive the striking distance distance processes of lightning. With clear physical process, it can be
of the object hit critical breakdownthe shot point is used to study the line structure, topography and other factors
uncertain. When the head of pilot comes first within striking which affect the distribution line shielding properties. Not
distanceit will discharge to the object. The size of the striking considering discharge dispersion and upward leader
distance positively correlated with the lighting current. competition, the accuracy of the LPM model, to a great extent,
Fig.1 shows a transmission line shielding EGM for the requires long-rationality of lightning and long-gap discharge
calculation of the geometric drawing method as in [3]. observation data.
 E. Travelling Wave Method
Travelling Wave Method recognizes the tower of the cross
arm as a set of short transmission line, from the line of
Bergerac Long mathematical model, using the lumped
parameter circuit of the node analysis method to analysis, it is
a real reflection of the tower structure on the wave propagation
process, each point on the tower obtained in this way can meet
the actual potential of the tower better when lightning striking
the transmission line. Fig. 2 is the prototype of a transmission
line. It is converted into an equivalent lumped parameter
model using Bergerac dragon as in [1][11],[12], in which
is the line impedance.
 

151
m t - i km
i mkt i t design of the case for the protection angle is too large to take
appropriate measures to reduce the probability lightning
i kmt i mkt ut shielding failure.
m
ut
k ut
m Zc Z c ut
m 2Reinforced insulation and insulation using unbalanced
way. In intense lightning activity area, such as the big leap
tall tower and into the line, should increase the number of
k t -
i
insulators as in [2].
3The processing of grounding device. The lightning
Fig. 2 The equivalent circuit of a prototype line (time domain) protection level of High Voltage Transmission Line decreases
while the tower grounding resistance increases. To reduce

tower grounding resistance, we also need to ensure that
k and m are both ends of the wire, which are separated when overhead ground wire, ground deflectors, and a good
calculating the equivalent circuits; connection of network with each other as in [2].
Each node contains an equivalent current source
4Set up ground coupling. Set up coupled ground when
 or , the value is determined by voltage
unable to reduce the grounding resistance is a kind of method.
and current on the other side of the line which is early than
Erecting a ground wire in the bottom, it can enhance the
current time point. (which is past record) the recursive
coupling effect between the conductor and ground wire,
formula of these equivalent current (t-) and is

played the role of triage, thereby enhancing transmission line
(8) anti-Ray level. Meanwhile, the erection of ground coupling

can also reduce the height of the tower, reducing around rate.
F. The EMTP Simulation Method
Electromagnetic transient process calculation program 5Ground wire should be set up all of the transmission
EMTP analysis is the use of characteristic line after being lines. To set up ground wire can prevent thunder from hitting
stuck by lightning wave process, the specified calculation wire. Erection of lightning conductor can play streaming
effectively, reducing the lightning current flowing through the
process is According to the individual characteristics of
tower. Grounding wire makes an important role to the wire
circuit components write the corresponding algebraic shielding effect and it also can reduce the induced voltage on
equations and differential equations. Based on trapezoidal the wire as in [5],[7]~[9]. By using the ground wire, it can
integration method the inductancepower and capacitance reduce the coupling voltage line insulators. In general,
element processed in the networkare looked on as resistive lightning conductor is not needed in below 35KV transmission
network. According to the characteristic line method, the lines. It is necessary to set up through the whole lightning line
distribution parameters such as line segments, are also above the 220KV transmission lines.
resistive network, as algebraic differential equations,
formation of nodal admittance matrix. After optimizing the 6Installation surge arresters. To install the surge
node number, according to the sparse matrix, get the solution arresters can discharge the lightening arrester into the earth,
of each branch current, voltage and power loss as in [1][11] thus limiting overvoltage protection of transmission lines and
guarantee the equipments safety as in [6].
[12]. Reference [4],[10] shows that EMTP is a powerful tool
for power system simulation, it not only can be used to study 7The Installation of automatic reclosing device. Because
the electromagnetic transient process of power system, but of the self-recovery performance in line insulation, most
also can be used to solve the general electrical circuit. accidents caused by lightning flashover can self eliminated
after tripping the circuit. Therefore, the installation of
III. LIGHTNING PROTECTION MEASURES automatic reclosing device has good effect for reducing the
Transmission line lightning protection is designed to accident rate by lightning lines.
improve the line lightning performance and reduce line
lightning trip rate. The system operation, the line voltage IV. CONCLUSIONS AND PROSPECT
levels and the degree of importance, the line through the Lightning activity is a complicated phenomenon in nature,
strength of lightning activity areas, topography features, soil there is no lightning protection measures in an absolute way,
resistivity and other natural conditions should be considered As a result, lightning protection measures should be treated on
when determining the way of lightning protection. After different local conditions, and taking targeted and feasibility
technical and economic comparison, reasonable protective lightning protection programs; Meanwhile, Strictly abide by
measures should be taken. the principle of equal potential, Comprehensive consideration
of the lightning protection and grounding, and inspection,
1Reduce the protective grounding wire or with a negative
testing and maintenance to the lightning protection facilities
angle corner protection. Using the effective shielding angle
should be taken by stages. Even the lightning protection
formula to calibrate tower effective protection angle as the
mountain running lines are vulnerable to strike around, so the measures are mature, it can relatively reduce the probability of
lightning protection and the times of lightning trip. To reduce

152
or eliminate the lightning accident significantly, it needs to lightning protection measures.
accumulate experience and improve transmission line
[5] Sun Guanghui, Wang Junfeng, Peng Haitao, Research on Different
ACKNOWLEDGMENT Strategy of Lightning Protection for Overhead Transmission Lines of
Medium Voltage Distribution Networks, Guangdong Electric Power,
My deepest gratitude goes first and foremost to my 2012,25 (6) :35-39 (in Chinese)
Professor Zhouxing Fu, for his constant encouragement and [6] Ji Ning, Luo Wenbo, High-voltage Transmission Line Lightning
guidance. He has walked me through all the stages of the Protection Measures Analysis and Improvement Method, Electrical
Technology, 2013 (6) :114-116 (in Chinese)
writing of this thesis. Without his instruction, this thesis [7] WALKER D N , BOWLER C E J, JACKSON R L, et al, Results of
could not have reached its present form. I also owe my Subsynchronous Resonance Test at Mohave, [J].IEEE Transactions
sincere gratitude to my friends and my fellow classmates on Power Apparatus and Systems,1975,94(5);1878-1889.
who gave me their help and time in listening to me and [8] HALL M C, HODGES D A, Experience with 500kv
Subsysnchronous Resonance and Resulting Turbine Generator Shaft
helping me work out my problems during the difficult course Damage at Mohave Generating Station, [M]. New York; IEEE Press,
of the thesis. 1976.
[9] WASYNZUK O. Damping Subsynchronous Resonance Using
REFERENCES Reactive Power Control, [J].IEEE Transactions on Power Apparatus
[1] Ren Haiyan, Research on Lightning Comprehensive Protection and Systems, 1981, 100(3):1096-1104.
Performance of 500kv Double Circuit Transmission Lines, Nanning, [10] Yokoyama S, Calculation of induced voltages on overhead lines
China: Guangxi University, 2012(in Chinese) multiconductor systems, IEEE Transaction on
[2] Fu Huiqin, Jiang Yichuan, Research on Lightning protection of PAS,1984,103(1):100-108
Transmission Line, Power System Technology, 2008, 36(2):247-249 [11] F.S. Young, M. Clayton and A .R. Hileman , Shielding of
(in Chinese) Transmission Lines, IEEE , Transactions on Power Apparatus and
[3] Huang Tao, Study on Lightning Performance Calculation of Systems,1963,(82):132-154
Ttransmission Lines and Accurate Modeling of Grounding Device, [12] Eriksson A J, An Improved Electro geometric Model for
Wuhan: Hua Zhong University of Science and Technology, 2012 (in Transmission Line Shielding Analysis, IEEE Transactions on Power
Chinese) Delivery.1987,2(3):871-886
[4] Zhuang Yanfei, Study on Lightning Protection Performance for
110kv Transmission Lline, Nanning: Guangxi University, 2006 (in
Chinese)