1. Purpose
To establish a system for identifying the potential emergency situations, responding to such
situations for prevention and mitigation of adverse OH&S consequences.
2. Scope
This procedure is applicable to all activities carried out in the CORR Project site.
On getting the message about emergency, he will take overall charge of the situation and
report to Emergency Controller. He will assess the scale of emergency and decide on its
severity and inform the Emergency Controller accordingly. In absence of project Head, the
Incident Controller shall be the Head of Emergency Response Team.
Direct all operations within the affected areas with the priorities for safety of personnel
minimise damage to the property and minimise loss of materials.
Direct the shutting down and evacuation of plant (Batching Plant/Hot Mix Plant/Precast
yard, etc.) and areas likely to be adversely affected by the emergency.
Ensure that all Key personnel and outside help are called in.
Inform the Fire squad & Security Officer and the local fire service about the emergency.
Ensure that all workers/staff of the areas affected are evacuated to the appropriate
assembly points, and the areas are searched for casualties.
Report all significant developments to the Emergency Controller.
Have regard to the need for preservation of evidence so as to facilitate any inquiry into the
causes and circumstances, which caused or escalated the emergency.
------------------------------------------------------------------------------------------------------------------------------------
2
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Emergency Team Members(Head Structures/ Highways/ P&M/ C&C/ Store/ etc)
Report to the team leader in case of any emergency.
Assist the Team leader & Emergency coordinator in evacuating the area.
Analyze and assess incidents.
Assess the impact to the infrastructure and people.
Resolve incidents and if no resolution is possible escalate the issue immediately.
In case of evacuation, help employees to move to the nearest fire exit and assemble at the
designated assembly point.
Provide recommendations to the incident management and evacuation teams.
Coordinate the return to normal operations once the threat has been concluded.
Initiate a post incident review on what went well/what did not work and areas for
improvement.
HSE (EmergencyCoordinator)
Mock drill to be organized to ensure preparedness of rescue team/individuals.
Inform the Chief Project Manager (Emergency Controller)and Head Office about the
occurrence of emergency.
Facilitatefor further investigation of incident.
Shall activate the emergency procedure at work place according to the severity.
Co-ordinate with HR & ADMIN, Security for the evacuation status
Constantly in touch with Chief Emergency Controller briefing the status of the site.
HR& Admin
Assist in organizing Mock Drill.
Obtain & maintain the following emergency contact numbers for the use during emergency.
Hospitals numbers
Ambulance numbers/Emergency vehicle number
Government fire station number
Client / customer / HSE-department Number
Nearby police station/ station under jurisdiction
Liaison with hospitals and local fire brigade for additional help if required.
Monitor attendance (inward and outward) registers of all the project staff / subcontractor
staff / visitors / service providers / suppliers / clients/ customers/ owners / security /
workers maintained up to date for use during the head count.
Keep Vehicle movement (inward and outward) registers maintained at all times.
Security Team
Guide external agencies like ambulance/ Fire Brigade to the place of emergency.
To control the traffic on road and keep them clear of any obstruction for free movement of
ambulance and other vehicles.
To cordon off the site and restrict the entry only to personnel who are required at the
location for rescue operation.
To ensure that evacuated personnel are assembled at the designated Emergency Assembly
points without any delay. Collect the attendance sheets of regular employees, contract
employees and Workmen (PRW and Subcontractor).To reconcile with head count of persons
at the Assembly Point department/contractors wise.
------------------------------------------------------------------------------------------------------------------------------------
3
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
To ensure that the person in charge of the Assembly point shall have an assistant or choose
a personnel at the assembly point to brief situation to the personnel assembled before the
Head count and also shall ensure that evacuated personnel shall leave only after hearing
the All Clear or on receiving the instruction from the Incident Controller.
4. Guidelines
4.1 Formation of Emergency Response Team
An Emergency Response Team has been formed comprising key personnel of the CORR-EPC
division site management. All the members shall have a deputy to replace them if necessary
during their absence.
The purpose of the ERT is to manage the orderly response to an emergency situation. Typical
constitution of an Emergency Response Committee is given below. Other members may be
included based on the site requirements
Mr. Ughandhar Dhanyamraju (Emergency controller)
Mr. Sridhar Gowda(Incident Controller)
Mr. Upendra Kumar( Member)
Mr. Kailash Chandra Kalapahad (Member)
Mr. Debasish Chatterjee (Member)
Mr. Lalit Kumar Bhansali ( Member)
Mr. Mohan Raj( Member)
Mr. Madhukar (Emergency Coordinator)
Mr. Nagalingam ( Member)
Note: Incident Controller will acts as Emergency Controller in absence of Emergency
Controller
------------------------------------------------------------------------------------------------------------------------------------
4
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Flood
Earth Quake
Cyclone
Land slides
Man Made/ Security Related Emergencies
Riots / Civil Disorder
Mob Attack
Bomb Threat
The prime risk scenarios as evaluated from hazard identification are:
Fires : Fire at fuel storage yard, Trash catching fire, diesel fire, cable fire, Paint fires,construction
waste fires, electrical fire in panels, transformer oil fire, Fire inadministrative building,
combustible gas fire, and flammable liquid fire, chemical fires etc.,
Explosion: Explosion of gas cylinders.
Construction disasters: Structure collapse, collapse of equipment, single/multiple fatality, Road
accidents
Natural Calamity: Flood, Cyclone, earth quake, Land slide, etc.
------------------------------------------------------------------------------------------------------------------------------------
5
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Reassessment of the work site must be completed prior to recommencement. Also resumption
of the work can be carried out only after the proper head count.
4.7 Emergency Communication System
The following emergency plans outline steps that should be followed in the event of anyof
the emergencies. The specifics of the plans are to be carried out on a case to case
basisdepending on the situation.
------------------------------------------------------------------------------------------------------------------------------------
6
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Flow chart landscape
------------------------------------------------------------------------------------------------------------------------------------
7
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
------------------------------------------------------------------------------------------------------------------------------------
8
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
------------------------------------------------------------------------------------------------------------------------------------
9
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Mean time with our emergency team members (traffic controller) will monitor and
control the traffic until the normal is restored.
This occurrence thoroughly investigated by the technical team and mitigation procedure
to be developed.
In case of occurrence of any emergency situation and mock drill,the emergency plan will be
reviewedfor its effectiveness. If necessary, revise the plan and inform the MR.
5. Reference
OHSAS 18001:2007 4.4.7
GIL EPC OH&S Manual (S 00/HS/S/01/V 0.0)
------------------------------------------------------------------------------------------------------------------------------------
10
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Emergency Preparedness and Response Procedure (S 00/HS/P/13/V 0.0)
6. Records
Annexure 1:List of Assembly Points
Annexure2:Emergency Contact Numbers
Annexure3:List of Tie up/ Nearest Hospitals
Annexure4: List of trained First Aider
Annexure5:List of trained Fire Fighters
Annexure 6: Mock Drill report (S00/HS/F/40/V 0.0)
*Efforts shall be taken for continual improvement of the system
------------------------------------------------------------------------------------------------------------------------------------
11
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Annexure 1: List of Assembly Points
------------------------------------------------------------------------------------------------------------------------------------
12
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Annexure 2: Emergency Contact Numbers
Key Personnel
Mr. Ughandhar Chief Project Manager (Emergency
1 8056011637
Dhanyamraju Controller)
2 Mr. Sridhar Gowda (Team Leader/ Incident Controller) 9003016139
( Head-Highways)
3 Mr. Upendra Kumar 8056011640
Team Members (Head-Structure)
4 Mr. Debasish Chatterjee 8056011611
Team Members (Head QA/QC)
5 Mr. Kailash Chandra 8056011736
Team Members (Head P&M)
Kalapahad
6 Mr. Madhukar 9840491314
HSE ( Coordinator)
7 Mr. Mohan Raj 9566076255
HR & Admin
8 Mr. Nagalingam 8056017424
PRO
9 Mr. Vijay Mankare 8056016013
First Aider
10 Mr. G Srinivas 9566077099
Security Officer
Emergency Services
1 Nazarathpet 9789813913
Police Station
2 103/100
Fire Station
3 ACS Hospital 9940517401
Hospital
4 Govt. Hospital 108/04426490361
Ambulance
------------------------------------------------------------------------------------------------------------------------------------
13
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Annexure 3: List of Tie up/ Nearest Hospitals
------------------------------------------------------------------------------------------------------------------------------------
14
Emergency Preparedness and Response PlanR02/HS/P/002/V0.0
________________________________________________________________________________
Annexure 5: List of Fire Fighting Team
Firefighting Team-PCY
------------------------------------------------------------------------------------------------------------------------------------
15