Project Spreadsheets to BS 8110 The Concrete Centre

Client Advisory Group Made by Date Page


Location Level 2 - Beam on Grid 7 RMW 18-Jul-2017 93
POST-TENSIONED ANALYSIS & DESIGN to BS 8110:2005 Checked Revision Job No
Originated from RCC42.xls v4.0 on CD 2006 TCC chg - R68
SUMMARY iv
(e) SHEAR Link = 10
Span 1 Span 2 Span 3
Left Right Left Right Left Right
V 225.1 293.0 239.7 232.3 252.6 198.0
cracked? N Y Y Y Y N
Vc 428.3 304.3 292.5 202.3 302.7 399.2
No of legs 8 8 8 8 8 8
Link spacing 1950 1950 1950 1950 1950 1950

ULS SHEAR ENVELOPE


400

225.1 234.0 252.6


200

-200 -232.3 -194.3


-293.0
-400

(f) VIBRATION Span 1 Span 2 Span 3


Response factor 0.75 0.65 0.74
OK OK OK

(g) DEFLECTION
MAX DEFLECTIONS
5

0 2.02
1.6
-0.01 -0.25
-5
-6.3
-10
-10.0
-15 Transfer Final Col centres Zero axis

Span 1 = 10mm < 64 OK Span 2 = 2mm < 57.6 OK


Span 3 = 6.3mm < 55.2 OK OK

SUPPORT REACTIONS Supt 1 Supt 2 Supt 3 Supt 4


ULS 4 225.1 532.8 479.1 194.3 kN
ULS 5 225.1 395.6 331.3 197.9 kN
ULS 6 73.9 365.7 350.0 59.5 kN
DEAD 88.9 210.0 191.7 77.1 kN
IMPOSED 58.1 154.5 135.2 50.0 kN

COLUMN MOMENTS Supt 1 Supt 2 Supt 3 Supt 4


ULS 4 Above 0.00 0.00 0.00 0.00 kNm
Below 0.00 0.00 0.00 0.00 kNm
ULS 5 Above 0.00 0.00 0.00 0.00 kNm
Below 0.00 0.00 0.00 0.00 kNm
ULS 6 Above 0.00 0.00 0.00 0.00 kNm
Below 0.00 0.00 0.00 0.00 kNm