1.INTRODUCTION
2.132 KV SIDE
3.POWER TRANSFORMER
Power transformer is used to step down the voltage from 132 KV to
36KV. Power transformers are installed on concrete slabs.
Transformer 1 50MVA
Transformer 2 20MVA
Transformer 3 20MVA
Transformer 4 20MVA
Figure 3: Transformers
4.36 KV SIDE
Figure 4: 36 KV Side
It has six commissioned feeders, one auxillary feeder and three spare
feeder. The feeder wise detail is as under:
6.CONTROL ROOM
a. 132KV panels.
b. 36KV panels.
c. Battery charger.
d. Battery bank.
e. DC distribution board.
f. AC distribution board.
g. Power factor panel.
7.MAIN EQUIPMENTS
Figure 9: Isolator
Ammeters
Voltmeters
Energy meters
Power factor meters etc.
7.6 Relay:
It is a protective device that detects the fault and initiates the
operation of circuit breaker to isolate the defective element from rest of
the system.
Figure 12 : Relay.
8.CAPACITOR BANK
It is used for power factor improvement. The equipment used here for
this purpose are static capacitors. Power factor improvement is required
because most power loads are inductive taking lagging current.
9.WAVE TRAP
It is used for traping the high frequency communication signals sent on
power line from the remote sub station. It diverts this communication
signal to the telecom panel in the sub station control room.