Republic of the Philippines

DEPARTMENT OF THE INTERIOR AND LOCAL GOVERNMENT


DILG - NAPOLCOM Center, EDSA Corner Quezon Avenue, Quezon City

DESIGN REPORT CHECKLIST


FOR ROAD PROJECTS

DESCRIPTION REMARKS/COMMENTS
CHAPTER 1. THE PROJECT
1.1 General
1.1.1 Brief Description of the Project
1.2 Scope and Objectives
1.3 Reference and Information
1.4 Road Descriptions
1.5 Summary of Over-all Physical Road Condition
1.5.1 Recommendations
CHAPTER 2. HIGHWAY DESIGN (ROAD DESIGN)
2.1 Formulation of Design Criteria
2.1.1 Introduction
2.1.2 Establishment of Design Criteria and Other
Parameters
2.2 Geometric Design Standard
2.3 Cross-Slope
2.4 Cross Section
2.5 Horizontal Alignment
2.6 Vertical Alignment
CHAPTER 3. TOPOGRAPHIC SURVEY AND GEOTECHNICAL INVESTIGATION
3.1 Topographic Surveys
3.1.1 Horizontal Control
3.1.2 Data Processing
3.2 Geotechnical Surveys
3.2.1 Site Description
3.2.2 Methodology Used
3.3 Potential Material Source Investigations
3.4 Limitations
CHAPTER 4. PAVEMENT DESIGN
4.1 Introduction
4.2 Guidelines and General Factors Related to Pavement Design
4.3 Design Methodology
4.3.1 Established Design Parameters
4.3.2 Recommended Pavement Design
CHAPTER 5. DRAINAGE DESIGN
5.1 General
5.2 Catchment Area and River System
5.2.1 Rainfall Intensity-Duration-Frequency (RIDF)
5.2.2 Runoff
5.2.3 Peak Flow Determination
5.2.4 Design Flood Frequency
5.3 Hydraulic Design Considertions
5.3.1 General
5.3.2 Open Channel Hydraulics
5.3.3 Minor Cross Culverts
5.3.4 Roadside Ditches
5.4 Recommendations
CHAPTER 6. COST ESTIMATE: GUIDELINES ON UNIT PRICE ANALYSIS
6.1 Introduction
6.2 Project Description and Materials Sources
6.2.1 Material Sources
6.3 Objective
6.4 Procedure for Cost Estimate
6.5 Composition of Cost Estimate
6.5.1 Direct Costs
6.5.2 Indirect Costs
6.5.3 Bid Unit Prices
6.6 Assumptions in the Cost Estimate
6.6.1 Work Schedule
6.6.2 Work Hours
6.6.3 Field Efficiency
6.6.4 Taxes and Duties
6.6.5 Escalation Protection
6.6.6 Right of Way
6.6.7 Work Areas
6.6.8 Hauling Distance
6.6.9 Wastage Factor
6.6.10 Minor Tools
6.7 Derivation of Unit Price
6.8 Approved Budget for the Contract
6.9 Remarks
TABLES
Table 1.4: Reference Design Data
Table 1.5: Description of Proposed Road Project
Table 1.6.1: Recommendations
Table 2.2: Geometric Design Catalogue for Local Roads
Table 2.4: Recommended Cross-Slopes
Table 2.5: Slope Ratios
Table 3.3-A: The Potential Material Sources
Table 4.3.1-A: Traffic Count Summary
Table 4.3.2-B: Seasonal Roadbed Soil Resilient Modulus, MR (Mpa)
Table 5.3.2: Values of Manning Coefficient "n"
Table 6.6.1: Estimated Net Working Days for Each Month
Table 6.6.9: Wastage Factor
APPENDICES
Appendix A Quarry Source Map
Appendix B Test Results
Appendix C DPWH Department Orders

EVALUATED BY:

________________________
NAME
POSITION

CHECKED BY:

____________________________
NAME
POSITION