Ref No : CHN/POG/Tripping/C-42/ Date:

EVENT ANALYSIS REPORT


UNIT NO : 4 TPS: CSTPS Unit Capacity : 210 MW
Station Code Tripping Date and No. of days from last syn
time
CSTPS U-4 T-09
12/27/2016 9:45 80
2016-2017
Last Overhaul (AOH/COH) Period in year since las
No of Days since last OH
synchronisation Date overhaul
9/27/2015 457 1.25
2. Operating conditions at the Load MW Coal Cycles in Oil Support
time of Event :- service
180 4 coal cycle Nil
3. Nature of Event : Unit withdrawn to attend BTL ( Zone - Water wall)
4. Name of First Up, Main protection and protection on which GCB opened
First up : Boiler hand tripped
Main Protection: Boiler Trip, Turbine trip, Generator trip
GCB Opened on : Low forward power Relay 86 GT

5 A) Observations :- Abnormal sound was heard at wall soot blower No 11 suddenly fluctuations obser
in furnace draught to +30 mmwc BTL confirmed and set withdrawn. After inspection it is observed that f
water wall neck tubes at 8mtr No. 35,36,37,38,39,40 and economiser bottom bank coil no 11 RHS at 33
found damaged.

5 B) Remedial Action/work done :- All damaged portion of tubes replaced by providing speol pieces. T
14 nos. joints welded. Radiography of all 14 No. joints carried out of front water wall neck at 8 mtr
economiser at 33 mtr cleaned by water jetting. Boiler hydraulic test and air leak test for R/H carried out.

6. Root Cause Analysis : Main failure is due to short overheating due to falling of clinker at bottom neck.

7. Preventive action suggested (Short Term) : Failed tube will be sent to CPRI for failure analysis

8. Preventive action suggested (Long Term) : As a scheduled practice of overhaul thickness survey an
checking overheating will be checked . Based on this survey eroded and overheated tubes will be replace

9. Similar event occurred last time:- U# 4- 210 MW Time : Date :

9A. Implementation Status of Long Term/Short Term measures stated at Sr No 9:-


10. Boiler lighted up Time- 22:15 Hrs Date- 29-12-2016

11. T-A Set Synchronised Time - 06:00 Hrs Date- 30-12-2016


12. Remark :- Nil

Chief Engineer (O&M)


CSTPS, Chandrapur.

13. Recommendations of Works Section:

1. Procurement/Replacement Plan:
2. Operational Error:

3. Delay in Maintenance:

4. Delay in bringing back the Unit:

5. Training of Staff:

6. Whether remedial action is completed satisfactory & point is closed :

C E/Dy C E (Works)
*HO Code will be given by Works Section.
Date:

city : 210 MW
of days from last sync.

80

iod in year since last


overhaul
1.25
Oil Support

Nil

nly fluctuations observed


n it is observed that front
coil no 11 RHS at 33 mtr

viding speol pieces. Total


wall neck at 8 mtr and
or R/H carried out.

inker at bottom neck.

failure analysis

ul thickness survey and


tubes will be replaced.

9:-
29-12-2016

30-12-2016

gineer (O&M)
Chandrapur.

C E (Works)
UNIT NO # 4 Nature of tripping : Unit withdrawn to attend BTL ( Zone - Wa

Date & Time of 27/Dec/16 09:45 Hrs.


trip

warm start: HPT -- Top/


HPT lower casing Temperature Bottom

Turbine Casing Temp at Start up ( Deg C) IPT -- Top/


Bottom

Activity Date & Time Time Benchmark Reason


taken time In for
from hh:mm deviati
Boiler on
lightup in
hh:mm
Boiler lightup 12/29/2016 22:15

PRDS Charging

FO Changeover

Fire Killing 12/30/2016 2:05 3:50

Header Blow 12/30/2016 2:10 3:55


Down Completion

Boiler Relight UP 12/30/2016 2:40 4:25

Vacuum Pulling 12/30/2016 3:20 5:05


completion

Rolling 12/30/2016 5:40 7:25 9:00

Synchronisation 12/30/2016 6:00 7:45

Oil Support 12/30/2016 10:25 12:10


withdrawn at
Oil Cons (LDO / LDO - 4 KL
FO) till Oil LVFO - 64 KL
withdrawn
Full Load/Max
Load (MW)
achieved at

Problems Faced
During Start UP