Volume Pekerjaan Persiapan

No Item Pekerjaan Satuan Volume


1 Pembersihan Lahan m2 87.5
2 Pekerjaan pengukuran dan pasang bowplank m' 35.5

Contoh Perhitungan:

Asumsi luas lahan = 12,5 * 7

Pembersihan lahan = p*l


= 12,5 * 7
= 87,5

Pekerjaan pengukuran dan pasang bowplank = (l+2)*2+(p+2)*2


= (6+2)*2+(7,75+2)*2
{ = 35,5 m'
+2)*2
Menghitung Volume Galian

No. Jenis Pondasi Sumbu Panjang (m) a (m)

1 P1 B (2-7) 7.95 1
2 P1 C (2-4) 3.2 1
3 P1 C (5-7) 3.2 1
4 P1 C' (4-5) 1.95 1
5 P1 2 (C-D) 3.2 1
6 P1 3 (B-C) 3.2 1
7 P1 4 (C-D) 3.2 1
8 P1 5 (C-D) 3.2 1
9 P1 6 (B-C) 3.2 1
10 P1 7 (C-D) 3.2 1
11 P2 A (1-8) 12.7 0.8
12 P2 D (1-8) 12.7 0.8
13 P2 1 (A-C) 4.2 0.8
14 P2 8 (A-D) 7.2 0.8
Jumlah

Menghitung Urugan Pasir

No. Jenis Pondasi Sumbu Panjang (m) Tinggi (m)

1 P1 B (2-7) 7.75 0.05


2 P1 C (2-4) 3 0.05
3 P1 C (5-7) 3 0.05
4 P1 C' (4-5) 1.75 0.05
5 P1 2 (C-D) 3 0.05
6 P1 3 (B-C) 3 0.05
7 P1 4 (C-D) 3 0.05
8 P1 5 (C-D) 3 0.05
9 P1 6 (B-C) 3 0.05
10 P1 7 (C-D) 3 0.05
11 P2 A (1-8) 12.5 0.05
12 P2 D (1-8) 12.5 0.05
13 P2 1 (A-C) 4 0.05
14 P2 8 (A-D) 7 0.05
Jumlah

Menghitung Aanstamping
Aanstamping
Luas Penampang
No. Jenis Pondasi sumbu Panjang (m)
(m2)
1 P1 B (2-7) 7.75 0.060
2 P1 C (2-4) 3 0.060
3 P1 C (5-7) 3 0.060
4 P1 C' (4-5) 1.75 0.060
5 P1 2 (C-D) 3 0.060
6 P1 3 (B-C) 3 0.060
7 P1 4 (C-D) 3 0.060
8 P1 5 (C-D) 3 0.060
9 P1 6 (B-C) 3 0.060
10 P1 7 (C-D) 3 0.060
11 P2 A (1-8) 12.5 0.060
12 P2 D (1-8) 12.5 0.060
13 P2 1 (A-C) 4 0.060
14 P2 8 (A-D) 7 0.060
Jumlah

Perhitungan Pondasi Batu Kali


Luas Penampang
No. Jenis Pondasi sumbu Panjang (m)
(m2)
1 P1 B (2-7) 7.75 0.27
2 P1 C (2-4) 3 0.27
3 P1 C (5-7) 3 0.27
4 P1 C' (4-5) 1.75 0.27
5 P1 2 (C-D) 3 0.27
6 P1 3 (B-C) 3 0.27
7 P1 4 (C-D) 3 0.27
8 P1 5 (C-D) 3 0.27
9 P1 6 (B-C) 3 0.27
10 P1 7 (C-D) 3 0.27
11 P2 A (1-8) 12.5 0.27
12 P2 D (1-8) 12.5 0.27
13 P2 1 (A-C) 4 0.27
14 P2 8 (A-D) 7 0.27
Jumlah

No. Jenis Pondasi sumbu Total Luas Penampang

1 P1 B (2-7) 0.360
2 P1 C (2-4) 0.360
3 P1 C (5-7) 0.360
4 P1 C' (4-5) 0.360
5 P1 2 (C-D) 0.360
6 P1 3 (B-C) 0.360
7 P1 4 (C-D) 0.360
8 P1 5 (C-D) 0.360
9 P1 6 (B-C) 0.360
10 P1 7 (C-D) 0.360
11 P2 A (1-8) 0.360
12 P2 D (1-8) 0.360
13 P2 1 (A-C) 0.360
14 P2 8 (A-D) 0.360
Jumlah 5.040

menghitung volume timbunan


Luas Penampang
No. Jenis Pondasi sumbu Panjang (m) (m2)
1 P1 B (2-7) 7.95 0.578
2 P1 C (2-4) 3.2 0.578
3 P1 C (5-7) 3.2 0.578
4 P1 C' (4-5) 1.95 0.578
5 P1 2 (C-D) 3.2 0.578
6 P1 3 (B-C) 3.2 0.578
7 P1 4 (C-D) 3.2 0.578
8 P1 5 (C-D) 3.2 0.578
9 P1 6 (B-C) 3.2 0.578
10 P1 7 (C-D) 3.2 0.578
11 P2 A (1-8) 12.7 0.315
12 P2 D (1-8) 12.7 0.315
13 P2 1 (A-C) 4.2 0.315
14 P2 8 (A-D) 7.2 0.315
Jumlah
b (m) Tinggi (m) Luas Penampang Volume (^3
)

1.5 0.75 0.9375 7.453 Contoh Perhitungan Galian Pon


1.5 0.75 0.9375 3.000
Asumsi:
1.5 0.75 0.9375 3.000 a = 0,6 + 0,2 + 0,2 = 1m
1.5 0.75 0.9375 1.828 b = 0,3 + 0,6 + 0,6 =1,5m
1.5 0.75 0.9375 3.000 t = 0,75m
1.5 0.75 0.9375 3.000 Luas penampang = ((a+b)*t)/2
1.5 0.75 0.9375 3.000 = ((1+1,5) * 0,75)/2
1.5 0.75 0.9375 3.000 = 0,9375 m2
Volume = luas penampang * pa
1.5 0.75 0.9375 3.000 = 0,9375 *7,95
1.5 0.75 0.9375 3.000 = 7,453 m3
1 0.75 0.675 8.573
1 0.75 0.675 8.573
1 0.75 0.675 2.835
1 0.75 0.675 4.860
58.121

Luas Penampang^2
( ) Volume (^3)
Contoh Perhitungan Urugan Pasir
0.03 0.2325 Luas Penampang = l * t
0.03 0.09 = 0,6*0,05
0.03 0.09 =0,03 m2
0.03 0.0525 Volume = Luas Penampang * panjang
0.03 0.09 = 0,03 *7,75
0.03 0.09 = 0,2325 m3
0.03 0.09
0.03 0.09
0.03 0.09
0.03 0.09
0.03 0.375
0.03 0.375
0.03 0.12
0.03 0.21
2.085

Contoh Perhitungan Aanstamping


Volume (m3) Luas Penampang = l * t
= 0,6 * 0,1
0.465 = 0,06 m2
0.180
0.180 Volume = Luas Penampang * Panjang
= 0,06 * 7,75
= 0,456 m3
Luas Penampang = l * t
= 0,6 * 0,1
= 0,06 m2

Volume = Luas Penampang * Panjang


= 0,06 * 7,75
0.105 = 0,456 m3
0.180
0.180
0.180
0.180
0.180
0.180
0.750
0.750
0.240
0.420
4.170

Volume (m3)
Contoh Perhitungan Pondasi Batu Kali
2.0925
a = 0,6 m
0.81 b= 0,3 m
0.81 t = 0,6 m
0.4725
Luas Penampang = (( a+b )*t )/2
0.81 = (( 0,6 + 0,3 ) * 0,6)/2
0.81 = 0,27 m2
0.81 Volume= Luas Penampang * panjang
0.81 = 0,27 * 7,75
0.81 = 2,0925 m3
0.81
3.375
3.375
1.08
1.89
18.765
Volume (m3)
Contoh Perhitungan Pekerjaan Timbunan
4.59 Total Luas Penampang = Pen. urugan pasir + Pen. aanstamping + Pen.pondasi batu kal
1.848 = 0,03 + 0,06 + 0,27
1.848 = 0,36 m2
1.126125 Luas Penampang Timbunan = Luas Penampang Galian - Total Luas Penampang
1.848 = 0,9375 - 0,36
1.848 = 0,578 m2
1.848 Volume Timbunan = Luas Penampang Timbunan * Panjang
1.848 = 0,578 * 7,95
1.848 = 4,59 m3
1.848
4.0005
4.0005
1.323
2.268
32.093
ntoh Perhitungan Galian Pondasi 1 Contoh Perhitungan Galian Pondasi 2
umsi: Asumsi:
= 0,6 + 0,2 + 0,2 = 1m a = 0,6 + 0,2 = 0,8m
= 0,3 + 0,6 + 0,6 =1,5m b = 0,3 + 0,7 =1m
0,75m t = 0,75m
as penampang = ((a+b)*t)/2 Luas penampang = ((a+b)*t)/2
= ((1+1,5) * 0,75)/2 = ((0,8+1) * 0,75)/2
= 0,9375 m2 = 0,675 m2
lume = luas penampang * panjang Volume = luas penampang * panjang
= 0,9375 *7,95 = 0,675 *12,7
= 7,453 m3 = 8,572m3
mping + Pen.pondasi batu kali

Total Luas Penampang

ng
Perhitungan sloof
No. Sloof sumbu Panjang (m) Luas Penampang (m2) Volume (m3)

1 Sloof 1 B (2-7) 7.75 0.03 0.2325


2 Sloof 2 C (2-4) 3 0.03 0.09
3 Sloof 3 C (5-7) 3 0.03 0.09
4 Sloof 4 C' (4-5) 1.75 0.03 0.0525
5 Sloof 5 2 (C-D) 3 0.03 0.09
6 Sloof 6 3 (B-C) 3 0.03 0.09
7 Sloof 7 4 (C-D) 3 0.03 0.09
8 Sloof 8 5 (C-D) 3 0.03 0.09
9 Sloof 9 6 (B-C) 3 0.03 0.09
10 Sloof 10 7 (C-D) 3 0.03 0.09
11 Sloof 11 A (1-8) 12.5 0.03 0.375
12 Sloof 12 D (1-8) 12.5 0.03 0.375
13 Sloof 13 1 (A-C) 4 0.03 0.12
14 Sloof 14 8 (A-D) 7 0.03 0.21
Jumlah 2.085

Perhitungan Ring Balk


No. Ring Balk sumbu Panjang (m) Luas Penampang (m2) Volume (m3)

1 Ring balk 1 B (2-7) 7.75 0.03 0.2325


2 Ring balk 2 C (2-4) 3 0.03 0.09
3 Ring balk 3 C (5-7) 3 0.03 0.09
4 Ring balk 4 C' (4-5) 1.75 0.03 0.0525
5 Ring balk 5 2 (C-D) 3 0.03 0.09
6 Ring balk 6 3 (B-C) 3 0.03 0.09
7 Ring balk 7 4 (C-D) 3 0.03 0.09
8 Ring balk 8 5 (C-D) 3 0.03 0.09
9 Ring balk 9 7 (C-D) 3 0.03 0.09
10 Ring balk 10 D (2-8) 8.75 0.03 0.2625
11 Ring balk 11 8 (A-D) 7 0.03 0.21
Jumlah 1.388

Perhitungan kolom
No. Kolom Tinggi (m) Panjang (m) Lebar (m) Volume (m3)

1 Kolom 1 4.02 0.15 0.15 0.09045


2 Kolom 2 4.85 0.15 0.15 0.109125
3 Kolom 3 4.85 0.15 0.15 0.109125
4 Kolom 4 3.61 0.15 0.15 0.081225
5 Kolom 5 1.42 0.15 0.15 0.03195
6 Kolom 6 3.79 0.15 0.15 0.085275
7 Kolom 7 5.23 0.15 0.15 0.117675
8 Kolom 8 4.84 0.15 0.15 0.1089
9 Kolom 9 3.7 0.15 0.15 0.08325
10 Kolom 10 3.7 0.15 0.15 0.08325
11 Kolom 11 4.94 0.15 0.15 0.11115
12 Kolom 12 4.94 0.15 0.15 0.11115
13 Kolom 13 3.7 0.15 0.15 0.08325
Jumlah 1.206
Contoh perhitungan Sloof

Panjang sumbu = 7.75 m


b penampang = 0.15 m
h penampang = 0.2 m

Luas penampang = 0.15*0.2


= 0.03 ^2
Volume = luas penampang*panjang sumbu
= 0.03*7.75
= 0.2325 ^3

Contoh perhitungan Ring Balk

Panjang sumbu = 7.75 m


b penampang = 0.15 m
h penampang = 0.2 m

Luas penampang = 0.15*0.2


= 0.03 ^2
Volume = luas penampang*panjang sumbu
= 0.03*7.75
Contoh perhitungan Ring Balk

Panjang sumbu = 7.75 m


b penampang = 0.15 m
h penampang = 0.2 m

Luas penampang = 0.15*0.2


= 0.03 ^2
Volume = luas penampang*panjang sumbu
= 0.03*7.75
= 0.2325 ^3

Contoh perhitungan kolom

Tinggi = 4.02 m
panjang = 0.15 m
lebar = 0.15 m

Volume = Tinggi*panjang*lebar
= 4.02*0.15*0.15
= 0.09045 ^3
Bekisting sloof
No. Sloof sumbu Panjang (m) Lebar (m) Tinggi (m) Volume (m2)
Contoh perh
1 Sloof 1 B (2-7) 7.75 0.15 0.2 3.1
Panjang sum
2 Sloof 2 C (2-4) 3 0.15 0.2 1.2 lebar =0
3 Sloof 3 C (5-7) 3 0.15 0.2 1.2 tinggi = 0
4 Sloof 4 C' (4-5) 1.75 0.15 0.2 0.7
Volume = (
5 Sloof 5 2 (C-D) 3 0.15 0.2 1.2 = (2*0.2
6 Sloof 6 3 (B-C) 3 0.15 0.2 1.2 = 3.1
7 Sloof 7 4 (C-D) 3 0.15 0.2 1.2
8 Sloof 8 5 (C-D) 3 0.15 0.2 1.2
9 Sloof 9 6 (B-C) 3 0.15 0.2 1.2
10 Sloof 10 7 (C-D) 3 0.15 0.2 1.2
11 Sloof 11 A (1-8) 12.5 0.15 0.2 5
12 Sloof 12 D (1-8) 12.5 0.15 0.2 5
13 Sloof 13 1 (A-C) 4 0.15 0.2 1.6
14 Sloof 14 8 (A-D) 7 0.15 0.2 2.8
Jumlah 27.800

Bekisting Ring Balok


No. Ring Balk sumbu Panjang (m) Lebar (m) Tinggi (m) Volume (m3)
Contoh perh
1 Ring balk 1 B (2-7) 7.75 0.15 0.2 3.1
Panjang sum
2 Ring balk 2 C (2-4) 3 0.15 0.2 1.2 lebar =0
3 Ring balk 3 C (5-7) 3 0.15 0.2 1.2 tinggi = 0
4 Ring balk 4 C' (4-5) 1.75 0.15 0.2 0.7
Volume = (
5 Ring balk 5 2 (C-D) 3 0.15 0.2 1.2 = (2*0.2
= 3.1^
lebar =0
tinggi =0

Volume = (
= (2*0.2
6 Ring balk 6 3 (B-C) 3 0.15 0.2 1.2 = 3.1^
7 Ring balk 7 4 (C-D) 3 0.15 0.2 1.2
8 Ring balk 8 5 (C-D) 3 0.15 0.2 1.2
9 Ring balk 9 7 (C-D) 3 0.15 0.2 1.2
10 Ring balk 10 D (2-8) 8.75 0.15 0.2 3.5
11 Ring balk 11 8 (A-D) 7 0.15 0.2 2.8
Jumlah 18.500

Bekisting Kolom
Contoh perhitungan b
No. Kolom Tinggi (m) Panjang (m) Lebar (m) Volume (m2)
Panjang = 0.15 m
1 Kolom 1 4.02 0.15 0.15 2.412 lebar = 0.15 m
2 Kolom 2 4.85 0.15 0.15 2.91 tinggi = 4.02 m
3 Kolom 3 4.85 0.15 0.15 2.91
Volume = (2*lebar+2*
4 Kolom 4 3.61 0.15 0.15 2.166 = (2*0.15+2*0.15)
5 Kolom 5 1.42 0.15 0.15 0.852 = 2.412^2
6 Kolom 6 3.79 0.15 0.15 2.274
7 Kolom 7 5.23 0.15 0.15 3.138
8 Kolom 8 4.84 0.15 0.15 2.904
9 Kolom 9 3.7 0.15 0.15 2.22
10 Kolom 10 3.7 0.15 0.15 2.22
11 Kolom 11 4.94 0.15 0.15 2.964
12 Kolom 12 4.94 0.15 0.15 2.964
13 Kolom 13 3.7 0.15 0.15 2.22
Jumlah 32.154
Contoh perhitungan bekisting sloof

Panjang sumbu = 7.75 m


lebar = 0.15 m
tinggi = 0.2 m

Volume = (2*tinggi)*panjang
= (2*0.2)*7.75
= 3.1 ^2

Contoh perhitungan bekisting sloof

Panjang sumbu = 7.75 m


lebar = 0.15 m
tinggi = 0.2 m

Volume = (2*tinggi)*panjang
= (2*0.2)*7.75
= 3.1^3
lebar = 0.15 m
tinggi = 0.2 m

Volume = (2*tinggi)*panjang
= (2*0.2)*7.75
= 3.1^3

Contoh perhitungan bekisting kolom

Panjang = 0.15 m
lebar = 0.15 m
tinggi = 4.02 m

Volume = (2*lebar+2*panjang)*4.02
= (2*0.15+2*0.15)*4.02
= 2.412^2
Penulangan d10 kolom
Panjang Total Kolom = 65.55 m

Kebutuhan Tulangan = 161.6463 kg


= 162 kg

Penulangan sengkang d6
keliling kolom +6d = 0.552
Jarak sengkang = 0.2 m
jumlah sengkang = 268 buah
berat jenis = 0.2219
Kebutuhan tulangan sengkang = 32,826 kg
= 33 kg

tulangan d10

asumsi:
panjang penjangkaran = 40d = 40*0.01*2 = 0.8
panjang tekuk 135 = 6d = 6*0.01*2 = 0.12
Bj beton =7850 kg
Tulangan * bj beton = (1/4)**0,01^2*7850 = 0,6165 kg/m3
Tulangan Pokok = panjang total * jumlah tulangan * bj
= 65,55 * 4 * 0,6165
= 161,64 kg = 162 kg

Sengkang d6

bj + tulangan d6 = (1/4)**0.006^2*7850
= 0.2219 kg/m3
jumlah sengkang = (panjang/jarak sengkang) = 268 buah
tulangan sengkang = (keliling +(6d*2)) * jumlah tulangan sengkang * bj
= (0,12*4 + (6*0.006*2)) * 268 * 0.2219
= 32,826 kg = 33 kg

bekisting = keliling * tinggi


= (0.15*2+0.15*2)*4.02
= 2,412 m2
Penulangan D10 sloof

panjang total = 60.29 m

Kebutuhan tulangan = 148,675 kg


= 149 kg

penulangan sengkang d6
keliling kolom 6d = 0.652 m
jarak sengkang = 0.2 m
jumlah sengkang = 246 buah
berat jenis = 0,2219 kg/m3
tulangan sengkang = 35.59 kg
= 36 kg

tulangan d10 sloof


BJ = 0,6165 kg/m3
tulangan pokok = panjang total * jumlah tulangan * bj
= 60,29 *4 * 0,6165
= 148,675 kg = 149 kg

tulangan sengkang d6

bj = 0.2219 kg/m3
jumlah sengkang = (panjang/jarak sengkang) = 246 buah
tulangan sengkang = (keliling + (6d*2) * jumlah tulangan sengkang * bj
= (0,12*2+0,17*2)+(6*0,006*2) * 246 * 0,2219
= 35,59 kg = 36 kg

bekisting = (tinggi * 2) * panjang


Kolom Tinggi (m) panjang penjangkaran + tekuk

Kolom 1 4.02 0.92


Kolom 2 4.85 0.92
Kolom 3 4.85 0.92
Kolom 4 3.61 0.92
Kolom 5 1.42 0.92
Kolom 6 3.79 0.92
Kolom 7 5.23 0.92
Kolom 8 4.84 0.92
Kolom 9 3.7 0.92
Kolom 10 3.7 0.92
Kolom 11 4.94 0.92
Kolom 12 4.94 0.92
Kolom 13 3.7 0.92
Jumlah

sloof Panjang (m) panjang penjangkaran + tekuk

sloof 1 B (2-7) 7.75 0.92


sloof 2 C (2-4) 3 0.92
sloof 3 C (5-7) 3 0.92
sloof 4 C' (4-5) 1.75 0.92
sloof 5 2 (C-D) 3 0.92
sloof 6 3 (B-C) 3 0.92
sloof 7 4 (C-D) 3 0.92
sloof 8 5 (C-D) 3 0.92
sloof 9 6 (B-C) 3 0.92
sloof 10 7 (C-D) 3 0.92
sloof 11 D (2-8) 8.75 0.92
sloof 12 8 (A-D) 7 0.92
Jumlah
panjang total (m) Luas Penampang (m2) tulangan sengkang (bh) bekisting (m2) Volume (m3)

4.94 0.0225 20 2.412 0.09045


5.77 0.0225 24 2.91 0.109125
5.77 0.0225 24 2.91 0.109125
4.53 0.0225 18 2.166 0.081225
2.34 0.0225 7 0.852 0.03195
4.71 0.0225 19 2.274 0.085275
6.15 0.0225 26 3.138 0.117675
5.76 0.0225 24 2.904 0.1089
4.62 0.0225 19 2.22 0.08325
4.62 0.0225 19 2.22 0.08325
5.86 0.0225 25 2.964 0.11115
5.86 0.0225 25 2.964 0.11115
4.62 0.0225 19 2.22 0.08325
65.55 268 32.154 1.205775

panjang total (m) Luas Penampang (m2) tulangan sengkang (bh) bekisting (m2) Volume (m3)

8.67 0.03 39 3.1 0.2325


3.92 0.03 15 1.2 0.09
3.92 0.03 15 1.2 0.09
2.67 0.03 9 0.7 0.0525
3.92 0.03 15 1.2 0.09
3.92 0.03 15 1.2 0.09
3.92 0.03 15 1.2 0.09
3.92 0.03 15 1.2 0.09
3.92 0.03 15 1.2 0.09
3.92 0.03 15 1.2 0.09
9.67 0.03 44 3.5 0.2625
7.92 0.03 35 2.8 0.21
60.29 246 19.7 1.4775
LUAS BRUTO DINDING
Segmen DINDING Panjang(m) tinggi (m) Luas (m2) luas kusen + ven

As C 2~4 2.85 3.3 9.405 0


As C 5~7 2.85 3.3 9.405 0
AS 6 B~C 2.85 4.45 12.6825 4.84
As 3 B~C 2.85 4.45 12.6825 6.29
As 5 C~D 2.85 3.3 9.405 1.97
As 4 C~D 2.85 3.3 9.405 1.97
AS 2 C~D 2.85 3.3 9.405 1.755
AS C' 5~4 1.6 3.3 5.28 1.4
AS D 2~7 7.3 3.3 24.09 0
AS 7 C~D 2.85 3.3 9.405 1.795
AS B 3~7 6.25 3.3 20.625 2.95
Volume Contoh Perhitungan Dinding
9.405 Luas = p*t
9.405 = 2,85 * 4,45
= 12,6825 m2
7.8425
6.3925 (luas kusen + ven )= jendela 1 + pintu 1 + ventilasi
7.435 = (1,45*1,96) + (0,9*2,15) +((0,4*0,1)*2)
= 4,85 m2
7.435 Volume = Luas - (luas kusen + ven)
7.65 = 12,6825 - 4,85
3.88 = 7,8425 m2
24.09
7.61
17.675
Segmen DINDING Panjang(m) tinggi (m) Luas (m2) luas kusen + ven

As C 2~4 2.85 3.3 9.405 0


As C 5~7 2.85 3.3 9.405 0
AS 6 B~C 2.85 4.45 12.6825 4.67
As 3 B~C 2.85 4.45 12.6825 6.12
As 5 C~D 2.85 3.3 9.405 1.8
As 4 C~D 2.85 3.3 9.405 1.8
AS 2 C~D 2.85 3.3 9.405 1.755
AS C' 5~4 1.6 3.3 5.28 1.4
AS D 2~7 7.3 3.3 24.09 0
AS 7 C~D 2.85 3.3 9.405 1.795
AS B 3~7 6.25 3.3 20.625 2.95
Jumlah
Volume

18.81
18.81
16.025
13.125
15.21
15.21
15.3
7.76
48.18
15.22
35.35
219
No Uraian Pekerjaan Koef Sat Harga Satuan (Rp)
A Pekerjaan Persiapan
1 Pembersihan lokasi dan penataan
Pekerja 0.1 OH 99,000
Mandor 0.05 OH 159,000
Jumlah
2 Pengukuran dan pasang bow plank
Pekerja 0.1 OH 99,000
Tukang Kayu 0.1 OH 149,000
Kepala tukang kayu 0.01 OH 164,000
Mandor 0.005 OH 159,000
Kayu Borneo 5/7 0.007 4,922,770
Paku biasa 2"-5" 0.02 19,010
Kayu papan albiasa 0.007 2,005,570
Jumlah
B Pekerjaan Tanah
1 1 m2 Galiaan Tanah Biasa Kedalaman 1 m
Pekerja 0.75 OH 99000
Mandor 0.025 OH 159000
Jumlah
2 1 m3 Urugan Tanah Kembali
Pekerja 0.25 OH 99000
Mandor 0.0083 OH 159000
Jumlah
3 1 m3 Urugan Pasir
Pekerja 0.3 OH 99000
Mandor 0.01 OH 159000
Pasir Urug 1.2 m2 110500
Jumlah
C Pekerjaan Pondasi
1 Pasangan Batu Kosong /Aanstamping
Pekerja 0.78 OH 99000
Tukang Batu 0.39 OH 119000
Kepala Tukang Batu 0.039 OH 159000
Mandor 0.039 OH 159000
Batu Belah 15/20 cm 1.2 124890
Pasir Urug 0.432 110500
Jumlah
2 1m3 Pasangan Pondasi Batu Belah , 1Pc : 4 PS
Pekerja 1.5 OH 99000
Tukang Batu 0.75 OH 119000
Kepala Tukang Batu 0.075 OH 159000
Mandor 0.075 OH 159000
Batu Belah 15/20 cm 1.2 124890
Semen Portland 202 1524.2
Pasir pasang 0.485 149480
Jumlah
D Pekerjaan Beton
1 Membuat 1 m3 beton mutu K250
Pekerja 1.65 OH 99000
Tukang Batu 0.275 OH 119000
Kepala Tukang 0.028 OH 159000
Mandor 0.083 OH 159000
Semen Portland 7.68 kg 1524.2
Pasir beton 0.494 m3 232640
Kerikil (max 30mm) 0.77 m2 250,000
air 215 Liter 4.3
Jumlah
2 1 kg Penulangan Dengan Baja Polos Atau Ulir
pekerja 0.007 OH 99000
tukang besi 0.007 OH 145000
kepala tukang besi 0.0007 OH 163000
mandor 0.0004 OH 159000
besi beton (polos/ulir) 1.05 13090
kawat beton 0.015 20520
Jumlah
3 1 m2 Pasangan Bekisting Untuk Sloof
Pekerja 0.52 OH 99000
Tukang Kayu 0.26 OH 149000
Kepala Tukang Kayu 0.026 OH 164000
Mandor 0.026 OH 159000
Kayu Kelas III 0.04 2005570
Paku Biasa 2"-5" 0.3 19010
Minyak Bekisting 0.1 18230
Jumlah
4 1 m2 Pasangan Bekisting Untuk Ring Balok
Pekerja 0.66 OH 99000
Tukang Kayu 0.33 OH 149000
Kepala Tukang Kayu 0.033 OH 164000
Mandor 0.033 OH 159000
Kayu Kelas III 0.04 2005570
Paku Biasa 2"-5" 0.4 19010
Minyak Bekisting 0.2 18230
balok kayu kelas II 0.018 4922770
plywood 9mm 0.35 151930
dolken kayu galam d8-d10 400cm 2 32700
Jumlah
5 1 m2 pasangan bekisting untuk kolom
Pekerja 0.66 OH 99000
Tukang Kayu 0.33 OH 149000
Kepala Tukang Kayu 0.033 OH 164000
Mandor 0.033 OH 159000
Kayu Kelas III 0.04 2005570
Paku Biasa 2"-5" 0.4 19010
Minyak Bekisting 0.2 18230
Balok Kayu Kelas II 0.015 4922770
Plywood 9 mm 0.35 151930
Dolken Kayu Galam D8-D10 - 400cm 2 32700
Jumlah
6 1 m2 pasangan bekisting untuk lantai
Pekerja 0.66 OH 99000
Tukang Kayu 0.33 OH 149000
Kepala Tukang Kayu 0.033 OH 164000
Mandor 0.033 OH 159000
Kayu Kelas III 0.04 2005570
oajy 0.4 19010
Minyak Bekisting 0.2 18230
Balok Kayu Kelas II 0.015 4922770
Plywood 9 mm 0.35 151930
Dolken Kayu Galam D8-D10 - 400cm 6 32700
Jumlah
E Pekerjaan Dinding
1 1 m2 Pasangan Bata merah Uk ( 5x11x22)cm Tebal 1 Bata ,Campuran 1 Pc : 8 Ps
Pekerja 0.3 OH 99000
Tukang Batu 0.1 OH 119000
Kepala Tukang Batu 0.01 OH 159000
Mandor 0.015 OH 159000
Bata Merah Kelas I 70 BH 880
Semen Portland 6.5 1524.2
Pasir Pasang 0.05 149480
Jumlah
Jumlah (Rp)

9900
7950
17850

9900
14900
1640
795
34459.39
380.2
14038.99
76113.58

74250
3975
78225

24750
1319.7
26069.7

29700
1590
132600
163890

77220
46410
6201
6201
149868
47736
333636

148500
89250
11925
11925
149868
307888.4
72497.8
791854.2
163350
32725
4452
13197
11705.856
114924.16
192500
924.5
533778.516

693
1015
114.1
63.6
13744.5
307.8
15938

51480
38740
4264
4134
80222.8
5703
1823
186366.8

65340
49170
5412
5247
80222.8
7604
3646
88609.86
53175.5
65400
423827.16

65340
49170
5412
5247
80222.8
7604
3646
73841.55
53175.5
65400
409058.85

65340
49170
5412
5247
80222.8
7604
3646
73841.55
53175.5
196200
539858.85

29700
11900
1590
2385
61600
9907.3
7474
124556.3
NO Item Pekerjaan Sat volume
A Pekerjaan Persiapan
1 Pembersihan lokasi dan penataan m2 87.5
2 Pengukuran dan pasang bow plank m' 35.5
Total
B Pekerjaan Tanah
1 1 m2 Galiaan Tanah Biasa Kedalaman 1 m m3 58.12125
2 1 m3 Urugan Tanah Kembali m3 32.09325
3 1 m3 Urugan Pasir m3 2.085
Total
C Pekerjaan Pondasi
1 Pasangan Batu Kosong /Aanstamping m3 4.17
2 1m3 Pasangan Pondasi Batu Belah , 1Pc : 4 PS m3 18.765
Total
D Pekerjaan Beton
1 Membuat 1 m3 beton mutu K250 m3 4.678
2 1 m2 Pasangan Bekisting Untuk Sloof m2 27.800
3 1 m2 Pasangan Bekisting Untuk Ring Balok m2 18.500
4 1 m2 pasangan bekisting untuk kolom m2 32.154
5 1 m2 pasangan bekisting untuk lantai m2
6 Tulangan d10 kg 311
7 Tulangan d8 kg
8 Tulangan d6 kg 69
9
Jumlah
Analisa Harga Satuan Total (Rp)

17850 1561875
76113.58 2702032.09
4263907.09

78225 4546534.78125
26069.7 836661.399525
163890 341710.65
5724906.830775

333636 1391262.12
791854.2 14859144.063
16250406.183

533778.516 2497162.6869399
186366.8 5180997.04
423827.16 7840802.46
539858.85 17358621.4629
539858.85
15938 4951080.7294
0
15938 1099722

38928386.37924

Anda mungkin juga menyukai