Project Title: Design & Installation of Corporate Office Space for Metro Makers BD at Baridhara DOHS, Dhaka
Project Consultant : PORISOR ARCHITECTS
A. Reception
Rate
Quantity [in
Sl NoItem Specification [nos/sft] Unit taka] Subtotal Total
Back Drop
A06 Curtain Curtain with support rail 90 sft 200 18,000.00 18,000.00
Wall Tiles RAK/Star tiles with fixing as per
A07 Cladding design 150 sft 250 37,500.00 37,500.00
TOTAL 257,000.00
Page 1 of 7
B. Conference Room
Rate
Quantity [in
Sl NoItem Specification [nos/sft] Unit taka] Subtotal Total
Back Drop
B04 Curtain Curtain with support rail 229 sft 200 45,800.00 45,800.00
TOTAL ###
C. Work Station
Rate
Quantity [in
Sl NoItem Specification [nos/sft] Unit taka] Subtotal Total
Page 2 of 7
1/2" Particle Board Suspended
Drop Partition supported by
2"X1" Gorjon Wood Frame and
Drop finished with matte Enamel
C02 Partition Paint 40 sft 300 12,000.00 12,000.00
TOTAL 400,100.00
Page 3 of 7
Superior
Desk
remodelin
g
[Chairman
D02 ] Existing Table Duco Paint 01 job LS 10,000.00 10,000.00
TOTAL 68,960.00
TOTAL 20,000.00
F. Electric Works
Area Rate
Quantity [ taka
Sl NoItem Specification [ nos ] [ sft ] per sft ] Subtotal Total
general Lighting, Gallery
Electrificat Lighting, Pendent Lights, Wires,
ion & Switches, and Electrification
F01 Lighting works 01 job LS 150,000.00 ###
TOTAL ###
G. Miscellaneous
Area Rate
Sl Quantity [ taka
No Item Specification [ nos ] [ sft ] per sft ] Subtotal Total
Main ceiling and All wall of
G01 Paint Work concerned area plastic paint 6200 sft LS 65,000.00 65,000.00
Floor Imported matte for all
G02 Matting concerned areas 1245 sft 36 44,820.00 44,820.00
Site
G03 Cleaning As per needed 01 job 10,000 10,000.00 10,000.00
G04 Carrying As per needed 01 job 10,000 10,000.00 10,000.00
Demolitio
G05 n As per needed 01 job 5,000 5,000.00 5,000.00
G06 ACP Works Column molding with ACP panel 01 job LS 20,000.00 20,000.00
Page 4 of 7
G07 Branding ACP, Acrylic lettering with light 01 job LS 70,000.00 70,000.00
TOTAL 224,820.00
Summary
A. Reception ###
B. Conference Room ###
C. Work Station ###
D. Superior Suite [ Chairman & Managing Director ] 68,960.00
E. In-House Meeting Room 20,000.00
F. Electric Works ###
G. Miscellaneous ###
Total Cost of Construction ###
Consultancy & Supervision Fee [ 12.5 % ] ###
GRAND TOTAL ###
[ Twenty One Laces Thirty Eight Thousand Four Hundred and Forty Taka Only ]
Mode of Payment
Page 5 of 7
Ar. Sakib Ahsan Choudhury
CEO / Partner Architect