BILLS OF QUANTITIES FOR ROAD REINSTATEMENT ON JINJA ROAD AT NAKAWA TRAFFIC LIGHTS
Item Description Unit Quantity Rate Amount
BILL 1: EARTHWORKS & PAVEMENT LAYER
CONSTRUCTION OF GRAVEL OR CRUSHED STONE
Breaking up abd disposing off existing pavement
1 layers Excavating or milling material from an existing pavement 1.1 and carting to spoil as directed by the employer's representative: 1.1(a) Granular Material depth N.E 1.5m M 444.60 1.1(b) Bituminous material Average depth 75mm thick M 23.40
ROAD BED FORMATION
2 Subgrade layer formation
2.1 Fill and Improved Subgrade layers Fill and Compacting gravel materials (G45) andf 2.1(a) M 46.80 compacting in layers not exeeding 150mm to 98%MDD Backfilling with imported and approved granullar 2.1(b) material (G15) and compacting in layers not exceeding M 335.40 150mm to 95% MDD
2.2 Crushed Aggregate Road Base
Crushed aggregate class CRR compacted to 102% MDD 2.2(a) M 62.40 of BS-Heavy (Base) 2.2(b) Ditto but for walkways M 9.78
TOTAL CARRIED TO SUMMARY
1/1/1 BILLS OF QUANTITIES FOR ROAD REINSTATEMENT ON JINJA ROAD AT NAKAWA TRAFFIC LIGHTS
Item Description Unit Quantity Rate Amount
BILL No.2: BITUMINOUS LAYERS AND SEALS
3.1 Prime Coat (On repaired sections)
Prepare base course, provide heat and spray MC-70 cutback bitumen (1.0 litres/sqm) including application of 3.1(a) M2 347.55 approved aggregate binding material at a rate of 200sqm/m3 as directed by the engineer.
3.2 Bituminous Base Course and Asphaltic Surfacing
Provide all materials for asphaltic concrete surfacing 75mm thick over recycled bituminous base nominal 3.2(a) M 23.4 binder content 5.5%, 60/70 penetration bitumen heat mix lay and compact to approval. 3.2(b) Ditto but for 25mm walkway 35.55 3.2(c) Tact coat of K1-70 emulsion (0.4/m2) ltrs 124.8
TOTAL CARRIED TO SUMMARY
2/1/1 BILLS OF QUANTITIES FOR ROAD REINSTATEMENT ON JINJA ROAD AT NAKAWA TRAFFIC LIGHTS
Item Description Unit Quantity Rate Amount
BILL No.3: ANCILLARY ROAD WORKS,
TOLERANCES, TESTING AND QUALITY CONTROL
4 Precast Concrete Kerbing
Precast Concrete class 30 semi-mountable kerbs, 150 x 450mm, with embedded A98 BRC for edging foot path 4.1 M 30.5 including 100mm class 15 Concrete bedding as directed by the employer's representatives
4.1 Special Tests
Allow a Provisional sum for material testing as directed Sum by the engineer
TOTAL CARRIED TO SUMMARY
3/1/1 BILLS OF QUANTITIES FOR ROAD REINSTATEMENT ON JINJA ROAD AT NAKAWA TRAFFIC LIGHTS
Project Title: Cyberjaya 5-Storey Bus Terminal Project Subject: Road Works Person in Charge: Shanggara A/L Balu Date: 7/3/2021 No - Description Unit Quantity Rate (RM) Amount (RM)