RecordingSystem
forJackInPile
Ir.LiewShawShong
GeotechnicalAutomation&Innovation
BackGround&Objectives
ProblemStatement
Solutions&FutureR&D
Learning& ApplicationofMultiEngineeringDisciplines
CaseHistory
ConcludingRemarks
2 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
PileFoundation
Support
LoadCarryingCapacity&SafetyFactor
AretheseLoadingsaStaticorDynamicActions?
SettlementPerformance&StiffnessResponse
3 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
StaticInjection
Newtons3rd Law:Action=Reaction
ProofLoadedbyKentledge StaticLoading
UntilInjectionRefusal(Shortterm)
4 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
JackInPilingSystem
DeadWeightBallast
SelfServiceCrane
PowerPack
HydraulicGrippingSystem
HydraulicInjectionSystem
MovableBearingSleepers
5 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
JackInPilingSystem
HydraulicActuators(2&4ConcentricPairs)
HydraulicGrippingSystem
CurvatureofGrippingarchtofitpilediameter
Contactareaforgrippingfriction
6 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Schematic
7 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ProblemStatement
InjectionObstruction(Boulders,shallow&
intermittenthardlayers) Preboring
BucklinginPrebored Hole&ToeRelaxation
Backfilling/Grouting
Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement LongerHoldingTime
ErroneousRecording
8 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ProblemStatement
InjectionObstruction(Boulders,shallow&
intermittenthardlayers) Preboring
BucklinginPrebored Hole&ToeRelaxation
Backfilling/Grouting
Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement LongerHoldingTime
ErroneousRecording
9 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ProblemStatement
InjectionObstruction(Boulders,shallow&intermittent
hardlayers) Preboring
BucklinginPrebored Hole&ToeRelaxation
Backfilling/Grouting
Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement LongerHoldingTime
ErroneousRecording
10 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ProblemStatement
KickOutofPileToe InjectionObstruction(Boulders,shallow&
intermittenthardlayers) Preboring
BucklinginPrebored Hole&ToeRelaxation
Backfilling/Grouting
Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement LongerHoldingTime
ErroneousRecording
11 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Load
(kN)
Pile
Heave
Settlement(mm)
ProblemStatement
InjectionObstruction(Boulders,shallow&
intermittenthardlayers) Preboring
BucklinginPrebored Hole&ToeRelaxation
Backfilling/Grouting
Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement LongerHoldingTime
ErroneousRecording
12 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
CreepingBehaviour:
Dissipationofexcessporepressure
(Cohesivefinematerials) ProblemStatement
HighcomponentofpilecapacityonEnd InjectionObstruction(Boulders,shallow&
BearingonStiffFineSoils intermittenthardlayers) Preboring
ImposedloadneartoUltimateResistance BucklinginPrebored Hole&ToeRelaxation
(PlasticdeformationinProgressiveLoad Backfilling/Grouting
TransferofLoadPile) Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement LongerHoldingTime
ErroneousRecording
13 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
CarbonFootprint:EnergytoinstallaPile,E=F(x)dx
PileJointWelding
ProblemStatement
InjectionObstruction(Boulders,shallow&
intermittenthardlayers) Preboring
BucklinginPrebored Hole&ToeRelaation
Backfilling/Grouting
Kickout(Pileflexuraldistress) PointedPileShoe
PileHeave(Soildisplacement)&ToeRelaxation
Rejacking
CreepingSettlement
ErroneousRecording Automation
14 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Solutions
RealtimeMonitoringSystem
WirespringLVDTPenetrationDecoder
PressuretransducersforJackingLoad
Measurement&FlagofPileGrip
LCDPanel
15 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Advantages
Continuousmonitoringand Preventuncontrolledstructural
recordingofJackingLoad&Pile damagetopileresultinginthe
Penetration(Goodrecordofjacking abandonmentoforiginaldamaged
resistanceratherthanerroneous jackedpileandmorecompensation
manualrecording,pilejointing,etc ) pilesandpilecap enlargementare
Criteriontoeithertimelymanually needed
ceaseorautomatedJackingon Rejacking ofundercapacitypileto
SuddenReductionofJackingLoad maximiseusablecapacityofpilesat
Reducetheworkloadofjackingrig riskyareaswherepiledamageis
operator expectedifjackingisnotcontrolled
16 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
PileProductivity
CoolingDurationforPileJointWelding
ApplicationofAntiCorrosionPaint
InvestigationusingThermalImagingTool
NaturalCooling&InducedAirFlowCooling
FluxCoredArchWelding(FCAW)/GasMetal
ArchWelding(GMAW)
17 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
FluxCoredArch
Welding(FCAW)/
GasMetalArch
Welding(GMAW)
18 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
1)PILE INSTALLATION PROCEDURE
Checklist:
1) Rockheadlevel(______m)
2) 400mmspunpileClassB(WorkingLoad=120Tonne,Grade80)
3) JackingLoad=2xWL=2x120=240Tonne
YES,WITH
NORMAL
CHANGE IFCHANGEINGRADIENTOBSERVED
STARTINSTALLTHEPILE
e.g.ATPOINTC,SETTERMINATION
LOADTO95%OFONEREADINGLESS
WHICHISATPOINTB.
PLOTGRAPHOFJACKING
LOADVSDEPTH
APPLYSETCRITERIAFOR
DOWNGRADEDTERMINATIONLOAD
CHECKTHECHANGEINLOAD
DEPTHGRADIENT
JACKINGMUSTBESTOPPED
AT100%,150%AND200%WL INSPECTIFPILEISINGOOD
ANDAT1MABOVEROCK CONDITION(SEESTANDARD
HEADTOVERIFYRECORDS PROCEDURE) TERMINATIONAT2xWL
NO,CONTINUEJACKING
TERMINATEAT2xWL.CHECK
THEFLOWCHARTOF
TERMINATIONCRITERIA
YES,WITH
ABNORMAL CONSULTENGINEERTOCHECK
CHANGE
IFDOWNGRADINGISREQUIRED
2) FLOW CHART OF TERMINATION
CRITERIA FOREACHSET
Oncereachintendedload
STAGE
1st Set
3)Hold20Seconds
Jack:2xWLorDowngradedLoad <2mm
2)Apply200%WL
Hold:20Seconds
4)ReleaseLoad
CheckSettlement:<2mm 1)Beforeapplyload
ReleaseLoad
OK Wait3minutes
NOTOK
2nd Set
Jack:2xWLorDowngradedLoad
Hold:20Seconds
CheckSettlement:<2mm
ReleaseLoad
OK Wait3minutes
3rd Set
Jack:2xWLorDowngradedLoad
Hold:20Seconds
CheckSettlement:<2mm
ReleaseLoad
REFERTOTHEPROCEDURETO
PASS OBSERVEANDRECORDPILE
HEAVINGAFTERINSTALLATION
ChangeinGradient
95%OFLOADATPOINTB
*Changein
Gradient(AB,BC)
A
B C
NORMAL ABNORMAL
3) STANDARD PROCEDURE FOR PILE INSPECTION OF DOWNGRADED PILES
TO INSPECT POSSIBLE SIGNS OF DAMAGE
PILETERMINATEDAT SHINEATORCHLIGHTTHATISTIEDTOA
DOWNGRADEDLOAD MEASURINGTAPETHORUGHTHECENTRAL
ANNULUSOFSPUNPILE.
INSPECTTHELOCATIONOFDEFECTS
NO YES
PILECONSIDEREDACCEPTABLE MEASURETHEDEPTHOFDEFECTS.
USECAMERAFORVIDEORECORDING.(IF
CONDITIONPERMITTED)
REFERTOTHEPROCEDURETOOBSERVE
ANDRECORDPOSSIBLEPILEHEAVING RECORDTHEFOLLOWINGINFORMATION:
AFTERINSTALLATION I) Typeandsizeofspunpile
II) Jackingpressure
III) Lengthofpileinstalled
IV) Numberofpilesectionsanditsindividuallengths
V) Depthofdefects
VI) Directionandorientationofthedefectsortiltingdirectionof
damagedpilesegment
VII) Anyobservationofwaterseepages,riseofwaterorsoildebris
insidespunpile
VIII) Photographrecordsofinternalanexternalpileconditions
IX) Possiblemechanismofbreakage
ENGINEERTOASSESSACCEPTABILITYOFPILES
4) PROCEDURE TO RECORD POSSIBLE PILE HEAVING
AFTER PILE INSTALLATION
INSTALLATIONOFSPUNPILE
COMPLETED.
LEVELLINGSTAFFSHALLBE
LOCATEDOVERTHETOPSURFACE
OFCUTPILE
CUTOFF
INDICATETHEPRECISELEVELOF LEVEL
THESPUNPILE
CHECKTHEPRECISELEVELLINGOFPREVIOUSLY
INSTALLEDPILESTODETERMINEANYHEAVINGOF
PILEOBSERVED
FutureR&D
RealTimeMonitoringSystem JackInHydraulicSystem
LaserDistanceRangingMeasurement PressureControlHydraulicSystem
IndependentPreciseLevel (againstexistingconstantfluiddischarge
Measurement(forRateofPile pumpsystem)
Pressureregulatorychamber(AirFluidPhases)
PenetrationatTermination)
Variablereliefvalveandbackflowsystem
Higherscanningfrequencydatalogger Lowflow&highpressurepump
fortimelyresponse&pilecreep
LoadHoldingforMLT
measurementduringloadholdingfor
pileterminationandMLT AutomationControlSystem
Automationjackingcontrolregimeto OperationalCriteriatoControlJacking
preventstructuraldamagetopiles RateofJackingpenetration
ThresholdofJackingLoadReduction
Rejacking LoadforDowngradingPileCapacity
24 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
FutureR&D
LaserDetection&RangingSystem JackInHydraulicSystem
http://www.dynexhydraulics.com/cbpump.htm
25 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Learning& ApplicationofMultiEngineeringDisciplines
Geotechnical&StructuralEngineering:KnowledgeinProblemIdentification
andSolution
Electronic&MechanicalSensors:MeanstoachievingMeasurementsin
JackingOperation
HydraulicSysteminMechanicalEngineering:ToexpandCapabilityofJacking
OperationtoperformingMaintainLoadTest
SystemControl:CriteriaManagementforPotentialAutomationControl
Psychology:FriendlyInteractionbetweenHuman&Machine
26 July22,2012 Footertexthere
CaseHistory
SiteArea:2.5Acres
2Blocksof18StoreyTowers(250Units)
27 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
GroundConditions
MineTailingMaterialsofClayeySILT/Silty SAND
SPTN:5to20
LimestoneBedrock:16to40mbgl
Groundwater:3mbgl
28 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ComplianceFoundationDesign
Boredpilesandspunpiles,withboredpilesusedatlocationswithlarge
loadsandwheretherearecavities
29 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
AlternativeFoundationDesign
KeyObjectives
OptimiseCost
CompleteFoundation
Constructionin100days
30 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
AlternativeFoundationDesign
ChangeallBoredPilestoClassBJackinSpunPiles
SimplifyConstructionWorks
LessCongestiononSite&NoisePollution
ReduceMobilisationCost
ProofLoadingeveryPiles
RemovePointedPileShoe&OpenEnded
LessLateralSoilDisplacement
AllowInstallationofUnderpinningMicropile ifneeded
ReduceTypeofSpunPileSizes
Only400mm&500mmSpunPilesforBetterEfficiency
StreamlinetheJackingOperation
31 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
PileInjectionTrialTests
PLT1 PLT2
Withoutinstrumentation withinstrumentationusingthe
GlobalStrainExtensometer
Toverifymaximumpilecapacity
(Glostrext)system
Thejackingloadduringinstallation
tomeasurethemovementofpile
wasrecordedmanuallyatthisstage
astherealtimemonitoringdevice segmentsforglobalaxialstrain,load
wasnotreadyforthetestpile transferbehaviorduringjackingand
installation. alsointerpretedlockedin/residual
stressinthepileaftertheunloading
cycle
32 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
FindingsfromPLT1&PLT2
Pilegeotechnicalcapacityachieved
fora500mmdiameterpileismuch
lessthanitsstructuralcapacityasin
PLT2
Existingweakgroundcondition
doesnotpermitjackingrigtotake
excessivereactionweight
Hence,asmaller400mmdiameter
pilewithworkingloadof1,200kN
wasproposed
33 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
FinalAlternativePileDesign
34 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
PileLayout
35 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Construction Timing
36 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Construction ReducedCoolingTimeAfterWelding
Thermalimagingtocomparetherateofreductionintemperatureofa
naturallyventilatedweldcomparedtoonewithforcedventilationusing
blowerfan
37 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Construction ReducedCoolingTimeAfterWelding
Coolingtimereducedfrom30minto5min
Productionrateincreasedfrom4to7piles/rig/day
38 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
DailyPilingProduction
39 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ReviewofAsbuiltStatistics
336pileswithcapacitiesdowngraded,outofwhich305pileshavecapacities>
2/3originalcapacities
96piles(8%)addedtocompensatefordowngradedpiles
Pilewastages~10%
40 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Conclusions&RecommendationsofCaseStudy
Casestudyonsuccessfulimplementationofjackinpilesysteminlimestone
geologyfortwo18storeys towerblocks
Useofrealtimemonitoringduringjackingoperationhasenabledhigher
utilizationfactorandminimizeriskofoverstressingthepiles
Shortercoolingperiodforwelding
AchievebothTime&CostSavings
41 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
FinalConcludingRemarks
Technologyadvancementispossibleifengineerisabletoprocureandpractise
amultidisciplinaryknowledge.i.e.basedonfundamentalprincipleof
mechanics&physics.
Innovations:UseofICT&TechnologyforRapidFeedbackControlin
AutomationtoattainHighEfficiency&EffectivenessofConstruction
Improvements:ConstructionMethodology,Materials,Workmanship
Benefits:Faster,LessWastage,GreenerConstruction,BetterAssurancein
Performance,BetterCostEconomics,LessHumanErrors
42 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
Step1
EngineeringProcessCycle Design
Objectives
Step5 Step2
Performance Problem
Feedback Identification
Step4 Step3
Executionof Option
Solution Exploration
43 July22,2012 2DaySeminaronAdvancementinGroundInvestigationandGeotechnicalInstrumentation
ThankYou