Pb= 900,000.

00
Fpb= JUN.
Po= 890,000.00 D.S#011-79-VC
FR= 0.98889

A.P.A
MES SET. OCT. NOV.
VP 290,000.00 300,000.00 310,000.00
VA 290,000.00 590,000.00 900,000.00

VALORIZACIONES REALES
Vset= 260,000.00 K=0.997
CLCULO DE REINTEGROS Y DEDUCCIONES

OBRA:

SUPERVISOR:

CONTRATISTA:

PRESUPUESTO BASE:

PRESUPUESTO CONTRATADO:

FORMULA POLINOMICA UNICA

A= MONTO DEL ADELANTO DIRECTO (SIN IGV)

C= MONTO CONTRACTUAL (SIN IGV)

K= COEFICIENTE DE REAJUSTE FR=

Ka = COEFICIENTE DE REAJUSTE AL MES DEL ADELANTO EN EFECTIVO FECHA:

D = DEDUCCION Ka=

VRC = V x K - A x V / C (K / Ka - 1)

AVANCE DE OBRA
N FECHA A.P.A A.R.A AVANCE DS# 011-79-VC
1 SET. 290,000.00 260,000.00 ATRS.
Rprog= Vprog (K-1)
R= V ( K-1)
Rreal= Vreal (K-1)
REINTEGROS

N FECHA Vpro Vre K-1 Rprog Rreal Rrecon.


1 SET. 286,778.10 257,111.40 -0.003 -860.33 -771.33 -771.33

DEDUCCIN

N FECHA Vpro Vre K Ka A/C Dprog Dreal Drecon

AMORTIZACIN

N FECHA Vreal % AMORT. DEUDA SALDO


CUADRO RESUMEN DE VALORIZACION N 01
DEL 01 AL 30 SET.

OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE: 900,000.00
PRESUPUESTO CONTRATADO: 890,000.00

MONTO CONTRATADO VALORIZACION


DESCRIPCIN
SIN IGV (S/.) ANTERIOR (S/.)

VALORIZACIN (V) 890,000.00 0.00

TOTAL CONTRACTUAL
Avances en porcentaje

REAJUSTES (R) 0.00

DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO
POR ADELANTO PARA MATERIALES

TOTAL DEDUCCIONES

VALORIZACIN BRUTA (VB = V + R - D)

AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO
AMORTIZACION DEL ADELANTO PARA MATERIALES

TOTAL AMORTIZACIONES (A)

VALORIZACIN NETA (VN = VB - A)

RETENCIONES ( C )
FONDOS DE GARANTIA (5% X VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL

MONTO A PAGAR AL CONTRATISTA


EN EFECTIVO (VN-C)
MONTO POR I.G.V. (VN x 0,18)
MONTO TOTAL CON I.G.V.

TOTAL COMPROMISO DE PAGO>>>>>>>>>>>>>>>> S/. 302,481.28


DE VALORIZACION N 01
AL 30 SET.

VALORIZACION % DE AVANCE SALDO POR VALORIZAR


ACTUAL (S/.) ACUMULADO (S/.) ACUMULADO (S/.)

257,111.40 257,111.40 28.89% 632,888.60

-771.33 -771.33

256,340.07

256,340.07

256,340.07
46,141.21
302,481.28

S/. 302,481.28
N 1 2 3 CURVA "S"- SET.
FECHA SET. OCT. NOV
1,000,000.00
A.P.A. 290,000.00 590,000.00 900,000.00
900,000.00
A.R.A. 260,000.00 800,000.00
MIN. 80 %A.P.A. 232,000.00 472,000.00 720,000.00
700,000.00
600,000.00
500,000.00

SOLES
400,000.00
300,000.00
200,000.00
100,000.00
0.00
SET. OCT. NOV
1 2 3
NOV
3