Anda di halaman 1dari 102

TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 471-D Case 5 Lot No. 21886 Public Land Applicant No.
Location Polangui Albay P.L. Applicant
CM 13'17''30 N. 123-29'45'' E. Sec. 2-C Orig. Isolated Survey
Cad. Survey Claimant EDITHA F. GARCIA Identical/Equiv. Cad/Pls Lot No
Date Surveyed November 5 - December 15, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor Angel T. Pormalejo Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY No. 3969 Surveyor

Tie Line N 10 - 50 E 150.512 Area 134 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 75 47 E 17.03 m. -4.18 16.51
2-3 N 18 23 E 1.69 m. 1.60 0.53
3-4 S 79 59 E 2.91 m. -0.51 2.86
4-5 S 76 49 E 2.56 m. -0.58 2.50
5-6 S 20 4 W 7.44 m. -6.99 -2.55
6-7 N 76 12 W 10.51 m. 2.51 -10.20
7-8 N 77 25 W 11.20 m. 2.44 -10.93
8-1 N 12 41 E 5.86 m. 5.72 1.29

12.27 23.69
-12.26 -23.68
0.01 0.01

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Maria Dulcena S. Samar Researched by: GREJAN B. BARISO Date: 3/22/2016
Date Requested: March 14, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1609625 Date 22-Mar-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 471-D Case 6 Lot No. 145747 Public Land Applicant No.
Location Balinad, Polangui, Albay P.L. Applicant
CM 13-37 N. 123-32 E. Sec. 3 Orig. Isolated Survey
Cad. Survey Claimant UNKNOWN CLAIMANT Identical/Equiv. Cad/Pls Lot No
Date Surveyed Sept. - Dec. 2010 Isolated Survey Claimant
Date Approved Dec. 16, 2014 Subdivision Survey
Chief of Party/Surveyor Jo Raymund O. Fernandez Assigned Cad/Pls Lot No.
Covered by Old Survey Port. Of Lot. 8601 Date Surveyed
Date Spproved
Tie Point from ABY-3940 (PRS'92) Surveyor

Tie Line S. 50 - 18 E., 835.04 m. Area 1,470 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 78 23 E 16.69 m. -3.36 16.35
2-3 S 5 49 W 14.11 m. -14.04 -1.43
3-4 S 25 2 W 40.64 m. -36.82 -17.20
4-5 N 82 38 W 34.35 m. 4.40 -34.07
5-1 N 36 7 E 61.67 m. 49.82 36.35

54.22 52.7
-54.22 -52.7
0 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Rolando Naperi Researched by: GREJAN B. BARISO Date: 3/22/2016
Date Requested: March 11, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 22-Mar-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 201 Case 6 Lot No. 6324 Public Land Applicant No.
Location Guinobatan Albay P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Identical/Equiv. Cad/Pls Lot No
Date Surveyed September 1923 - September 1928 Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor Severino Nico Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BBM NO. 22 Surveyor

Tie Line N 85 - 47 E 1214.92 Area 8,603 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 25 23 E 75.78 m. 68.46 32.48
2-3 S 46 48 E 152.83 m. -104.62 111.41
3-4 S 40 7 W 45.21 m. -34.57 -29.13
4-5 N 88 42 W 7.90 m. 0.18 -7.90
5-6 N 54 16 W 74.96 m. 43.78 -60.85
6-1 N 59 49 W 53.24 m. 26.77 -46.02

139.19 143.89
-139.19 -143.9
0 -0.01

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

Requested by: Estela Rabe Researched by: GREJAN B. BARISO Date:


Date Requested: September 10, 2015 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1319575 Date 10-Sep-15

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 461-D Case 3 Lot No. 5530 Public Land Applicant No.
Location Bangate, Barcelona, Sorsogon P.L. Applicant
CM 12-48 N. 124-08 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Maximo Gacosta Identical/Equiv. Cad/Pls Lot No
Date Surveyed Isolated Survey Claimant
Date Approved March 14, 1983 Subdivision Survey
Chief of Party/Surveyor Francisco Q. Caldoza Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM NO. 1 Surveyor

Tie Line S 05 - 41 E., 5996.86 m. Area 2,700 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 1 32 E 60.83 m. -60.81 1.63
2-3 S 85 47 W 17.58 m. -1.29 -17.53
3-4 S 86 0 W 23.35 m. -1.63 -23.29
4-5 N 9 4 W 48.97 m. 48.36 -7.72
5-6 N 5 3 W 10.90 m. 10.86 -0.96
6-1 N 84 37 E 48.08 m. 4.51 47.87

63.73 49.5
-63.73 -49.5
0 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Researched by: GREJAN B. BARISO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 28-Mar-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls PSU-129249 Case Lot No. Public Land Applicant No.


Location Gahunon, Daet, Camarines Norte P.L. Applicant
CM 14-17 N. 122-57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant ILDEFONSO RIEZA Identical/Equiv. Cad/Pls Lot No
Date Surveyed October 27, 1950 Isolated Survey Claimant
Date Approved May 10, 1951 Subdivision Survey
Chief of Party/Surveyor Antonio G. Sergio Assigned Cad/Pls Lot No.1593 & 1594
Covered by Old Survey PSU-129249 Date Surveyed
Date Spproved
Tie Point from BLLM NO. 2 Surveyor

Tie Line N 13 - 10 E., 1229.33 M. 28,846 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 64 19 W 31.39 m. 13.60 -28.29
2-3 S 32 4 W 20.64 m. -17.49 -10.96
3-4 N 62 44 W 21.13 m. 9.68 -18.78
4-5 S 34 4 W 4.26 m. -3.53 -2.39
5-6 S 89 34 W 42.20 m. -0.32 -42.20
6-7 N 2 46 E 65.11 m. 65.03 3.14
7-8 N 89 10 W 89.13 m. 1.30 -89.12
8-9 N 70 21 W 32.64 m. 10.98 -30.74
9 - 10 N 41 58 E 119.12 m. 88.57 79.66
10 - 11 N 39 36 E 9.08 m. 7.00 5.79
11 - 12 S 56 2 E 15.12 m. -8.45 12.54
12 - 13 N 44 38 E 41.60 m. 29.60 29.23
13 - 14 S 24 26 E 64.82 m. -59.01 26.81
14 - 15 N 55 57 E 62.96 m. 35.25 52.17
15 - 16 S 54 56 E 82.00 m. -47.11 67.12
16 - 1 S 23 21 W 136.25 m. -125.09 -54.00

261.01 276.46
-261.00 -276.48
0.01 -0.02
Description of corners
As per cadastral map/plan
Purpose: For LRA
SKETCH

See the drawing at the back

not drawn to scale

Requested by: Edgar Rieza Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 5-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls PSU-129249 Case Lot No. Public Land Applicant No.


Location Gahunon, Daet, Camarines Norte P.L. Applicant
CM 14-17 N. 122-57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant ILDEFONSO RIEZA Identical/Equiv. Cad/Pls Lot No
Date Surveyed October 27, 1950 Isolated Survey Claimant
Date Approved May 10, 1951 Subdivision Survey
Chief of Party/Surveyor Antonio G. Sergio Assigned Cad/Pls Lot No. 1593 & 1594
Covered by Old Survey PSU-129249 Date Surveyed
Date Spproved
Tie Point from BLLM NO. 2 Surveyor

Tie Line N 13 - 10 E., 1229.33 M. Area 28,855 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE

261.05 276.46
-261.00 -276.56
0.05 -0.10

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

See the drawing at the back

Requested by: Edgar Rieza Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 5-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Cad-1170-D Case 2 Lot No. 303 Public Land Applicant No.
Location Poblacion West, Milagros, Masbate P.L. Applicant
CM 12-13 N. 123-30'15'' E. Sec. 4-C-SW Orig. Isolated Survey
Cad. Survey Claimant FIGURACION FELIMON Identical/Equiv. Cad/Pls Lot No
Date Surveyed June 15 - 28, 2015 Isolated Survey Claimant
Date Approved April 30, 2015 Subdivision Survey
Chief of Party/Surveyor Rogelio F. Olivete Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM No. 4 Surveyor

Tie Line S 03 - 19 W., 315.40 Area 401 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 10 9 W 4.77 m. -4.70 -0.84
2-3 S 7 21 W 18.36 m. -18.21 -2.35
3-4 N 83 22 W 19.13 m. 2.21 -19.00
4-5 N 14 11 E 4.42 m. 4.29 1.08
5-6 N 14 15 E 12.62 m. 12.23 3.11
6-1 N 8 24 E 4.92 m. 4.87 0.72
7-8 S 87 37 E 3.00 m. -0.12 3.00
8-9 S 87 41 E 8.00 m. -0.32 7.99
9-1 S 87 45 E 6.29 m. -0.25 6.29

23.60 22.19
-23.60 -22.19
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Helen S. Figuracion Researched by: GREJAN B. BARISO Date:


Date Requested: March 31, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 12-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Cad-1170-D Case 2 Lot No. 313 Public Land Applicant No.
Location Poblacion West, Milagros, Masbate P.L. Applicant
CM 12-13 N. 123-30'15'' E. Sec. 4-C-SW Orig. Isolated Survey
Cad. Survey Claimant ABON CORAZON Identical/Equiv. Cad/Pls Lot No
Date Surveyed June 15 - 28, 2015 Isolated Survey Claimant
Date Approved April 30, 2015 Subdivision Survey
Chief of Party/Surveyor Rogelio F. Olivete Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM No. 4 Surveyor

Tie Line S 07 - 29 W., 333.29 Area 32 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 78 26 W 5.85 m. 1.17 -5.73
2-3 N 6 20 E 5.57 m. 5.54 0.61
3-4 S 76 35 E 6.00 m. -1.39 5.84
4-1 S 7 40 W 5.36 m. -5.31 -0.72

6.71 6.45
-6.70 -6.45
0.01 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Helen S. Figuracion Researched by: GREJAN B. BARISO Date:


Date Requested: March 31, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 12-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Cad-1170-D Case 2 Lot No. 333 Public Land Applicant No.
Location Poblacion West, Milagros, Masbate P.L. Applicant
CM 12-13 N. 123-30'15'' E. Sec. 4-C-SW Orig. Isolated Survey
Cad. Survey Claimant ARNAIZ LUCY Identical/Equiv. Cad/Pls Lot No
Date Surveyed June 15 - 28, 2015 Isolated Survey Claimant
Date Approved April 30, 2015 Subdivision Survey
Chief of Party/Surveyor Rogelio F. Olivete Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM No. 4 Surveyor

Tie Line S 23 - 57 W., 326.78 Area 122 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 82 53 E 5.30 m. -0.66 5.26
2-3 S 5 52 W 20.01 m. -19.91 -2.05
3-4 N 81 50 W 6.98 m. 0.99 -6.91
4-1 N 10 42 E 19.92 m. 19.57 3.70

20.56 8.96
-20.57 -8.96
-0.01 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: HELEN S. FIGURACION Researched by: GREJAN B. BARISO Date:


Date Requested: March 31, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656315 Date 22-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Cad-1170-D Case 2 Lot No. 594 Public Land Applicant No.
Location P P.L. Applicant
CM 12-13'7.5'' N. 123-30'22.5'' E. Sec. 4-C-NE Orig. Isolated Survey
Cad. Survey Claimant LORENZO, RANULFO Identical/Equiv. Cad/Pls Lot No
Date Surveyed June 15 - 28, 2015 Isolated Survey Claimant
Date Approved April 30, 2015 Subdivision Survey
Chief of Party/Surveyor Rogelio F. Olivete Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM No. 4 Surveyor

Tie Line S 21 - 05 E., 201.77 Area 320 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 5 38 W 30.23 m. -30.08 -2.97
2-3 N 78 33 W 11.31 m. 2.25 -11.08
3-4 N 8 7 E 30.11 m. 29.81 4.25
4-1 S 78 39 E 10.00 m. -1.97 9.80

32.06 14.05
-32.05 -14.05
0.01 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Helen S. Figuracion Researched by: GREJAN B. BARISO Date:


Date Requested: March 31, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 12-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls PLS 488-D Case 2 Lot No. 1593 Public Land Applicant No.
Location Gahonon, Daet, Camarines Norte P.L. Applicant
CM 14 - 07 N. 122 - 57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant RIEZA ILDEFONSO Identical/Equiv. Cad/Pls Lot No
Date Surveyed November 4, 1959 Isolated Survey Claimant
Date Approved March 23, 1982 Subdivision Survey
Chief of Party/Surveyor Bicol Surv. Ent. Assigned Cad/Pls Lot No.
Covered by Old Survey Psu-129249 Date Surveyed
Date Spproved
Tie Point from BLLM No. 1 Surveyor

Tie Line N 14 - 01 E., 1321.86 Area 3,389 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 64 19 W 27.85 m. 12.07 -25.10
2-3 N 26 4 E 139.67 m. 125.46 61.37
3-4 S 54 56 E 21.65 m. -12.44 17.72
4-1 S 23 21 W 136.25 m. -125.09 -54.00

137.53 79.09
-137.53 -79.1
0 -0.01

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: EDGAR RIEZA Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 6-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls PLS 488-D Case 2 Lot No. 1594 Public Land Applicant No.
Location Gahonon, Daet, Camarines Norte P.L. Applicant
CM 14 - 07 N. 122 - 57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant RIEZA ILDEFONSO Identical/Equiv. Cad/Pls Lot No
Date Surveyed November 4, 1959 Isolated Survey Claimant
Date Approved March 23, 1982 Subdivision Survey
Chief of Party/Surveyor Bicol Surv. Ent. Assigned Cad/Pls Lot No.
Covered by Old Survey Psu-129249 Date Surveyed
Date Spproved
Tie Point from BLLM No. 1 Surveyor

Tie Line N 11 - 55 E., 1486.79 Area 25,456 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 54 56 E 60.35 m. -34.67 49.40
2-3 S 26 4 W 139.67 m. -125.46 -61.37
3-4 N 63 57 W 3.54 m. 1.55 -3.18
4-5 S 32 4 W 20.64 m. -17.49 -10.96
5-6 N 62 44 W 21.13 m. 9.68 -18.78
6-7 S 34 4 W 4.25 m. -3.52 -2.38
7-8 S 89 34 W 42.20 m. -0.32 -42.20
8-9 N 2 46 E 65.11 m. 65.03 3.14
9 - 10 N 89 10 W 89.13 m. 1.30 -89.12
10 - 11 N 70 21 W 32.64 m. 10.98 -30.74
11 - 12 N 41 58 E 119.12 m. 88.57 79.66
12 - 13 N 39 36 E 9.08 m. 7.00 5.79
13 - 14 S 56 2 E 15.12 m. -8.45 12.54
14 - 15 N 44 38 E 41.53 m. 29.55 29.18
15 - 16 S 24 26 E 64.86 m. -59.05 26.83
16 - 1 N 55 57 E 62.95 m. 35.25 52.16

248.91 258.7
-248.96 -258.73
-0.05 -0.03
Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

See the drawing at the back

not drawn to scale

Requested by: EDGAR RIEZA Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 6-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 135 Case Lot No. 6975B Public Land Applicant No.
Location Quiragnay, Camalig, Albay P.L. Applicant
CM 14 - 07 N. 122 - 57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant PEDRO VILLANUEVA AND BRO Identical/Equiv. Cad/Pls Lot No
Date Surveyed December 11-18, 1921 Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor S. Bautista Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BBM 9 Surveyor

Tie Line N 61 - 31 W., 1237.84 Area 3,389 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 10 42 W 113.11 m. -111.14 -21.00
2-3 S 22 48 W 67.89 m. -62.59 -26.31
3-4 N 63 38 W 85.18 m. 37.83 -76.32
4-1 N 35 48 E 38.06 m. 30.87 22.26
5-6 N 38 12 E 19.75 m. 15.52 12.21
6-7 N 57 21 E 43.16 m. 23.29 36.34
7-8 N 3 25 E 15.93 m. 15.90 0.95
8-9 S 84 14 E 1.89 m. -0.19 1.88
9-1 N 44 42 E 71.07 m. 50.52 49.99

173.93 123.63
-173.92 -123.63
0.01 0.00

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: EDGAR RIEZA Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 6-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 135 Case Lot No. 6975B Public Land Applicant No.
Location Quiragnay, Camalig, Albay P.L. Applicant
CM 14 - 07 N. 122 - 57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant PEDRO VILLANUEVA AND BRO Identical/Equiv. Cad/Pls Lot No
Date Surveyed December 11-18, 1921 Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor S. Bautista Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BBM 9 Surveyor

Tie Line N 61 - 31 W., 1237.84 Area 3,389 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 9### 0 W 283.58 m. 280.09 -44.36
2-3 N 9###28 E 135.22 m. 133.38 22.24
3-4 N 62###49 W 482.24 m. 220.31 -428.98
4-1 N 7###57 E 119.72 m. 118.57 16.56
5-6 N 89###27 W 30.11 m. 0.29 -30.11
6-7 N 86###49 W 2.88 m. 0.16 -2.88
7-8 N 87### 7 W 12.32 m. 0.62 -12.30
8-9 S 89###43 W 10.29 m. -0.05 -10.29
9 - 10 N 17###31 E 118.22 m. 112.74 35.58
10 - 11 S 74###10 E 72.11 m. -19.67 69.37
11 - 12 S 75###52 E 734.48 m. -179.34 712.25
12 - 13 S 1###56 W 129.78 m. -129.71 -4.38
13 - 14 S 3###14 W 164.93 m. -164.67 -9.30
14 - 15 S 5###34 E 160.46 m. -159.70 15.57
15 - 16 S 87###59 W 55.45 m. -1.95 -55.42
16 - 17 N 8###17 W 32.30 m. 31.96 -4.65
17 - 18 S 79###18 W 24.76 -4.60 -24.33

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: EDGAR RIEZA Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 6-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 135 Case Lot No. 6975B Public Land Applicant No.
Location Quiragnay, Camalig, Albay P.L. Applicant
CM 14 - 07 N. 122 - 57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant PEDRO VILLANUEVA AND BRO Identical/Equiv. Cad/Pls Lot No
Date Surveyed December 11-18, 1921 Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor S. Bautista Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BBM 9 Surveyor

Tie Line N 61 - 31 W., 1237.84 Area 3,389 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


18 - 19 S 82 46 W 65.08 m. -8.19 -64.56
19 - 20 S 2 47 E 110.92 m. -110.79 5.39
20 - 21 S 15 48 E 27.80 m. -26.75 7.57
21 - 22 N 78 24 W 21.98 m. 4.42 -21.53
22 - 23 N 19 2 W 100.11 m. 94.64 -32.65
23 - 24 N 12 24 W 111.08 m. 108.49 -23.85
24 - 25 N 85 30 W 35.15 m. 2.76 -35.04
25 - 26 S 13 16 W 68.67 m. -66.84 -15.76
26 - 27 S 38 41 E 62.66 m. -48.91 39.16
27 - 28 S 23 43 E 45.55 m. -41.70 18.32
28 - 29 N 85 46 W 70.44 m. 5.20 -70.25
29 - 30 S 1 45 E 93.74 m. -93.70 2.86
30 - 31 S 88 30 E 68.35 m. -1.79 68.33
31 - 32 N 6 17 W 43.35 m. 43.09 -4.74
32 - 33 S 88 40 E 53.61 m. -1.25 53.60
33 - 34 S 78 24 E 21.98 m. -4.42 21.53
34 - 35 N 82 36 E 57.81 m. 7.45 57.33

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: EDGAR RIEZA Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 6-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 135 Case Lot No. 6975B Public Land Applicant No.
Location Quiragnay, Camalig, Albay P.L. Applicant
CM 14 - 07 N. 122 - 57 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant PEDRO VILLANUEVA AND BRO Identical/Equiv. Cad/Pls Lot No
Date Surveyed December 11-18, 1921 Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor S. Bautista Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BBM 9 Surveyor

Tie Line N 61 - 31 W., 1237.84 Area 3,389 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


35 - 36 S 80 30 E 28.96 m. -4.78 28.56
36 - 37 S 3 42 E 58.67 m. -58.55 3.79
37 - 01 S 82 36 W 284.92 m. -36.70 -282.55

1164.17 1177.91
### -1177.93
0.15 -0.02

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: EDGAR RIEZA Researched by: GREJAN B. BARISO Date:


Date Requested: April 4, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656140 Date 6-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 3 Lot No. 1729 Public Land Applicant No.
Location Basud, Polangui, Albay P.L. Applicant
CM 13-16 N. 123-29 E. Sec. 2 Orig. Isolated Survey
Cad. Survey Claimant TEODOCIA DELA PENA Identical/Equiv. Cad/Pls Lot No
Date Surveyed May 30 - June 25, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor ANGEL T. PORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY 3941 Surveyor

Tie Line S 04 - 04 E., 1,255.03 Area 5,892 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 7 1 E 83.59 m. -82.96 10.21
2-3 S 16 34 W 99.37 m. -95.25 -28.33
3-4 S 86 12 W 334.58 m. -22.17 -333.84
4-1 N 74 21 W 50.73 m. 13.68 -48.85
5-6 N 37 23 W 120.43 m. 95.69 -73.12
6-7 S 39 54 W 170.17 m. -130.55 -109.16
7-8 N 63 19 W 115.83 m. 52.01 -103.49
8-9 N 33 50 E 59.15 m. 49.13 32.93
9 - 10 N 4 27 W 19.95 m. 19.89 -1.55
10 - 11 N 16 13 E 16.90 m. 16.23 4.72
11 - 12 N 5 51 E 27.26 m. 27.12 2.78
12 - 13 N 35 37 E 3.64 m. 2.96 2.12
13 - 14 S 63 38 E 85.18 m. -37.83 76.32
14 - 15 N 22 48 E 67.89 m. 62.59 26.31
15 - 16 S 61 23 E 33.13 m. -15.87 29.08
16 - 17 S 82 16 E 57.26 m. -7.71 56.74
17 - 18 S 44 45 W 30.81 m. -21.88 -21.69

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: CELENIA O. BRONCATE Researched by: GREJAN B. BARISO Date:


Date Requested: March 28, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 14-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 3 Lot No. 1729 Public Land Applicant No.
Location Basud, Polangui, Albay P.L. Applicant
CM 13-16 N. 123-29 E. Sec. 2 Orig. Isolated Survey
Cad. Survey Claimant TEODOCIA DELA PENA Identical/Equiv. Cad/Pls Lot No
Date Surveyed May 30 - June 25, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor ANGEL T. PORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY 3941 Surveyor

Tie Line S 04 - 04 E., 1,255.03 Area 5,892 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


18 - 29 S 64 18 E 34.03 m. -14.76 30.66
19 - 20 S 52 40 E 38.04 m. -23.07 30.25
20 - 21 S 51 43 E 33.58 m. -20.80 26.36
21 - 22 S 60 8 E 36.41 m. -18.13 31.57
22 - 23 N 35 16 E 96.03 m. 78.41 55.45
23 - 24 N 24 38 E 76.31 m. 69.37 31.81
24 - 25 N 32 53 E 71.91 m. 60.39 39.04
25 - 26 N 17 9 E 120.25 m. 114.90 35.46
26 - 01 S 49 9 E 262.07 m. -171.41 198.24

662.37 720.05
-662.39 -720.03
-0.02 0.02

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent

not drawn to scale

Requested by: CELENIA O. BRONCATE Researched by: GREJAN B. BARISO Date:


Date Requested: March 28, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 14-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 3 Lot No. 1729 Public Land Applicant No.
Location Basud, Polangui, Albay P.L. Applicant
CM 13-16 N. 123-29 E. Sec. 2 Orig. Isolated Survey
Cad. Survey Claimant TEODOCIA DELA PENA Identical/Equiv. Cad/Pls Lot No
Date Surveyed May 30 - June 25, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor ANGEL T. PORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY 3941 Surveyor

Tie Line S 04 - 04 E., 1,255.03 Area 5,892 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 70 51 W 42.87 m. 14.06 -40.50
2-3 S 36 37 W 51.96 m. -41.71 -30.99
3-4 S 17 23 W 46.23 m. -44.12 -13.81
4-1 N 6 50 E 21.96 m. 21.80 2.61
5-6 N 11 32 W 13.60 m. 13.33 -2.72
6-7 N 18 43 E 52.77 m. 49.98 16.93
7-8 N 13 54 E 21.82 m. 21.18 5.24
8-9 N 32 48 E 49.50 m. 41.61 26.81
9 - 10 N 19 52 E 30.43 m. 28.62 10.34
10 - 11 N 72 4 E 15.23 m. 4.69 14.49
11 - 12 N 43 25 E 27.04 m. 19.64 18.58
12 - 13 S 85 7 E 68.84 m. -5.86 68.59
13 - 14 S 18 0 W 121.48 m. -115.53 -37.54
14 - 1 S 78 34 W 38.81 m. -7.69 -38.04

214.91 163.59
-214.91 -163.6
0.00 -0.01
Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: CELENIA O. BRONCATE Researched by: GREJAN B. BARISO Date:


Date Requested: March 28, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 14-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 3 Lot No. 1729 Public Land Applicant No.
Location Basud, Polangui, Albay P.L. Applicant
CM 13-16 N. 123-29 E. Sec. 2 Orig. Isolated Survey
Cad. Survey Claimant TEODOCIA DELA PENA Identical/Equiv. Cad/Pls Lot No
Date Surveyed May 30 - June 25, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor ANGEL T. PORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY 3941 Surveyor

Tie Line S 04 - 04 E., 1,255.03 Area 5,892 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 27 34 E 7.51 m. 6.66 3.48
2-3 N 60 21 W 58.01 m. 28.70 -50.41
3-4 N 27 48 E 14.40 m. 12.74 6.72
4-1 N 27 49 E 32.71 m. 28.93 15.26
5-6 S 62 32 E 60.86 m. -28.07 54.00
6-7 S 6 37 E 2.01 m. -2.00 0.23
7-8 S 54 26 E 58.55 m. -34.06 47.63
8-9 S 32 50 W 47.31 m. -39.75 -25.65
9-1 N 62 20 W 57.84 m. 26.86 -51.23

103.89 127.32
-103.88 -127.29
0.01 0.03

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: CELENIA O. BRONCATE Researched by: GREJAN B. BARISO Date:


Date Requested: March 28, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 14-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 3 Lot No. 1729 Public Land Applicant No.
Location Basud, Polangui, Albay P.L. Applicant
CM 13-16 N. 123-29 E. Sec. 2 Orig. Isolated Survey
Cad. Survey Claimant TEODOCIA DELA PENA Identical/Equiv. Cad/Pls Lot No
Date Surveyed May 30 - June 25, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor ANGEL T. PORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY 3941 Surveyor

Tie Line S 04 - 04 E., 1,255.03 Area 5,892 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 27 34 E 7.51 m. 6.66 3.48
2-3 N 60 21 W 58.01 m. 28.70 -50.41
3-4 N 27 48 E 14.40 m. 12.74 6.72
4-1 N 27 49 E 32.71 m. 28.93 15.26
5-6 S 62 32 E 60.86 m. -28.07 54.00
6-7 S 6 37 E 2.01 m. -2.00 0.23
7-8 S 54 26 E 58.55 m. -34.06 47.63
8-9 S 32 50 W 47.31 m. -39.75 -25.65
9-1 N 62 20 W 57.84 m. 26.86 -51.23

103.89 127.32
-103.88 -127.29
0.01 0.03

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: CELENIA O. BRONCATE Researched by: GREJAN B. BARISO Date:


Date Requested: March 28, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 14-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 5 Lot No. 21001 Public Land Applicant No.
Location Magurang, Polangui, Albay P.L. Applicant
CM 13-17'30'' N. 123-29'30'' E. Sec. 2-D Orig. Isolated Survey
Cad. Survey Claimant APOLONIA S. VALDERAMA Identical/Equiv. Cad/Pls Lot No
Date Surveyed Nov. 5 - Dec. 15, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor Angel T. Pormalejo Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY No. 3969 Surveyor

Tie Line S 68 - 57 W., 123.489 Area 74 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 75 11 E 6.42 m. -1.64 6.21
2-3 S 19 14 W 12.62 m. -11.91 -4.16
3-4 N 72 43 W 5.44 m. 1.62 -5.19
4-1 N 14 44 E 12.34 m. 11.94 3.14

13.56 9.35
-13.55 -9.35
0.01 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: MARLON C. FRANCIA Researched by: GREJAN B. BARISO Date:


Date Requested: April 6, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 18-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 5 Lot No. 21002 Public Land Applicant No.
Location Magurang, Polangui, Albay P.L. Applicant
CM 13-17'30'' N. 123-29'30'' E. Sec. 2-D Orig. Isolated Survey
Cad. Survey Claimant UNKNOWN CLAIMANT Identical/Equiv. Cad/Pls Lot No
Date Surveyed Nov. 5 - Dec. 15, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor Angel T. Pormalejo Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY No. 3969 Surveyor

Tie Line S 62 - 54 W., 217.147 Area 38 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 19 54 W 5.79 m. -5.44 -1.97
2-3 N 85 38 W 5.70 m. 0.43 -5.68
3-4 N 14 31 E 7.07 m. 6.84 1.77
4-4 S 72 22 E 0.72 m. -0.22 0.69
5-1 S 72 43 E 5.44 m. -1.62 5.19

7.27 7.65
-7.28 -7.65
-0.01 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: MARLON C. FRANCIA Researched by: GREJAN B. BARISO Date:


Date Requested: April 6, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 18-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 19 Lot No. 18564 Public Land Applicant No.
Location Sugcad, Polangui, Albay P.L. Applicant
CM 13-18' N. 123-29' E. Sec. 4-A Orig. Isolated Survey
Cad. Survey Claimant UNKNOWN CLAIMANT Identical/Equiv. Cad/Pls Lot No
Date Surveyed March 15 - April 15, 2012 Isolated Survey Claimant
Date Approved September 13, 2014 Subdivision Survey
Chief of Party/Surveyor Rene D. Salazar Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY No. 3387 Surveyor

Tie Line S 86 - 18 W., 2595.93 Area 178 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 55 4 W 14.33 m. -8.21 -11.75
2-3 N 35 7 W 12.34 m. 10.09 -7.10
3-4 N 52 24 E 13.82 m. 8.43 10.95
4-1 S 37 25 E 12.99 m. -10.32 7.89

18.52 18.84
-18.53 -18.85
-0.01 -0.01

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: MARLON C. FRANCIA Researched by: GREJAN B. BARISO Date:


Date Requested: April 6, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 18-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD-471-D Case 5 Lot No. 2425 Public Land Applicant No.
Location Magurang, Polangui, Albay P.L. Applicant
CM 13-17'30'' N. 123-29'30'' E. Sec. 2-D Orig. Isolated Survey
Cad. Survey Claimant EMELIANA AGUAS Identical/Equiv. Cad/Pls Lot No
Date Surveyed Nov. 5 - Dec. 15, 2013 Isolated Survey Claimant
Date Approved December 16, 2014 Subdivision Survey
Chief of Party/Surveyor Angel T. Pormalejo Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from ABY No. 3969 Surveyor

Tie Line S 66 - 04 W., 326.933 Area 182 sq. m.Bearings Grid

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 59 26 E 5.33 m. -2.71 4.59
2-3 S 59 26 E 4.68 m. -2.38 4.03
3-4 S 29 2 W 8.83 m. -7.72 -4.29
4-5 S 32 33 W 8.92 m. -7.52 -4.80
5-6 N 57 55 W 10.39 m. 5.52 -8.81
6-1 N 32 4 E 17.48 m. 14.81 9.28

20.33 17.9
-20.33 -17.9
0 0

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: MARLON C. FRANCIA Researched by: GREJAN B. BARISO Date:


Date Requested: March 29, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date 22-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys & Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls CAD 290 Case Lot No. 1844 Public Land Applicant No.
Location Abella, Naga, Camarines Sur P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Filomeno Olao & Ramon Olao Identical/Equiv. Cad/Pls Lot No
Date Surveyed February 17, 1974 Isolated Survey Claimant
Date Approved June 27, 1974 Subdivision Survey
Chief of Party/Surveyor Rolando A. Sales Assigned Cad/Pls Lot No. 1844-A & 1844-B
Covered by Old Survey CSD-05-000069 Date Surveyed
Date Spproved
Tie Point from MBM 20 Surveyor

Tie Line N 69 - 25 E., 419.79 m. Area 1,578 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 39 40 E 21.76 m. 16.75 13.89
2-3 N 41 45 E 26.90 m. 20.07 17.91
3-4 S 51 56 E 31.02 m. -19.13 24.42
4-5 S 31 25 W 35.75 m. -30.51 -18.63
5-6 S 26 47 W 5.72 m. -5.11 -2.58
6-7 N 66 57 W 5.70 m. 2.23 -5.24
7-8 N 62 21 W 15.15 m. 7.03 -13.42
8-1 N 62 5 W 18.50 m. 8.66 -16.35

54.74 56.22
-54.75 -56.22
-0.01 0.00

Description of corners
As per cadastral map/plan
Purpose: For issuance of Free Patent
SKETCH

not drawn to scale

Requested by: Filomeno Olao, Jr. Researched by: GREJAN B. BARISO Date:
Date Requested: April 26, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656369 Date 26-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Cad 732-D Case Lot No. 4876 Public Land Applicant No.
Location Consosep, Tigaon, Camarines Sur P.L. Applicant
CM 13 - 36 N. 123 - 25' 26" E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Mauricio Olivades Identical/Equiv. Cad/Pls Lot No
Date Surveyed Isolated Survey Claimant
Date Approved March 27, 1987 Subdivision Survey
Chief of Party/Surveyor E.J. Loleng Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM 1 Surveyor

Tie Line S 69 - 41 W., 7315.00 m. Area 23,772 sq. m.Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 10 10 W 116.33 m. 114.50 -20.53
2-3 N 64 12 E 19.93 m. 8.67 17.94
3-4 N 49 23 E 26.23 m. 17.08 19.91
4-5 S 32 26 E 30.01 m. -25.33 16.09
5-6 S 21 4 E 202.68 m. -189.13 72.85
6-7 S 14 50 E 27.90 m. -26.97 7.14
7-8 S 26 51 W 57.49 m. -51.29 -25.97
8-1 N 71 31 W 138.01 m. 43.75 -130.89
9-1 N 33 38 E 61.83 m. 51.48 34.25
10 - 1 N 9 9 E 57.99 m. 57.25 9.22
11 - 1 N
12 - 1 N 292.73 177.40
13 - 1 N -292.72 -177.39
14 - 1 N 0.01 0.01
15 - 1 N
16 - 1 N
17 - 1 N

Description of corners
As per cadastral map/plan
Purpose: For Free Patent
SKETCH

not drawn to scale

Requested by: EMERITA A. RAMOS Researched by: MARLON V. MORANO Date:


Date Requested: April 26, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656379 Date 26-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls PLS 737-D Case 1 Lot No. 4905 Public Land Applicant No.
Location San Fernando, Camarines Sur P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Mauricio Olivades Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant
Date Approved September 7, 1965 Subdivision Surve
Chief of Party/Surveyor Certeza Survey Inc. Assigned Cad/Pls Lot No.
Covered by Old Survey Portion of Lot 4, Psu 127637 Date Surveyed
Date Spproved
Tie Point from BLLM 1 Surveyor

Tie Line N 16 - 00 E., 1225.74 m. Area 134,208 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 25 29 E 135.81 m. 122.60 58.43
2-3 N 25 39 E 64.50 m. 58.14 27.92
3-4 S 79 34 E 130.00 m. -23.54 127.85
4-5 S 19 38 E 399.49 m. -376.26 134.23
5-6 S 19 46 E 190.84 m. -179.60 64.54
6-7 S 54 6 W 228.28 m. -133.86 -184.92
7-8 N 17 54 W 92.12 m. 87.66 -28.31
8-9 N 50 37 E 130.86 m. 83.03 101.14
9 - 10 N 42 57 W 45.68 m. 33.44 -31.12
10 - 11 N 42 20 W 172.27 m. 127.35 -116.01
11 - 12 S 52 33 W 125.69 m. -76.43 -99.78
12 - 13 N 39 44 E 18.05 m. 13.88 11.54
13 - 14 N 17 20 E 164.08 m. 156.63 48.88
14 - 15 N 63 43 W 80.07 m. 35.46 -71.79
15 - 16 S 18 21 W 146.54 m. -139.09 -46.13
16 - 17 N 24 58 W 112.76 m. 102.22 -47.59
17 - 1 N 25 13 E 119.84 m. 108.42 51.06

928.83 625.59
-928.78 -625.65
0.05 -0.06

Description of corners
As per cadastral map/plan
Purpose: For LRA reference
SKETCH

not drawn to scale

Requested by: VICKY BUHAY Researched by: MARLON V. MORANO Date:


Date Requested: April 26, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656380 Date 27-Apr-16

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Pls 819-D Case Lot No. 757 Public Land Applicant No.
Location Sta. Rosa Norte, Jose Panganiban P.L. Applicant
CM 14-16' N. 122-41' E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Apolinio Rion Identical/Equiv. Cad/Pls Lot No.
Date Surveyed February 1, 1964 Isolated Survey Claimant
Date Approved February 29, 1972 Subdivision Surve
Chief of Party/Surveyor Miguel M. Ramos Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
Tie Point from BLLM 1 Surveyor

Tie Line N 75 - 20 E., 5087.11 m. Area 20,760 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 88 11 E 64.40 m. -2.04 64.37
2-3 S 32 29 E 205.15 m. -173.05 110.18
3-4 N 80 12 W 185.38 m. 31.55 -182.67
4-5 N 69 45 W 30.00 m. 10.38 -28.15
5-6 N 15 15 E 138.03 m. 133.17 36.31

175.10 210.86
-175.09 -210.82
0.01 0.04

Description of corners
As per cadastral map/plan
Purpose: For LRA reference
SKETCH

not drawn to scale

Requested by: HONEYLENE C. LETADA Researched by: MARLON V. MORANO Date:


Date Requested: April 22, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656383 Date April 28, 2016

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls Cad 1038-D Case Lot No. 1017 Public Land Applicant No.
Location Brgy. V (Pob.), Daet, Cam. Norte P.L. Applicant
CM 14-07' N. 122-57' E. Sec. 4-A Orig. Isolated Survey
Cad. Survey Claimant Dionisio Resurrecion Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Feb. 11-Feb 22, 1991 Isolated Survey Claimant
Date Approved Nov. 25, 1995 Subdivision Surve
Chief of Party/Surveyor Pastor Q. Floresca Jr. Assigned Cad/Pls Lot No.
Covered by Old Survey Psu-225765 Date Surveyed
Date Spproved
Tie Point from BLLM 1 Surveyor

Tie Line N 17 - 21 E., 1065.29 m. Area 833 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 88 58 E 4.47 m. 0.08 4.47
2-3 S 14 0 W 28.34 m. -27.50 -6.86
3-4 N 80 5 W 9.47 m. 1.63 -9.33
4-5 N 80 11 W 12.32 m. 2.10 -12.14
5-6 N 80 9 W 13.38 m. 2.29 -13.18
6-7 N 14 16 E 3.00 m. 2.91 0.74
7-8 N 14 20 E 14.10 m. 13.66 3.49
8-9 N 14 2 E 1.86 m. 1.80 0.45
9-1 N 84 39 E 32.50 m. 3.03 32.36

27.50 41.51
-27.50 -41.51
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For LRA reference
SKETCH

not drawn to scale

Requested by: HONEYLENE C. LETADA Researched by: MARLON V. MORANO Date:


Date Requested: April 22, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656383 Date April 28, 2016

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 239 Case Lot No. 8908 Public Land Applicant No.
Location Oma-Oma, Ligao, Albay P.L. Applicant
CM 13-12 N. 123-31 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant JESUS G. BALANA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed 11/26-11/31 Isolated Survey Claimant JESUS G. BALANA
Date Approved March 31, 1932 Subdivision Surve Csd-05-020351
Chief of Party/Surveyor Assigned Cad/Pls Lot No. 8908-A
Covered by Old Survey Date Surveyed 26-Aug-15
Date Spproved
### 19-Apr-16
Tie Point from BLLM No. 15 Surveyor ALAN G. MATA

Tie Line S 21 - 50 W., 737.44 m. Area 21,772 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 67 35 E 17.20 m. 6.56 15.90
2-3 N 62 23 W 28.27 m. 13.10 -25.05
3-4 N 72 28 W 25.82 m. 7.78 -24.62
4-5 N 60 01 W 10.67 m. 5.33 -9.24
5-6 S 64 29 W 13.81 m. -5.94 -12.46
6-7 N 81 42 W 12.42 m. 1.79 -12.29
7-8 S 89 38 W 9.98 m. -0.06 -9.98
8-9 S 77 49 W 8.24 m. -1.74 -8.05
9 - 10 S 64 28 W 9.30 m. -4.01 -8.39
10 - 11 S 57 03 W 14.00 m. -7.61 -11.75
11 - 12 S 50 33 W 20.27 m. -12.88 -15.65
12 - 13 S 49 47 W 12.03 m. -7.77 -9.19
13 - 14 S 61 43 W 9.63 m. -4.56 -8.48
14 - 15 S 67 29 W 23.29 m. -8.92 -21.51
15 - 16 S 72 36 W 11.63 m. -3.48 -11.10
16 - 17 S 72 21 W 6.60 m. -2.00 -6.29
17 - 18 S 68 54 W 26.44 m. -9.52 -24.67

Description of corners
As per cadastral map/plan
Purpose: For issuance of free PATENT
SKETCH

not drawn to scale


not drawn to scale

Requested by: JESUS G. BALANA Researched by: MARLON V. MORANO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
CONT.
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 239 Case Lot No. 8908 Public Land Applicant No.
Location Oma-Oma, Ligao, Albay P.L. Applicant
CM 13-12 N. 123-31 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant JESUS G. BALANA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed 11/26-11/31 Isolated Survey Claimant JESUS G. BALANA
Date Approved March 31, 1932 Subdivision Surve Csd-05-020351
Chief of Party/Surveyor Assigned Cad/Pls Lot No. 8908-A
Covered by Old Survey Date Surveyed 26-Aug-15
Date Spproved
### 19-Apr-16
Tie Point from BLLM No. 15 Surveyor ALAN G. MATA

Tie Line S 21 - 50 W., 737.44 m. Area 21,772 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


18-19 S 67 03 W 9.66 m. -3.77 -8.90
19 - 20 S 58 32 W 8.70 m. -4.54 -7.42
20 - 21 S 52 41 W 31.64 m. -19.18 -25.16
21 - 22 S 48 07 W 15.39 m. -10.27 -11.46
22 - 23 S 46 18 W 22.93 m. -15.84 -16.58
23 - 24 N 00 56 E 50.17 m. 50.16 0.82
24 - 25 N 61 18 E 40.44 m. 19.42 35.47
25 - 26 N 66 58 E 53.79 m. 21.05 49.50
26 - 27 N 01 46 W 30.78 m. 30.77 -0.95
27 - 28 N 71 03 E 83.04 m. 26.97 78.54
28 - 29 N 09 32 E 85.16 m. 83.98 14.10
29 - 30 S 72 58 E 86.00 m. -25.19 82.23
30 - 21 S 62 53 E 47.03 m. -21.44 41.86
31 - 1 S 01 30 E 98.22 m. -98.19 2.57

266.91 305.09
-266.91 -305.09
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For issuance of free PATENT
SKETCH

See the drawing at the back

not drawn to scale


not drawn to scale

Requested by: JESUS G. BALANA Researched by: MARLON V. MORANO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 239 Case Lot No. 8908 Public Land Applicant No.
Location Oma-Oma, Ligao, Albay P.L. Applicant
CM 13-12 N. 123-31 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant JESUS G. BALANA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed 11/26-11/31 Isolated Survey Claimant JESUS G. BALANA
Date Approved March 31, 1932 Subdivision Surve Csd-05-020351
Chief of Party/Surveyor Assigned Cad/Pls Lot No. 8908-B
Covered by Old Survey Date Surveyed 26-Aug-15
Date Spproved
### 19-Apr-16
Tie Point from BLLM No. 15 Surveyor ALAN G. MATA

Tie Line S 36 - 33 W., 971.56 m. Area 32,747 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 46 18 E 28.77 m. 19.88 20.79
2-3 N 48 07 E 15.14 m. 10.11 11.27
3-4 N 52 41 E 30.93 m. 18.74 24.59
4-5 N 58 32 E 7.99 m. 4.17 6.82
5-6 N 67 03 E 9.15 m. 3.57 8.43
6-7 N 68 54 E 26.19 m. 9.42 24.43
7-8 N 72 21 E 5.68 m. 1.72 5.41
8-9 N 72 36 E 12.55 m. 3.75 11.98
9 - 10 N 67 29 E 23.84 m. 9.13 22.02
10 - 11 N 61 43 E 10.62 m. 5.03 9.35
11 - 12 N 49 47 E 12.40 m. 8.01 9.47
12 - 13 S 10 27 E 158.32 m. -155.69 28.72
13 - 14 S 33 34 W 51.52 m. -42.93 -28.49
14 - 15 S 59 15 W 110.99 m. -56.75 -95.40
15 - 16 N 37 28 W 18.03 m. 14.31 -10.97
16 - 17 N 00 26 E 47.17 m. 47.17 0.36
17 - 18 N 86 40 W 2.75 m. 0.16 -2.75
18 - 18 S 07 20 W 46.34 m. -45.96 -5.91
19 - 18 N 84 13 W 50.24 m. 5.06 -49.98
20 - 18 N 05 54 E 87.40 m. 86.94 8.98
21 - 18 N 00 56 E 54.17 m. 54.16 0.88

301.33 193.50
-301.33 -193.50
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For issuance of free PATENT
SKETCH

See the drawing at the back


See the drawing at the back

not drawn to scale

Requested by: JESUS G. BALANA Researched by: MARLON V. MORANO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 239 Case Lot No. 8908 Public Land Applicant No.
Location Oma-Oma, Ligao, Albay P.L. Applicant
CM 13-12 N. 123-31 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant JESUS G. BALANA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed 11/26-11/31 Isolated Survey Claimant JESUS G. BALANA
Date Approved March 31, 1932 Subdivision Surve Csd-05-020351
Chief of Party/Surveyor Assigned Cad/Pls Lot No. 8908-D
Covered by Old Survey Date Surveyed 26-Aug-15
Date Spproved
### 19-Apr-16
Tie Point from BLLM No. 15 Surveyor ALAN G. MATA

Tie Line S 23 - 11 W., 743.47 m. Area 31,321 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 67 35 E 20.07 m. -7.65 18.55
2-3 S 01 30 E 22.20 m. -22.19 0.58
3-4 S 54 36 E 37.28 m. -21.60 30.39
4-5 S 25 23 W 28.59 m. -25.83 -12.26
5-6 S 25 01 W 95.03 m. -86.11 -40.18
6-7 S 13 26 E 101.25 m. -98.48 23.52
7-8 N 66 29 W 48.69 m. 19.43 -44.64
8-9 N 63 04 W 39.73 m. 18.00 -35.42
9 - 10 N 30 14 W 25.98 m. 22.45 -13.08
10 - 11 N 35 08 W 52.28 m. 42.76 -30.09
11 - 12 N 10 27 W 158.32 m. 155.69 -28.72
12 - 13 N 50 33 E 20.19 m. 12.83 15.59
13 - 14 N 57 03 E 18.53 m. 10.08 15.55
14 - 15 N 77 49 E 9.92 m. 2.09 9.70
15 - 16 N 89 38 E 8.91 m. 0.06 8.91
16 - 17 S 81 42 E 13.77 m. -1.99 13.63
17 - 18 N 64 29 E 12.48 m. 5.38 11.26
18 - 18 S 60 01 E 8.17 m. -4.08 7.08
19 - 18 S 72 28 E 25.90 m. -7.80 24.70
20 - 18 S 62 23 E 28.13 m. -13.04 24.93

288.77 204.39
-288.77 -204.39
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For issuance of free PATENT
SKETCH

See the drawing at the back

not drawn to scale

Requested by: JESUS G. BALANA Researched by: MARLON V. MORANO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:


MA. FENIA V. BAHILLO JOSIE A. COLUMNA
Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 56 Case 4 Lot No. 7190 Public Land Applicant No.


Location Legazpi, Albay P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant CRESENCIANA ESQUIVEL Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant
Date Approved Subdivision Surve
Chief of Party/Surveyor Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Spproved
###
Tie Point from BBM No. 22 Surveyor

Tie Line N 82 - 03 E., 336.26 m. Area 17,565 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 66 52 E 50.24 m. -19.74 46.21
2-3 S 37 37 W 15.86 m. -12.56 -9.68
3-4 S 66 43 E 130.60 m. -51.62 119.96
4-5 S 12 11 W 28.61 m. -27.97 -6.03
5-6 S 83 06 E 64.42 m. -7.74 63.95
6-7 S 28 14 W 50.62 m. -44.59 -23.94
7-8 S 86 09 E 8.03 m. -0.54 8.01
8-9 S 19 39 W 18.22 m. -17.16 -6.13
9 - 10 N 73 19 W 32.27 m. 9.26 -30.91
10 - 11 N 38 15 W 17.08 m. 13.41 -10.57
11 - 12 S 83 49 W 19.10 m. -2.06 -18.99
12 - 13 S 15 46 W 15.72 m. -15.13 -4.27
13 - 14 N 83 12 W 12.92 m. 1.53 -12.83
14 - 15 N 73 37 W 33.23 m. 9.37 -31.88
15 - 16 N 50 55 W 16.72 m. 10.54 -12.98
16 - 17 N 17 23 W 72.45 m. 69.14 -21.65
17 - 18 N 83 08 W 68.32 m. 8.17 -67.83
18 - 18 N 12 10 W 14.37 m. 14.05 -3.03
19 - 1 N 19 33 E 67.52 m. 63.64 22.59

199.11 260.72
-199.11 -260.72
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For LRA reference
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: CRESENCIANA ESQUIVEL Researched by: MARLON V. MORANO Date:


Date Requested: May 3, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656475 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls Case Lot No. Public Land Applicant No.


Location Villazar, Sipocot, Camarines Sur P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant PUBLIA AGRAVANTE
Date Approved Subdivision Survey Lot-1,Psu-109159
Chief of Party/Surveyor Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed July 26-27, 1939
Date Approved
### May 22, 1940
Tie Point from BLLM No. 1 Surveyor Rafael Tayag

Tie Line N 12 - 25 E., 11,975.14 m. Area 188,608 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 01 26 W 55.66 m. -55.65 -1.40
2-3 S 68 12 W 84.50 m. -31.38 -78.47
3-4 S 28 09 W 37.10 m. -32.71 17.49
4-5 S 36 38 E 122.32 m. -98.16 -72.99
5-6 S 58 06 W 49.75 m. -26.29 -42.24
6-7 S 76 46 W 46.98 m. -10.75 -45.73
7-8 S 89 29 W 213.70 m. -1.93 -213.69
8-9 N 41 45 W 141.36 m. 105.46 -94.13
9 - 10 N 40 46 W 185.30 m. 140.34 -121.00
10 - 11 N 65 03 W 187.68 m. 79.17 -170.15
11 - 12 N 34 27 W 59.92 m. 49.41 -33.89
12 - 13 N 85 21 E 109.14 m. 8.85 108.79
13 - 14 S 79 07 E 248.00 m. -46.82 243.55
14 - 15 S 88 52 E 246.77 m. -4.88 246.73
15 - 16 S 88 53 E 246.76 m. -4.81 246.72
16 - 1 S 08 28 E 70.61 m. -69.85 10.41

383.23 873.69
-383.23 -873.69
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: FILBERT E. BACCAY Researched by: MARLON V. MORANO Date:


Date Requested: April 8, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls Case Lot No. Public Land Applicant No.


Location Villazar, Sipocot, Camarines Sur P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant PUBLIA AGRAVANTE
Date Approved Subdivision Survey Lot-2,Psu-109159
Chief of Party/Surveyor Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed July 26-27, 1939
Date Approved
### May 22, 1940
Tie Point from BLLM No. 1 Surveyor Rafael Tayag

Tie Line N 12 - 30 E., 12,118.61 m. Area 44,384 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 04 09 W 18.76 m. -18.70 -1.36
2-3 S 38 24 E 63.93 m. -49.40 39.41
3-4 N 88 53 W 246.76 m. 4.81 -246.71
4-5 N 88 52 W 246.77 m. 4.88 -246.72
5-6 N 79 07 W 248.00 m. 46.82 -243.54
6-7 N 54 55 E 56.53 m. 32.49 45.91
7-8 S 87 41 E 276.24 m. -11.17 276.01
8-9 S 88 39 E 132.61 m. -3.09 132.57
9-1 S 88 26 E 244.52 m. -6.64 244.43

89.00 738.33
-89.00 -738.33
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: FILBERT E. BACCAY Researched by: MARLON V. MORANO Date:


Date Requested: April 8, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 780 Case Lot No. Public Land Applicant No.


Location San Antonio, Milaor, Camarines Sur P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Identical/Equiv. Cad/Pls Lot No. 64
DON SUSANO
Date Surveyed Isolated Survey Claimant RUDRIGUEZ ET.AL

Date Approved Subdivision Survey Bsd-05-001685 (OLT)


Chief of Party/Surveyor Assigned Cad/Pls Lot No. 64-76
Covered by Old Survey Date Surveyed Aug. 1-31, 1987
Date Approved
### Aug. 24, 1989
Tie Point from Surveyor V.D. BATOON

Tie Line N 84 - 50 E., 7,002.00 m. Area 10,419 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 83 31 W 59.41 m. -6.71 -59.03
2-3 S 72 04 W 58.47 m. -18.00 -55.63
3-4 S 11 27 W 6.55 m. -6.42 -1.30
4-5 S 58 34 W 43.35 m. -22.61 -36.99
5-6 N 31 44 W 34.54 m. 29.38 -18.17
6-7 N 09 17 W 22.86 m. 22.56 -3.69
7-8 N 63 48 E 41.83 m. 18.47 37.53
8-9 N 58 51 E 94.64 m. 48.96 80.99
9 - 10 S 55 51 E 58.95 m. -33.09 48.79
10 - 11 S 69 59 E 22.61 m. -7.74 21.24
11 - 12 S 39 24 E 40.91 m. -31.61 25.97
12 - 1 N 80 15 W 40.30 m. 6.82 -39.72

126.19 214.52
-126.18 -214.53
0.01 -0.01

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

not drawn to scale

Requested by: ENGR. ANGEL T. PORMALEJO Researched by: MARLON V. MORANO Date:
Date Requested: April 27, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1656473 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 769-D Case 13 Lot No. 4008 Public Land Applicant No.
Location Caramoan, Camarines Sur P.L. Applicant
CM 13-46 N. 123-50 E. Sec. 3 Orig. Isolated Survey
Cad. Survey Claimant ANDRES ABLES Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant
Date Approved May 7, 1985 Subdivision Survey
Chief of Party/Surveyor CEASAR Q. DEL MORO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line N 83 - 53 W. 2,112.91 m. Area 14,086 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 46 58 E 28.06 m. -19.15 20.51
2-3 S 84 34 E 33.09 m. -3.13 32.94
3-4 S 65 59 E 33.60 m. -13.68 30.68
4-5 S 24 54 E 53.69 m. -48.70 22.61
5-6 S 64 09 W 39.24 m. -17.11 -35.31
6-7 S 11 13 W 21.04 m. -20.64 -4.09
7-8 S 80 26 W 46.31 m. -7.70 -45.67
8-9 S 47 08 W 11.60 m. -7.89 -8.50
9-1 S 80 59 W 22.53 m. -3.53 -22.25
10 - 11 S 73 33 W 56.77 m. -16.08 -54.45
11 - 12 N 01 40 W 47.30 m. 47.28 -1.38
12 - 13 N 59 39 W 32.32 m. 16.33 27.89
13 - 14 N 28 28 W 46.31 m. 40.71 22.07
14 - 1 N 15 40 W 55.35 m. 53.29 14.95

157.61 171.65
-157.61 -171.65
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

not drawn to scale

Requested by: MARILYN ABARCA Researched by: MARLON V. MORANO Date:


Date Requested: May 13, 2016 Verified by: Date:
Research/Preparation Fee: 60.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676640 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 769-D Case 13 Lot No. 4166 Public Land Applicant No.
Location Caramoan, Camarines Sur P.L. Applicant
CM 13-46 N. 123-50 E. Sec. 1 Orig. Isolated Survey
Cad. Survey Claimant ANDRES ABLES Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant
Date Approved May 7, 1985 Subdivision Survey
Chief of Party/Surveyor CEASAR Q. DEL MORO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line N 84 - 45 W. 2231.05 m. Area 20,415 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 80 01 W 50.65 m. 8.78 -49.88
2-3 N 70 04 W 35.93 m. 12.25 -33.78
3-4 N 34 11 W 90.85 m. 75.16 -51.04
4-5 N 22 15 E 97.72 m. 90.44 37.00
5-6 S 83 57 E 33.61 m. -3.54 33.42
6-7 S 51 11 E 93.01 m. -58.30 72.47
7-8 S 46 33 E 53.96 m. -37.11 39.17
8-9 S 39 21 W 55.04 m. -42.56 -34.90
9-1 S 15 27 W 46.81 m. -45.12 -12.47

186.63 182.06
-186.63 -182.07
0.00 -0.01

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

not drawn to scale

Requested by: MARILYN ABARCA Researched by: MARLON V. MORANO Date:


Date Requested: May 13, 2016 Verified by: Date:
Research/Preparation Fee: 60.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676640 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 769-D Case 12 Lot No. 2070 Public Land Applicant No.
Location Caramoan, Camarines Sur P.L. Applicant
CM 13-46 N. 123-51 E. Sec. 1-A Orig. Isolated Survey
Cad. Survey Claimant No Claimant Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Feb. 16, 1984 Isolated Survey Claimant
Date Approved Dec. 19, 1984 Subdivision Survey
Chief of Party/Surveyor CESAR Q. DEL MORO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line S 56 - 58 W. 1,377.40 m. Area 5,431 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 73 36 E 53.88 m. -15.21 51.69
2-3 S 01 41 W 74.26 m. -74.23 -2.18
3-4 N 86 26 W 35.77 m. 2.23 -35.70
4-5 N 57 40 W 18.92 m. 10.12 -15.99
5-6 S 39 48 W 15.67 m. -12.04 -10.03
6-7 N 65 54 W 22.10 m. 9.02 -20.17
7-8 N 22 01 E 86.41 m. 80.11 32.39

101.48 84.08
-101.48 -84.07
0.00 0.01

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

not drawn to scale

Requested by: MARILYN ABARCA Researched by: MARLON V. MORANO Date:


Date Requested: May 13, 2016 Verified by: Date:
Research/Preparation Fee: 60.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676640 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 737-D Case 3 Lot No. 2004 Public Land Applicant No.
Location San Fernando Camarines Sur P.L. Applicant
CM 13-32 N. 123-07 E. Sec. 1 Orig. Isolated Survey
Cad. Survey Claimant CEFERINO BALANGOSO Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Aug. 27, 1960 Isolated Survey Claimant
Date Approved Oct. 29, 1965 Subdivision Survey
Chief of Party/Surveyor Certeza Survey Inc. Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line S 53 - 55 W. 3,321.52 m. Area 15,267 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 33 46 W 45.42 m. 37.76 -25.24
2-3 N 04 26 E 29.20 m. 29.11 2.26
3-4 N 68 57 W 13.31 m. 4.78 -12.42
4-5 N 52 37 W 29.37 m. 17.83 -23.34
5-6 N 37 37 E 58.42 m. 46.28 35.66
6-7 S 81 01 E 72.46 m. -11.31 71.57
7-8 N 53 45 E 34.60 m. 20.46 27.90
8-9 S 60 29 E 64.22 m. -31.64 55.89
9 - 10 S 42 40 W 152.15 m. -111.88 -103.12
10 - 1 S 87 19 W 29.17 m. -1.37 -29.14

156.22 193.28
-156.20 -193.26
0.02 0.02

Description of corners
As per cadastral map/plan
Purpose: For reference
SKETCH
SKETCH

not drawn to scale

Requested by: NENA ATACADOR Researched by: MARLON V. MORANO Date:


Date Requested: May 12, 2016 Verified by: Date:
Research/Preparation Fee: 100.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676615 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 1053-D Case 18 Lot No. 20075 Public Land Applicant No.
Location Malawag, Nabua, Camarines Sur P.L. Applicant
CM 13-22 N. 123-18 E. Sec. 3 Orig. Isolated Survey
Cad. Survey Claimant HIGINO ABITAN Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Aug. 06, 1974 Isolated Survey Claimant
Date Approved Jan. 06, 1976 Subdivision Survey
Chief of Party/Surveyor Geodesy & C C Grp Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line S 56 - 03 W. 8,103.69 m. Area 1,129 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 38 47 E 113.53 m. -88.50 71.11
2-3 S 61 01 W 9.76 m. -4.73 -8.54
3-4 N 39 11 W 112.30 m. 87.05 -70.95
4-5 N 53 36 E 10.40 m. 6.17 8.37

93.22 79.48
-93.23 -79.49
-0.01 -0.01

Description of corners
As per cadastral map/plan
Purpose: For LRA reference
SKETCH
SKETCH

not drawn to scale

Requested by: JOCELYN P. ABINAL Researched by: MARLON V. MORANO Date:


Date Requested: May 11, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676607 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 1053-D Case 6 Lot No. 7778 Public Land Applicant No.
Location La Opinion, Nabua, Cam. Sur. P.L. Applicant
CM 13-22 N. 123-21 E. Sec. 2-D Orig. Isolated Survey
Cad. Survey Claimant HIGINO ABINAL Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Jan. 01, 1974 Isolated Survey Claimant
Date Approved March 24, 1976 Subdivision Survey
Chief of Party/Surveyor Geodesy & C C Grp Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line S 18 - 25 W. 3,593.46 m. Area 610 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 57 56 W 0.98 m. 0.52 -0.83
2-3 N 31 30 E 60.53 m. 51.61 31.63
3-4 S 60 04 E 9.76 m. -4.87 8.46
4-5 S 30 46 W 59.62 m. -51.23 -30.50
5-1 N 65 39 W 9.63 m. 3.97 -8.77

56.10 40.09
-56.10 -40.10
0.00 -0.01

Description of corners
As per cadastral map/plan
Purpose: For LRA reference
SKETCH
SKETCH

not drawn to scale

Requested by: JOCELYN P. ABINAL Researched by: MARLON V. MORANO Date:


Date Requested: May 11, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676607 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 56 Case 1 Lot No. 2160 Public Land Applicant No.


Location Daraga, Albay P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant LUIS IMPERIAL et al Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Nov. 14 - April 14, 1920 Isolated Survey Claimant
Date Approved Oct. 8, 1921 Subdivision Survey
Chief of Party/Surveyor William Begg Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 2 Surveyor

Tie Line N 46 - 58 E. 41.26 m. Area 821 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 68 50 W 16.57 m. -5.98 -15.45
2-3 N 17 26 W 37.53 m. 35.81 -11.24
3-4 N 72 21 E 29.83 m. 9.04 28.43
4-5 S 17 20 E 14.00 m. -13.36 4.17
5-6 S 72 18 W 8.09 m. -2.46 -7.71
6-7 S 10 55 E 1.74 m. -1.71 0.33
7-8 S 75 28 W 3.63 m. -0.91 -3.51
8-1 S 13 42 E 21.04 m. -20.44 4.98

44.85 37.91
-44.86 -37.91
-0.01 0.00

Description of corners
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: LENI M. ALFANTA Researched by: MARLON V. MORANO Date:


Date Requested: May 23, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 1222-D Case 26 Lot No. 5174 Public Land Applicant No.
Location AGOSAIS, LAGONOY, CAM.SUR P.L. Applicant
CM 13-45 N. 123-30 E. Sec. 3 Orig. Isolated Survey
Cad. Survey Claimant UNKNOWN CLAIMANT Identical/Equiv. Cad/Pls Lot No.
Date Surveyed June 2011 - September 2011 Isolated Survey Claimant
Date Approved March 5, 2013 Subdivision Survey
Chief of Party/Surveyor JO RAYMUND O. FERNANDEZ Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 (PRS'92) Cad-1222-D Surveyor

Tie Line N 08-39 W., 2,291.54 m. Area 1,881 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 64 57 E 15.21 m. 6.44 13.78
2-3 S 75 34 E 50.41 m. -12.56 48.82
3-4 S 59 08 W 44.38 m. -22.77 -38.09
4-5 S 78 07 W 48.48 m. -9.98 -47.44
5-1 N 30 32 E 45.13 m. 38.87 22.93

45.31 85.53
-45.31 -85.53
0.00 0.00

Description of corners ALL CORNERS MARKED BY "PS" CYL. CONC. MONS. 15X40m
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: Researched by: MARLON V. MORANO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls Case Lot No. Public Land Applicant No.


Location P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from Surveyor

Tie Line Area sq. m. Bearings

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 67 59 E 259.98 m. -97.46 241.02
2-2 S 03 55 E 24.78 m. -24.72 1.69
3-2 S 05 23 E 9.05 m. -9.01 0.85
4-2 S 04 33 E 157.13 m. -156.63 12.46
5-2 N 65 42 W 127.64 m. 52.53 -116.33
6-2 N 52 18 W 52.95 m. 32.38 -41.90
7-2 N 15 30 W 133.90 m. 129.03 -35.78
8-2 N 61 15 W 33.58 m. 16.15 -29.44
9-2 N 26 47 W 64.69 m. 57.75 -29.15

Description of corners
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: Researched by: MARLON V. MORANO Date:


Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 471-D Case 7 Lot No. 15376 Public Land Applicant No.
Location Brgy. Ponso, Polangui, Albay P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant RAMON B. DELATADO Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Sept. 2010 - Dec. 2010 Isolated Survey Claimant
Date Approved Sept. 18, 2014 Subdivision Survey
Chief of Party/Surveyor JO RAYMUND O. FERNANDEZ Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from ABY-3977 Surveyor

Tie Line S 64 - 31 E., 323.86 m. Area 103 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 72 40 E 3.99 m. 1.19 3.81
2-3 S 85 29 E 8.61 m. -0.68 8.58
3-4 N 79 24 E 2.64 m. 0.49 2.59
4-5 S 15 59 E 6.72 m. -6.46 1.85
5-6 S 88 17 W 16.51 m. -0.49 -16.50
6-1 N 03 18 W 5.97 m. 5.96 -0.34

7.64 16.83
-7.63 -16.84
0.01 -0.01

Description of corners
As per cadastral map/plan
Purpose: for reference
SKETCH
SKETCH

not drawn to scale

Requested by: MARLON C. FRANCIA Researched by: MARLON V. MORANO Date:


Date Requested: May 11, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 1073-D Case 5 Lot No. 7927 Public Land Applicant No.
Location Brgy. Catioan, Capalonga, Camarines Norte P.L. Applicant
CM 14 - 19 N. 123 - 30 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant LESLIE ESTURAS vs. SELATAR GO Identical/Equiv. Cad/Pls Lot No.
Date Surveyed August 1-31, 2014 Isolated Survey Claimant
Date Approved June 15, 2015 Subdivision Survey
Chief of Party/Surveyor ROGELIO F. OLIVETE Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from CMN 3200 Capalonga Cadastre Surveyor

Tie Line N. 25 - 29 E., 51.03 m. Area 4,152 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 16 31 E 14.85 m. 14.24 4.22
2-3 N 47 30 E 2.31 1.56 1.70
3-4 N 58 46 E 50.57 26.22 43.24
4-5 S 88 49 E 9.10 -0.19 9.10
5-6 S 55 50 E 30.94 -17.38 25.60
6-7 S 12 52 W 55.90 -54.50 -12.45
7-8 N 78 53 W 13.47 2.60 -13.22
8-9 N 78 53 W 24.72 4.77 -24.26
9 - 10 N 68 43 W 4.95 1.80 -4.61
10 - 11 S 86 43 W 13.25 -0.76 -13.23
11 - 12 N 46 32 W 9.40 6.47 -6.82
12 - 13 N 44 45 W 7.96 5.65 -5.60
13 - 1 N 21 07 W 10.21 9.52 -3.68

72.83 83.86
-72.83 -83.87
0.00 -0.01

Description of corners
As per cadastral map/plan
Purpose: for issuance of Free Patent
SKETCH
SKETCH

not drawn to scale

Requested by: LESLIE ESTURAS Researched by: MARLON V. MORANO Date:


Date Requested: May 30, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676785 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 1038-D Case Lot No. 763 Public Land Applicant No.
Location P.L. Applicant
CM 14-06 N. 122-56 E. Sec. 2-B Orig. Isolated Survey
Cad. Survey Claimant FELIPE NAPOLES, JR. Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Feb. 2-Feb 11, 1991 Isolated Survey Claimant
Date Approved Nov. 22, 1995 Subdivision Survey
Chief of Party/Surveyor Engr. PASTOR Q. FLORESCA Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM no. 1 Surveyor

Tie Line N. 89 - 49 W., 581.83 m. Area 200 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 86 10 E 9.57 m. -0.64 9.55
2-3 S 00 32 W 2.18 m. -2.18 -0.02
3-4 S 00 34 W 18.00 m. -18.00 -0.18
4-1 N 88 51 W 10.02 m. 0.20 -10.02
5-1 N 01 52 E 20.63 m. 20.62 0.67

20.82 10.22
-20.82 -10.22
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: For Records and Reference purposes only
SKETCH
SKETCH

not drawn to scale

Requested by: PONCIANO M. MABEZA, JR. Researched by: MARLON V. MORANO Date:
Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 471-D Case 34 Lot No. 3964 Public Land Applicant No.
Location Brgy. Gamot, Polangui, Albay P.L. Applicant
CM 13-19 N. 123-29 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant AQUINO LYDIA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed APRIL 5-30, 2013 Isolated Survey Claimant
Date Approved DEC. 16, 2015 Subdivision Survey
Chief of Party/Surveyor ANGEL T. FORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No.1, Cad-471-D (PRS'92) Polangui, Cadastre Surveyor

Tie Line N. 19 - 30 E., 5109.516 m. Area 19,445 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 75 43 E 23.58 m. 5.82 22.85
2-3 N 74 09 E 62.06 m. 16.95 59.70
3-4 N 76 23 E 8.66 m. 2.04 8.42
4-5 N 51 37 E 31.24 m. 19.40 24.49
5-6 N 51 37 E 11.11 m. 6.90 8.71
6-7 N 33 07 W 38.50 m. 32.25 -21.03
7-8 S 81 50 E 9.49 m. -1.35 9.39
8-9 S 21 16 E 8.56 m. -7.98 3.10
9 - 10 S 32 21 E 13.17 m. -11.13 7.05
10 - 11 S 72 29 E 17.49 m. -5.26 16.68
11 - 12 N 75 09 E 23.60 m. 6.05 22.81
12 - 13 N 11 15 W 1.56 m. 1.53 -0.30
13 - 14 S 85 27 E 14.99 m. -1.19 14.94
14 - 15 S 61 21 E 13.54 m. -6.49 11.88
15 - 16 S 04 11 W 14.38 m. -14.34 -1.05
16 - 17 S 27 45 W 16.06 m. -14.21 -7.48
17 - 18 S 19 44 W 24.65 m. -23.20 -8.32
18 - 19 S 04 56 W 6.92 m. -6.89 -0.60
19 - 20 S 13 29 W 13.11 m. -12.75 -3.06
20 - 21 S 16 02 W 16.01 m. -15.39 -4.42

Description of corners
As per cadastral map/plan
Purpose: for Issuance of Free Patent
SKETCH
SKETCH

not drawn to scale

Requested by: MARICEL BENDAA Researched by: MARLON V. MORANO Date:


Date Requested: May 26, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676757 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
CONT.

TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 471-D Case 34 Lot No. 3964 Public Land Applicant No.
Location Brgy. Gamot, Polangui, Albay P.L. Applicant
CM 13-19 N. 123-29 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant NARDITO VEGA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed APRIL 5-30, 2013 Isolated Survey Claimant
Date Approved Subdivision Survey
Chief of Party/Surveyor ANGEL T. FORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No.1, Cad-471-D (PRS'92) Polangui, Cadastre Surveyor

Tie Line N. 19 - 30 E., 5109.516 m. Area 19,445 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


21 -22 S 13 04 W 38.00 m. -37.02 -8.59
22 -23 S 09 26 W 9.86 m. -9.73 -1.62
23 -24 S 15 16 W 7.35 m. -7.09 -1.94
24 -25 S 02 01 E 11.91 m. -11.90 0.42
25 -26 S 25 54 E 7.41 m. -6.67 3.24
26 -27 S 54 56 E 13.72 m. -7.88 11.23
27 -28 S 42 19 W 2.71 m. -2.00 -1.82
28 -29 N 53 20 W 5.42 m. 3.24 -4.35
29 -30 N 77 22 W 21.81 m. 4.77 -21.28
30 -31 N 77 22 W 5.86 m. 1.28 -5.72
31 -32 N 77 22 W 32.89 m. 7.19 -32.09
32 -33 N 79 19 W 69.59 m. 12.90 -68.38
33 -34 N 23 05 W 34.64 m. 31.87 -13.58
34 -1 N 20 56 W 53.87 m. 50.31 -19.25

202.5 224.91
-202.47 -224.88
0.03 0.03

Description of corners
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: MARICEL BENDAA Researched by: MARLON V. MORANO Date:


Date Requested: May 26, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676757 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 471-D Case 34 Lot No. 3965 Public Land Applicant No.
Location Brgy. Gamot, Polangui, Albay P.L. Applicant
CM 13-19 N. 123-29 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant LETECIA TULIN Identical/Equiv. Cad/Pls Lot No.
Date Surveyed APRIL 5-30, 2013 Isolated Survey Claimant
Date Approved DEC. 16, 2015 Subdivision Survey
Chief of Party/Surveyor ANGEL T. FORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No.1, Cad-471-D (PRS'92) Polangui, Cadastre Surveyor

Tie Line N. 20 - 15 E., 4,884.79 m. Area 26,249 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 57 23 W 25.45 m. 13.72 -21.44
2-3 N 57 22 W 3.93 m. 2.12 -3.31
3-4 N 40 09 W 56.23 m. 42.98 -36.26
4-5 N 39 18 W 25.63 m. 19.83 -16.23
5-6 N 42 24 W 16.94 m. 12.51 -11.42
6-7 N 61 44 E 2.85 m. 1.35 2.51
7-8 N 61 38 E 25.37 m. 12.05 22.32
8-9 N 58 12 E 5.45 m. 2.87 4.63
9 - 10 N 57 47 E 12.25 m. 6.53 10.36
10 - 11 N 41 35 E 21.20 m. 15.86 14.07
11 - 12 N 69 25 E 48.34 m. 16.99 45.25
12 - 13 S 82 54 E 12.70 m. -1.57 12.60
13 - 14 N 77 12 E 26.24 m. 5.81 25.59
14 - 15 S 79 20 E 69.59 m. -12.88 68.39
15 - 16 S 77 22 E 32.90 m. -7.19 32.10
16 - 17 S 77 22 E 5.85 m. -1.28 5.71
17 - 18 S 77 22 E 21.82 m. -4.77 21.29
18 - 19 S 53 19 E 5.42 m. -3.24 4.35
19 - 20 S 42 21 W 12.23 m. -9.04 -8.24
20 - 21 S 33 09 W 4.10 m. -3.43 -2.24

Description of corners
As per cadastral map/plan
Purpose: for Issuance of Free Patent
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: MARICEL BENDAA Researched by: MARLON V. MORANO Date:


Date Requested: May 26, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676757 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
CONT.

TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 471-D Case 34 Lot No. 3965 Public Land Applicant No.
Location Brgy. Gamot, Polangui, Albay P.L. Applicant
CM 13-19 N. 123-29 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant LETECIA TULIN Identical/Equiv. Cad/Pls Lot No.
Date Surveyed APRIL 5-30, 2013 Isolated Survey Claimant
Date Approved DEC. 16, 2015 Subdivision Survey
Chief of Party/Surveyor ANGEL T. FORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No.1, Cad-471-D (PRS'92) Polangui, Cadastre Surveyor

Tie Line N. 20 - 15 E., 4,884.79 m. Area 26,249 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


21 - 2 S 56 51 W 1.17 m. -0.64 -0.98
22 - 23 S 56 24 W 3.33 m. -1.84 -2.77
23 - 24 N 77 26 W 10.61 m. 2.31 -10.36
24 - 25 S 72 29 W 6.68 m. -2.01 -6.37
25 - 26 S 33 51 E 7.83 m. -6.50 4.36
26 - 27 S 20 50 E 15.46 m. -14.45 5.50
27 - 28 S 13 43 E 10.46 m. -10.16 2.48
28 - 29 S 06 43 E 12.75 m. -12.66 1.49
29 - 30 N 85 09 W 21.67 m. 1.83 -21.59
30 - 31 N 82 20 W 8.25 m. 1.10 -8.18
31 - 32 S 80 01 W 7.04 m. -1.22 -6.93
32 - 33 S 20 40 W 6.40 m. -5.99 -2.26
33 - 34 S 41 05 E 9.41 m. -7.09 6.18
34 - 35 S 60 49 E 13.62 m. -6.64 11.89
35 - 36 N 88 51 E 17.36 m. 0.35 17.36
36 - 37 S 66 59 W 21.74 m. -8.50 -20.01
37 - 38 S 69 51 W 8.88 m. -3.06 -8.34
38 - 39 S 61 22 W 11.75 m. -5.63 -10.31
39 - 40 S 80 37 W 5.65 m. -0.92 -5.57
40 - 41 N 56 34 W 13.37 m. 7.37 -11.16

Description of corners
As per cadastral map/plan
Purpose: for Issuance of Free Patent
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: MARICEL BENDAA Researched by: MARLON V. MORANO Date:


Date Requested: May 26, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676757 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
CONT.

TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 471-D Case 34 Lot No. 3965 Public Land Applicant No.
Location Brgy. Gamot, Polangui, Albay P.L. Applicant
CM 13-19 N. 123-29 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant LETECIA TULIN Identical/Equiv. Cad/Pls Lot No.
Date Surveyed APRIL 5-30, 2013 Isolated Survey Claimant
Date Approved DEC. 16, 2015 Subdivision Survey
Chief of Party/Surveyor ANGEL T. FORMALEJO Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No.1, Cad-471-D (PRS'92) Polangui, Cadastre Surveyor

Tie Line N. 20 - 15 E., 4,884.79 m. Area 26,249 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


41 - 42 N 59 02 W 5.25 m. 2.70 -4.50
42 - 43 S 65 43 W 3.60 m. -1.48 -3.28
43 - 44 S 02 08 W 6.17 m. -6.17 -0.23
44 - 45 S 35 25 E 7.47 m. -6.09 4.33
45 - 46 S 79 54 W 10.73 m. -1.88 -10.56
46 - 47 S 45 52 W 15.94 m. -11.10 -11.44
47 - 48 S 15 57 W 17.55 m. -16.87 -4.82
48 - 49 S 08 48 E 10.19 m. -10.07 1.56
49 - 50 S 10 13 W 4.00 m. -3.94 -0.71
50 - 51 N 86 53 W 23.92 m. 1.30 -23.88
51 - 52 N 16 50 W 7.36 m. 7.04 -2.13
52 - 53 N 37 34 E 7.99 m. 6.33 4.87
53 - 54 N 10 28 W 9.08 m. 8.93 -1.65
54 - 55 N 69 28 W 21.22 m. 7.44 -19.87
55 - 56 N 36 38 W 17.97 m. 14.42 -10.72
56 - 57 N 74 59 W 6.95 m. 1.80 -6.71
57 - 58 S 74 12 W 16.63 m. -4.53 -16.00
58 - 59 S 17 36 W 2.38 m. -2.27 -0.72
59 - 1 S 05 35 E 20.53 m. -20.43 2.00

215.54 331.19
-215.54 -331.19
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose: for Issuance of Free Patent
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: MARICEL BENDAA Researched by: MARLON V. MORANO Date:


Date Requested: May 26, 2016 Verified by: Date:
Research/Preparation Fee: 40.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676757 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 56 Case Lot No. 5327 Public Land Applicant No.


Location Bigaa, Legazpi City P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant PROCOPIO BORRAS Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Nov. 04-14, 1920 Isolated Survey Claimant
Date Approved Oct. 27, 1921 Subdivision Survey
Chief of Party/Surveyor W. MANUEL Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLBM No. 1 Surveyor

Tie Line S 07 - 42 W., 203.84 m. Area 7,258 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 10 00 W 99.25 m. -97.74 -17.23
2-3 N 68 58 W 92.31 m. 33.13 -86.16
3-4 N 28 28 E 48.28 m. 42.44 23.01
4-5 N 17 17 E 37.39 m. 35.70 11.11
5-1 S 78 57 E 70.57 m. -13.53 69.26

111.27 103.38
-111.27 -103.39
0.00 -0.01

Description of corners
As per cadastral map/plan
Purpose: for LRA
SKETCH
SKETCH

not drawn to scale

Requested by: ELENA PAMA Researched by: MARLON V. MORANO Date:


Date Requested: May 30, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676794 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 699 Case 2 Lot No. 501 Public Land Applicant No.
Location Casay, Lupi, Camarines Sur P.L. Applicant
CM 13-49 N. 122-53 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant BANGA FEDERICO Identical/Equiv. Cad/Pls Lot No.
Date Surveyed January 28, 1961 Isolated Survey Claimant
Date Approved February 22, 1974 Subdivision Survey
Chief of Party/Surveyor R. MANLOGON Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line S 38 - 57 E., 2191.54 m. Area 81,318 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 80 32 E 263.34 m. 43.31 259.75
2-3 S 44 06 E 226.54 m. -162.68 157.65
3-4 S 53 15 W 129.01 m. -77.19 -103.37
4-5 S 61 36 W 218.98 m. -104.15 -192.63
5-6 N 20 44 W 221.57 m. 207.22 -78.44
6-1 N 24 41 W 102.86 m. 93.46 -42.95

343.99 417.40
-344.02 -417.39
-0.03 0.01

Description of corners
As per cadastral map/plan
Purpose: for LRA
SKETCH
SKETCH

See the drawing at the back

not drawn to scale

Requested by: HARRY PANGANIBAN Researched by: MARLON V. MORANO Date:


Date Requested: May 31, 2016 Verified by: Date:
Research/Preparation Fee: 25.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676810 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 483-D Case 1 Lot No. 748 Public Land Applicant No.
Location 60 4 A Pob. Malilipot, Albay P.L. Applicant
CM 13-19 N. 123-44 E. Sec. 4-A Orig. Isolated Survey
Cad. Survey Claimant FORTUNATO DEL VALLE Identical/Equiv. Cad/Pls Lot No.
Date Surveyed August 14, 1973 Isolated Survey Claimant
Date Approved August 5, 1975 Subdivision Survey
Chief of Party/Surveyor Certeza Surveying CO Assigned Cad/Pls Lot No.
Covered by Old Survey Psu-246305 Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1, Cadm-483-D, Malilipot Albay Surveyor

Tie Line N. 42 - 07 E., 84.20 m. Area 1,308 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 03 59 E 30.53 m. 30.46 2.12
2-3 N 45 27 E 0.90 m. 0.63 0.64
3-4 S 85 28 E 19.46 m. -1.54 19.40
4-5 S 73 14 E 12.79 m. -3.69 12.25
5-6 S 88 17 E 10.00 m. -0.30 10.00
6-7 S 00 08 W 28.83 m. -28.83 -0.07
7-1 N 85 47 W 44.46 m. 3.27 -44.34

34.36 44.41
-34.36 -44.41
0.00 0.00

Description of corners
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: JESUS DEL VALLE Researched by: MARLON V. MORANO Date:
Date Requested: May 31, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676807 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls Case Lot No. Public Land Applicant No.


Location P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant Identical/Equiv. Cad/Pls Lot No.
Date Surveyed July 1, 1946 - Apr. 6, 1949 Isolated Survey Claimant
Date Approved June 30, 1955 Subdivision Survey
Chief of Party/Surveyor Valentin Esguerra Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BBM No 9, Pls-199 Surveyor

Tie Line N. 04 - 12 W., 967.56 m. Area sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 89 52 W 201.24 m. 0.47 -201.24
2-3 N 00 14 E 350.07 m. 350.07 1.43
3-4 S 89 25 E 190.75 m. -1.94 190.74
4-1 S 01 30 E 348.74 m. -348.62 9.13

350.54 201.30
-350.56 -201.24
-0.02 0.06

Description of corners
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: NESTOR H. AUSTRIA Researched by: MARLON V. MORANO Date:


Date Requested: May 30, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676830 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 56 Case 6 Lot No. 10357 Public Land Applicant No.


Location Brgy. Taysan, Legazpi City P.L. Applicant
CM 13-07 N. 123-44 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant TOMAS DEL MUNDO Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Nov. 1914 - April 1920 Isolated Survey Claimant
Date Approved Nov. 27, 1921 Subdivision Survey
Chief of Party/Surveyor WILLIAM BEGG Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from BLBM no. 1 Surveyor

Tie Line N. 77-03 E., 813.62 m. Area 13,738 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 88 53 E 88.85 m. 1.73 88.83
2-3 S 10 40 E 26.83 m. -26.37 4.97
3-4 S 35 15 E 56.73 m. -46.33 32.74
4-5 S 59 36 W 46.47 m. -23.52 -40.08
5-6 S 32 51 W 54.46 m. -45.75 -29.54
6-7 S 20 54 E 7.93 m. -7.41 2.83
7-8 N 27 04 W 13.80 m. 12.29 -6.28
8-9 N 53 36 W 80.47 m. 47.75 -64.77
9 - 10 N 44 56 W 40.67 m. 28.79 -28.72
10 - 11 N 37 48 E 57.33 m. 45.30 35.14
11 - 1 N 19 52 E 14.37 m. 13.51 4.88

149.37 169.39
-149.38 -169.39
-0.01 0.00

Description of corners
As per cadastral map/plan
Purpose: for reference
SKETCH
SKETCH

not drawn to scale

Requested by: JENIFER P. NAVARRO Researched by: MARLON V. MORANO Date:


Date Requested: June 2, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676858 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

MA. FENIA V. BAHILLO JOSIE A. COLUMNA


Chief, Original and Other Surveys Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 480-D Case 4 Lot No. 3570 Public Land Applicant No.
Location Bahay, Pasacao, Camarines Sur P.L. Applicant
CM 13-32 N. 123-02 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant DIEGO GAMBOA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Nov. 1-30, 2010 Isolated Survey Claimant
Date Approved March 31, 2015 Subdivision Survey
Chief of Party/Surveyor ERNESTO LIDRES Assigned Cad/Pls Lot No.
Covered by Old Survey Psu-33447 Date Surveyed
Date Approved
###
Tie Point from BLLM No. 23, Cad 480-D Pasacao Cadastre Surveyor

Tie Line N. 34 - 44 E., 238.78 Area 82,203 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 57 11 W 134.01 m. -72.63 -112.62
2-3 N 11 09 W 87.65 m. 86.00 -16.95
3-4 N 17 24 W 75.70 m. 72.24 -22.64
4-5 N 80 36 W 32.79 m. 5.36 -32.35
5-6 S 52 11 W 83.87 m. -51.42 -66.26
6-7 N 82 28 W 79.94 m. 10.48 -79.25
7-8 N 30 38 W 88.37 m. 76.04 -45.03
8-9 N 09 43 E 28.31 m. 27.90 4.78
9 - 10 N 65 13 E 26.58 m. 11.14 24.13
10 - 11 N 62 26 E 26.93 m. 12.46 23.87
11 - 12 N 64 5 E 46.83 m. 20.47 42.12
12 - 13 N 50 15 E 10.98 m. 7.02 8.44
13 -14 N 58 47 W 77.19 m. 40.01 -66.01
14 - 15 N 70 33 W 68.53 m. 22.82 -64.62
15 - 16 N 57 05 W 59.01 m. 32.07 -49.54
16 - 17 N 01 15 W 46.76 m. 46.75 -1.02
17 - 18 N 08 32 W 60.60 m. 59.93 -8.99
18 - 19 N 82 28 E 97.29 m. 12.76 96.45
19 - 20 N 70 54 E 30.80 m. 10.08 29.10
20 - 20 S 38 03 E 8.01 m. -6.31 4.94
21 - 22 S 38 04 E 335.74 m. -264.33 207.01
22 - 1 S 38 04 E 201.80 m. -158.88 124.43

553.53 565.27
-553.57 -565.28
-0.04 -0.01
Description of corners
As per cadastral map/plan
Purpose: for LRA purposes
SKETCH
SKETCH

not drawn to scale

Requested by: BENJIE B. BUAG Researched by: MARLON V. MORANO Date:


Date Requested: May 20, 2016 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 480-D Case 1 Lot No. 1310 Public Land Applicant No.
Location Brgy. San Cirilo, Pasacao, Camarines Sur P.L. Applicant
CM 13-30 N. 123-02 E. Sec. Orig. Isolated Survey
Cad. Survey Claimant ROAD Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Feb. 15 - July 20, 1978 Isolated Survey Claimant
Date Approved Oct. 16, 1978 Subdivision Survey
Chief of Party/Surveyor Julian B. Loleng, Sr. Assigned Cad/Pls Lot No.
Covered by Old Survey Psu-116527 Date Surveyed
Date Approved
###
Tie Point from BLLM No. 1 Surveyor

Tie Line S. 34 - 48 E., 329.11 m. Area 1,462 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 24 49 E 17.99 m. 16.33 7.55
2-3 N 79 20 E 89.46 m. 16.56 87.91
3-4 S 34 37 E 16.60 m. -13.66 9.43
4-1 S 79 37 W 106.64 m. -19.22 -104.89

32.89 104.89
-32.88 -104.89
0.01 0.00

Description of corners
As per cadastral map/plan
Purpose: for LRA purposes
SKETCH
SKETCH

not drawn to scale

Requested by: BENJIE B. BUAG Researched by: MARLON V. MORANO Date:


Date Requested: May 20, 2916 Verified by: Date:
Research/Preparation Fee: Checked by: MARILOU M. ABACHE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES
/BL Form 700-2A

Cad./Pls 135 Case 6 Lot No. 397 Public Land Applicant No.
Location Taloto, Camalig, Albay P.L. Applicant
CM N. E. Sec. Orig. Isolated Survey
Cad. Survey Claimant RUFO LLENA Identical/Equiv. Cad/Pls Lot No.
Date Surveyed Jan. 07, 1920 Isolated Survey Claimant
Date Approved Jan. 29, 1923 Subdivision Survey
Chief of Party/Surveyor V C Rivera Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from MBM No. 31, Camalig Surveyor

Tie Line S. 64 - 44 W., 295.53 Area 13,493 sq. m. Bearings 1

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 S 32 25 E 42.59 m. -35.95 22.83
2-3 S 16 10 W 36.63 m. -35.18 -10.20
3-4 S 08 46 E 55.96 m. -55.31 8.53
4-5 S 23 17 W 14.01 m. -12.87 -5.54
5-6 S 89 00 W 26.88 m. -0.47 -26.88
6-7 N 49 32 W 46.19 m. 29.98 -35.14
7-8 N 86 16 W 39.37 m. 2.56 -39.29
8-9 N 23 54 E 9.41 m. 8.60 3.81
9 - 10 N 02 33 E 106.40 m. 106.29 4.73
10 - 11 N 61 29 E 63.13 m. 30.14 55.47
11 - 1 S 29 51 E 43.57 m. -37.79 21.69

177.57 117.06
-177.57 -117.05
0.00 0.01

Description of corners
As per cadastral map/plan
Purpose:
SKETCH
SKETCH

not drawn to scale

Requested by: SATURNINO L. MACASINAG, JR. Researched by: MARCY FLOR E. NERY Date:
Date Requested: June 6, 2016 Verified by: Date:
Research/Preparation Fee: 20.00 Checked by: MARILOU M. ABACHE Date:
O.R. No. 1676902 Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:

OSCAR T. GUETA JOSIE A. COLUMNA


Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
TECHNICAL SERVICES

/BL Form 700-2A

Cad./Pls 531-D Case 2 Lot No. 352 Public Land Applicant No.
Location Poblacion Dist. 2, Mobo, Masbate P.L. Applicant
CM 12-20' N. 123-39' E. Sec. 4-B Orig. Isolated Survey
Cad. Survey Claimant Roger Maristela Identical/Equiv. Cad/Pls Lot No.
Date Surveyed August 17 - September 12, 1989 Isolated Survey Claimant
Date Approved November 7, 1990 Subdivision Survey
Chief of Party/Surveyor E.A.M. LOLENG II Assigned Cad/Pls Lot No.
Covered by Old Survey Date Surveyed
Date Approved
###
Tie Point from Cad 531-D, Mobo Cadastre Surveyor

Tie Line S. 66 - 04 E., 622.93 m. Area 160 sq. m. Bearings GRID

LINE BEARINGS DISTANCE LATITUDE DEPARTURE


1-2 N 16 36 W 8.58 m. 8.22 -2.45
2-3 N 65 33 E 16.82 m. 6.96 15.31
3-4 S 17 1 E 10.56 m. -10.10 3.09
4-1 S 72 20 W 16.74 m. -5.08 -15.95

15.18 18.4
-15.18 -18.4
0 0

Description of corners
As per cadastral map/plan
Purpose: for Reference
SKETCH

not drawn to scale

Requested by: CENRO - MASBATE Researched by: IRVIN PAUL S. AGUINALDO Date:
Date Requested: Verified by: Date:
Research/Preparation Fee: Checked by: IMMANUEL C. NATE Date:
O.R. No. Date

CHECKED & VERIFIED BY: CERTIFIED CORRECT:


OSCAR T. GUETA JOSIE A. COLUMNA
Chief, Aggregate Surveys and Correction Section Chief, Surveys and Mapping Division
Latitude Departure
1 5.82 22.85
2 16.95 59.70
3 2.04 8.42
4 19.40 24.49
5 6.90 8.71
6 32.25 -21.03
7 -1.35 9.39
8 -7.98 3.10
9 -11.13 7.05
10 -5.26 16.68
11 6.05 22.81
12 1.53 -0.30
13 -1.19 14.94
14 -6.49 11.88
15 -14.34 -1.05
16 -14.21 -7.48
17 -23.20 -8.32
18 -6.89 -0.60
19 -12.75 -3.06
20 -15.39 -4.42
21 -37.02 -8.59
22 -9.73 -1.62
23 -7.09 -1.94
24 -11.90 0.42
25 -6.67 3.24
26 -7.88 11.23
27 -2.00 -1.82
28 3.24 -4.35
29 4.77 -21.28
30 1.28 -5.72
31 7.19 -32.09
32 12.90 -68.38
33 31.87 -13.58
34 50.31 -19.25

202.5 224.91
-202.47 -224.88
0.03 0.03
Latitude Departure
1 -35.74 58.17
2 -2.60 5.07
3 -21.15 34.65
4 21.77 17.62
5 2.31 1.91
6 19.54 12.38
7 35.45 -53.40
8 16.07 8.42
9 -32.71 64.37
10 -11.64 22.92
11 -38.86 76.49
12 -12.80 23.11
13 -11.06 -4.24
14 -47.68 -18.27
15 -28.36 59.46
16 -7.53 -2.23
17 -87.51 -25.98
18 5.32 -30.99
19 -5.51 -16.44
20 -1.37 -10.10
21 1.00 -5.79
22 3.46 -8.04
23 14.00 -21.36
24 30.99 -67.21
25 52.05 19.72
26 36.69 13.90
27 12.29 -25.18
28 31.08 -33.02
29 -39.10 -30.70
30 40.47 -73.96
31 4.48 -4.14
32 8.27 -14.37
33 48.39 27.23
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

383.63 445.42
-383.62 -445.42
0.01 0

Latitude Departure
1 -18.48 -50.19
2 10.16 -54.03
3 -70.43 -43.76
4 -32.25 -60.27
5 4.63 -23.51
6 70.59 -136.96
7 40.18 7.40
8 82.05 21.78
9 4.23 -2.53
10 111.03 1.13
11 35.10 25.51
12 45.62 14.62
13 116.48 -13.85
14 35.57 0.68
15 24.72 9.48
16 24.97 -21.45
17 -48.33 158.42
18 4.34 16.68
19 -128.06 -19.37
20 -14.47 -3.68
21 -3.43 -39.29
22 -126.71 -25.55
23 -31.63 0.54
24 -41.54 18.83
25 -19.18 5.63
26 -8.05 50.06
27 -14.93 23.32
28 -9.43 40.73
29 16.42 33.44
30 4.61 54.00
31 -28.82 5.50
32 -34.95 6.68
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59

630.7 494.43
-630.69 -494.44
0.01 -0.01

Anda mungkin juga menyukai