Department /Project: Asset Integrity Risk Assessment by: Basharat Ali Date: 02/08/2017 Verification by: Syed Haider Raza Date: 02/08/2017
Location: Futehally Chemical Ltd Karachi Sign: Sign:
SECTION I: RISK ASSESSMENT Section II: Control Measures
Consequence (C) Likelihood (L) Residual Risk after Control Measures Responsibility
Assessed Risk Planned Actual Reason in case of
Sr. No. Activity Identified Hazard Impact Control Measures Assessed Risk= L Remarks
(L X C) Consequence ( C ) Likelihood (L) Name Target Date Completion Date Delay
xC
Descriptor Rating Descriptor Rating
Client will
provide
- Wearing harness -
Ultrasonic Thickness - Improper Scaffolding for Elevated Personal injury/Fracture Owner/Engineer proper
2 Major 4 Major 4 16 Ensure availability of appropriate working 2 1 2 Immediate
Monitoring places (abv 6 ft) /Fatality Operator scafolding
plateform.
where
required
Extensive Injuries with lost time injury > 5 days, Severe Will probably occur in most
Major 4 Likely 4 High 12-18 Immediate action Required; notify site supervisor
Environmental Spillage circumstances
Note: Working above 12 rated residual risk is not acceptable unless otherwise special precautionary measures have been
Incident that don't require serious medical treatment, May occur only in unexceptional taken.
Insignificant 1 Very Unlikely 1
Negligible Environmental Spillage circumstances
Incident that don't require serious medical treatment, May occur only in unexceptional
Insignificant 1 Very Unlikely 1
Negligible Environmental Spillage circumstances