41 31 9
Hasan Mahmood Raja, Chair- Australia is blessed with enor- It is by now well accepted that the power
man, United Gropu said an un- mous primary energy resources. sector has made a commendable progress
precedented and commendable The large continent with sparse over the last eight years. The installed
success has been achieved in population have huge reserve of power generation capacity, including
the Bangladesh power sector coal, natural gas and uranium. It 2,300 MW captive power, now stands at
especially due to opening the has huge potential for all type of 15,351 MW. Excluding the captive genera-
power generation to private renewable energy resources tion, the grid connected generation capac-
sector under an appropriate solar, wind, geothermal, ocean ity is 13,051 MW. The actual average
policy. Now transmission and waves, biogas and hydroelectric- generation however is far less than the in-
distribution segments should ity. But for negative public per- stalled capacity. The highest generation
also be opened to the private ceptions Australia cannot recorded so far was 9,479 MW on 7 June
sector, in an exclusive inter- develop nuclear power though 2017. The optimum benefit from extensive
view with EP. possessing the largest reserve... investment in increasing the generation...
Encouraged by the readers and patrons, the EP would continue bringing
out Green Pages to contribute to the countrys efforts in its journey
towards environment-friendly energy.
29 Investment in Green
Ventures Increases on
Banks' Push
The transaction was closed in the shortest time for any multi An HC division bench comprising Justice Quazi Reza-Ul
export credit agency (ECA) financed power project in Hoque and Justice Mohammad Ullah passed the order, asking
Bangladesh. Unit 3 comes less than a year after the successful BREB to pay the money to Siam Khan within the next 30 days.
closure of North-West Powers Sirajganj 225MW Unit 2 CCPP According the case documents, transmission line of BREB in
project. village Pashchim Bijari was snapped in a storm on April 5 and
The awards were handed over to Naser Ezaz Bijoy, Managing fell on land. A complaint was lodged to local office of BREB
Director and Country Head of Global Banking, Standard on the same day. But the official, who received the complaint,
Chartered Bangladesh at a grand gala event held in Hong didn't bother to register it.
Kong recently. BREB the very next day turned the power again on the
snapped line. Siam (17) accidentally came in contact with the
wire and was severely
burned. He was ad-
mitted to Burn Unit of
the Dhaka Medical
College Hospital
(DMCH), where doc-
tors were forced to
cut both of his arms to
stop infection.
I
t is by now well accepted that
the power sector has made a
commendable progress over the
last eight years. The installed
power generation capacity, includ-
ing 2,300 MW captive power, now
stands at 15,351 MW. Excluding
the captive generation, the grid
connected generation capacity is
13,051 MW. The actual average
generation however is far less than
the installed capacity. The highest
generation recorded so far was
9,479 MW on 7 June 2017. The
optimum benefit from extensive in-
vestment in increasing the genera-
tion capacity cannot be derived
due to short supply of primary fuel,
especially natural gas.
B
angladesh over the last 8 years has mission, distribution and retail services structured energy and power sector
achieved commendable success is the key in achieving success. The management.
in quadrupling power generation Australian model can be ideal to follow
to over 15,000 MW installed generation though in many ways situation and cir- Bangladesh on the other hand has over
capacity but it can hardly generate and cumstances differ. 160 million people living in a very small
supply over 8,500 MW consistently. country. It has almost the entire popula-
Australia is a huge confinement but tion of Australia living in congested cap-
There are issues with fuel supply, con-
sparsely populated. Only 23 million ital city Dhaka only. It relied almost
straints in power transmission and dis-
people live in a vast continent of 6 states exclusively on mono fuel cheap natural
tribution networks and over all sector
(5 in mainland and one isolated island) gas for power generation. But the
planning and management. In the un-
and two territories. But it is blessed with proven reserve of natural gas is fast de-
bundling and restructuring process gen-
huge natural resources. It has abundant pleting. It could not adopt appropriate
eration, transmission and distribution
reserve of coal, natural gas, uranium to policy so far for exploring and exploit-
are segmented and separated. Private
fuel power generation. It has enormous ing substantial reserve of high quality
sector is introduced alongside state
prospect of renewable power genera- coal. Now for achieving power sector
owned enterprises. But transmission and
tion -- solar, wind, ocean waves, geot- vision it has adopted a plan for major re-
distribution still remains state monopoly.
hermal. But its power generation is liance on imported fuel coal and LNG
Distribution and retail services still re-
almost exclusively dominated by coal. as well as power import from neigh-
main bundled.
Off late Australian Government is in a bouring countries. But there also it has
Bangladesh intends to achieve long dilemma whether it should replace its huge challenges as it does not have a
term energy security and ensure quality many ageing old technology using coal deep sea port for setting up fuel import
power supply to all on uninterruptible fired power plants with modern High Ef- infrastructures. The coastal areas have
basis at affordable cost. Experts believe ficiency Low Emission (HELE) power very limited scope for setting up coal
that careful privatisation and introduc- plants or go for relatively expensive re- import terminals. Moreover, fuel and
ing competitiveness in the power trans- newable energy. Australia has very well power price in domestic market is well
below economic
price requiring
manyfold adjust-
ment for absorbing
price shock from
imported fuel. But
beside all these
challenges power
transmission and
distribution is a
major challenge
where private sector
needs to be given
access like many
developed and de-
veloping countries.
Private sector will
bring investment,
create competition,
efficiency and relia-
bility if carefully in-
troduced and
Electricity workers in Brisbane regulated.
A
two-day event titled Bangladesh the session that the ministry wanted to growing economy compared with the
Power Summit - 2017 was held arrange at least five programs of this other parts of the world.
in Dhaka on July 11-12, creating kind in a year so that the investors and Member of the Sustainable and Renew-
possibilities for investment in the coun- stakeholders could meet in a platform able Energy Development Authority
trys power generation and transmission and explore more investment opportu- (SREDA) Siddique Zobair spoke on Re-
sectors. It also focused on the renewable nities. newable Energy Situation in Bangladesh
energy sector and its development. He said the ministry was also working and Opportunities where he briefly de-
Wispool Group in collaboration with to develop the local human resources. scribed the present situation and the fu-
Energy & Power magazine and ExpoNet They have a plan to train up engineers ture challenges on this sector.
Exhibition Bangladesh organized the by sending them abroad for 3-6 months Zobair informed the meeting that at
summit, where state-owned power when they could gather some theoreti- present Bangladesh was getting 433
companies, IPPs, worlds leading solu- cal and practical knowledge. MW of electricity from renewable sector
tion providers and investors from 20 He also hoped that the Excelerate En- which is only 3 percent of the total gen-
countries took part showcasing their ergy and Summit will be able to inject eration. Bangladesh set a target to gen-
products and services on the sidelines of 1,000 mmcfd of Liquefied Natural Gas erate 2000 MW by the year 2020 which
the event. (LNG) by the next year and it will miti- will be 10 percent of the total genera-
At the concluding session, State Minister gate the existing energy crisis. tion by then.
for Power, Energy and Mineral Re- He said: If we see the world situation,
Earlier, Chairman of the Institute for Pol-
sources Nasrul Hamid spoke about the this target is not difficult one to achieve,
icy, Advocacy and Governance (IPAG)
current and upcoming foreign invest- but it is really an ambitious target for
Syed Munir Khasru made a power point
ments in Bangladesh. He said Bangladesh. But we believed that it is
presentation on Energy for Peace: The
Bangladesh was changing to become a very achievable.
Unexplored Potential of South Asia. He
most potential country in south Asia for
showed that this region could become Zobair also mentioned that Bangladesh
Investment. Investors from America,
energy sufficient area by sharing its is the largest user of solar home system
Japan, China, Indonesia, Malaysia and
prospects and opportunities. in the world with around 4.5 million
Sweden were showing their interests to
invest here. Khasru emphasized on power sharing solar home systems so far installed. Most
and inter-connectivity to becoming an of those were set up in the off-grid areas,
He added that Bangladesh was also which is helping to reach another target
energy independent region. He also
working on importing another 1,000 to ensure power access to all by 2021.
mentioned that south Asia is the fastest
megawatt (MW)
He said SREDA
of electricity
was working to
from India, in
support the re-
addition to the
newable energy
present import of
sector of
650 MW. Power
Bangladesh by
giant Reliance
making policies,
Group and
offering finan-
Adani were also
cial conces-
showing their in-
sions, trying to
terests to supply
form joint ven-
some electricity.
tures (JV) and
We are looking
bringing the ex-
for more joint
pertise through
ventures (JV) in
the JV. We were
power genera-
also working for
tion and trans-
developing our
mission.
capacity to go
The junior minis- Prime Ministers Energy Adviser Dr TawfiqeElahi Chowdhury inaugurates Bangladesh Power Summit for the sustain-
ter also informed 2017 recently in Dhaka able development
President Abdul Hamid hands over the Doctor of Laws Degree to IAEA Director Gen
eral Yukiya Amano Photo: PID
Major DPDC Power Project Faces Deals with Rental Power Plants
Execution Delays Get Another Five Years Extension
Qatar Signals LNG Price War for China Firms to Carry Out
Market Share in Asia Feasibility Study on LNG Terminal
T he state-owned Coal
Power Generation Com-
pany Bangladesh Limited
Power Division said.
Matarbari power project is a
EP
The Minister of State for Power, Coal, New and Renewable Energy and Mines (Independent Charge) India , Piyush
Goyal releasing the report Pathways to Integrate 175 Gigawatts of Renewable Energy into Indias Electric Grid
National Study, in New Delhi on June 29, 2017.
A
ustralia is blessed with enormous ment for achieving emissions target.
versus emission trading versus carbon
primary energy resources. The Chief Scientist Alan Finkel has recently
tax we should ask ourselves what the
large continent with sparse pop- submitted a report of review of Aus-
policy is designed to achieve.
ulation have huge reserve of coal, natu- tralian future electricity market. His re-
ral gas and uranium. It has huge port is extensively debated in Australian Current Prime Minister Malcolm Turn-
potential for all type of renewable en- federal parliament, print, electronic and bull and his predecessor Tony Abbott
ergy resources solar, wind, geothermal, social media. Finkel report in summary are leading two schools of thought in
ocean waves, biogas and hydroelectric- sounded alarm on power generation. the debate. Australias position is really
ity. But for negative public perceptions critical following US President Donald
The report has something for everyone
Australia cannot develop nuclear power Trump announcing withdrawal from the
(loosely being yes to coal but not too
though possessing the largest reserve of Paris Agreement.
much, yes to renewables provided they
uranium. Coal remains the dominating
have gas and storage backup). Few Prime Minister Turnbull spoke of
fuel for power in Australia. Over the last
asked questions whether the report trilemma of security, affordability and
four years coal is contributing about
would bring to an end political climate emissions reduction. Australia may not
72% of fuel mix in power generation.
wars that have been waged for more need to worry about long term energy
There was significant spinning reserve than a decade in Australia. Federal Gov- security and affordability as being
in national power grid for responding to ernment power bill is expected bringing blessed with huge coal and gas re-
contingencies. But situation changed some energy reforms in the power bill. sources. The energy security and afford-
dramatically last year when ambient If approved, households stand to gain ability according to The Australian
temperature soared to all time high in hundreds of dollars in lower energy has only been compromised through
some states causing shut down of some bills. Questions are being asked government interception for delivering
large thermal power plants. States of whether renewables solar, wind and reduction in CO2 emmissions.
Victoria and South Australia are at a risk others can provide reliable power at af- The concerns of security and affordabil-
of damaging blackouts following shut
fordable cost? Whether Ultra Super Crit- ity are unreal. Tony Abbott repealed the
down of Hazelwood coal power station.
ical Technology and CCS can bring carbon tax introduced by Kevin Rudd.
Australia is a signatory of Paris Climate down emissions meeting the committed But he signed the emissions target under
Agreement. It has to honour its commit- emissions target? Paris accord and stuck with the renew-
able energy target. The daily
The Australian suggested
Tony Abbott for agreeing with
Malcolm Turnbull plan for
meeting the agreed emmis-
sions target. Whether or not
the energy policy would be
updated adopting all recom-
mendations in Alan Frankel
strategy can be discussed.
The situation is that the
largest polluters would con-
tinue expanding their emis-
sions over the next 15 years
and US has also withdrawn.
Australia does not contribute
that much compared to USA
and China. The newspaper in
editorial asked questions
Hazelwood coal power plant, Australia
whether it will be appropriate
Question: How important is staff train- also the training of regulatory body or
ing in the NPP safety management sys- operating organization staff, if needed.
tem?
Question: How many people have been
Sergei Liashchenko: Nuclear energy is trained in Russia?
one of the industries using potentially
Sergei Liashchenko: Russia has huge ex-
hazardous technologies. Respectively,
perience in NPP staff training, including
safety and reliability requirements are
foreign staff. The figures speak for them-
higher. Staff training is one of the key
selves: the number of experts who have
tasks of ensuring NPP safety.
been trained in the NPP staff training Sergei Liashchenko
Question: The Russian nuclear tech- system is over 60 thousand with more
nologies are considered to be among than 5 thousand from all over the world, sioning works and starts immediately
the safest nuclear technologies in the including 1,071 from Bulgaria, 143 after the contract is signed for the con-
world. What role does staff training play from Germany, 952 from Czech Repub- struction of an NPP.
in this process?" lic and Slovakia, 869 from Hungary, At stage 1, the Customer and our com-
707 from Cuba, 155 from Finland, pany determine the positions for which
Sergei Liashchenko: Providing the NPP
1,042 from Iran, 323 from the PRC, and training is needed. Then those positions
with qualified staff is an extremely, if not
135 from India. are singled out the training for which
the most significant aspect of safe oper-
ation. Therefore, special attention is The approximate number of staff that is would be held in Russia. After that, the
paid to staff training. When offering nu- going to be trained for the Bangladesh groups are formed."
clear technologies, Russia implements a NPP is 1,712 people." Question: What should the beginner
comprehensive approach. The inte- countries do, the ones where there are
Question: How does the staff training
grated offer of the ROSATOM State no university courses in nuclear special-
process go?
Atomic Energy Corporation includes not ities or they have been started only re-
only the design and construction of the Sergei Liashchenko: Staff training is a cently?
plant, supply of the equipment and fuel, long, demanding and labour-intensive
Sergei Liashchenko: The candidate's
and training of NPP operating staff, but process. It precedes the pre-commis-
level of education is indeed taken into
account when making a choice.
Each speciality has the minimum
level of education required. When
there are no specialized educa-
tional institutions in the country,
one can be educated in Russia.
For the last three years, Russia has
been annually inviting 15 thou-
sand foreign citizens to receive
higher education free of charge.
More than 400 Russian universi-
ties participate in this process.
In MEPhI alone (National Re-
search Nuclear University
"Moscow Engineering Physics In-
stitute") over 800 people from
about 40 countries are study-
ing nuclear specialities, in-
Foreign students during a practical class cluding around 40 people from
T
he eye-opining AFP news from Oslo,
Norway about the ferrying passen-
ger and cargo across the North sea
was published by a local English daily on
May 11th. Unfortunately and very sadly
there was no reaction on this critical fuel
saving simple idea, either by our IWTA au-
thorities or the ministry responsible for in-
land water transport over the last two
months. Adopting this simple and very
cost effective and environmentally clean
transport idea, for us in Bangladesh could
well usher a new era, for providing pollu-
tion and smoke free motive power for
small coastal self propelled marine ves-
sels, and possibly all of our river crossing
ferries that hauls cars, buses and trucks
Ampere Worlds First AllElectric BatteryPowered Ferry
across many rivers in Bangladesh; that
have no bridges; but roads are there on public and private power plants running sume more fuel at these low load periods.
both banks of the river; and vehicles are well below their minimum load - and thus
ferried across. having higher specific fuel consumption - Norway has set the idea to a reality; based
Imagine having a battery operated, smoke because of low loads. This could well be on their experiments with battery operated
and pollution free self propelled coastal a nationally cost effective solution and cut shallow draft coasters on their shores, and
vessels and river crossing vehicle ferries. down on our overall consumption of im- many car ferries across their fjords, all over
Today, all our rivers crossing barges and ported diesel fuel for running these barges the coastal areas of Norway. We could
ferries, are usually propelled by diesel en- or river plying cargo boats. The charging easily adopt this idea for our coastal area
gines -- that are in service across many of batteries could lead to quite economic water transport vessels and the many fer-
river crossings and small coastal cargo - reducing overall operating costs, cutting ries that are crossings many rivers all
boats -- all across Bangladesh. If these ves- down all consumption of imported diesel across Bangladesh.
sels were powered by batteries charged at fuel, engine oil and lubricants for the large The authorities of IWTA and R&H, who
night, when electric power demand is at diesel engines (the prime movers); that we are custodian of coastal trade and river
its lowest; with many generators of both now consume nationally for these ferries crossings should go ahead with top prior-
ity to implement this proposal at the earli-
est to contain our increasing dependence
on imported liquid fuel for these works
now. I will implore the Hon. Prime Minis-
ter in overall national interest to ensure
that this matter is implemented at the
soonest; more so; as no high technology is
involved; and our ship and dock yards can
easily do this modification work. This mat-
ter will curtail the import of diesel fuel na-
tionally, by eliminating the need of diesel
engines for coastal vessels and river cross-
ing ferry's and powered barges; all across
Bangladesh.
EP
Engr. S. A. Mansoor;
Sun21 the first solar power boat across the Atlantic Ocean in 2007 Energy Expert
T he 48 Least Developed
Countries (LDCs) an-
nounced a major new South-
national Conference on
Community Based Adapta-
tion by the Chair of the LDC
cles powered by alternative
fuels (including CNG, LNG
tiative.
By 2020 UPS plans that one
and biomethane) to its fleet in four new vehicles pur-
South initiative on Group Gebru Jember from while increasing its reliance chased annually will be an
knowledge sharing and ca- Ethiopia. on renewable energy alternative fuel or advanced
pacity development to tackle The Secretariat of LUCCC is sources. technology vehicle, up from
climate change, said a press headquartered at the Interna- The goals, available in the 16% in 2016. The company
release. tional Centre for Climate companys 2016 Corporate also set a new goal that by
The LDCs Universities Con- Change and Development (IC- Sustainability Report, support 2025, 40% of all ground fuel
sortium for Climate Change CCAD) at the Independent Uni- UPSs commitment to reduce will be from sources other
(LUCCC) was launched in versity, Bangladesh. Dr its absolute greenhouse gas than conventional gasoline
Kampala, Uganda recently at Saleemul Huq, director of ICC- (GHG) emissions from global and diesel, an increase from
the opening of the 11th Inter- CAD, spoke at the event. EP ground operations 12% by 19.6% in 2016. EP
Power Transmission,
Distribution Should be Opened
to Private Sector
A
n unprecedented and commend- speedy power generation and fuel sup-
able success has been achieved ply. It would not be necessary if the gov-
in the Bangladesh power sector ernment could achieve all out success
especially due to opening the power in its power system mega plan.
generation to private sector under an Let us give some examples. A power
appropriate policy. Starting with the for- transmission tower was collapsed by
eign private sector, almost the entire pri- Nor-westerly cyclone. It was told that it
vate sector generation is now managed cannot be repaired in less than three to
by local private sector. Now transmis- four months. Why? The government
sion and distribution segments should Hasan Mahmood Raja
must investigate whether any conspir-
also be opened to the private sector if acy or vested interest was behind this.
the government intends to achieve un-
interrupted supply of quality power to There could be 20% generation margin
all citizens within the next four to five by now if plans were appropriately im-
years. plemented. I think for a sustainable so-
lution of this crisis,the Prime Minister
Hasan Mahmood Raja, Chairman, The matter is advancing in a very un
should take initiatives for finalizing planned manner at this stage. One
United Group, said this in an exclusive plans and implementation strategy upon
interview with Energy & Power Editor after another, unsolicited proposals
discussions with the stakeholders. Oth- are coming for LNG import and sell
Mollah Amzad Hossain. He said that erwise, such crisis will continue hap-
BPDB had to account for a huge ing, and the government is accepting
pening in future too. those. These may not bring any
amount of financial loss due to going for
EP: Why power sector could not be- happy news in the future. The gov
dual-fuel power generation system. He
come efficient? Lot of time has already ernment must have a proper policy
suggested not to going for any dual-fuel
elapsed. Are there flaws in the planning? for LNG import.
generation plant in future.
Following is the excerpts: HMR: Look no country can achieve sus-
tainable success in anything without
EP: The government received a lot of ac- long term planning and continuity in
colades for its success in the power sec- implementation. Bangladesh so far
tor. But it also embraced a lot of gets costlier for inefficiency of BPDB
failed to achieve continuity in imple-
criticism for diabolic power system fi- and its companies. What are your ob-
mentation. Power sector is not an iso-
asco in the early parts of this summer. servations?
lated island. It lacks proper planning for
How do you look at it? creating a solid foundation. HMR: There must be a thorough audit-
HMR: There is no scope at all to under- EP: Tariff structure has been adjusted ing system for assessing whether BPDB
mine the success of the government in over the past eight years. What are your generation costs are appropriate or not.
the power sector. People pin greater ex- views? But the decision for dual-fuel power
pectations on those who can do it. From generation and continuation of the pro-
that consideration, I feel the government HMR: Power sector in Bangladesh had gram would increase average genera-
should have adopted a well-coordi- huge subsidy. Tariff has been adjusted tion cost. I think besides enhancing
nated long-term sustainable work pro- despite significant political risks. But efficiency through avoiding wastages in
gram. The plan could be finalized subsidy is essential for supplying power BPDB generation, arrangement must be
through extensive discussion with rele- at affordable price to lower income ensured for purchasing power from IPPs
vant stakeholders. The government fail- group. That money can be recovered at competitive price. On top of these,
ures in mid and long term power through cross subsidy. Meaning that power retailing opportunities may be
generation plans, despite success in higher tariff needs to be introduced for created keeping a 10% margin over av-
short term contingency plan, must be the affluent citizens. BERC is endeav- erage generation cost of BPDB. Other-
objectively assessed. This failure led to ouring for it in phases. wise,the single buyer of power, PDB,
extending terms of special power act for EP: It is often alleged that power system will lose financial capability.