JOB SAFETY ANALYSIS

HAZARD & Effect Management


FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

7. CHECK BEAM PUMP ALIGNMENT


3 C C3(P) Conduct dedicated safety meeting with all crew Call trained base
members on the job planning, hazards involved and first-aiders & offer
Slippery Surfaces Tripping hazards the HSE controls to be in place. 1(P) first aid.

Hand & finger injuries High Call Client


risk Check for pinch points and discuss the Hands Off Emergency number
Rotating Equipment Other bodily injuries approach as possible. Low
(5555) / in case of
Risk
serious injury
Power supply to the well pumping unit should be
Ignition Sources properly isolated. Report the incident to
Gulf Energy Mgt &
Client.

Failure to wear proper Refer to Gulf Energy


PPE HSE Manual Ch. 8
Emergency
Response Procedure

11 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

8. RIG UP BRINE MIXING PACKAGE AND PUMPING EQUIPMENT


3 C C3(P) Conduct dedicated safety meeting with all crew Call trained base
members on the job planning, hazards involved and first-aiders & offer
Unsafe Crane Bodily injury the HSE controls to be in place. 1(P) first aid.
Operations Ensure that the mobile crane is certified (RAS
Mediu certification) and safe working load is clearly Call Client
Hand & finger injuries m risk marked on the crane. Emergency number
Ensure that the crane operator has valid ROP Low
(5555) / in case of
Working at Heights license as well as PDO Plant & Equipment permit. Risk
serious injury
Dropped loads Ensure that daily crane inspection has been
conducted and documented by the crane operator.
Report the incident to
Ensure that all loose lifting slings and shackles are
Gulf Energy Mgt &
Slippery Surfaces Fall from height certified and properly colour coded.
Ensure that all third party lifting certificates are Client.
available at site.
Tripping hazard bodily Ensure that trained banksman is available to give Refer to Gulf Energy
injuries proper signals to the crane operator. Ensure that HSE Manual Ch. 8
only one designated banksman has been assigned Emergency
for crane signaling. Response Procedure
Ensure that nobody is passing / working under
suspended load.
While working at height, ensure that fall protection
devices and correct PPE (safety harness) are in
use.
Check for all tripping hazards before starting any
job / undertaking any activity
Implement continuous supervision at site.

12 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

9. MIXING BRINE
Chemical exposure to 4 C C4(P) Conduct safety toolbox talk meeting, prior to Call trained base
employees / spillage / leakage starting the chemical transferring / mixing first-aiders & offer
Chemical hazards operation. 1(P) first aid.
This TBT should cover sequence of operation,
High individual responsibilities, HSE controls to be in Call Client
Chemical burns and ill health risk place based on operational requirements & MSDS Emergency number
Unsafe material effects / environmental sheet, emergency response procedure in case Low
(5555) / in case of
handling practices pollution chemical spillage or accidental contact etc. Risk
Ensure that all employees are wearing correct serious injury
chemical protection PPE (Rubber hand gloves, face
shield, PVC apron, PVC shoes, gas mask etc.) prior Report the incident to
to starting any brine mixing activity. Gulf Energy Mgt &
Slippery surfaces Bodily injury
Ensure that first aid kit is available. Client.
Ensure that the emergency response procedures
are posted and known Refer to Gulf Energy
Barricade the operational area and inform all crew HSE Manual Ch. 8
members regarding restrictions in place. As Emergency
applicable. Post safety signs. Response Procedure
Ensure that safety shower, eyewash station are
available at site.

13 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

10. WELL KILL PRELIMINARY JOBS


Presence of H2S Exposure to H2S might 4 C C4(P) Please refer to HSE control measures already listed Call trained base
cause unconsciousness / under Moving to location for protecting against first-aiders & offer
death H2S exposure. 1(P) first aid.
Conduct pre-job safety meeting with all crew
Hydrocarbons at High members. Discuss hazards related to pressure Call Client
surface Exposure to uncontrolled risk testing, and HSE controls to be in place such as Emergency number
release of high pressure / PPE requirements, no-go zones etc. in detail. Low
Ensure that appropriate Risk Assessment has been (5555) / in case of
struck by uncontrolled Risk
movement of hoses carried out prior to commencement of task. serious injury
Slippery surfaces The line test pressure and limits during a job should
be discussed with the client DSV before testing. Report the incident to
Do not use any damaged or faulty chicksan Gulf Energy Mgt &
Never hammer on or break any chicksan containing Client.
Pressure during pressure.
testing Never walk near or over a chicksan under pressure. Refer to Gulf Energy
HSE Manual Ch. 8
Emergency
Response Procedure
Pumping at high
pressure

14 | P a g e
JOB SAFETY ANALYSIS
HAZARD & Effect Management
FOR WORKOVER OPERATIONS
Doc.Ref:

Control Measures

Residual Risk
Consequence

Risk Rating
Probability
Identify Hazard Hazard Effect

measures
Recovery
(Potential to do (PPE / Procedure)
harm) (If hazard is released)

11. PRESSURE TEST TUBING


Pressure during uncontrolled release of 3 C C3(P) Conduct pre-job safety meeting with all crew Call trained base
testing high pressurized parts members. Discuss hazards related to pressure first-aiders & offer
movement testing, and HSE controls to be in place such as 1(P) first aid.
PPE requirements, no-go zones etc. in detail.
Exposure to uncontrolled Med Call Client
Pumping at high Ensure that appropriate Risk Assessment has been
release of high pressure / Emergency number
pressure risk carried out prior to commencement of task. Low
struck by uncontrolled (5555) / in case of
movement of hoses Risk
serious injury
The line test pressure and limits during a job should
be discussed with the client DSV before testing. Report the incident to
Gulf Energy Mgt &
Client.
Do not use any damaged or faulty chicksan
Refer to Gulf Energy
HSE Manual Ch. 8
Never hammer on or break any chicksan containing Emergency
pressure.
Response Procedure

Never walk near or over a chicksan under


pressure.or over a chicksan under pressure.