ASSET PENDING ISSUE HYPERMART 20

BULAN : Juni 2017


REGIONAL STORE NO PROBLEM

JATENG & 328 HPM Paragon Semarang 1 Exhouse Fan Kantin dan Kompresor
JATIM

2 Meter Gas merk ITRON Fish/BBQ

3 AVR utk Negatif temp

4 Water Pump merk NOCCHI (1 UNIT)

5 Filter Drier Emerson ASF - 45 F3VV ( 2 Pcs )

6 Mesin Wrapping Machine

7 AC Split 1 PK utk Ruang CCTV dan Ruang


Server UPS EDP
8 Nylon PE uk.200x15x5 (4pcs)

9 Nylon PE uk.100x15x5 (4pcs)


JATENG & 231 HPM Pekalongan 1 Auto Gate macet / mati
JATIM
2 Hand pallet truck Rusak 3 unit

3 Rollingdoor entrance Rusak

4 Sensor Gas Meat Error

5 2 Unit UPS CCTV No2 Battre rusak

6 Bulgar Alarm & Door Lock (magnetic Lock)


rusak

7 APAR ( 19 unit kosong )

8 Acces Door
JATENG & 324 Java Mall Semarang 1 alat water spraying pump merk sea horse
JATIM

2 2 unit ariston water heater kap 80 ltr ( meat


and Bakery )

3 handtrex rusak 2 unit

4 Flytop /trolly buat ambil barang gudang


rusak 2 unit

5 lampu building sign mati huruf m dan h

6 Autogate Entrance/motor rusak


7 UPS CCTV 2 unit Baterai Rusak

8 Pedestal di area kassa & karyawan

9 HT kondisi rusak Antena dan juga batre nya.

JATENG & 364 HPM Kudus 1 Plug in Trouble 2 unit


JATIM

2 heater Evap Frozen meat putus

3 pompa aquarium fish rusak

JATENG - AVR Compresor Low Rusak (tidak bisa


JATIM 540 - GRANDMALL SOLO 1 dipakai)

2 EAS/Pedestal Rusak 5 unit

3 Hitter Air panas Meat. Fish, Produce, bakery


& RTE Rusak. Dan dilelang

4 1 Hand Truck patah handle, dan bocor

JATENG - 220 - SOLO SQUARE 1 DVR CCTV mati


JATIM

2 Lensa Proyektor ada bintik-bintik putih

3 2 Hand Truck, Lolos hidrolik nya,

4 Instalasi rte dan bakery diputus saat


perubhan lay out
JATENG - 335 - SOLO HARTONO 1 1 DVR error dan juga ID Door , problem,
JATIM
JATENG - 399 YOGYA CITY MALL 1 WC PRIA RUSAK
JATIM

2 Pembuatan Gudang asset dan Galon kosong

3 Pengajuan AC Ruang Meeting

JATENG - 489 YOGYA SAPPHIRE 1 1 mesin laminating rusak motor tebakar


JATIM

2 1 Hand truck shok rusak tidak bisa turun

3 1 price check error di lorong tissue

Check poin di Gd kering,pintu M1 trouble


4 serta di area kassa saat rolling door di tutup
check poin berbunyi

5 DVR 1 UNIT MATI


JATENG - 227 HARTONO YOGYA 1 Bocor di area fresh,
JATIM
ASSET PENDING ISSUE HYPERMART 2017

PENAWARAN
ACTION PLAN NO.PP/NTMS/CPR
TANGGAL KERUSAKAN
ADA TIDAK

PP Maintenance HO dan survay lokal PP utk perbaikan 1-Jan-17

PP ke Maintenance HO PP utk perbaikan 1-Jan-17

Contact PT Sumber Citra (Garansi) PP utk perbaikan 1-Jan-17

PP via NTMS REQ 0075645 1-Jan-17

Request Form (AdhocItem) 1-Jan-17 V

PP via CPR CPR 20-Jan-17

PP via CPR CPR 9-Apr-17

PP via CPR CPR 9-May-17

PP via CPR CPR 9-May-17

Report HO/ cari supplyer CPR 1-Jan-17 V

sudah di coba perbaiki seal/ganti olie CPR 1-Jan-17 V

Ajukan CPR perbaikan/ Penggantian CPR 1-Jan-17 V

PP / Request Form (AdhocItem) 20-May-17 V

report / buat PP ke HO 1-Jan-17 V

Email dan Konfirmasi ke PT Jesselindo 2-Jan-17 V

Email dan Konfirmasi ke PT Jesselindo 1-Jan-17 V

Email dan Konfirmasi ke PT Jesselindo 1-Jan-17 V

Mengajukan CAPEX 2017 1-Jan-17 V

sudah Buat CPR 2016, Buat Lagi CPR 2017 CPR 11-May-17 V

PP via capex V

Buat CPR 2017 1-Mar-17 V

konfirmasi Kontraktor utk proses perbaikannya 21-Feb-17 V

confirmasi ke kontraktor 12-Mar-17 V


Sudah mengajukan PP Aki baru atau UPS. CPR 1-Jan-17 V

Koordinasi PT jeselindo untuk segera diperbaiki CPR 1-Jan-17 V

PP an antena dan juga batre CPR 1-Jan-17 V

maret
Pengecekan bersama teknisi Luxindo V
2017

Pengecekan bersama teknisi Luxindo 10-May-17 V

pengajuan pembelian baru 15-May-17

Pengajuan TBAT ke Toko Lain , krn sdh tidak 7 Juni


terpakai Via Fax dan E_mail 2017 V

Pengajuan Ulang Penawaran ke Jesselindo Via Phone & @mail 7 Juni V


2017

6 Juni
Pengajuan CPR CPR V
2017

20 Juni
Sudah proses perbaikan kontraktor lokal, biaya OPEX Toko V
2017
Sudah dikirim ke jesselindo, proses penawaran 7 Juni
via @mail V
harga ke HO 2017
7 Juni
PP Baru CPR, pengajuan ulang ke HRD CPR V
2017
4 Unit sdh diperbaiki , secara bergantian setiap 1 Juni
Lokal V
bulan dilokal 2017

Mencari kontraktor lokal Lokal 1-Feb-17 V

DVR dikirim ke Jesselindo . Dan Pengajuan via @mail 1Juni 2017 V


Penawaran ke Jesselindo
7 Juni
Pengajuan Budget Target Juni 2017 sdh dibeli Beli Lokal, V
2017

Perbaikan lokal dan toko, Lokal 1-Feb-16 V

5 Juni
CPR Proses CPR V
2017

Kondisi Rusak , tdk bisa diperbaiki, lelang 7 Juni V


2017
sudah dimabil Kontraktor lokal, proses 2 minggu Perbaikan Lokal 20 Juni V
selesai 2017
1 Juni
Mother board dan hardsisk rusak, harus ganti Info MIS V
2017

1 Juni
Pengajuan Ulang Penawaran ke Jesselindo Via @mail V
2017

1 Juni
harus dikirim ke Jesselindo Via @mail V
2017
Meeting mall. Progres inject dan juga cooring sebelum
Meeting mall V
oleh mall proses GO
KETERANGAN

Belum

Belum

Belum

Belum

Dikembalikan lagi karena beda


Spesifikasi dan Bentuk

Belum

Sudah Approval Reg.Manager

Belum

Belum

dikondisikan / Capex 2017

dikondisikan

dikondisikan / proses penawaran


kontraktor

dikondisikan

Dalam proses PP/ approval / masih


bisa operasional

Dalam proses PP/ approval

Dalam proses PP/ approval

Sedang menunggu proses

Sedang menunggu proses CPR

masuk capex

sudah di perbaiki rusak lagi

Sedang menunggu proses

masih menunggu realisasi dari HO


PP UPS atau Aki baru untuk UPS
tersebut.

Belum ada follow up dari Jaselindo


dan Risk Management HO

Baru Buat PP-an

prosses pengajuan penawaran

prosses pengajuan penawaran

tunggu proses BS nya

dana belum cair , handtruck belum


dikirim ke toko

rusak AS nya, sehingga harus ganti


AS
MALL PENDING ISSUE
BULAN : Juni 2017

REGIONAL STORE NO PROBLEM

JATENG & Sering Melupanya Sampit Didepan Parkir


540 GRANDMALL SOLO 1
JATIM Hypermart
2
Bocor Tetesan Air Di Atap Gudang Grocresies

JATENG & 220 SOLO SQUARE 1


JATIM
Redistribusi Beban Ac Kepada Tenant Lain.

2
Sinyal Area Office Hypermart Tidak Ada,

3
Mall Ingin Meminta Kwh Chiller Lwbp Yg Mati
Ditahun 2014, Bisa Ditagihkan
JATENG & 335 SOLO HARTONO 1
JATIM Pembuatan Tangga Di Depan Lift Barang

2 Lilft Barang 2 Unit, Untuk Lantai Dan Plat Bordes


Masih Beegelombang Belum Diganti, Serta 1 Unti
Kabel Selling Belum Diganti Kondisi Resiko Putus
JATENG & 1 Sinyal Hp Belum Stabil, ( Indosat Dan Telkomsel
JATIM 399 YOGYA CITY MALL Sangat Lemah Di Area Toko )
2
Signed Hypermart Didalam Mall Masih Kurang
JATENG & 1 Pintu Ruang Meeting Proses Finishing Cat Dan
JATIM 489 YOGYA SAPPHIRE Acian, Serta Perapihan Pintu
2 Banjir Karena Air Hujan Di Loadiang Dan Area
Xpdc
3 Signage Ke Hypermart Masih Sangat Kurang
Didalam Mall,

4 Gutter Di Area Parkir Mobil Lantai Lg Mall. Air


Menggenang, Dan Hama Nyamuk Banyak.
JATENG &
227 HARTONO YOGYA 1
JATIM Bocor Di Area Hypermart
JATENG & 328 - Paragon Semarang 1
JATIM Display Remote Fcu

2 Kwh Meter Untuk Chiller Ac Mall

Tembok Ruang Panel Dan Tembok Ruang


3 Komersial Ada Keretakan Pada Dinding.
4 Cerobong Asap Genset ( Muffler )
5
Bearing Motor Fcu No: 4
6 Parkir Mahal Per Jam Rp. 3500,-
7
Area Furniture Sering Bocor Bila Hujan
8 Plafon Atas Area Tenan Rusak(Akibat Kebocoran
Fcu)
JATENG &
JATIM 231 HPM Pekalongan 1 Bocor Pintu Ruang Training Lt 2 Komersil

2 Bocor Area Gudang Atas / Ram Parkir

3 Bocor Area Gudang Bawah / R. Panel Elektronik


Rembesan Area Seling Elektronik ( Depan Area
4 Jam )
5 Ac Area Komersil Tidak Dingin
JATENG &
JATIM 324 HPM Java Mall Semar 1 Kondisi Mall Sudah Tua Dan Kurang Fresh
2
Grouping Tenant Blocking Area Bakery

3 Kebersihan Mall Masih Kurang

4 Ac Area Depan Kassa


JATENG &
JATIM 364 HPM Kudus 1 Bocor Di Selling Area & Gudang

2 Bocor Di Atas Area Bakery


MALL PENDING ISSUE HYPERMART 2017

ACTION PLAN NO & TGL SURAT/EMAIL/FAX/ MOM TANGGAL KERUSAKAN

Info Ke Mall 20 Mei 2017 20 Mei 2017

Info Ke Mall 20 Mei 2017 20 Mei 2017

Bersurat Resmi ( Surat No. : 04/Ekt-Hpm/10/12 ;


Tgl 26 Okt 12 ). Info Lisan Reduksi Hanya Sekitar 1 Juni 2017 1 Juni 2017
2-3 %. Plan Meeting 10 Juni 2014

Meeting Dengan Mall Telkomsel Proses 01-Apr-17 01-Apr-17


Pengajuan Pemasangan Ulang

Proses Pengajuan Ke Ho, Karena Kwh Mati,


Adalah Kesalahan Mall Yg Tidak Segera
Mengganti, Sedangkan Hypermart Selalu 35/OPR-TK/SSQ/V/17 35/OPR-TK/SSQ/V/17
Menegur Dari Tahun 2014, Namun Tidak
Direspon
Sdh Ada Approve Dari Mall, Mencari Penawaran 05-Jul-16 05-Jul-16
Lokal, Dana Capex

Mall Sdh Memberikan Action Plan, Namun


Perbaikan Lantai Tidak Masuk Dalam Action Plan 20 Maret 2017 20 Maret 2017
Mereka

Meeting Dengan Mall, Masih Proses Pengajuan 01-Nov-17


01-Nov-17
Titik Tempat Sdh Diberikan Namun Sangat 01-Jun-17
Terbatas, Bukan Area Strategis, 01-Jun-17
Progres Sudah Dilakukan, Menunggu Bap 20 juni 2107
Pekerjaan Dari Mall 20 juni 2107
Sudah Di Laporkan Ke Ibu.Retnayu Mall 30 Mei 2107
30 Mei 2107
Sudah Di Laporkan Ke Ibu.Retnayu Mall 30 Mei 2107
30 Mei 2107

Sudah Di Laporkan Ke Ibu.Retnayu 30 Mei 2107


30 Mei 2107
Lapor Pihak Mall, Sudah Ada Perbaikan Dan
Sejak GO HPM 227 Sejak GO HPM 227
Pemasangan Drain

Confirm Ke Mall
surat confirm Jan-17
Confirm Ke Mall Dan Email Ho
surat confirm Jan-17

Konfirmasi Ke Building
surat confirm Jan-17
Tunggu Capex 2017 Penawaran Jan-17
Confirm Ke Engineering Mall Dan Sudah
Dilakukan Pengecekan 2-Jan-2017
surat confirm mall
Koordinasi Dengan Management Mall surat confirm mall Jan-17
Koordinasi Dengan Tenant Relation Officer
Paragon Mall surat confirm mall Jan-17
Konfirmasi Dengan Manager Civil & Me Paragon 1-May-2017
Mall surat confirm mall
Penanganan Sementara Ditalang/Dlm Monitor
surat Compalin Jan-17
Penambalan Bagian Tepi Lantai Ram Parkir Atas
surat Compalin Jan-17
Confirmasi Ke Mall Dan Buat Surat Komplain Ke
Mall 01/EXT/HPM/I/17 19-Jan-17
Surat Ke Mall
01/EXT/HPM/II/17 11-Feb-17
Surat Ke Mall/Operasional All Bm 12/EXT/HPM/IV/17 Apr-17
On Progress Renovasi Mall
Email dan surat complain Jan-17
Masih Dipantau Utk Kebijakan Mall Tentang Email dan surat complain Apr-17
Tenant
Memberikan Masukan Ke Pada Pihak
Management Mall, Email dan surat complain May-17
Sudah Konfermasi Pihak Gedung Dan Sudah Di
Meeting Kan. Email dan surat complain May-17
Bikin Talangan Bocor Di Gudang
Email dan surat complain 11-Feb-17
Bikin Talangan Bocor
Email dan surat complain 11 februari 2017
STATUS KETERANGAN

Progress Progress Cleaning Rutin By Mall

Progress Masih Dicarikan Solusi By Msll


Mall Menyetujui, Revisi / Reduce 2-3
% Untuk Pembagian Ac Chiller,
Setelah Ada Informasi Kejelasan
Tenant Mall Yaitu Ace Hardware
Progres Masuk.

Mmeting Di Tgl 1 Mei 2107. Mall


Akan Memasang Untuk Sinyal
Progres Tambahan

Menunggu Kebijakan Hypermart


Progress Devrel
Proses Penawaran Lokal. Dan Budget
On ProgressCapex

On ProgressPengerjaan Oleh Teknisi Mall

On ProgressSignal Indosat Masih Proses

On Progress

On ProgressOn Progres

On ProgressOn Progress

On ProgressOn Progress

On ProgressOn Progress

Sedang Dal On Proses

Not Ok Sudah Di Bicarakan Oleh Pihak Mall.

Not Ok Sudah Di Bicarakan Oleh Pihak Mall.


Belum Ada Tindak Lanjutnya
(Keretakan Ruang Panel Di Tutup
Not Ok Semen Putih).
Not Ok Nunggu Budget Dari Ho
Progress Not Ok
Not Ok Not Ok
Sudah Check Area Dan
Not Ok Pendokumentasian

Progress Not Ok

Not Ok Kondisi Masih Bocor

Not Ok Kondisi Masih Bocor

Not Ok Bocor Baru / Masih Bocor

Not Ok Bocor Baru


Not Ok Belum

Pending Peremajaan Gedung On Progres

Proses On Progress
Masih Dalam Proses Realisasi Dari
Pending Mall

Proses On Progress
Proses Pengerjaan Talangan Air
Progress Gudang
Sementara Masih Di Buatkan
Progress Talangan Di Titik Bocor
REFRI PENDING ISSUE HYPERMART 20
BULAN : Juni 2017
Status
NO STORES OPENING STORE TANGGAL RUSAK
Contract- service / waranty
5 328 HPM Paragon Semar 28-Mar-10 Contract- service 10-Jun-17

Contract- service 17-Jan-17

8 231 HPM Pekalongan 1-Mar-10


1-Feb-17

5-Mar-17
324 HPM Java Mall
9 Contract- service Oct-15
Semarang
Contract- service Jan-17
10 364 HPM Kudus 10-Nov-11

CONTRACT- SERVICE 7-Nov-16

CONTRACT- SERVICE 7-Nov-16


19 220 SOLO SQUARE 24-Apr-08

CONTRACT- SERVICE 19-Mar-17

CONTRACT- SERVICE 19-Mar-17

CONTRACT- SERVICE 19-Mar-17

CONTRACT- SERVICE 1-Dec-16

20 335 SOLO HARTONO 19-Oct-12 CONTRACT- SERVICE 1-Dec-16

CONTRACT- SERVICE 1-Dec-16

CONTRACT- SERVICE 7 Juni 2014

21 540 GRANDMALL SOLO 3-Dec-04


CONTRACT- SERVICE 1-Sep-16
21 540 GRANDMALL SOLO 3-Dec-04
CONTRACT- SERVICE 1-Sep-16

CONTRACT- SERVICE 1-Feb-17

CONTRACT- SERVICE 15-Feb-16

CONTRACT- SERVICE 5-Dec-16

CONTRACT- SERVICE 5-Feb-15


22 399 YOGYA CITY MALL 14-Nov-13

CONTRACT- SERVICE 20 January 2016

CONTRACT- SERVICE 20 Juni 2017

17-Dec-13 CONTRACT- SERVICE 5-Sep-16

23 489 YOGYA SAPPHIRE

CONTRACT- SERVICE 20 January 2016

24 227 HARTONO YOGYA 18-Dec-15 CONTRACT- SERVICE 1-Apr-17


PENDING ISSUE HYPERMART 2017

Tingkat kerusakan IMPACT DEPT DONE/ NOT YET


Issue /Problem
Mayor/ Minor 61 96 97 69 39 92 SUDAH/BELUM
MINOR Heater Evap Frozen Islands V belum dipasang

pipa suction kompressor 2 low temperatur


MINOR V V V V V V Sdh Ada PO perbaika
bocor

MINOR Plug in Frezer suhu tidak mencapai V Sdh Ada PO perbaika

MINOR Plug in Frezer suhu tidak mencapai V Sdh Ada PO perbaika

MINOR Spare compresor medium 2 unit

MINOR kompresor medium no 3 Packing bocor v Belum

MINOR Suhu showcase dairy kurang dingin V on progress

Sudah Saatnya Ganti Oli 9 Galon Dan Filter


MAYOR Batu 4 Dan Suction 9 Pc ( Comp Low Sudah, V V V V V V NOT YET
Budget Toko , Medium Belum Dilakukan )

Pp Penggantian Transducer, Mengurangi


MINOR V V V V V V NOT YET
Beban Kerja Compresor Agar Hemat Daya

MAYOR 1 Comp Low Temp Gulungan Terbakar V V V V V V NOT YET

MAYOR 1 Comp Ice Flake Kebakar Putus / Short 1 V NOT YET

Pp Mata Pisau Ice Flake Sudah Aus, 8 Tahun


MAYOR V NOT YET
Belum Pernah Ganti

Sudah Saatnya Ganti Oli 9 Galon Dan Filter


MAYOR V V V V V V NOT YET
Batu 4 Dan Suction 9 Pc

MAYOR Rebuild Comp Low , Karena Piston Macet V V V V V V NOT YET

Connect Wiring Hitter ( Ladn 11 = 9 Pc, Kabel V


MINOR V V V V V NOT YET
Nyaf 0.75/1 Mm =1 Roll, Mp4 / Opc =2 Pc )

MINOR Avr Compresor Low Rusak (Tidak Bisa Dipakai) V V V V V V NOT YET
1 Comp Low Mati , Over Houl , Ganti Bushing V
MAYOR V V V V V NOT YET
Dalam

MAYOR 2 Hitter Battang Di Frozen Island Coc Mati V NOT YET

1 Comp Low Mati , Over Houl , Gulungan


MAYOR Terbakar V V V V V V NOT YET

MAYOR Comp Medium 1 Unit Masih Dibawa Scr V V V V V V NOT YET

Comp Medium 1 Unit Terbakar Gulungan,


MAYOR V V V V V V NOT YET
Dan Ratalok Lolos,

MAYOR Comp Ice Flake Mati / Compresi 1 Unit, V NOT YET

Comp Sudah Di Ganti Oli Beli Lokal,Namun


MAYOR Ppan Ganti Filter Batu 4 Dan Suction 9 Pc V V V V V V NOT YET
Belum Ada Penawaran

Comp Low mati 1 unit, gulungan putus, MCB V


MAYOR V V V V V NOT YET
trip

Compresor Medium 2 Unit Terbakar


MAYOR V V V V V V NOT YET
Gulungan ( Hanya Jalan 3 ) Suhu Normal

Sudah Saatnya Ganti Oli 9 Galon Dan Filter


MAYOR V V V V V V NOT YET
Batu 4 Dan Suction 9 Pc

1 Unit Hitter Batang Evap Coldroom Bakery


MINOR V NOT YET
Terbakar, Kondisi Saat Ini Dilepas
KONTRAKTOR SESUAI KETERANGAN
LIST KONTRAK SERVICE

Luxindo Wira PO00092169

Luxindo Wira dikondisikan

Luxindo Wira dikondisikan

Luxindo Wira dikondisikan

Luxindo Wira

Luxindo Wira Belum

Luxindo Wira Progress

Capex di tolah HO, progres OPEX


LUXINDO WIRA pembuatan NTMS

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

Capex di tolah HO, progres OPEX


LUXINDO WIRA pembuatan NTMS

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA
LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

LUXINDO WIRA

AIR TECKH
BULAN : Juni 2017

REGIONAL STORE NO PROBLEM

JATENG & JATIM 328 HPM Paragon Semarang 1 Mesin Kassa IBM lama sdh Tdk terpakai dan rusak

JATENG & JATIM 231 HPM Pekalongan 2 Mesin Kassa IBM lama sdh Tdk terpakai dan rusak

JATENG & JATIM 324 HPM Java Mall Semarang 1 GAMA UPS EDP rusak 1unit

2 Timbangan SM 300 rusak 4 unit dan Tanita

3 mesin price check untuk area bazar mati total

1 timbangan sm 300 mati total ( mainboard + power


JATENG & JATIM 364 HPM Kudus 1 supply + thermal head )
2 2 unit monitor kassa mati total
3 4 unit hand scaning kassa mati

4 4 unit printer kassa error / head buram ( tidak jelas )

5 1 unit price chek mati total


6 1 unit pdet mati total
JATENG & JATIM 540 GRANDMALL SOLO 1 4 unit timbangan Digi SM 300 Rusak

JATENG & JATIM 220 SOLO SQUARE 1 IT Type lama tahun 2008 , pengajuan lelang

JATENG & JATIM 335 SOLO HARTONO 1 1 unit Timbangan Digi SM 500 rusak
JATENG & JATIM 399 YOGYA CITY MALL 1 1 UPS Server EDP, baterai Drop

JATENG & JATIM 489 YOGYA SAPPHIRE 1 1 Unit Price Cek area , kondisi mati
PENAWARAN
ACTION PLAN NO.PP/NTMS/CPR TANGGAL KERUSAKAN
ADA
Konfirmasi MIS/ RAB/ Ajukan Lelang 2017 By Email/ Telp 1-Feb-17

Konfirmasi MIS/ RAB/ Ajukan Lelang 2017 By Email/ Telp 1-Feb-17

Sudah dilakukan pengecekan/ Email MIS PP Email 1-Jan-17 V

PP ke HO CPR RAB 1-May-17

Buat CPR 2017 RAB 1-May-17

Report HO MIS ( RAB ) Jan-17

Report HO MIS ( RAB ) Jan-17


Report HO MIS ( RAB ) Jan-17 V

Report HO MIS ( RAB ) Jan-17 V

Report HO MIS ( RAB ) Jan-17


Report HO MIS ( RAB ) Jan-17
Dikirim ke Service " Bonnie " Paket 1 Juni 2107
List sdh dikirim ke HO : pak Wisnu, pak
via @mail 2015
haruman
Dikirim ke Service " Bonnie " Paket 1 Juni 2107
Pengajuan MIS, Ibu Reni Via @mail 20 Juni 2107

Sudaj diajukan ke MIS, belum ada followup Via @mail dan WEB mis 1 Juni 2017
PENAWARAN
KETERANGAN
TIDAK

V Belum ada confirmasi dr MIS

Kurang 1 UPS yg belum

V Menunggu approval dan kedatangan di toko

menunggu dan terus lakukan konfirmasi ke


V MIS

v proses lelang

V proses lelang
in proses cpr

in proses

V proses lelang
V barang sudah berada di HO
V Tagihan Langsung ke MIS

V Belum ada approval

V Tagihan Langsung ke MIS


V

V
BULAN : Juni 2017

REGIONAL STORE NO PROBLEM

1 Tray Jepang (12 pcs)


JATENG & JATIM 328 HPM Paragon Semarang
Cover bag tray UK.660X810X1720MM
2 ( Bakery )
324 HPM Java Mall 2 unit ariston water heater kap 80 ltr
1
JATENG & JATIM Semarang ( meat and Bakery )
JATENG & JATIM 364 HPM Kudus 1 frayer rte rusak
JATENG & JATIM 220 SOLO SQUARE 2 Unit Mixer tidak terpakai

Oil Filter winston baru, tidak terpakai


JATENG & JATIM 227 HARTONO YOGYA
PENAWARAN
ACTION PLAN NO.PP/NTMS/CPR TANGGAL KERUSAKAN
ADA
Sdh ada PO PO00088814 & PO00088815 1-Feb-17

Sdh ada PO PO00091690 1-Feb-17

sudah Buat CPR 2016, Buat Lagi CPR CPR 1-May-17


2017
koordinasi dengan mco PP Heater v
Pengajuan Tbat via @mail 1 Juni 2017

Pengajuan TBAT via @mail 20 Juni 2017


PENAWARAN
KETERANGAN
TIDAK

Belum

Belum
V
Sedang Menunggu Proses Cpr
Request Form Adhoc
V