Anda di halaman 1dari 2

LABORATORIO EN MECNICA DE SUELOS Y ENSAYO DE MATERIALES

PROYECTO:
NORMA DE ENSAYO AASHTO T193 O ASTM D1883

MUESTRA No. TRAMO 2 FECHA: 7/20/2014

UBICACIN: VIA TOLONTAG - PINTAG KM 2+000 LABORATORISTA: DARWIN CADENA BARRENO

USO: CALCULADO: DARWIN CADENA BARRENO

ENSAYO RELACIN SOPORTE DE CALIFORNIA


C.B.R.
MOLDE No. G-21 SL-8 D-11
No. DE CAPAS 5 5 5
No. DE GOLPES POR CAPAS 56 25 10

CONDICIONES DE LA MUESTRA ANT. SATU. DES. SATU. ANT. SATU. DES. SATU. ANT. SATU. DES. SATU.

PESO MUESTRA HM. + MOLDE A 11005 11243 10875 11453 11289 12144
PESO MOLDE B 7015 7015 7215 7215 7670 7670
PESO MUESTRA HMEDA C =A- B 3990 4228 3660 4238 3619 4474
CONSTAN MOLDE (VOLUMEN) D 2215 2215 2234 2234 2323 2323
DENSIDAD HMEDA E = C/D*1000 1.801 1.909 1.638 1.897 1.558 1.926
DENSIDAD SECA F = E / (1 + G) 1564 1612 1422 1587 1351 1568

CONTENIDO DE HUMEDAD ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO ARRIBA ABAJO

RECIPIENTE No. ML-32 ML-20 23 B-4 J-9 23 ML-32 P-11 B-4 P-11 J-9 ML-20
PESO MUESTRA HM. + RECIPIENTE G 79.20 90.27 107.77 96.22 104.16 105.04 81.83 85.20 96.36 115.11 98.51 110.26
PESO MUESTRA SECA + RECIPIENTE H 70.64 80.83 94.24 83.08 93.35 93.76 70.67 74.86 85.25 102.54 84.45 93.08
PESO AGUA I=G-H 8.56 9.44 13.53 13.14 10.81 11.28 11.16 10.34 11.11 12.57 14.06 17.18
PESO RECIPIENTE J 14.40 18.50 20.12 12.26 22.12 20.12 14.40 21.08 12.26 21.08 22.12 18.50
PESO MUESTRA SECA K=H-J 56.24 62.33 74.12 70.82 71.23 73.64 56.27 53.78 72.99 81.46 62.33 74.58
CONTENIDO DE HUMEDAD L =( I / K)*100 15.22% 15.15% 18.25% 18.55% 15.18% 15.32% 19.83% 19.23% 15.22% 15.43% 22.56% 23.04%
CONTENIDO PROMEDIO DE HUMEDAD M = (L1+L2)/2 15.18% 18.40% 15.25% 19.53% 15.33% 22.80%

PORCENTAJE DE AGUA ABSORBIDA

MOLDE No. G-21 SL-8 D-11


PESO MUESTRA HMEDA + MOLDE DESPUES DE SATURACIN N 11243 11453 12144
PESO MUESTRA HMEDA + MOLDE ANTES DE SATURACIN P 11005 10875 11289
PESO AGUA ABSORBIDA Q=N-P 238 578 855
PORCENTAJE DE AGUA ABSORBIDA R=(Q/C)*100 5.96 15.79 23.63

DATOS DE ESPONJAMIENTOS

MOLDE No.G-21 MOLDE No.SL-8 MOLDE No.D-11


FECHA Y HORA TIEMPO EN DAS DIAL ESPONJAMIENTO DIAL ESPONJAMIENTO DIAL ESPONJAMIENTO
0.01 mm mm % 0.01 mm mm % 0.01 mm mm %
7/20/2014 0 0 0 0
7/21/2014 1 2 6 11
7/22/2014 2 5 9 15
7/23/2014 3 7 12 19
7/24/2014 4 7 12 20

DATOS DE ENSAYOS DE PENETRACIN

MOLDE No.G-21 MOLDE No.SL-8 MOLDE No.D-11


PENETRACIN EN
CARGAS TIPO lb/pulg2 CARGA DE ENSAYO CBR CCRR CARGA DE ENSAYO CBR CCRR CARGA DE ENSAYO CBR CCRR
PULGADAS
DIAL lb/pulg2 % DIAL lb/pulg2 % DIAL lb/pulg2 %
0.025 167 55.7 105 35.0 35 11.7
0.050 263 87.7 153 51.0 89 29.7
0.075 351 117.0 209 69.7 126 42.0
0.100 1000 456 152.0 15.20 257 85.7 8.57 174 58.0 5.80
0.150 534 178.0 312 104.0 233 77.7
0.200 586 195.3 13.02 356 118.7 7.91 256 85.3 5.69
0.250 613 204.3 411 137.0 281 93.7
0.300 638 212.7 452 150.7 311 103.7
0.400 663 221.0 486 162.0 342 114.0
0.500 682 227.3 507 169.0 363 121.0

RESPONSABLE DEL ENSAYO


LABORATORIOS LDMS

362392059.xls 2
GRFICOS DE PRESIONES C.B.R.

250.0

200.0
PRESIONES lb - pulg

150.0

100.0

50.0

0.0
0.000 0.100 0.200 0.300 0.400 0.500 0.600

DENCIDAD MAXIMA VERSUS CBR VALOR C.B.R.

RESUMEN DE DATOS

Lmite Lquido = %
1800.00
1775.00
Lmite Plstico = %
1750.00 ndice Plstico = %
1725.00
ndice de Grupo = %
1700.00
1675.00
Clasificacin =
1650.00 Grupo Smbolos =
DENSIDAD MXIMA kg-m3

1625.00
Humedad Natural = %
1600.00
1575.00 Humedad ptima = 15.14 %
1550.00 Densidad Seca = 1564 g/cm3
1525.00
Densidad Mxima = 1567 g/cm3
1500.00
1475.00 Valor C.B.R. = 11.10 %
1450.00 95% Densidad Mxima = 1489 g/cm3
1425.00
Espesor Sub-Base = cm
1400.00
1375.00 Espesor Base = cm
1350.00 Espesor Base Asfltica = cm
1325.00
1300.00
Espesor Carpeta = cm
0.00 2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00 20.00 Observaciones

CBR

362392059.xls 2

Anda mungkin juga menyukai