Control System For Civil Engineering Works under the Buildings Ordinance
Buildings Ordinance
Building Regulations
(e.g. B(A)R, B(C)R, B(P)R, etc.)
Technical
Memorandum
CoPs, Design Manuals & Guidelines etc.
2.4 Guidelines
2.4 Guidelines
2.4 Guidelines
6.3 Registration systems for AP, RSE, RGE, RGBC and RSC
Statutory
Response Period
Approval of plans (First submission) 60 Days
The grounds set out for any refusal to approve plans shall not be
treated as being exhaustive
Control System For Civil Engineering Works under the Buildings Ordinance
For any building works or street works which have not been
commenced within 3 months after the issuance of the consent, such
consent shall be deemed to be revoked
6.3 Registration systems for AP, RSE, RGE, RGBC & RSC
Authorized Persons (for co-ordination of building works)
o Architects
o Engineers
o Surveyors
Registered Structural Engineers (for structural elements of building
works)
Registered Geotechnical Engineers (for geotechnical elements)
Registered General Building Contractors (for general building works)
Registered Specialist Contractors (for special building works) :
o Demolition
o Site formation
o Foundation
o Ground investigation field works
o Ventilation
Control System For Civil Engineering Works under the Buildings Ordinance
Material deviation
Consent has not been given or conditions imposed are not complied
with
Control System For Civil Engineering Works under the Buildings Ordinance
The cost of works carried out may be recovered from the owner(s) of
the building
Control System For Civil Engineering Works under the Buildings Ordinance
The building has been erected or the building works have been or
being carried out with a view to sale, letting or other disposal;
Building Plans
Demolition Plans
Structural Plans
Foundation Plans
Site Formation Plans
Excavation and Lateral Support Plans
Ground Investigation Plans for Scheduled Areas
Drainage Plans
Control System For Civil Engineering Works under the Buildings Ordinance
Mid-levels Areas
North-Western New Territories
Railway Protection Areas
Ma On Shan Area
Sewage Tunnel Protection Areas
Control System For Civil Engineering Works under the Buildings Ordinance
Thank You