Anda di halaman 1dari 3

JULY 2017 VOLUME 8 NUMBER 3 ITSEAJ (ISSN 1949-3029)

PAPERS
Solar Irradiance Forecasting in Remote Microgrids Using Markov Switching Model . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . A. Shakya, S. Michael, C. Saunders, D. Armstrong, P. Pandey, S. Chalise, and R. Tonkoski 895
Optimal Resource Allocation and Charging Prices for Benefit Maximization in Smart PEV-Parking Lots . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . A. S. A. Awad, M. F. S. Awad, T. H. M. EL-Fouly, E. F. El-Saadany, and M. M. A. Salama 906
An Adaptive Feedback Linearization Approach to Inertial Frequency Response of Wind Turbines . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M. Toulabi, A. S. Dobakhshari, and A. M. Ranjbar 916
A Developed Integrated Scheme Based Approach for Wind Turbine Intelligent Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . T. K. Mahmoud, Z. Y. Dong, and J. Ma 927
Real-Time Integration of Intermittent Generation With Voltage Rise Considerations . . . . . . . . P. Srikantha and D. Kundur 938
Thermal and Reliability Assessment for Wind Energy Systems With DSTATCOM Functionality in Resilient Microgrids
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M. Aly, E. M. Ahmed, and M. Shoyama 953
Improved Cycle Control and Sizing Scheme for Wind Energy Storage System Based on Multiobjective Optimization . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F. Zhang, G. Wang, K. Meng, J. Zhao, Z. Xu , Z. Y. Dong, and J. Liang 966
Storage Sizing With Peak-Shaving Policy for Wind Farm Based on Cyclic Markov Chain Model . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J. Dong, F. Gao, X. Guan, Q. Zhai, and J. Wu 978
Power Smoothing of a Variable-Speed Wind Turbine Generator in Association With the Rotor-Speed-Dependent Gain . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y. Kim, M. Kang, E. Muljadi, J.-W. Park, and Y. C. Kang 990
Dependent Discrete Convolution Based Probabilistic Load Flow for the Active Distribution System . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y. Wang, N. Zhang, Q. Chen, J. Yang, C. Kang, and J. Huang 1000
On Distributed PV Hosting Capacity Estimation, Sensitivity Study, and Improvement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F. Ding and B. Mather 1010

(Contents Continued on Page 893)


(Contents Continued from Front Cover)

Worst-Case Photovoltaic Generation and Power Change Distribution Under Dense Cloud Cover . . . . . . . . . . . . . . . . S. Roy 1021
Hierarchical Optimization for the Double-Sided Ring Structure of the Collector System Planning of Large Offshore Wind
Farms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . S. Wei, L. Zhang, Y. Xu, Y. Fu, and F. Li 1029
Effect of Risk Aversion on Reserve Procurement With Flexible Demand Side Resources From the ISO Point of View . . .
. . . . . . . . . . . . . . . . . . . . . . . . . N. G. Paterakis, A. A. S. de la Nieta, A. G. Bakirtzis, J. Contreras, and Joao P. S. Catalao 1040
Model Predictive Control of LPC-Looped Active Distribution Network With High Penetration of Distributed Generation
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . X. Xing, J. Lin, C. Wan, and Y. Song 1051
Wind-Friendly Flexible Ramping Product Design in Multi-Timescale Power System Operations . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .M. Cui, J. Zhang, H. Wu, and B.-M. Hodge 1064
Conservation Voltage Reduction for Autonomous Microgrids Based on VI Droop Characteristics . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. M. Pasha, H. H. Zeineldin, A. S. Al-Sumaiti, M. S. El Moursi, and E. F. El Sadaany 1076
A Novel DC Fault Ride-Through Scheme for MTDC Networks Connecting Large-Scale Wind Parks . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W. Sanusi, M. Al Hosani, and M. S. El Moursi 1086
Multisampling Maximum Power Point Tracker (MS-MPPT) to Compensate Irradiance and Temperature Changes . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G. Escobar, S. Pettersson, C. N. M. Ho, and R. Rico-Camacho 1096
Look-Ahead Bidding Strategy for Energy Storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y. Wang, Y. Dvorkin, R. Fernandez-Blanco, B. Xu, T. Qiu, and D. S. Kirschen 1106
Statistical Analysis of a 1:7 Scale Field Test Wave Energy Converter Using WEC-Sim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R. So, C. Michelen, B. Bosma, P. Lenee-Bluhm, and T. K. A. Brekken 1118
New Voltage Control Strategies for VSC-Based DG Units in an Unbalanced Microgrid . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N. R. Merritt, C. Chakraborty, and P. Bajpai 1127
Coordinated Control Strategy of a Battery Energy Storage System to Support a Wind Power Plant Providing
Multi-Timescale Frequency Ancillary Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J. Tan and Y. Zhang 1140
Harmonic Domain Modeling of PV System for the Assessment of Grid Integration Impact . . . O. S. Nduka and B. C. Pal 1154
Coordinated Optimal Dispatch of Energy Storage in a Network of Grid-Connected Microgrids . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . M. R. Sandgani and S. Sirouspour 1166
Data-Driven Statistical Analysis and Diagnosis of Networked Battery Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . L. Y. Wang, W. Chen, F. Lin, and G. Yin 1177
Analysis of a Tidal Power Plant in the Estuary of Bacanga in Brazil Taking Into Account the Current Conditions and
Constraints . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . P. B. L. Neto, O. R. Saavedra, and L. A. de Souza Ribeiro 1187
Probabilistic Power Flow Analysis of Power Systems Incorporating Tidal Current Generation . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Z. Ren, K. Wang, W. Li, L. Jin, and Y. Dai 1195
MPPT in Dynamic Condition of Partially Shaded PV System by Using WODE Technique . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N. Kumar, I. Hussain, B. Singh, and B. K. Panigrahi 1204
Energy Demand Model for Residential Sector: A First Principles Approach . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . R. Subbiah, A. Pal, E. K. Nordberg, A. Marathe, and M. V. Marathe 1215
Dispatch Model of Combined Heat and Power Plant Considering Heat Transfer Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y. Dai, L. Chen, Y. Min, Q. Chen, K. Hu, J. Hao, Y. Zhang, and F. Xu 1225
Security-Constrained Unit Commitment With Flexible Uncertainty Set for Variable Wind Power . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C. Shao, X. Wang, M. Shahidehpour, X. Wang, and B. Wang 1237
Fatigue Load Sensitivity-Based Optimal Active Power Dispatch For Wind Farms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H. Zhao, Q. Wu, S. Huang, M. Shahidehpour, Q. Guo, and H. Sun 1247
Day-Ahead Self-Scheduling of a Transmission-Constrained GenCo With Variable Generation Units Using the Incomplete
Market Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y. K. Renani, M. Ehsan, and M. Shahidehpour 1260

(Contents Continued on Page 894)


(Contents Continued from Page 893)

Power Reserves Control for PV Systems With Real-Time MPP Estimation via Curve Fitting . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E. I. Batzelis, G. E. Kampitsis, and S. A. Papathanassiou 1269
Non-Homogeneous Markov Wind Speed Time Series Model Considering Daily and Seasonal Variation Characteristics .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . K. Xie, Q. Liao, H.-M. Tai, and Bo Hu 1281
Probabilistic Optimal PV Capacity Planning for Wind Farm Expansion Based on NASA Data . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Y. Cao, Y. Zhang, H. Zhang, X. Shi, and V. Terzija 1291
Power System Electromechanical Oscillation Modes as Affected by Dynamic Interactions From Grid-Connected PMSGs
for Wind Power Generation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . W. Du, X. Chen, and H. F. Wang 1301
Maximum Power Point Tracking in Grid Connected Wind Plant by Using Intelligent Controller and Switched Reluctance
Generator . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . E. Rahmanian, H. Akbari, and G. Hossein Sheisi 1313
An Ultrafast Maximum Power Point Tracking Technique for Optimal Battery Charging . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A. A. Hussein, A. A. Fardoun, and S. S. Stephen 1321
Coordinated Control Strategy of Battery Energy Storage System and PMSG-WTG to Enhance System Frequency
Regulation Capability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Z. Wu, D. W. Gao, H. Zhang, S. Yan, and X. Wang 1330

LETTERS
Enhancing Low-Throttle-Operation Robustness of ICE-Based APU by Supercapacitor-Realized Virtual Inertia . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . G. Geula, S. Bronshtein, M. Averbukh, and A. Kuperman 1344

Anda mungkin juga menyukai