Proposed construction R.C.C.

Drain near giraleshwar mandir at in


nager in p-03
ABSTRACT
Quantity Description of Item Rate Unit
Item No. 1
Excavation for foundation in earth, soils of all types sand, gravel
and soft murum including removing the excavated material upto a
distance of 50 m. beyond the building area stacking and spreading as
133.10 directed, dewatering, preparing the bed for the foundation and 141.40 Cu.M
necessary back filling, ramming, watering(including shoring and
strutting) etc. complete. Sr.No.1 P.No. 9

Item No. 2
Providing and laying in situ Cement concrete 1:4:8 of
trap/granite/ quartzite/gneiss metal for foundation and bedding
12.60 including bailing out water, form work, compacting, finishing if required 4715.38 Cu.M
and curing etc. complete. Sr.No.31 P.No.14
Item No. 3
Providing and casting in situ cement concrete M-20 of
trap/granite/quartzite/ gneiss metal for reinforced cement concrete
slabs and landings as per detailed designs and drawing or as
4.32 directed including centering, form work, compacting and roughening 6332.16 Cum
the surface if special finish is to be provided and curing etc. complete.
(Excluding reinforcement) (7.60bag/cum) Sr.No.51 P.No.19

Item No. 4
Providing and casting in situ cement concrete M-20 of trap/granite
/quartzite/gneiss metal for R.C.C. Pardi etc of required thickness
including centering, form work, compacting and roughening the
29.25 surface with cement mortar 1:3 of sufficient minimum thickness to give 6559.41 Cum
a smooth and even surface and curing etc complited (Excluding
reinforcement) (6.27bag/cum) Sr.No 55 P.No. 20

Item No. 5
Providing and laying in situ M-1:2:4 of trap/granite/qurtizite/gneiss
metal for foundation and bedding including bailing out water, form
18.60 work, compacting, finishing if required and curing etc. comp. 4707.69 Cum
Sr.No.27 P.No.14
Item No. 6
Providing and fixing in position HYSD bar reinforcement of various
diameters for reinforced cement concrete pile caps, footings,
foundations, slabs, beams, columns, conopies, stair case,
newels, chajjas,lintels, pardies, conopies fins, arches, etc. as per
1.868 detailed designs, drawings and schedules including cutting, bending, 49680.00 M.T.
hooking the bars binding with wires or tack welding and supporting as
required complete Sr.No.63.No.23
a) H.Y.S.D bar

Total Rs.
TOTAL COST

Jr Engineer Chief Officer President


M.C. Kalamnuri M.C. Kalamnuri M.C. Kalamnuri
Dist. Hingoli Dist. Hingoli Dist. Hingoli
aleshwar mandir at indira

Amount

18820.34

59413.81

27354.93

191862.71

87563.04

92777.40

477792.23
477792.23

President
M.C. Kalamnuri
Dist. Hingoli
Proposed construction R.C.C. Drain near giraleshwar mandir at indira nager in p-03

MEASURMANTS
Item No. 1
Excavation for foundation in earth, soils of all types sand, gravel and soft murum including removing the
excavated material upto a distance of 50 m. beyond the building area stacking and spreading as directed,
dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering(including
shoring and strutting) etc. complete. Sr.No.1 P.No. 5

1 X 70.00 X 1.00 X 1.10 = 77.00


1 X 110.00 X 0.60 X 0.85 56.10
= 133.10
Item No. 2.
Providing dry trap rubble soling 15 cm to 20 cm thick etc complited

1 X 60.00 X 1.00 X 0.20 = 12.00


1 X 110.00 X 0.60 X 0.15 9.90
= 21.90
Item No. 3.
Providing and laying in situ Cement concrete 1:4:8 of trap/granite/ quartzite/gneiss metal for
foundation and bedding including dewatering, formwork, compacting, roughing them if special finish is to
be provided, finishing if required and curing etc. complete.(4.42bag/cum) Sr.No31 P.No. 13

1 X 60.00 X 1.00 X 0.10 = 6.00


1 X 110.00 X 0.60 X 0.10 = 6.60
= 12.60
Item No. 4
Providing and casting in situ cement concrete 1:2:4 of trap/granite /quartzite/gneiss metal forR.C.C. Slabs
etc complited

1 X 6.00 X 1.50 X 0.30 = 2.70


2 X 4.50 X 1.20 X 0.15 = 1.62
= 4.32
Item No. 5
Providing and casting in situ cement concrete 1:2:4 of trap/granite /quartzite/gneiss metal for R.C.C. Pardi
etc complited

2 X 60.00 X 0.20 X 0.60 = 14.40


2 X 110.00 X 0.15 X 0.45 = 14.85
= 29.25
Item No. 6
Providing and casting in situ cement concrete 1:2:4 of trap/granite /quartzite/gneiss metal foundation
bedding etc complited

1 X 60.00 X 1.00 X 0.20 = 12.00


1 X 110.00 X 0.60 X 0.10 = 6.60
= 18.60

Item No. 7
Providing and fixing in position of H.Y.S.D. bar reinforcement of various for reinfrocement cement concrete
etc complited
18.60 + 29.25 = 47.85 cum

1435.50 1.44 mt
= 1.436
for slab = 0.432
total 1.868

Jr Engineer Chief Officer President


M.C. Kalamnuri M.C. Kalamnuri M.C. Kalamnuri
Dist. Hingoli Dist. Hingoli Dist. Hingoli
dir at indira nager in p-03

Cum
Cum
Cum

Cum
Cum
Cum

Cum
Cum
Cum

Cum
Cum
Cum

Cum
Cum
Cum

Cum
Cum
Cum
mt
mt
mt

President
12mm 10mm 8mm
slab 1 50 6 0.62 186 186
1 1.2 280 0.22 73.92 73.92
beam 0 5 2 0.62 0 0
0 5 2 0.89 0 0
0 1.1 32 0.22 0

259.92 259.92 0

0.25992
6mm

0
LEAD CHART
Net
Lead in Lead Initial lead
Sr.No. Material KM charges Lead charges remark

1 above 40mm Metal 10 360.74 254.8 105.94


2 Below 40mm metal 10 345.05 243.72 101.33
4 Sand 12 386.32 243.72 142.6

Jr Engineer Chief Officer President


M.C. Kalamnuri M.C. Kalamnuri M.C. Kalamnuri
Dist. Hingoli Dist. Hingoli Dist. Hingoli
Proposed construction R.C.C. Drain near giraleshwar mandir at indira nager in p
Rate Analysis
Item No.1
Excavation for foundation in earth, soils of all types sand, gravel and soft murum including removing the e
material upto a distance of 50 m. beyond the building area stacking and spreading as directed, dewatering, p
bed for the foundation and necessary back filling, ramming, watering(including shoring and strutting) etc.
Sr.No.1 P.No. 5
Rate as per DSR =
2016-17(pgno- 19 140.00
item no -51)
Add 1 % labour welfare
1.40
Total Rate 141.40
Item No. 2
Providing and laying in situ M-15 of trap/granite/qurtizite/gneiss metal for foundation and bedding including
form work, compacting, roughening them if specials finish is to be provided,finishing if required and curing
spec.no 31 B 30 Page.No 14.

Rate as per DSR =


2016-17(pgno- 19 4326.00
item no -51)
Add 1 % labour welfare
43.26

Add lead Charges


Metal 0.90 X 101.33 = 91.20
Sand 0.45 X 142.60 = 64.17
Royalty Charges 1.35 X 141.30 = 190.76
Total Rate = 4715.38

Item No. 3
Providing and casting in situ cement concrete M-20 of trap/granite/quartzite/ gneiss metal for reinforced ceme
slabs and landings as per detailed designs and drawing or as directed including centering, form work, compa
roughening the surface if special finish is to be provided and curing etc. complete. (Excluding
= reinforcement)
Rate as per DSR
2016-17(pgno- 19 5942.00
item no -51)
Add 1 % labour welfare

59.42

Add lead Charges


Metal 0.86 X 101.33 = 87.14
Sand 0.43 X 142.60 = 61.32
Royalty Charges 1.29 X 141.30 = 182.28
Total Rate = 6332.16
Item No. 4
Providing and casting in situ cement concrete M-20 of trap/granite /quartzite/gneiss metal for R.C.C. Pardi et
thickness including centering, form work, compacting and roughening the surface with cement mortar 1:3 of s
minimum thickness to give
Rate as per DSRa smooth and even surface and curing etc complited (Excluding = reinforcement)
2016-17(pgno- 20 6167.00
item no -55 )
Add 1 % labour welfare
61.67

Add lead Charges


Metal 0.86 X 101.33 = 87.14
Sand 0.43 X 142.60 = 61.32
Royalty Charges 1.29 X 141.30 = 182.28
Total Rate = 6559.41

Item No. 5
Providing and laying in situ M-1:2:4 of trap/granite/qurtizite/gneiss metal for foundation and bedding including
water, form work, compacting, finishing if required and curing etc. comp. Sr.No.27 P.No.14
Rate as per DSR =
2016-17(pgno- 4326.00
14 )
Add 1 % labour welfare
43.26

Add lead Charges


Metal 0.88 X 101.33 = 89.17
Sand 0.44 X 142.60 = 62.74
Royalty Charges 1.32 X 141.30 = 186.52
Total Rate = 4707.69

Item No. 6
Providing and fixing in position HYSD bar reinforcement of various diameters for reinforced cement concrete
footings, foundations, slabs, beams, columns, conopies, stair case, newels, chajjas,lintels, pardies, conopies
etc. as per Rate
detailed designs,
as per DSR drawings and schedules including cutting, bending, hooking the = bars binding wit
2016-17(pgno- 49680.00
22 )
Add 1 % labour welfare
496.80
Total Rate = 50176.80

M.C. Kalamnuri M.C. Kalamnuri M.C. Kalamnuri


Dist. Hingoli Dist. Hingoli Dist. Hingoli
ar giraleshwar mandir at indira nager in p-03
nalysis

and, gravel and soft murum including removing the excavated


ea stacking and spreading as directed, dewatering, preparing the
ming, watering(including shoring and strutting) etc. complete.
.1 P.No. 5

cum

cum

e/gneiss metal for foundation and bedding including dewatering,


sh is to be provided,finishing if required and curing etc. comp.
B 30 Page.No 14.

cum

cum

p/granite/quartzite/ gneiss metal for reinforced cement concrete


r as directed including centering, form work, compacting and
nd curing etc. complete. (Excluding reinforcement)

cum

cum
ap/granite /quartzite/gneiss metal for R.C.C. Pardi etc of required
roughening the surface with cement mortar 1:3 of sufficient
d curing etc complited (Excluding reinforcement)
cum

cum

e/gneiss metal for foundation and bedding including bailing out


ring etc. comp. Sr.No.27 P.No.14

cum

cum

of various diameters for reinforced cement concrete pile caps,


stair case, newels, chajjas,lintels, pardies, conopies fins, arches,
uding cutting, bending, hooking the bars binding with wires or
mt

mt

Anda mungkin juga menyukai