Anda di halaman 1dari 3

Job No: Rev. No.

1
Project: CITY GATE Date: 8/10/2017
Owner: Designed by: L Ngc Hin
Item: Checked by: Nguyn Vn Don

BORE PILE DESIGN

A. GENERAL DATA
Bottom level of pilecap: Df = 6.9 m
Diameter of pile: d= 0.8 m
Pile length: Lp = 50.1 m
Rebar diameter: f= 22 mm cm
Rebar number: n= 18
B. SOIL DATA
Underground water Hw = 0.5 m

Position layer type hi g tn


g dn C f SPT
(m) (T/m3) (T/m3) (T/m2)
ABOVE 0 clay 2.72 1.500 1.500 1.00 30.00 4
PILECAP 1 clay 4.18 1.476 0.476 0.68 6.45 1
1 clay 16.8 1.476 0.476 0.68 6.45 1
3 sand 4.5 1.961 0.961 1.00 27.60 26
4 clay 4.1 1.938 0.938 4.16 16.78 13
5 sand 1.9 1.892 0.892 2.81 21.72 12
6 clay 19.9 1.975 0.975 1.00 27.80 25
BELOW 8 sand 2.88 2.012 1.012 4.79 18.95 47
PILECAP
7 sand 0 0
8 sand 0 0
9 sand 0 0
10 sand 0
11 sand
END PILE 8 clay 0 2.012 1.012 4.790 18.950 47

C. PILE BEARING CAPACITY


Ptk = MIN(1,2,3) = 448 T

Chn Ptk = 350 T


1. Refer to material
Material data :
- Concrete grade: M300 Rn = 60.00 Kg/cm2
- Steel grade: A-III Ra = 2200 Kg/cm2

Pile capacity Qvl= 448 T (1)

3. Pile bearing capacity according to standard penetration test (TCXD 195-1997)

Allow Bearing Capacity: Qa = 710 Ton (3)


Qa = 1.5NTBAp + (0.15NcLc + 0.43NsLs)W - Wp
With:
NTB SPT index at bottom pile
Ns SPT index in clay soil layer
Nc SPT index in sand soil layer
Ls Length of pile in clay soil layer
Lc Length of pile in sand soil layer
Area of pile: Ap = 0.50 m2
Parameter of pile: W= 2.51 m

h Lc Ls Wp
layer NTB Nc Ns NcLc NsLs
(m) (m) (m) (T)
0 2.72 0 0 4 2.72
1 4.18 0 0 1 4.18
1 16.82 0 0 1 16.82 0 16.82 17.112
3 4.5 26 4.5 0 0 117 0 3.481
4 4.1 0 0 13 4.1 0 53.3 3.219
5 1.9 12 1.9 0 0 22.8 0 1.536
6 19.9 0 0 0 25 19.9 0 497.5 15.254
8 2.88 47 2.88 0 0 135.36 0 2.154
Job No: Rev. No. 1
Project: CITY GATE Date: 8/10/2017
Owner: Designed by: L Ngc Hin
Item: Checked by: Nguyn Vn Don

BORE PILE DESIGN

A. GENERAL DATA
Bottom level of pilecap: Df = 6.9 m
Diameter of pile: d= 0.8 m
Pile length: Lp = 50.1 m
Rebar diameter: f= 22 mm cm
Rebar number: n= 18
B. SOIL DATA
Underground water Hw = 0.5 m

Position layer type hi g tn


g dn C f SPT
(m) (T/m3) (T/m3) (T/m2)
ABOVE 0 clay 2.72 1.500 1.500 1.00 30.00 4
PILECAP 1 clay 4.18 1.476 0.476 0.68 6.45 1
1 clay 16.8 1.476 0.476 0.68 6.45 1
3 sand 4.5 1.961 0.961 1.00 27.60 26
4 clay 4.1 1.938 0.938 4.16 16.78 13
5 sand 1.9 1.892 0.892 2.81 21.72 12
6 clay 19.9 1.975 0.975 1.00 27.80 25
BELOW 8 sand 2.88 2.012 1.012 4.79 18.95 47
PILECAP
7 sand 0 0
8 sand 0 0
9 sand 0 0
10 sand 0
11 sand
END PILE 8 clay 0 2.012 1.012 4.790 18.950 47

C. PILE BEARING CAPACITY


Ptk = MIN(1,2,3) = 448 T

Chn Ptk = 350 T


1. Refer to material
Material data :
- Concrete grade: M300 Rn = 60.00 Kg/cm2
- Steel grade: A-III Ra = 2200 Kg/cm2

Pile capacity Qvl= 448 T (1)

2. According to soil data (appendix B -TCXD 205-1998)


Allowable pile capacity Qa = 244 T (2)
Qa = QS / FSs + Qp/FSp
Ultimate pile capacity Qu = 416 T
Qu = uSfsili + qpAp
With:
fsi: skin friction
qp: end bearing
u: pile diameter
Ap: pile cross section
FSs: safety factor for skin friction
FSp: safety factor for end bearing
FSs = 1.5
FSp = 2
u= 2.513 m
Ap = 0.503 m
+ fs = Ca + s'h tgja
Ca = C
ja = 3j/4
s'h = kss'v = (1-sinj)s'v
s'v = Sgihi
+ qp = cNc + s'vNq + gdNg
Nc ,Nq ,Ng sub to j

layer type h gi Ci ji s'v fs fs*li


m (T/m) (T/m) deg. (T/m) (T/m) (T/m)
0 clay 2.72 1.5 1 30
6.07
1 clay 4.18 0.476 0.68 6.45
1 clay 16.82 0.476 0.68 6.45 10.07 1.44 24.2
3 sand 4.5 0.961 1 27.6 16.24 4.29 19.3
4 clay 4.1 0.938 4.16 16.78 20.32 7.39 30.3
5 sand 1.9 0.892 2.81 21.72 23.09 7.06 13.4

END
PILE 1.012 4.79 18.95 46.26
sum 87.2
j= 18.95 deg. 0.3307398933
Nc Nq Ng 0.0000
16.5 6.67 5.00
qp = 391.49 T/m2

3. Pile bearing capacity according to standard penetration test (TCXD 195-1997)

Allow Bearing Capacity: Qa = 710 Ton (3)


Qa = 1.5NTBAp + (0.15NcLc + 0.43NsLs)W - Wp
With:
NTB SPT index at bottom pile
Ns SPT index in clay soil layer
Nc SPT index in sand soil layer
Ls Length of pile in clay soil layer
Lc Length of pile in sand soil layer
Area of pile: Ap = 0.50 m2
Parameter of pile: W= 2.51 m

h Lc Ls Wp
layer NTB Nc Ns NcLc NsLs
(m) (m) (m) (T)
0 2.72 0 0 4 2.72
1 4.18 0 0 1 4.18
1 16.82 0 0 1 16.82 0 16.82 17.112
3 4.5 26 4.5 0 0 117 0 3.481
4 4.1 0 0 13 4.1 0 53.3 3.219
5 1.9 12 1.9 0 0 22.8 0 1.536
6 19.9 0 0 0 25 19.9 0 497.5 15.254
8 2.88 47 2.88 0 0 135.36 0 2.154
7 0 0 0 0 0 0 0 0.000
8 0 0 0 0 0 0 0 0.000
9 0 0 0 0 0 0 0 0.000
10 0 0 0 0 0 0 0 0.000
11 0 0 0 0 0 0 0 0.000
END
PILE 47
SUM 275.16 567.62 42.756583